This solicitation notice is for a firm-fixed-price construction contract for the complete interior and exterior renovation of Building 1600 at Scott Air Force Base, Illinois. The project scope includes replacement of all mechanical, electrical, plumbing and communications systems, and has a total estimated value between $100-250 million. The contract duration is 1260 calendar days.

The U.S. Army Corps of Engineers Louisville District will issue the solicitation on the GSA beta.SAM website. Proposals will be evaluated using a trade-off best value approach. Registration on SAM.gov is required to be eligible for award. The North American Industry Classification System code for this project is 236220. The acquisition will be full and open competition with no set-aside designated.

View the file

Other files for this federal contract opportunity

Other files attached to Scott AFB B1600 Renovation, newest first.
File Type Posted
W912QR20R0087-0005.pdf PDF
W912QR20R0087_Plans-0004.pdf PDF
W912QR20R0087_Specs-0003.pdf PDF
W912QR20R0087_FFE-0003.pdf PDF
W912QR20R0087_Plans-0003.pdf PDF
W912QR20R0087-0002.pdf PDF
W912QR20R0087_Specs-0001.pdf PDF
W912QR20R0087_Plans-0001.pdf PDF
W912QR20R0087_FFE-0001.pdf PDF
Site Visit Attendee List - 27 April 2021.pdf PDF
JA - SCO (HVAC Chillers - Brand Name) - B1600 (Clean).pdf PDF
JA - District (Monaco - Brand Name) - B1600 (Clean).pdf PDF
JA - District (SidePlate - Brand Name) - B1600 (Clean).pdf PDF
JA - District (Vindicator - Brand Name) - B1600 (Clean).pdf PDF
JA - SCO (Basis of Design) - B1600 (Clean).pdf PDF
JA - District (Security Cameras - Brand Name) - B1600 (Clean).pdf PDF
JA - SCO (HVAC DDC - Brand Name) - B1600 (Clean).pdf PDF
W912QR20R0087_Plans_Vol2.1A-0000.pdf PDF
W912QR20R0087_Plans_Vol2.1C-0000.pdf PDF
W912QR20R0087_Plans_Vol2.2C-0000.pdf PDF
W912QR20R0087_Plans_Vol2.3C-0000.pdf PDF
W912QR20R0087_Specs_ Vol1.5-0000.pdf PDF
W912QR20R0087_SID-0000.pdf PDF
W912QR20R0087_Specs_ Vol1.3-0000.pdf PDF
W912QR20R0087_App_D3-Enviro-0000.pdf PDF
W912QR20R0087_Plans_Vol2.1E-0000.pdf PDF
W912QR20R0087_Plans_Vol2.3A-0000.pdf PDF
W912QR20R0087_Specs_ Vol1.1-0000.pdf PDF
W912QR20R0087_Specs_ Vol1.2-0000.pdf PDF
W912QR20R0087_FFE-0000.pdf PDF
W912QR20R0087_Plans_Vol2.1B-0000.pdf PDF
W912QR20R0087_Plans_Vol2.1D-0000.pdf PDF
W912QR20R0087_Plans_Vol2.2A-0000.pdf PDF
W912QR20R0087_Plans_Vol2.2B-0000.pdf PDF
W912QR20R0087_Plans_Vol2.3B-0000.pdf PDF
W912QR20R0087_Specs_ Vol1.4-0000.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR20R0087 for the Building 1600 renovation, AMC Headquarters, Scott Air Force Base, IL is hereby amended as follow s::

SEE CONTINUATION PAGE

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912QR20R0087

X 9B. DATED (SEE ITEM 11)

05-Apr-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Jul-2021

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR20R0087-0004

W912QR20R0087

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

AMENDMENT 0004

General Information:

1. The proposal due date has been revised to Friday, 23 July 2021 at 1400 HRS local time.

Specification and Plan Sections:

2. The following specification sections have been revised and replaced in their entirety.

TABLE OF CONTENTS

SUBMITTAL REGISTER

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

07 22 00 ROOF AND DECK INSULATION

07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 90 00 PAINTS AND COATINGS

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

3. The following specification sections have been added in their entirety:

07 19 00 WATER REPELLENTS

08 91 00 METAL LOUVERS

4. The following plan sheets have been revised and replaced in their entirety:

S-503 STEEL SECTIONS AND DETAILS

S-504 STEEL SECTIONS AND DETAILS

S-505 STEEL SECTIONS AND DETAILS

S-509 STEEL SECTIONS AND DETAILS

S-510 STEEL SECTIONS AND DETAILS

S-514 STEEL SECTIONS AND DETAILS

S-515 STEEL SECTIONS AND DETAILS

S-516 STEEL SECTIONS AND DETAILS

S-517 STEEL SECTIONS AND DETAILS

S-518 STEEL SECTIONS AND DETAILS

S-522 STEEL SECTIONS AND DETAILS

S-524 STEEL SECTIONS AND DETAILS

S-526 STEEL SECTIONS AND DETAILS

A-395 ARCHITECTURAL CASEWORK SECTIONS

A-396 ARCHITECTURAL CASEWORK SECTIONS

A-456 ENLARGED REFLECTED CEILING PLANS

A-550 DETAILS – CEILING

A-555 DETAILS – INTERIOR

A-706 PARTITION FRAMING DETAILS

AC102G REFLECTED CEILING PLAN LEVEL TWO – AREA G

AC103A REFLECTED CEILING PLAN LEVEL THREE – AREA A

AC103B REFLECTED CEILING PLAN LEVEL THREE – AREA B

W912QR20R0087

AC103E REFLECTED CEILING PLAN LEVEL THREE – AREA E

FA001 FIRE ALARM ABBREVIATIONS, LEGEND, AND GENERAL NOTES

T-603 TELECOMMUNICATIONS RISER DIAGRAM

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 09-Jul-2021 10:00 AM to 23-Jul-2021 02:00 PM.

