This is a Solicitation Contract Form (Section 00 10 00) for a construction repair project at the Defense Supply Center Columbus in Columbus, Ohio, issued under Project Number 519087. The document establishes the pricing structure and contract line item (CLIN) schedule that offerors must complete when submitting proposals.

The solicitation encompasses two base contract line items: CLIN 0001 covers all work, labor, materials, and supervision required to construct repairs to Building 27 as described in contract drawings and specifications (unit: Job); CLIN 0002 covers all work, labor, materials, and supervision required to replace two existing transformers and associated infrastructure per project drawings and specifications (unit: Job). Two optional CLINs are also included: CLIN 0003 (Option 1) requires pricing for removal of conduit and conductors back to source, marking breakers as spare, and patching/painting, with costs provided at $/100 linear feet that can be exercised up to twenty times; CLIN 0004 (Option 2) requires pricing for asbestos-containing material (ACM) abatement of flooring per Section 02 82 00, with costs provided at $/100 square feet exercisable up to twenty times. The document specifies that all numbered items, including options, must receive prices or the offer may be deemed unacceptable. For evaluation purposes, the government will add total option prices to the base proposal price using a trade-off process for lowest cost determination, though exercising options is not obligatory. Options may be exercised within 14 months from notice-to-proceed. The form was certified final on March 13, 2026.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P2# 519087 DLA Repair Building 27 Defense Supply Center Columbus; Columbus OH

SECTION 00 10 00

CERTIFIED FINAL 13 MARCH 2026

SECTION 00 10 00 – SOLICITATION CONTRACT FORM

SECTION 00 10 00 – SOLICITATION CONTRACT FORM

PRICE BREAKOUT SCHEDULE

OFFERERS NAME: _____________________

CONTRACT LINE-ITEM SCHEDUE

ITEM/CLIN

NUMBER DESCRIPTION UNIT AMOUNT

BASE PROPOSAL

1. ALL WORK, LABOR, MATERIALS,

AND SUPERVISION REQUIRED TO

CONSTRUCT THE REPAIRS TO BUILDING

27 AS DESCRIBED IN THE CONTRACT

DRAWINGS AND SPECIFICATIONS

JOB $_______________

0002 2. ALL WORK, LABOR, MATERIALS,

AND SUPERVISION REQUIRED TO

REPLACE THE TWO EXISTING

TRANSFORMERS AND ASSOCIATED

INFRASTRUCTURE AS DESCRIBED IN

THE PROJECT DRAWINGS AND

SPECIFICATIONS.

JOB $_______________

TOTAL BASE PROPOSAL $_______________

SECTION 00 10 00

CERTIFIED FINAL 13 MARCH 2026

OPTIONS PROPOSALS

0003 OPTION 1: ALL WORK,

LABOR,MATERIALS, AND SUPERVISION

REQUIRED TO REMOVE CONDUIT and

CONDUCTORS BACK TO SOURCE. MARK

BREAKERS AS SPARE. PATCH AND

PAINT AS REQUIRED. PROVIDE COSTS

FOR A QUANTITY OF 100 LF ($/LF)

THAT CAN BE EXERCISED TWENTY (20)

TIMES.

SEE NOTE NO. 4 $/100LF $_______________

JOB/CLIN

SUBTOTAL(X20) $_______________

OPTION 2: ALL WORK,

LABOR,MATERIALS, AND SUPERVISION

REQUIRED TO PROVIDE ABATEMENT OF

FLOORING CONTAINING ACM AS

INDICATED IN SECTION 02 82 00

ASBESTOS REMEDIATION. PROVIDE

COSTS FOR A QUANTITY OF 100 SF

($/SF) THAT CAN BE EXERCISED

TWENTY (20) TIMES.

SEE NOTE NO. 4 $/100SF $_______________

JOB/CLIN

SUBTOTAL(x20) $_______________

TOTAL

OPTIONS

TOTAL

BASE PLUS

ALL

OPTIONS

SECTION 00 10 00

CERTIFIED FINAL 13 MARCH 2026

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1: TO BETTER FACILITATE THE RECEIPT AND PROPOSAL PROCESS, ALL

MODIFICATIONS TO PROPOSALS ARE TO BE SUBMITTED ON COPIES OF THE LATEST

CONTRACT LINE ITEM (CLIN) SCHEDULES AS PUBLISHED IN THE SOLICITATION OR

THE LATEST AMENDMENT THERETO. IN LIEU OF INDICATING ADDITIONS/DEDUCTIONS

TO LINE ITEMS, ALL OFFERORS SHOULD STATE THEIR REVISED PRICES FOR EACH

ITEM.

NOTE NO. 2: OFFERORS MUST INSERT A PRICE ON ALL NUMBERED ITEMS [INCLUDING

OPTIONS] OF THE CLIN SCHEDULE. FAILURE TO DO SO MAY RESULT IN THE OFFER

BEING UNACCEPTABLE.

NOTE NO. 3: THE OFFEROR’S BASE BID AND ALL OPTIONS WILL BE EVALUATED FOR

LOWEST COST TO THE GOVERNMENT. THE BASIS FOR AWARD IS THE TRADE-OFF

PROCESS. IN ACCORDANCE WITH 52.217-5, EVALUATION OF OPTIONS, THE

GOVERNMENT WILL EVALUATE OFFERS FOR AWARD PURPOSES BY ADDING THE TOTAL

PRICE FOR ALL OPTIONS TO THE TOTAL PRICE FOR THE BASIC REQUIREMENT.

EVALUATION OF OPTIONS WILL NOT OBLIGATE THE GOVERNMENT TO EXERCISE THE

OPTION(S).

NOTE NO. 4: OPTIONS (0001 and 0002) MAY BE EXERCISED WITHIN 14 MONTHS FROM

NOTICE-TO-PROCEED.

-- END OF CLIN SCHEDULE --