(End of Summary of Changes)

RENOVATE BUILDING 1600Controlled Unclassified Information (CUI) W912QR-XX-R-XXXX

SCOTT AFB, IL AMENDMENT 0004 USACE - LOUISVILLE

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 80 00.00 06 SPECIAL PROVISIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 08/15 SUMMARY OF WORK

01 32 01.00 06 08/17 PROJECT SCHEDULE

01 33 00.00 06 08/17 SUBMITTAL PROCEDURES

01 33 29.00 06 11/17 SUSTAINABILITY REPORTING

01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS

01 42 00 11/14 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM)

01 45 04.10 06 CONTRACTOR QUALITY CONTROL

01 45 35 02/15 SPECIAL INSPECTIONS

01 50 00 08/09 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19.00 06 09/17 TEMPORARY ENVIRONMENTAL CONTROLS AND

PERMITS

01 74 19 01/07 CONSTRUCTION AND DEMOLITION WASTE

MANAGEMENT

01 78 23 08/15 OPERATION AND MAINTENANCE DATA

01 88 15 08/13 SEISMIC CERTIFICATION, SUPPORT, AND

ATTACHMENT OF EQUIPMENT AND

NON-STRUCTURAL COMPONENTS

01 91 00.15 10 05/19 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 05/10 DEMOLITION AND DECONSTRUCTION

02 42 51 02/12 CARPET REMOVAL AND RECLAMATION

02 82 16.00 20 08/11 ENGINEERING CONTROL OF ASBESTOS

CONTAINING MATERIALS

02 83 13.00 06 07/16 LEAD IN CONSTRUCTION

02 84 16 04/06 HANDLING OF UNIVERSAL WASTE AND

LIGHTING BALLASTS CONTAINING PCBs

DIVISION 03 - CONCRETE

03 11 13.00 10 05/14 STRUCTURAL CAST-IN-PLACE CONCRETE

FORMING

03 15 00.00 10 05/14 CONCRETE ACCESSORIES

03 20 00.00 10 05/14 CONCRETE REINFORCING

03 30 00.00 10 05/14 CAST-IN-PLACE CONCRETE

03 33 00 11/09 CAST-IN-PLACE ARCHITECTURAL CONCRETE

03 35 00.00 10 05/14 CONCRETE FINISHING

03 39 00.00 10 05/14 CONCRETE CURING

03 45 00 05/16 PRECAST ARCHITECTURAL CONCRETE

DIVISION 04 - MASONRY

04 20 00 11/15 UNIT MASONRY

DIVISION 05 - METALS

05 05 23.13 10 05/14 ULTRASONIC INSPECTION OF WELDMENTS

PROJECT TABLE OF CONTENTS Page 1 Controlled Unclassified Information (CUI)

05 05 23.16 05/14 STRUCTURAL WELDING

05 12 00 05/14 STRUCTURAL STEEL

05 21 00 05/15 STEEL JOIST FRAMING

05 30 00 05/15 Revised 07/18 STEEL DECKS

05 40 00 05/15 COLD-FORMED METAL FRAMING

05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS

05 51 00 Revised 07/11 METAL STAIRS

05 51 33 02/16 METAL LADDERS

05 52 00 02/18 METAL RAILINGS

05 73 13 08/18 GLASS SUPPORTED RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16 ROUGH CARPENTRY

06 20 00 08/16 FINISH CARPENTRY

06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 05/14 PRESSURE TESTING AN AIR BARRIER SYSTEM

FOR AIR TIGHTNESS

07 12 00 02/16 BUILT-UP BITUMINOUS WATERPROOFING

07 19 00 05/11, CHG 1: 08/17 WATER REPELLENTS

07 21 13 02/16 BOARD AND BLOCK INSULATION

07 21 16 11/11 MINERAL FIBER BLANKET INSULATION

07 22 00 02/16 ROOF AND DECK INSULATION

07 27 10.00 10 05/14 BUILDING AIR BARRIER SYSTEM

07 27 19.01 05/17 SELF-ADHERING AIR BARRIERS

07 27 26 05/17 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 05/17 SPRAY FOAM AIR BARRIERS

07 42 13 05/11 METAL WALL PANELS

07 54 23 07/18 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING

07 60 00 05/17 FLASHING AND SHEET METAL

07 81 00 02/11 SPRAY-APPLIED FIREPROOFING

07 84 00 05/10 FIRESTOPPING

07 92 00 08/16 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 02/10 STEEL DOORS AND FRAMES

08 11 16 05/17 ALUMINUM DOORS AND FRAMES

08 14 00 08/16 WOOD DOORS

08 31 00 05/17 ACCESS DOORS AND PANELS

08 33 23 08/15 OVERHEAD COILING DOORS

08 34 02 08/09 BULLET-RESISTANT COMPONENTS

08 34 73 02/15 SOUND CONTROL DOOR ASSEMBLIES

08 41 13 11/16 ALUMINUM-FRAMED ENTRANCES AND

STOREFRONTS

08 44 00 08/11 CURTAIN WALL AND GLAZED ASSEMBLIES

08 71 00 02/16 DOOR HARDWARE

08 81 00 08/11 GLAZING

08 91 00 08/20 METAL LOUVERS

DIVISION 09 - FINISHES

09 22 00 02/10 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/16 GYPSUM BOARD

09 30 10 08/17 CERAMIC, QUARRY, AND GLASS TILING

PROJECT TABLE OF CONTENTS Page 2 Controlled Unclassified Information (CUI)

***Amendment 0004

Amendment 0004***

09 51 00 08/17 ACOUSTICAL CEILINGS

09 64 29 08/16 WOOD STRIP AND PLANK FLOORING

09 65 00 08/10 RESILIENT FLOORING

09 68 00 11/17 CARPETING

09 69 13 11/15 RIGID GRID ACCESS FLOORING

09 72 00 08/17 WALLCOVERINGS

09 77 10 09/19 PREFABRICATED WALL PANEL SYSTEMS

09 84 20 08/16 ACOUSTICAL WALL PANELS

09 90 00 05/11 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.10 08/17 EXTERIOR SIGNAGE

10 14 00.20 08/17 INTERIOR SIGNAGE

10 21 13 08/17 TOILET COMPARTMENTS

10 21 23.16 04/06 CUBICLE TRACK AND HARDWARE

10 22 19 08/17 DEMOUNTABLE AND MOVABLE PARTITIONS

10 22 39 12/18 AUTOMATIC VERTICALLY RETRACTABLE

ACOUSTIC WALL

10 26 00 08/17 WALL AND DOOR PROTECTION

10 28 13 08/17 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

10 51 13 05/11 METAL LOCKERS

DIVISION 11 - EQUIPMENT

11 13 19.13 08/09 LOADING DOCK LEVELERS

DIVISION 12 - FURNISHINGS

12 22 00 08/16 CURTAINS AND DRAPES

12 24 13 08/17 ROLLER WINDOW SHADES

12 36 00 08/16 COUNTERTOPS

12 50 00.13 10 08/17 FURNITURE AND FURNITURE INSTALLATION

12 59 00 08/17 SYSTEMS FURNITURE

DIVISION 14 - CONVEYING EQUIPMENT

14 24 23 05/16 HYDRAULIC PASSENGER ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 05/09 COMBINED WET PIPE SPRINKLER AND

STANDPIPE SYSTEM, FIRE PROTECTION

21 21 03.00 10 02/09 WET CHEMICAL FIRE EXTINGUISHING SYSTEM

21 30 00 04/08 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 11/15 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 08/10 AIR SUPPLY, DISTRIBUTION, VENTILATION,

AND EXHAUST SYSTEMS

23 05 15 02/14 COMMON PIPING FOR HVAC

23 05 93.00 06 08/16 TESTING, ADJUSTING, AND BALANCING

(TAB) OF HVAC

23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL

PROJECT TABLE OF CONTENTS Page 3

SYSTEMS

23 09 00 11/15 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 11/15 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 11 25 11/08 FACILITY GAS PIPING

23 21 23 08/17 HYDRONIC PUMPS

23 25 00 11/08 CHEMICAL TREATMENT OF WATER FOR

MECHANICAL SYSTEMS

23 52 00 04/08 HEATING BOILERS

23 64 10 11/16 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 65 00 11/16 COOLING TOWERS AND REMOTE

EVAPORATIVELY-COOLED CONDENSERS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11 11/17 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS FIRE LIFE SAFETY AND

MASS NOTIFICATION SYSTEMS

25 05 11.01 11/17 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS UTILITY MONITORING AND

CONTROL SYSTEM ONLY HVAC AND ADVANCED

METER READING SYSTEM (AMRS)

25 05 11.02 11/17 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS ELECTRONIC SECURITY

SYSTEMS

25 10 10 11/15 UTILITY MONITORING AND CONTROL SYSTEM

(UMCS) FRONT END AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 08 00 08/08 APPARATUS INSPECTION AND TESTING

26 11 16 02/10 SECONDARY UNIT SUBSTATIONS

26 20 00 02/14 INTERIOR DISTRIBUTION SYSTEM

26 23 00 05/15 LOW-VOLTAGE SWITCHGEAR

26 24 13 05/15 SWITCHBOARDS

26 27 13.10 30 10/07 ELECTRIC METERS

26 28 01.00 10 10/07 COORDINATED POWER SYSTEM PROTECTION

26 29 23 04/06 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER

600 VOLTS

26 32 15.00 10 10/07 DIESEL-GENERATOR SET STATIONARY

100-2500 KW, WITH AUXILIARIES

26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY

(UPS)

26 36 00.00 10 10/07 AUTOMATIC TRANSFER SWITCH AND

BY-PASS/ISOLATION SWITCH

26 41 00 11/13 LIGHTNING PROTECTION SYSTEM

26 51 00 05/16 INTERIOR LIGHTING

26 56 00 05/13 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 08/11 Revised 08/17 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

27 53 19 RF TRANSPONDER SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

PROJECT TABLE OF CONTENTS Page 4

28 08 10 05/16 ELECTRONIC SECURITY SYSTEM ACCEPTANCE

TESTING

28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 08/11 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00.00 06 06/15 EARTHWORK

31 11 00 08/08 CLEARING AND GRUBBING

31 21 13 08/11 RADON MITIGATION

31 23 00.00 20 02/11 EXCAVATION AND FILL

31 32 11 08/08 SOIL SURFACE EROSION CONTROL

31 63 29 11/14 DRILLED CONCRETE PIERS AND SHAFTS

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 05 33 08/17 LANDSCAPE ESTABLISHMENT

32 11 23 08/17 AGGREGATE BASE COURSES

32 12 16 08/09 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 11/11 PORTLAND CEMENT CONCRETE PAVEMENT FOR

ROADS AND SITE FACILITIES

32 16 13 04/08 CONCRETE SIDEWALKS AND CURBS AND

GUTTERS

32 17 23 08/16 PAVEMENT MARKINGS

32 92 19 08/17 SEEDING

32 93 00 08/17 EXTERIOR PLANTS

DIVISION 33 - UTILITIES

33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING

33 30 00 04/08 SANITARY SEWERS

33 40 00 02/10 STORM DRAINAGE UTILITIES

33 71 02 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 5

THIS PAGE INTENTIONALLY LEFT BLANK

PROJECT TABLE OF CONTENTS Page 6

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 124 PAGES

B1600 Renovation CertifiedFinalRTA w Post_RTA_Updates

00 80 00.00 06 SD-01 Preconstruction Submittals

1.28 G ROLabor, Equipment, and Material

Report

1.28 G RODaily Equipment Report

1.14Fingerprints of all persons employed or to be employed

1.37 G RORadioactive material

(RAM)/equipment

SD-02 Shop Drawings

1.41 G AEMechanical/Electrical Room

Layout

SD-04 Samples

1.16 G ROEquipment Warranty Identification

Tags

SD-05 Design Data

1.9.1Equipment-in-Place List

1.9.1Maintenance and Parts Data

1.12SF1413 Statement and

Acknowledgement

1.14Local Agency Check

1.45Progress Photographs

1.40Storage Tanks - Fuels/Hazardous

Materials Requirements

1.38 G ROSite Plan for B1600 project

1.38 G RODirt and Dust Control Plan for

B1600 project

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

W912QR20R0087-0004

Snyder, Brandi LGI00704201 Text Box

AMENDMENT 0004

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 124 PAGES

00 80 00.00 06 SD-07 Certificates

1.16Warranty of Construction

1.15 G RONO ASBESTOS - CONTAINING

MATERIAL (ACM)

CERTIFICATION

1.32Insurance

1.30Sales and Use Tax

1.40Waste Test Results

SD-11 Closeout Submittals

1.7.4 G ROPreliminary (Working) As-Built

Drawings

1.7.1 G ROFinal As-Built Drawings

1.7.1.2 G ROCAD Working As-Built Drawings

1.16 G ROWarranty Management Plan

01 11 00 SD-01 Preconstruction Submittals

1.5 G ROSalvage Plan

01 32 01.00 06 SD-01 Preconstruction Submittals

3.4.1 GPreliminary Project Schedule

3.4 GProject Schedule

SD-05 Design Data

3.5.2Narrative Report

3.5.4Schedule Reports

3.4.4 GPeriodic Schedule Updates

01 33 00.00 06 SD-01 Preconstruction Submittals

3.3 G ROSubmittal Register

01 33 29.00 06 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 124 PAGES

01 33 29.00 06 1.4.2.1 G ROSustainability Action Plan

1.4.2.4 G ROSustainability Progress Report

SD-11 Closeout Submittals

1.4.2.2 G ROFinal Sustainability eNotebook

1.4.2.2 G TOAmended Final Sustainability

eNotebook

1.4.2.2 G ROFinal High Performance and

Sustainable Building Checklist

1.6.1.2 G ROUSGBC GPA Certificates

01 35 26.00 06 SD-01 Preconstruction Submittals

1.7 G ROAccident Prevention Plan (APP)

1.8 G ROActivity Hazard Analysis (AHA)

1.5.1.1 G ROSite Safety and Health Officer

Qualifications (SSHO)

1.12.7 G ROProof of qualification for Crane

Operators

1.12.7 G ROCritical Lift Plan

SD-06 Test Reports

1.12Reports

1.12.1Accident Reports

1.12.3Monthly Exposure Reports

1.12.5Crane Reports

1.12.4Regulatory Citations and

Violations

SD-07 Certificates

1.12.8Confined Space Entry Permit

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 124 PAGES

01 35 26.00 06 1.13Hot work permit

1.12.6Crane Certificate of Compliance

01 45 04.10 06 SD-01 Preconstruction Submittals

3.2 G ROConstruction Quality Control Plan

01 45 35 SD-01 Preconstruction Submittals

3.1.1 G ROSIOR Letter of Acceptance

3.1.1 G ROProject Manual

3.1.1 G ROProject Manual

3.1.1Written Practices

3.1.1NDT Procedures and Equipment

Calibration Records

SD-06 Test Reports

3.1.1Daily Reports

3.1.3Daily Reports

3.1.1Biweekly Reports

SD-07 Certificates

2.1Fabrication Plant

2.1Steel Joist Institute Membership

2.1Certified Plant

2.1Certificate of Compliance

1.5.13 G ROSpecial Inspector of Record

1.5 G ROSpecial Inspector

3.1.1Qualification Records

SD-11 Closeout Submittals

3.1.1Interim Final Report

3.1.1 G ROComprehensive Final Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 124 PAGES

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

SD-06 Test Reports

2.4Backflow Preventer Tests

SD-07 Certificates

1.4.1Backflow Tester

1.4Backflow Preventers

01 57 19.00 06 SD-01 Preconstruction Submittals

1.5.1Preconstruction Survey

1.9 GSolid Waste Management Permit

1.5.2 GRegulatory Notifications

1.6 GEnvironmental Protection Plan

1.6.8.1 GDirt and Dust Control Plan

1.5.5 GEmployee Training Records

1.5.4 GEnvironmental Manager

Qualifications

3.2.1 GNotice of Intent

3.2.1 GStormwater Pollution Prevention

Plan (SWPPP)

SD-06 Test Reports

3.6.1.1.2Laboratory Analysis

3.2.2.2Inspection Reports

3.6.2.1 GSolid Waste Management Report

SD-07 Certificates

1.5.5 GEmployee Training Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 124 PAGES

01 57 19.00 06 1.5.5Erosion and Sediment Control

Inspector

SD-11 Closeout Submittals

3.2.2.3 GStormwater Pollution Prevention

Plan Compliance Notebook

3.2.2.4 GStormwater Notice of Termination

3.6.1 GWaste Determination

Documentation

3.6.4.6 GDisposal Documentation for

Hazardous, Special, and

Regulated Waste

1.5.5 GAssembled Employee Training

Records

1.9 GSolid Waste Management Permit

3.6.2.1 GSolid Waste Management Report

3.6.4.1 GHazardous and Special

Waste/Debris Management

1.5.2 GRegulatory Notifications

3.6.2.1 GSales Documentation

3.6.2.1Contractor Certification

01 74 19 SD-01 Preconstruction Submittals

1.6 GWaste Management Plan

SD-11 Closeout Submittals

1.7 SRecords

01 78 23 SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 124 PAGES

01 78 23 1.4 G ROO&M Database

3.1.1 G ROTraining Plan

3.1.3 G ROTraining Outline

3.1.2 G ROTraining Content

SD-11 Closeout Submittals

3.1.4 G ROTraining Video Recording

3.1.6 G ROValidation of Training Completion

01 88 15 SD-02 Shop Drawings

3.1 G AECQC Plan for Seismic Supports

1.6 G AESeismic Component List

3.1 G AESeismic Support Drawings and

Calculations

SD-03 Product Data

3.6 G AEConcrete and Masonry Anchors

2.15 G AEPower Actuated Fasteners

2.10 G AECold Formed Steel Strut

Channels and Accessories

2.16 G AEBeam Clamps

1.6 G AEFlexible Couplers

SD-06 Test Reports

2.10Cold Formed Steel Strut

Channels and Accessories

SD-07 Certificates

1.8.2 G AESeismic Test Lab Qualifications

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 124 PAGES

01 88 15 2.10Cold Formed Steel Strut

Channels and Accessories

2.16Beam Clamps

1.6Flexible Couplers

01 91 00.15 10 SD-01 Preconstruction Submittals

1.8 G ROCommissioning Firm

1.8.1 G ROLead Commissioning Specialist

1.8.2 G ROTechnical Commissioning

Specialists

1.8 G ROCommissioning Firm's Contract

SD-06 Test Reports

3.1.3 G RODesign Review Report

3.1.2.1 G ROInterim Construction Phase

Commissioning Plan

3.1.2.2 G ROFinal Construction Phase

Commissioning Plan

3.1.2.1.2 G ROTemplate Building Envelope

Inspection Checklists

3.1.5.2 G ROBuilding Envelope Inspection

Checklists

3.1.5.3 G ROPre-Functional Checklists

1.10Issues Log

3.2 G ROCommissioning Report

SD-07 Certificates

1.11 G ROCertificate of Readiness

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 124 PAGES

01 91 00.15 10 SD-10 Operation and Maintenance

Data

3.1.6 G ROTraining Plan

3.1.6 G ROTraining Attendance Rosters

3.1.7 GSystems Manual

SD-11 Closeout Submittals

3.2 SFinal Commissioning Report

3.1.2.2 SFinal Construction Phase

Commissioning Plan

02 41 00 SD-01 Preconstruction Submittals

1.2.1 G AEDemolition Plan

1.2.1 G AEDeconstruction Plan

1.9Existing Conditions

SD-07 Certificates

1.7 G RONotification

SD-11 Closeout Submittals

3.3.4Receipts

02 42 51 SD-01 Preconstruction Submittals

1.4.2 G ROProposed Dust-Control Measures

1.4.2Proposed Packing and

Transportation Measures

1.4.4 G ROSchedule of Carpet Reclamation

Activities

1.4.3 G ROCarpet Reclamation Agency

Records

02 82 16.00 20 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 124 PAGES

02 82 16.00 20 3.1.4 G ROLocal Exhaust Equipment

3.1.5 G ROVacuums

3.1.1.1 G RORespirators

3.1.4 G ROPressure Differential Automatic

Recording Instrument

1.2.2 G ROAmended Water

3.1.7 G ROGlovebags

1.3.8 G ROSafety Data Sheets (SDS) For All

Materials

SD-06 Test Reports

1.5.5 G ROAir Sampling Results

1.5.6 G ROPressure Differential Recordings

For Local Exhaust System

3.3.3.2 G ROAsbestos Disposal Quantity

Report

3.2.6.3 G ROClearance Sampling

SD-07 Certificates

1.3.9 G ROAsbestos Hazard Abatement Plan

1.3.10 G ROTesting Laboratory

1.5.1 G ROPrivate Qualified Person

Documentation

1.5.4 G ROContractor's License

1.5.2 G ROCompetent Person

1.5.3 G ROWorker's License

1.3.11 G ROLandfill Approval

1.3.3 G ROEmployee Training

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 124 PAGES

02 82 16.00 20 1.3.12 G ROMedical Certification

1.3.11 G ROWaste Shipment Records

1.3.6 G RORespiratory Protection Program

1.3.11 G RODelivery Tickets

2.2 G ROMastic Remover Approval

3.1.5 G ROVacuums

3.1.2.3 G ROWater Filtration Equipment

3.1.5 G ROVentilation Systems

3.1 G ROEquipment Used To Contain

Airborne Asbestos Fibers

2.1 G ROEncapsulants

SD-11 Closeout Submittals

1.6.1 G RORental Equipment

1.3.6.1 G RORespirator Program Records

1.5.7 G ROProtective Clothing

Decontamination Quality Control

Records

1.5.8 G ROProtective Clothing

Decontamination Facility

Notification

02 83 13.00 06 SD-01 Preconstruction Submittals

1.5.2.2 G ROLead Compliance Plan

1.5.1.1 G ROCompetent Person

1.5.1.2 G ROTraining Certification

1.5.2.8 G ROLead waste management plan

3.5.2.1 G ROWritten evidence

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 124 PAGES

02 83 13.00 06 3.5.2.2 G ROWritten evidence

SD-06 Test Reports

1.5.2.3 G ROSampling results

SD-07 Certificates

1.5.1.3 G ROTesting laboratory

SD-11 Closeout Submittals

3.5.2.1 G ROhazardous waste manifest

3.5.2.1 G ROturn-in documents or weight

tickets

02 84 16 SD-01 Preconstruction Submittals

1.7.1 G ROPCB and Universal Waste

Removal and Disposal Workplan

SD-07 Certificates

3.1.2 G ROTraining records for employees

handling universal waste

SD-11 Closeout Submittals

3.2.4 G ROCertification of Decontamination

3.5.2.2Universal Waste Shipment

Records

3.5.2 G ROTransporter Certification

3.5.2.1 G ROCertificate of Disposal

03 11 13.00 10 SD-02 Shop Drawings

2.2.1 G ROFormwork

3.1.1 G ROFormwork

2.2.1 G ROForm Removal Schedule

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 124 PAGES

03 11 13.00 10 2.2Form Materials

SD-04 Samples

1.3 G ROSample Panels

2.2.3 G ROFiber Voids

SD-05 Design Data

2.1Calculations

SD-06 Test Reports

3.2Inspection

SD-07 Certificates

2.2.3Fiber Voids

03 15 00.00 10 SD-02 Shop Drawings

2.4 G AEWaterstops

SD-03 Product Data

2.2Preformed Expansion Joint Filler

2.3Sealant

2.4Waterstops

SD-04 Samples

2.3.2Field-Molded Type

2.4Waterstops

2.5.2 G ROSplicing Waterstops

SD-07 Certificates

2.2Preformed Expansion Joint Filler

2.3Sealant

2.4Waterstops

03 20 00.00 10 SD-02 Shop Drawings

3.1 G AEReinforcement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 124 PAGES

03 20 00.00 10 SD-03 Product Data

2.3 G ROReinforcing Steel

SD-04 Samples

2.3.1Epoxy-Coated Bars

SD-06 Test Reports

2.8 G ROTests, Inspections, and

Verifications

SD-07 Certificates

2.3Reinforcing Steel

1.3.1Qualified Welders

03 30 00.00 10 SD-01 Preconstruction Submittals

1.5.2 G ROQuality Control Plan

1.5.1Laboratory Accreditation

3.8.5.6 G ROSampling Plan

SD-02 Shop Drawings

3.6 G AEJoints and Placement

3.8.7 G AEScreeding and Finishing Plans

SD-03 Product Data

Part 2Recycled Content Products

2.2Cementitious Materials

2.10Vapor Retarder

2.4Chemical Admixtures

SD-04 Samples

2.4.5Surface Retarder

SD-05 Design Data

2.1.1 G AEMixture Proportions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 124 PAGES

03 30 00.00 10 3.3 G AELightweight Aggregate Concrete

SD-06 Test Reports

2.1.1 G AEMixture Proportions

3.8 G ROTesting and Inspection for CQC

2.2.3Fly Ash

2.2.6Ground Granulated Blast-Furnace

(GGBF) Slag

2.3Aggregates

3.8.5.1Air Content

3.8.5.3Slump

3.8.5.6 G AECompressive Strength

2.5Water

SD-07 Certificates

1.5Contractor Quality Control personnel

3.2.1Ready-Mix Plant

03 33 00 SD-02 Shop Drawings

1.4.1 G AEDetail Drawings

SD-04 Samples

2.1 G AEMaterials

1.4.2 G AEPanels

03 35 00.00 10 SD-03 Product Data

Part 2Recycled Content Products

SD-04 Samples

1.3.1Field Test Panels

1.3.1.1Sample Wall Panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 124 PAGES

03 35 00.00 10 1.3.1.2Slab Panels

1.3.1.3PCF-1 Flooring Mock-Up

03 39 00.00 10 SD-03 Product Data

2.1Curing Materials

SD-06 Test Reports

3.2Testing and Inspection for CQC

SD-08 Manufacturer’s Instructions

2.1Curing Compound

03 45 00 SD-01 Preconstruction Submittals

1.11.7Pre-Installation Meeting

SD-02 Shop Drawings

1.11.1 G AEPrecast Concrete Wall Panel

Drawings

SD-03 Product Data

2.3 G AECast-In Embedded Items and

Connectors

2.3.2 G AEConnection Devices

2.2.5Admixtures

2.5Gasket

2.6.1Thin Brick Veneer

2.7Bearing Pads

SD-04 Samples

1.11.4 G AEConcrete Wall Panel Surface

Finish

1.11.6 G AEMock-up

2.6.1 G AEBrick Color Chips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 124 PAGES

03 45 00 2.6.1Form Liner

1.11.4 G AEFull-Size Sample Panel

SD-05 Design Data

1.5.5 G AEDesign Calculations

1.5.5 G AEDesign Calculations

2.1.1 G AEContractor-Furnished Mix Design

2.4.9 G AERepair of Surface Defects

1.5.6 G AEThermal Calculations

SD-06 Test Reports

1.10.2 G AEStrength Tests

1.10.2Slump

1.10.2Air Content

1.10.1 G AETest for Concrete Materials

2.2.6Water

3.6.4Testing Precast Units for Strength

SD-07 Certificates

1.4 G ROManufacturer's Qualifications

1.8.1Fabricator Quality Certifications

1.9Erector Certification

SD-08 Manufacturer’s Instructions

3.3 G ROInstallation

3.8 G ROCleaning

2.6.1Thin Brick

SD-11 Closeout Submittals

1.11.5 G ROBatch Ticket Information

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 124 PAGES

03 45 00 2.2.1 SRecycled Content for Fly Ash and

Pozzolan

2.2.1 SRecycled Content for Ground Iron

Blast-Furnace Slag

04 20 00 SD-02 Shop Drawings

3.4.1.1 G AEDetail Drawings

SD-03 Product Data

1.5.1 G ROHot Weather Procedures

1.5.2 G ROCold Weather Procedures

2.2.2 G AEClay or Shale Brick

2.2.3.2 G AEConcrete Masonry Units (CMU)

2.4.1.3 G ROCement

2.4.1.1 G ROCementitious Materials

SD-04 Samples

1.3.1.1 G AEMock-Up Panel

2.2.2 G AEClay or Shale Brick

2.4.1.4 GMasonry Mortar

2.6.2 GAnchors, Ties, and Bar

Positioners

SD-05 Design Data

2.1.2 G ROMasonry Compressive Strength

3.2.5 G ROBracing Calculations

SD-06 Test Reports

2.2.2.1.3Efflorescence Test

3.6.1Field Testing of Mortar

3.6.1.2Prism Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 124 PAGES

04 20 00 3.6.1.3Single-Wythe Masonry Wall

Water Penetration Test

SD-07 Certificates

1.3.2Special Masonry Inspector

Qualifications

2.2.2Clay or Shale Brick

2.2.3.2Concrete Masonry Units (CMU)

2.4.1.1Cementitious Materials

2.4.1.4Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

SD-11 Closeout Submittals

2.2.3.2.1 SRecycled Content

05 05 23.13 10 SD-03 Product Data

1.4.1Ultrasonic Inspection

SD-06 Test Reports

1.4.5Equipment Qualifications

3.4.1 G AEInspection Test Reports

05 05 23.16 SD-01 Preconstruction Submittals

3.2Welding Quality Assurance Plan

SD-03 Product Data

1.3 G ROWelding Procedure Qualifications

1.3.5Welder, Welding Operator, and

Tacker Qualification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 124 PAGES

05 05 23.16 1.3.6Inspector Qualification

1.3.2Previous Qualifications

1.3.3Pre-Qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports

3.3 G AENondestructive Testing

05 12 00 SD-01 Preconstruction Submittals

1.5.1.1 G AEErection Drawings

SD-02 Shop Drawings

1.5.2 G AEFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.4.2 G AENon-Shrink Grout

2.3.3 G AETension Control Bolts

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.7.2.2Weld Inspection Reports

3.7.3.1Bolt Testing Reports

3.7.5Embrittlement Test Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 124 PAGES

05 12 00 1.3AISC Fabrication Plant Quality

Certification

1.3AISC Erector Quality Certification

1.5.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

05 21 00 SD-01 Preconstruction Submittals

1.3.2Welder Qualification

SD-02 Shop Drawings

1.3.1 G AESteel Joist Framing

SD-03 Product Data

2.3 SRecycled Content Of Steel

Products

SD-05 Design Data

2.2 G AEDesign Calculations

SD-06 Test Reports

3.3Erection Inspection

3.3Welding Inspections

SD-07 Certificates

1.3.2Certification of Compliance

05 30 00 SD-02 Shop Drawings

1.3.5 G AEFabrication and Erection

Drawings

SD-03 Product Data

2.2 G AEAccessories

2.1 G AEDeck Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 124 PAGES

05 30 00 2.1.5Galvanizing Repair Paint

2.2.16Mechanical Fasteners

2.1.5Touch-Up Paint

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

SD-05 Design Data

2.1 G AEDeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Fire Safety

1.3.4.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

2.2.11Stud Manufacture's Certification

2.2.11Stud Manufacture's Test Reports

SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products

05 40 00 SD-02 Shop Drawings

1.6.1 G AEFraming Components

SD-03 Product Data

2.1 G AEStuds, Joists

SD-05 Design Data

1.6.2 G ROMetal Framing Calculations

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 124 PAGES

05 40 00 1.4 G ROLoad-Bearing Cold-Formed Metal

Framing

SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products

05 50 13 SD-02 Shop Drawings

2.4 G AEAngles and Plates

1.5.2 G AEInstallation Drawings

SD-03 Product Data

2.5 G AEFloor Hatch

2.1 GCertificates of Compliance

2.1 SRecycled Content

05 51 00 SD-02 Shop Drawings

2.2.1 G AEMetal Stair System

SD-07 Certificates

1.3.1 G ROWelding Procedures

1.3.1 G ROWelder Qualification

05 51 33 SD-02 Shop Drawings

2.3 G AELadders

SD-03 Product Data

2.3 G AELadders

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

1.3Fabricator Certification for Ships

Ladder Assembly

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 124 PAGES

05 52 00 SD-02 Shop Drawings

1.2.1 G AEFabrication Drawings

SD-05 Design Data

1.2.2 G AEStructural Design Calculations

SD-07 Certificates

1.4.1 G ROWelding Procedures

1.4.2 G ROWelder Qualification

05 73 13 SD-02 Shop Drawings

1.5.1 G AEDrawings

SD-03 Product Data

1.5.2 G AEManufacturer's Product Data

3.4 G ROMaintenance Instructions

SD-04 Samples

1.5.3 G AEManufacturer's Samples

SD-05 Design Data

1.5.4 G AEStructural Design Calculations

SD-11 Closeout Submittals

1.5.5 G ROCleaning and Maintenance

Instructions

1.6 G ROWarranty

06 10 00 SD-06 Test Reports

1.4.3Preservative-treated

SD-07 Certificates

1.11.1Certificates of Grade

06 20 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 124 PAGES

06 20 00 1.3 G AEDetail Drawings Indicating All

Wood Assemblies

SD-03 Product Data

2.2 G ROWood Products

SD-04 Samples

1.5 G AESamples

SD-07 Certificates

1.7.1.1 G ROCertificates of Grade

1.7.1.2 G ROCertified Sustainably Harvested

Wood

1.7.1.3 G ROIndoor Air Quality

SD-11 Closeout Submittals

2.2.3 SCertified Sustainably Harvested

Wood for Trim and Frames

2.2.4 SCertified Sustainably Harvested

Softwood Plywood

2.2.5 SCertified Sustainably Harvested

Hardwood Plywood

2.2.4 SVOC Content for Softwood

Plywood

2.2.5 SVOC Content for Hardwood

Plywood

2.7.1.2 SIndoor Air Quality for Non-aerosol

Adhesives

2.7.1.2 SIndoor Air Quality for Aerosol

Adhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 124 PAGES

06 20 00 2.2.6 SRecycled Content for

MDF/Particleboard

06 41 16.00 10 SD-02 Shop Drawings

1.5.2 G AEShop Drawings

2.9 G AEShop Drawings

3.1 G AEInstallation

SD-03 Product Data

2.1 G AEWood Materials

1.5.3 G ROCertification

SD-04 Samples

2.3 G AEPlastic Laminates

2.6 G AECabinet Hardware

SD-07 Certificates

1.5 G ROQuality Assurance

3.1 G ROLaminate Clad Casework

SD-11 Closeout Submittals

1.3 SULE Greenguard

1.3 SVolatile Organic Compound

(VOC) Content

1.3 SRecycled Content

07 05 23 SD-01 Preconstruction Submittals

1.4 G ROWork Plan

SD-03 Product Data

2.2 G ROThermal Imaging Camera

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 124 PAGES

07 05 23 3.2 G ROEnvelope Surface Area

Calculations

SD-07 Certificates

1.6.2.1Pressure Test Agency

1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 G ROPressure Test Procedures

3.5.6 G AEAir Leakage Test Report

3.6.5 G AEDiagnostic Test Report

07 12 00 SD-03 Product Data

1.3 G AEManufacturer's Standard Details

2.7 GProtection Board

2.4 G AEMembrane Fabric

1.5.2.2 G AEReinforcement Fabrics

SD-07 Certificates

2.4 G ROMembrane Fabric

1.5.2.2 G ROReinforcement Fabrics

2.7 G ROProtection Board

2.1.1 G ROCertificates of Compliance

2.1.2 G ROCertificates of Compliance

SD-08 Manufacturer’s Instructions

3.3.5.1Installation Instructions

07 19 00 SD-03 Product Data

2.2 G AEWater Repellents

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 124 PAGES

07 19 00 SD-06 Test Reports

1.3.2 G AEWater Absorption

2.3.1 G AEAccelerated Weathering

2.3.1 G AEResistance to Chloride Ion

Penetration

1.3.2 G AEMoisture Vapor Transmission

2.3.1 G AEMoisture Vapor Transmission

2.3.1 G AEScaling Resistance

1.3.2 G AEWater Penetration and Leakage

SD-07 Certificates

1.3.1 G ROManufacturer's Qualifications

1.3.1 G ROApplicator's Qualifications

1.3.3 G ROEvidence of Acceptable Variation

1.12 G ROWarranty

SD-08 Manufacturer’s Instructions

3.4 G ROApplication

1.7.1 G ROSafety Data Sheets

07 21 13 SD-03 Product Data

1.3 G AEManufacturer's Standard Details

2.2 G AEBlock or Board Insulation

2.3 G AEVapor Retarder

2.4 G AEPressure Sensitive Tape

2.5 G AEProtection Board or Coating

2.6 G AEAccessories

SD-07 Certificates

2.2 G ROBlock or Board Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 124 PAGES

07 21 13 2.3 G ROVapor Retarder

1.8 G ROSpecial Warranties

1.8 G ROSpecial Warranties

SD-08 Manufacturer’s Instructions

2.6.1 G ROAdhesive

SD-11 Closeout Submittals

1.5 SULE Greenguard

2.1.1 SVolatile Organic Compound

(VOC) Content

2.1.2 SRecycled Content

07 21 16 SD-03 Product Data

2.2Blanket Insulation

2.3Accessories

SD-08 Manufacturer’s Instructions

3.3.1Insulation

SD-11 Closeout Submittals

2.1.1 SRecycled Content for Insulation

Materials

2.1.2 SReduce Volatile Organic

Compounds (VOC)

07 22 00 SD-02 Shop Drawings

1.3 G AEInsulation Board Layout

1.3 G AEVerification of Existing Conditions

SD-03 Product Data

2.2 G AEInsulation

1.4 G AECover Board

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 124 PAGES

07 22 00 2.5 G AEFasteners

SD-06 Test Reports

2.3.1 GFlame Spread Rating

SD-07 Certificates

2.1.1 G ROVolatile Organic Compounds

(VOC) Content

1.6 G ROInstaller Qualifications

SD-08 Manufacturer’s Instructions

2.5 G ROFasteners

2.2 G ROInsulation

SD-11 Closeout Submittals

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .