This solicitation notice is for a firm-fixed-price construction contract for the complete interior and exterior renovation of Building 1600 at Scott Air Force Base, Illinois. The project scope includes replacement of all mechanical, electrical, plumbing and communications systems, and has a total estimated value between $100-250 million. The contract duration is 1260 calendar days.
The U.S. Army Corps of Engineers Louisville District will issue the solicitation on the GSA beta.SAM website. Proposals will be evaluated using a trade-off best value approach. Registration on SAM.gov is required to be eligible for award. The North American Industry Classification System code for this project is 236220. The acquisition will be full and open competition with no set-aside designated.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR20R0087 for the Building 1600 renovation, AMC Headquarters, Scott Air Force Base, IL is hereby amended as follow s::
SEE CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912QR20R0087
X 9B. DATED (SEE ITEM 11)
05-Apr-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Jul-2021
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR20R0087-0004
W912QR20R0087
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
AMENDMENT 0004
General Information:
1. The proposal due date has been revised to Friday, 23 July 2021 at 1400 HRS local time.
Specification and Plan Sections:
2. The following specification sections have been revised and replaced in their entirety.
TABLE OF CONTENTS
SUBMITTAL REGISTER
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
07 22 00 ROOF AND DECK INSULATION
07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 90 00 PAINTS AND COATINGS
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
3. The following specification sections have been added in their entirety:
07 19 00 WATER REPELLENTS
08 91 00 METAL LOUVERS
4. The following plan sheets have been revised and replaced in their entirety:
S-503 STEEL SECTIONS AND DETAILS
S-504 STEEL SECTIONS AND DETAILS
S-505 STEEL SECTIONS AND DETAILS
S-509 STEEL SECTIONS AND DETAILS
S-510 STEEL SECTIONS AND DETAILS
S-514 STEEL SECTIONS AND DETAILS
S-515 STEEL SECTIONS AND DETAILS
S-516 STEEL SECTIONS AND DETAILS
S-517 STEEL SECTIONS AND DETAILS
S-518 STEEL SECTIONS AND DETAILS
S-522 STEEL SECTIONS AND DETAILS
S-524 STEEL SECTIONS AND DETAILS
S-526 STEEL SECTIONS AND DETAILS
A-395 ARCHITECTURAL CASEWORK SECTIONS
A-396 ARCHITECTURAL CASEWORK SECTIONS
A-456 ENLARGED REFLECTED CEILING PLANS
A-550 DETAILS – CEILING
A-555 DETAILS – INTERIOR
A-706 PARTITION FRAMING DETAILS
AC102G REFLECTED CEILING PLAN LEVEL TWO – AREA G
AC103A REFLECTED CEILING PLAN LEVEL THREE – AREA A
AC103B REFLECTED CEILING PLAN LEVEL THREE – AREA B
W912QR20R0087
AC103E REFLECTED CEILING PLAN LEVEL THREE – AREA E
FA001 FIRE ALARM ABBREVIATIONS, LEGEND, AND GENERAL NOTES
T-603 TELECOMMUNICATIONS RISER DIAGRAM
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 09-Jul-2021 10:00 AM to 23-Jul-2021 02:00 PM.
(End of Summary of Changes)
RENOVATE BUILDING 1600Controlled Unclassified Information (CUI) W912QR-XX-R-XXXX
SCOTT AFB, IL AMENDMENT 0004 USACE - LOUISVILLE
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15 SUMMARY OF WORK
01 32 01.00 06 08/17 PROJECT SCHEDULE
01 33 00.00 06 08/17 SUBMITTAL PROCEDURES
01 33 29.00 06 11/17 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 11/14 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 02/15 SPECIAL INSPECTIONS
01 50 00 08/09 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19.00 06 09/17 TEMPORARY ENVIRONMENTAL CONTROLS AND
PERMITS
01 74 19 01/07 CONSTRUCTION AND DEMOLITION WASTE
MANAGEMENT
01 78 23 08/15 OPERATION AND MAINTENANCE DATA
01 88 15 08/13 SEISMIC CERTIFICATION, SUPPORT, AND
ATTACHMENT OF EQUIPMENT AND
NON-STRUCTURAL COMPONENTS
01 91 00.15 10 05/19 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 05/10 DEMOLITION AND DECONSTRUCTION
02 42 51 02/12 CARPET REMOVAL AND RECLAMATION
02 82 16.00 20 08/11 ENGINEERING CONTROL OF ASBESTOS
CONTAINING MATERIALS
02 83 13.00 06 07/16 LEAD IN CONSTRUCTION
02 84 16 04/06 HANDLING OF UNIVERSAL WASTE AND
LIGHTING BALLASTS CONTAINING PCBs
DIVISION 03 - CONCRETE
03 11 13.00 10 05/14 STRUCTURAL CAST-IN-PLACE CONCRETE
FORMING
03 15 00.00 10 05/14 CONCRETE ACCESSORIES
03 20 00.00 10 05/14 CONCRETE REINFORCING
03 30 00.00 10 05/14 CAST-IN-PLACE CONCRETE
03 33 00 11/09 CAST-IN-PLACE ARCHITECTURAL CONCRETE
03 35 00.00 10 05/14 CONCRETE FINISHING
03 39 00.00 10 05/14 CONCRETE CURING
03 45 00 05/16 PRECAST ARCHITECTURAL CONCRETE
DIVISION 04 - MASONRY
04 20 00 11/15 UNIT MASONRY
DIVISION 05 - METALS
05 05 23.13 10 05/14 ULTRASONIC INSPECTION OF WELDMENTS
PROJECT TABLE OF CONTENTS Page 1 Controlled Unclassified Information (CUI)
05 05 23.16 05/14 STRUCTURAL WELDING
05 12 00 05/14 STRUCTURAL STEEL
05 21 00 05/15 STEEL JOIST FRAMING
05 30 00 05/15 Revised 07/18 STEEL DECKS
05 40 00 05/15 COLD-FORMED METAL FRAMING
05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS
05 51 00 Revised 07/11 METAL STAIRS
05 51 33 02/16 METAL LADDERS
05 52 00 02/18 METAL RAILINGS
05 73 13 08/18 GLASS SUPPORTED RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16 ROUGH CARPENTRY
06 20 00 08/16 FINISH CARPENTRY
06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 05/14 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS
07 12 00 02/16 BUILT-UP BITUMINOUS WATERPROOFING
07 19 00 05/11, CHG 1: 08/17 WATER REPELLENTS
07 21 13 02/16 BOARD AND BLOCK INSULATION
07 21 16 11/11 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16 ROOF AND DECK INSULATION
07 27 10.00 10 05/14 BUILDING AIR BARRIER SYSTEM
07 27 19.01 05/17 SELF-ADHERING AIR BARRIERS
07 27 26 05/17 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 05/17 SPRAY FOAM AIR BARRIERS
07 42 13 05/11 METAL WALL PANELS
07 54 23 07/18 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING
07 60 00 05/17 FLASHING AND SHEET METAL
07 81 00 02/11 SPRAY-APPLIED FIREPROOFING
07 84 00 05/10 FIRESTOPPING
07 92 00 08/16 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 02/10 STEEL DOORS AND FRAMES
08 11 16 05/17 ALUMINUM DOORS AND FRAMES
08 14 00 08/16 WOOD DOORS
08 31 00 05/17 ACCESS DOORS AND PANELS
08 33 23 08/15 OVERHEAD COILING DOORS
08 34 02 08/09 BULLET-RESISTANT COMPONENTS
08 34 73 02/15 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 11/16 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 44 00 08/11 CURTAIN WALL AND GLAZED ASSEMBLIES
08 71 00 02/16 DOOR HARDWARE
08 81 00 08/11 GLAZING
08 91 00 08/20 METAL LOUVERS
DIVISION 09 - FINISHES
09 22 00 02/10 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16 GYPSUM BOARD
09 30 10 08/17 CERAMIC, QUARRY, AND GLASS TILING
PROJECT TABLE OF CONTENTS Page 2 Controlled Unclassified Information (CUI)
***Amendment 0004
Amendment 0004***
09 51 00 08/17 ACOUSTICAL CEILINGS
09 64 29 08/16 WOOD STRIP AND PLANK FLOORING
09 65 00 08/10 RESILIENT FLOORING
09 68 00 11/17 CARPETING
09 69 13 11/15 RIGID GRID ACCESS FLOORING
09 72 00 08/17 WALLCOVERINGS
09 77 10 09/19 PREFABRICATED WALL PANEL SYSTEMS
09 84 20 08/16 ACOUSTICAL WALL PANELS
09 90 00 05/11 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 08/17 EXTERIOR SIGNAGE
10 14 00.20 08/17 INTERIOR SIGNAGE
10 21 13 08/17 TOILET COMPARTMENTS
10 21 23.16 04/06 CUBICLE TRACK AND HARDWARE
10 22 19 08/17 DEMOUNTABLE AND MOVABLE PARTITIONS
10 22 39 12/18 AUTOMATIC VERTICALLY RETRACTABLE
ACOUSTIC WALL
10 26 00 08/17 WALL AND DOOR PROTECTION
10 28 13 08/17 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 05/11 METAL LOCKERS
DIVISION 11 - EQUIPMENT
11 13 19.13 08/09 LOADING DOCK LEVELERS
DIVISION 12 - FURNISHINGS
12 22 00 08/16 CURTAINS AND DRAPES
12 24 13 08/17 ROLLER WINDOW SHADES
12 36 00 08/16 COUNTERTOPS
12 50 00.13 10 08/17 FURNITURE AND FURNITURE INSTALLATION
12 59 00 08/17 SYSTEMS FURNITURE
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 05/16 HYDRAULIC PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 05/09 COMBINED WET PIPE SPRINKLER AND
STANDPIPE SYSTEM, FIRE PROTECTION
21 21 03.00 10 02/09 WET CHEMICAL FIRE EXTINGUISHING SYSTEM
21 30 00 04/08 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 11/15 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 08/10 AIR SUPPLY, DISTRIBUTION, VENTILATION,
AND EXHAUST SYSTEMS
23 05 15 02/14 COMMON PIPING FOR HVAC
23 05 93.00 06 08/16 TESTING, ADJUSTING, AND BALANCING
(TAB) OF HVAC
23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL
PROJECT TABLE OF CONTENTS Page 3
SYSTEMS
23 09 00 11/15 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 11/15 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 11 25 11/08 FACILITY GAS PIPING
23 21 23 08/17 HYDRONIC PUMPS
23 25 00 11/08 CHEMICAL TREATMENT OF WATER FOR
MECHANICAL SYSTEMS
23 52 00 04/08 HEATING BOILERS
23 64 10 11/16 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 65 00 11/16 COOLING TOWERS AND REMOTE
EVAPORATIVELY-COOLED CONDENSERS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS FIRE LIFE SAFETY AND
MASS NOTIFICATION SYSTEMS
25 05 11.01 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS UTILITY MONITORING AND
CONTROL SYSTEM ONLY HVAC AND ADVANCED
METER READING SYSTEM (AMRS)
25 05 11.02 11/17 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS ELECTRONIC SECURITY
SYSTEMS
25 10 10 11/15 UTILITY MONITORING AND CONTROL SYSTEM
(UMCS) FRONT END AND INTEGRATION
DIVISION 26 - ELECTRICAL
26 08 00 08/08 APPARATUS INSPECTION AND TESTING
26 11 16 02/10 SECONDARY UNIT SUBSTATIONS
26 20 00 02/14 INTERIOR DISTRIBUTION SYSTEM
26 23 00 05/15 LOW-VOLTAGE SWITCHGEAR
26 24 13 05/15 SWITCHBOARDS
26 27 13.10 30 10/07 ELECTRIC METERS
26 28 01.00 10 10/07 COORDINATED POWER SYSTEM PROTECTION
26 29 23 04/06 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER
600 VOLTS
26 32 15.00 10 10/07 DIESEL-GENERATOR SET STATIONARY
100-2500 KW, WITH AUXILIARIES
26 33 53 05/19 STATIC UNINTERRUPTIBLE POWER SUPPLY
(UPS)
26 36 00.00 10 10/07 AUTOMATIC TRANSFER SWITCH AND
BY-PASS/ISOLATION SWITCH
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 51 00 05/16 INTERIOR LIGHTING
26 56 00 05/13 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 Revised 08/17 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 53 19 RF TRANSPONDER SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
PROJECT TABLE OF CONTENTS Page 4
28 08 10 05/16 ELECTRONIC SECURITY SYSTEM ACCEPTANCE
TESTING
28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 08/11 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00.00 06 06/15 EARTHWORK
31 11 00 08/08 CLEARING AND GRUBBING
31 21 13 08/11 RADON MITIGATION
31 23 00.00 20 02/11 EXCAVATION AND FILL
31 32 11 08/08 SOIL SURFACE EROSION CONTROL
31 63 29 11/14 DRILLED CONCRETE PIERS AND SHAFTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 23 08/17 AGGREGATE BASE COURSES
32 12 16 08/09 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 11/11 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 16 13 04/08 CONCRETE SIDEWALKS AND CURBS AND
GUTTERS
32 17 23 08/16 PAVEMENT MARKINGS
32 92 19 08/17 SEEDING
32 93 00 08/17 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING
33 30 00 04/08 SANITARY SEWERS
33 40 00 02/10 STORM DRAINAGE UTILITIES
33 71 02 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 6
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 124 PAGES
B1600 Renovation CertifiedFinalRTA w Post_RTA_Updates
00 80 00.00 06 SD-01 Preconstruction Submittals
1.28 G ROLabor, Equipment, and Material
Report
1.28 G RODaily Equipment Report
1.14Fingerprints of all persons employed or to be employed
1.37 G RORadioactive material
(RAM)/equipment
SD-02 Shop Drawings
1.41 G AEMechanical/Electrical Room
Layout
SD-04 Samples
1.16 G ROEquipment Warranty Identification
Tags
SD-05 Design Data
1.9.1Equipment-in-Place List
1.9.1Maintenance and Parts Data
1.12SF1413 Statement and
Acknowledgement
1.14Local Agency Check
1.45Progress Photographs
1.40Storage Tanks - Fuels/Hazardous
Materials Requirements
1.38 G ROSite Plan for B1600 project
1.38 G RODirt and Dust Control Plan for
B1600 project
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
W912QR20R0087-0004
Snyder, Brandi LGI00704201 Text Box
AMENDMENT 0004
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 124 PAGES
00 80 00.00 06 SD-07 Certificates
1.16Warranty of Construction
1.15 G RONO ASBESTOS - CONTAINING
MATERIAL (ACM)
CERTIFICATION
1.32Insurance
1.30Sales and Use Tax
1.40Waste Test Results
SD-11 Closeout Submittals
1.7.4 G ROPreliminary (Working) As-Built
Drawings
1.7.1 G ROFinal As-Built Drawings
1.7.1.2 G ROCAD Working As-Built Drawings
1.16 G ROWarranty Management Plan
01 11 00 SD-01 Preconstruction Submittals
1.5 G ROSalvage Plan
01 32 01.00 06 SD-01 Preconstruction Submittals
3.4.1 GPreliminary Project Schedule
3.4 GProject Schedule
SD-05 Design Data
3.5.2Narrative Report
3.5.4Schedule Reports
3.4.4 GPeriodic Schedule Updates
01 33 00.00 06 SD-01 Preconstruction Submittals
3.3 G ROSubmittal Register
01 33 29.00 06 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 124 PAGES
01 33 29.00 06 1.4.2.1 G ROSustainability Action Plan
1.4.2.4 G ROSustainability Progress Report
SD-11 Closeout Submittals
1.4.2.2 G ROFinal Sustainability eNotebook
1.4.2.2 G TOAmended Final Sustainability
eNotebook
1.4.2.2 G ROFinal High Performance and
Sustainable Building Checklist
1.6.1.2 G ROUSGBC GPA Certificates
01 35 26.00 06 SD-01 Preconstruction Submittals
1.7 G ROAccident Prevention Plan (APP)
1.8 G ROActivity Hazard Analysis (AHA)
1.5.1.1 G ROSite Safety and Health Officer
Qualifications (SSHO)
1.12.7 G ROProof of qualification for Crane
Operators
1.12.7 G ROCritical Lift Plan
SD-06 Test Reports
1.12Reports
1.12.1Accident Reports
1.12.3Monthly Exposure Reports
1.12.5Crane Reports
1.12.4Regulatory Citations and
Violations
SD-07 Certificates
1.12.8Confined Space Entry Permit
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 124 PAGES
01 35 26.00 06 1.13Hot work permit
1.12.6Crane Certificate of Compliance
01 45 04.10 06 SD-01 Preconstruction Submittals
3.2 G ROConstruction Quality Control Plan
01 45 35 SD-01 Preconstruction Submittals
3.1.1 G ROSIOR Letter of Acceptance
3.1.1 G ROProject Manual
3.1.1 G ROProject Manual
3.1.1Written Practices
3.1.1NDT Procedures and Equipment
Calibration Records
SD-06 Test Reports
3.1.1Daily Reports
3.1.3Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1Fabrication Plant
2.1Steel Joist Institute Membership
2.1Certified Plant
2.1Certificate of Compliance
1.5.13 G ROSpecial Inspector of Record
1.5 G ROSpecial Inspector
3.1.1Qualification Records
SD-11 Closeout Submittals
3.1.1Interim Final Report
3.1.1 G ROComprehensive Final Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 124 PAGES
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
SD-06 Test Reports
2.4Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19.00 06 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
1.9 GSolid Waste Management Permit
1.5.2 GRegulatory Notifications
1.6 GEnvironmental Protection Plan
1.6.8.1 GDirt and Dust Control Plan
1.5.5 GEmployee Training Records
1.5.4 GEnvironmental Manager
Qualifications
3.2.1 GNotice of Intent
3.2.1 GStormwater Pollution Prevention
Plan (SWPPP)
SD-06 Test Reports
3.6.1.1.2Laboratory Analysis
3.2.2.2Inspection Reports
3.6.2.1 GSolid Waste Management Report
SD-07 Certificates
1.5.5 GEmployee Training Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 124 PAGES
01 57 19.00 06 1.5.5Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.2.2.3 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.2.4 GStormwater Notice of Termination
3.6.1 GWaste Determination
Documentation
3.6.4.6 GDisposal Documentation for
Hazardous, Special, and
Regulated Waste
1.5.5 GAssembled Employee Training
Records
1.9 GSolid Waste Management Permit
3.6.2.1 GSolid Waste Management Report
3.6.4.1 GHazardous and Special
Waste/Debris Management
1.5.2 GRegulatory Notifications
3.6.2.1 GSales Documentation
3.6.2.1Contractor Certification
01 74 19 SD-01 Preconstruction Submittals
1.6 GWaste Management Plan
SD-11 Closeout Submittals
1.7 SRecords
01 78 23 SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 124 PAGES
01 78 23 1.4 G ROO&M Database
3.1.1 G ROTraining Plan
3.1.3 G ROTraining Outline
3.1.2 G ROTraining Content
SD-11 Closeout Submittals
3.1.4 G ROTraining Video Recording
3.1.6 G ROValidation of Training Completion
01 88 15 SD-02 Shop Drawings
3.1 G AECQC Plan for Seismic Supports
1.6 G AESeismic Component List
3.1 G AESeismic Support Drawings and
Calculations
SD-03 Product Data
3.6 G AEConcrete and Masonry Anchors
2.15 G AEPower Actuated Fasteners
2.10 G AECold Formed Steel Strut
Channels and Accessories
2.16 G AEBeam Clamps
1.6 G AEFlexible Couplers
SD-06 Test Reports
2.10Cold Formed Steel Strut
Channels and Accessories
SD-07 Certificates
1.8.2 G AESeismic Test Lab Qualifications
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 124 PAGES
01 88 15 2.10Cold Formed Steel Strut
Channels and Accessories
2.16Beam Clamps
1.6Flexible Couplers
01 91 00.15 10 SD-01 Preconstruction Submittals
1.8 G ROCommissioning Firm
1.8.1 G ROLead Commissioning Specialist
1.8.2 G ROTechnical Commissioning
Specialists
1.8 G ROCommissioning Firm's Contract
SD-06 Test Reports
3.1.3 G RODesign Review Report
3.1.2.1 G ROInterim Construction Phase
Commissioning Plan
3.1.2.2 G ROFinal Construction Phase
Commissioning Plan
3.1.2.1.2 G ROTemplate Building Envelope
Inspection Checklists
3.1.5.2 G ROBuilding Envelope Inspection
Checklists
3.1.5.3 G ROPre-Functional Checklists
1.10Issues Log
3.2 G ROCommissioning Report
SD-07 Certificates
1.11 G ROCertificate of Readiness
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 124 PAGES
01 91 00.15 10 SD-10 Operation and Maintenance
Data
3.1.6 G ROTraining Plan
3.1.6 G ROTraining Attendance Rosters
3.1.7 GSystems Manual
SD-11 Closeout Submittals
3.2 SFinal Commissioning Report
3.1.2.2 SFinal Construction Phase
Commissioning Plan
02 41 00 SD-01 Preconstruction Submittals
1.2.1 G AEDemolition Plan
1.2.1 G AEDeconstruction Plan
1.9Existing Conditions
SD-07 Certificates
1.7 G RONotification
SD-11 Closeout Submittals
3.3.4Receipts
02 42 51 SD-01 Preconstruction Submittals
1.4.2 G ROProposed Dust-Control Measures
1.4.2Proposed Packing and
Transportation Measures
1.4.4 G ROSchedule of Carpet Reclamation
Activities
1.4.3 G ROCarpet Reclamation Agency
Records
02 82 16.00 20 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 124 PAGES
02 82 16.00 20 3.1.4 G ROLocal Exhaust Equipment
3.1.5 G ROVacuums
3.1.1.1 G RORespirators
3.1.4 G ROPressure Differential Automatic
Recording Instrument
1.2.2 G ROAmended Water
3.1.7 G ROGlovebags
1.3.8 G ROSafety Data Sheets (SDS) For All
Materials
SD-06 Test Reports
1.5.5 G ROAir Sampling Results
1.5.6 G ROPressure Differential Recordings
For Local Exhaust System
3.3.3.2 G ROAsbestos Disposal Quantity
Report
3.2.6.3 G ROClearance Sampling
SD-07 Certificates
1.3.9 G ROAsbestos Hazard Abatement Plan
1.3.10 G ROTesting Laboratory
1.5.1 G ROPrivate Qualified Person
Documentation
1.5.4 G ROContractor's License
1.5.2 G ROCompetent Person
1.5.3 G ROWorker's License
1.3.11 G ROLandfill Approval
1.3.3 G ROEmployee Training
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 124 PAGES
02 82 16.00 20 1.3.12 G ROMedical Certification
1.3.11 G ROWaste Shipment Records
1.3.6 G RORespiratory Protection Program
1.3.11 G RODelivery Tickets
2.2 G ROMastic Remover Approval
3.1.5 G ROVacuums
3.1.2.3 G ROWater Filtration Equipment
3.1.5 G ROVentilation Systems
3.1 G ROEquipment Used To Contain
Airborne Asbestos Fibers
2.1 G ROEncapsulants
SD-11 Closeout Submittals
1.6.1 G RORental Equipment
1.3.6.1 G RORespirator Program Records
1.5.7 G ROProtective Clothing
Decontamination Quality Control
Records
1.5.8 G ROProtective Clothing
Decontamination Facility
Notification
02 83 13.00 06 SD-01 Preconstruction Submittals
1.5.2.2 G ROLead Compliance Plan
1.5.1.1 G ROCompetent Person
1.5.1.2 G ROTraining Certification
1.5.2.8 G ROLead waste management plan
3.5.2.1 G ROWritten evidence
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 124 PAGES
02 83 13.00 06 3.5.2.2 G ROWritten evidence
SD-06 Test Reports
1.5.2.3 G ROSampling results
SD-07 Certificates
1.5.1.3 G ROTesting laboratory
SD-11 Closeout Submittals
3.5.2.1 G ROhazardous waste manifest
3.5.2.1 G ROturn-in documents or weight
tickets
02 84 16 SD-01 Preconstruction Submittals
1.7.1 G ROPCB and Universal Waste
Removal and Disposal Workplan
SD-07 Certificates
3.1.2 G ROTraining records for employees
handling universal waste
SD-11 Closeout Submittals
3.2.4 G ROCertification of Decontamination
3.5.2.2Universal Waste Shipment
Records
3.5.2 G ROTransporter Certification
3.5.2.1 G ROCertificate of Disposal
03 11 13.00 10 SD-02 Shop Drawings
2.2.1 G ROFormwork
3.1.1 G ROFormwork
2.2.1 G ROForm Removal Schedule
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 124 PAGES
03 11 13.00 10 2.2Form Materials
SD-04 Samples
1.3 G ROSample Panels
2.2.3 G ROFiber Voids
SD-05 Design Data
2.1Calculations
SD-06 Test Reports
3.2Inspection
SD-07 Certificates
2.2.3Fiber Voids
03 15 00.00 10 SD-02 Shop Drawings
2.4 G AEWaterstops
SD-03 Product Data
2.2Preformed Expansion Joint Filler
2.3Sealant
2.4Waterstops
SD-04 Samples
2.3.2Field-Molded Type
2.4Waterstops
2.5.2 G ROSplicing Waterstops
SD-07 Certificates
2.2Preformed Expansion Joint Filler
2.3Sealant
2.4Waterstops
03 20 00.00 10 SD-02 Shop Drawings
3.1 G AEReinforcement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 124 PAGES
03 20 00.00 10 SD-03 Product Data
2.3 G ROReinforcing Steel
SD-04 Samples
2.3.1Epoxy-Coated Bars
SD-06 Test Reports
2.8 G ROTests, Inspections, and
Verifications
SD-07 Certificates
2.3Reinforcing Steel
1.3.1Qualified Welders
03 30 00.00 10 SD-01 Preconstruction Submittals
1.5.2 G ROQuality Control Plan
1.5.1Laboratory Accreditation
3.8.5.6 G ROSampling Plan
SD-02 Shop Drawings
3.6 G AEJoints and Placement
3.8.7 G AEScreeding and Finishing Plans
SD-03 Product Data
Part 2Recycled Content Products
2.2Cementitious Materials
2.10Vapor Retarder
2.4Chemical Admixtures
SD-04 Samples
2.4.5Surface Retarder
SD-05 Design Data
2.1.1 G AEMixture Proportions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 124 PAGES
03 30 00.00 10 3.3 G AELightweight Aggregate Concrete
SD-06 Test Reports
2.1.1 G AEMixture Proportions
3.8 G ROTesting and Inspection for CQC
2.2.3Fly Ash
2.2.6Ground Granulated Blast-Furnace
(GGBF) Slag
2.3Aggregates
3.8.5.1Air Content
3.8.5.3Slump
3.8.5.6 G AECompressive Strength
2.5Water
SD-07 Certificates
1.5Contractor Quality Control personnel
3.2.1Ready-Mix Plant
03 33 00 SD-02 Shop Drawings
1.4.1 G AEDetail Drawings
SD-04 Samples
2.1 G AEMaterials
1.4.2 G AEPanels
03 35 00.00 10 SD-03 Product Data
Part 2Recycled Content Products
SD-04 Samples
1.3.1Field Test Panels
1.3.1.1Sample Wall Panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 124 PAGES
03 35 00.00 10 1.3.1.2Slab Panels
1.3.1.3PCF-1 Flooring Mock-Up
03 39 00.00 10 SD-03 Product Data
2.1Curing Materials
SD-06 Test Reports
3.2Testing and Inspection for CQC
SD-08 Manufacturer’s Instructions
2.1Curing Compound
03 45 00 SD-01 Preconstruction Submittals
1.11.7Pre-Installation Meeting
SD-02 Shop Drawings
1.11.1 G AEPrecast Concrete Wall Panel
Drawings
SD-03 Product Data
2.3 G AECast-In Embedded Items and
Connectors
2.3.2 G AEConnection Devices
2.2.5Admixtures
2.5Gasket
2.6.1Thin Brick Veneer
2.7Bearing Pads
SD-04 Samples
1.11.4 G AEConcrete Wall Panel Surface
Finish
1.11.6 G AEMock-up
2.6.1 G AEBrick Color Chips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 124 PAGES
03 45 00 2.6.1Form Liner
1.11.4 G AEFull-Size Sample Panel
SD-05 Design Data
1.5.5 G AEDesign Calculations
1.5.5 G AEDesign Calculations
2.1.1 G AEContractor-Furnished Mix Design
2.4.9 G AERepair of Surface Defects
1.5.6 G AEThermal Calculations
SD-06 Test Reports
1.10.2 G AEStrength Tests
1.10.2Slump
1.10.2Air Content
1.10.1 G AETest for Concrete Materials
2.2.6Water
3.6.4Testing Precast Units for Strength
SD-07 Certificates
1.4 G ROManufacturer's Qualifications
1.8.1Fabricator Quality Certifications
1.9Erector Certification
SD-08 Manufacturer’s Instructions
3.3 G ROInstallation
3.8 G ROCleaning
2.6.1Thin Brick
SD-11 Closeout Submittals
1.11.5 G ROBatch Ticket Information
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 124 PAGES
03 45 00 2.2.1 SRecycled Content for Fly Ash and
Pozzolan
2.2.1 SRecycled Content for Ground Iron
Blast-Furnace Slag
04 20 00 SD-02 Shop Drawings
3.4.1.1 G AEDetail Drawings
SD-03 Product Data
1.5.1 G ROHot Weather Procedures
1.5.2 G ROCold Weather Procedures
2.2.2 G AEClay or Shale Brick
2.2.3.2 G AEConcrete Masonry Units (CMU)
2.4.1.3 G ROCement
2.4.1.1 G ROCementitious Materials
SD-04 Samples
1.3.1.1 G AEMock-Up Panel
2.2.2 G AEClay or Shale Brick
2.4.1.4 GMasonry Mortar
2.6.2 GAnchors, Ties, and Bar
Positioners
SD-05 Design Data
2.1.2 G ROMasonry Compressive Strength
3.2.5 G ROBracing Calculations
SD-06 Test Reports
2.2.2.1.3Efflorescence Test
3.6.1Field Testing of Mortar
3.6.1.2Prism Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 124 PAGES
04 20 00 3.6.1.3Single-Wythe Masonry Wall
Water Penetration Test
SD-07 Certificates
1.3.2Special Masonry Inspector
Qualifications
2.2.2Clay or Shale Brick
2.2.3.2Concrete Masonry Units (CMU)
2.4.1.1Cementitious Materials
2.4.1.4Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
SD-11 Closeout Submittals
2.2.3.2.1 SRecycled Content
05 05 23.13 10 SD-03 Product Data
1.4.1Ultrasonic Inspection
SD-06 Test Reports
1.4.5Equipment Qualifications
3.4.1 G AEInspection Test Reports
05 05 23.16 SD-01 Preconstruction Submittals
3.2Welding Quality Assurance Plan
SD-03 Product Data
1.3 G ROWelding Procedure Qualifications
1.3.5Welder, Welding Operator, and
Tacker Qualification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 124 PAGES
05 05 23.16 1.3.6Inspector Qualification
1.3.2Previous Qualifications
1.3.3Pre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3 G AENondestructive Testing
05 12 00 SD-01 Preconstruction Submittals
1.5.1.1 G AEErection Drawings
SD-02 Shop Drawings
1.5.2 G AEFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.4.2 G AENon-Shrink Grout
2.3.3 G AETension Control Bolts
SD-06 Test Reports
2.6.2Class B Coating
2.3Bolts, Nuts, and Washers
3.7.2.2Weld Inspection Reports
3.7.3.1Bolt Testing Reports
3.7.5Embrittlement Test Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 124 PAGES
05 12 00 1.3AISC Fabrication Plant Quality
Certification
1.3AISC Erector Quality Certification
1.5.3.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
05 21 00 SD-01 Preconstruction Submittals
1.3.2Welder Qualification
SD-02 Shop Drawings
1.3.1 G AESteel Joist Framing
SD-03 Product Data
2.3 SRecycled Content Of Steel
Products
SD-05 Design Data
2.2 G AEDesign Calculations
SD-06 Test Reports
3.3Erection Inspection
3.3Welding Inspections
SD-07 Certificates
1.3.2Certification of Compliance
05 30 00 SD-02 Shop Drawings
1.3.5 G AEFabrication and Erection
Drawings
SD-03 Product Data
2.2 G AEAccessories
2.1 G AEDeck Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 124 PAGES
05 30 00 2.1.5Galvanizing Repair Paint
2.2.16Mechanical Fasteners
2.1.5Touch-Up Paint
1.3.3Welding Equipment
1.3.3Welding Rods and Accessories
SD-05 Design Data
2.1 G AEDeck Units
SD-07 Certificates
1.3.2Powder-Actuated Tool Operator
1.3.3Welder Qualifications
1.3.3Welding Procedures
1.3.4.1Fire Safety
1.3.4.2Wind Storm Resistance
1.3.1Manufacturer's Certificate
2.2.11Stud Manufacture's Certification
2.2.11Stud Manufacture's Test Reports
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products
05 40 00 SD-02 Shop Drawings
1.6.1 G AEFraming Components
SD-03 Product Data
2.1 G AEStuds, Joists
SD-05 Design Data
1.6.2 G ROMetal Framing Calculations
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 124 PAGES
05 40 00 1.4 G ROLoad-Bearing Cold-Formed Metal
Framing
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products
05 50 13 SD-02 Shop Drawings
2.4 G AEAngles and Plates
1.5.2 G AEInstallation Drawings
SD-03 Product Data
2.5 G AEFloor Hatch
2.1 GCertificates of Compliance
2.1 SRecycled Content
05 51 00 SD-02 Shop Drawings
2.2.1 G AEMetal Stair System
SD-07 Certificates
1.3.1 G ROWelding Procedures
1.3.1 G ROWelder Qualification
05 51 33 SD-02 Shop Drawings
2.3 G AELadders
SD-03 Product Data
2.3 G AELadders
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
1.3Fabricator Certification for Ships
Ladder Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 124 PAGES
05 52 00 SD-02 Shop Drawings
1.2.1 G AEFabrication Drawings
SD-05 Design Data
1.2.2 G AEStructural Design Calculations
SD-07 Certificates
1.4.1 G ROWelding Procedures
1.4.2 G ROWelder Qualification
05 73 13 SD-02 Shop Drawings
1.5.1 G AEDrawings
SD-03 Product Data
1.5.2 G AEManufacturer's Product Data
3.4 G ROMaintenance Instructions
SD-04 Samples
1.5.3 G AEManufacturer's Samples
SD-05 Design Data
1.5.4 G AEStructural Design Calculations
SD-11 Closeout Submittals
1.5.5 G ROCleaning and Maintenance
Instructions
1.6 G ROWarranty
06 10 00 SD-06 Test Reports
1.4.3Preservative-treated
SD-07 Certificates
1.11.1Certificates of Grade
06 20 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 124 PAGES
06 20 00 1.3 G AEDetail Drawings Indicating All
Wood Assemblies
SD-03 Product Data
2.2 G ROWood Products
SD-04 Samples
1.5 G AESamples
SD-07 Certificates
1.7.1.1 G ROCertificates of Grade
1.7.1.2 G ROCertified Sustainably Harvested
Wood
1.7.1.3 G ROIndoor Air Quality
SD-11 Closeout Submittals
2.2.3 SCertified Sustainably Harvested
Wood for Trim and Frames
2.2.4 SCertified Sustainably Harvested
Softwood Plywood
2.2.5 SCertified Sustainably Harvested
Hardwood Plywood
2.2.4 SVOC Content for Softwood
Plywood
2.2.5 SVOC Content for Hardwood
Plywood
2.7.1.2 SIndoor Air Quality for Non-aerosol
Adhesives
2.7.1.2 SIndoor Air Quality for Aerosol
Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 124 PAGES
06 20 00 2.2.6 SRecycled Content for
MDF/Particleboard
06 41 16.00 10 SD-02 Shop Drawings
1.5.2 G AEShop Drawings
2.9 G AEShop Drawings
3.1 G AEInstallation
SD-03 Product Data
2.1 G AEWood Materials
1.5.3 G ROCertification
SD-04 Samples
2.3 G AEPlastic Laminates
2.6 G AECabinet Hardware
SD-07 Certificates
1.5 G ROQuality Assurance
3.1 G ROLaminate Clad Casework
SD-11 Closeout Submittals
1.3 SULE Greenguard
1.3 SVolatile Organic Compound
(VOC) Content
1.3 SRecycled Content
07 05 23 SD-01 Preconstruction Submittals
1.4 G ROWork Plan
SD-03 Product Data
2.2 G ROThermal Imaging Camera
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 124 PAGES
07 05 23 3.2 G ROEnvelope Surface Area
Calculations
SD-07 Certificates
1.6.2.1Pressure Test Agency
1.6.2.2Thermographer Qualifications
1.6.3Test Instruments
1.6.3Date Of Last Calibration
SD-06 Test Reports
3.5 G ROPressure Test Procedures
3.5.6 G AEAir Leakage Test Report
3.6.5 G AEDiagnostic Test Report
07 12 00 SD-03 Product Data
1.3 G AEManufacturer's Standard Details
2.7 GProtection Board
2.4 G AEMembrane Fabric
1.5.2.2 G AEReinforcement Fabrics
SD-07 Certificates
2.4 G ROMembrane Fabric
1.5.2.2 G ROReinforcement Fabrics
2.7 G ROProtection Board
2.1.1 G ROCertificates of Compliance
2.1.2 G ROCertificates of Compliance
SD-08 Manufacturer’s Instructions
3.3.5.1Installation Instructions
07 19 00 SD-03 Product Data
2.2 G AEWater Repellents
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 124 PAGES
07 19 00 SD-06 Test Reports
1.3.2 G AEWater Absorption
2.3.1 G AEAccelerated Weathering
2.3.1 G AEResistance to Chloride Ion
Penetration
1.3.2 G AEMoisture Vapor Transmission
2.3.1 G AEMoisture Vapor Transmission
2.3.1 G AEScaling Resistance
1.3.2 G AEWater Penetration and Leakage
SD-07 Certificates
1.3.1 G ROManufacturer's Qualifications
1.3.1 G ROApplicator's Qualifications
1.3.3 G ROEvidence of Acceptable Variation
1.12 G ROWarranty
SD-08 Manufacturer’s Instructions
3.4 G ROApplication
1.7.1 G ROSafety Data Sheets
07 21 13 SD-03 Product Data
1.3 G AEManufacturer's Standard Details
2.2 G AEBlock or Board Insulation
2.3 G AEVapor Retarder
2.4 G AEPressure Sensitive Tape
2.5 G AEProtection Board or Coating
2.6 G AEAccessories
SD-07 Certificates
2.2 G ROBlock or Board Insulation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 124 PAGES
07 21 13 2.3 G ROVapor Retarder
1.8 G ROSpecial Warranties
1.8 G ROSpecial Warranties
SD-08 Manufacturer’s Instructions
2.6.1 G ROAdhesive
SD-11 Closeout Submittals
1.5 SULE Greenguard
2.1.1 SVolatile Organic Compound
(VOC) Content
2.1.2 SRecycled Content
07 21 16 SD-03 Product Data
2.2Blanket Insulation
2.3Accessories
SD-08 Manufacturer’s Instructions
3.3.1Insulation
SD-11 Closeout Submittals
2.1.1 SRecycled Content for Insulation
Materials
2.1.2 SReduce Volatile Organic
Compounds (VOC)
07 22 00 SD-02 Shop Drawings
1.3 G AEInsulation Board Layout
1.3 G AEVerification of Existing Conditions
SD-03 Product Data
2.2 G AEInsulation
1.4 G AECover Board
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 124 PAGES
07 22 00 2.5 G AEFasteners
SD-06 Test Reports
2.3.1 GFlame Spread Rating
SD-07 Certificates
2.1.1 G ROVolatile Organic Compounds
(VOC) Content
1.6 G ROInstaller Qualifications
SD-08 Manufacturer’s Instructions
2.5 G ROFasteners
2.2 G ROInsulation
SD-11 Closeout Submittals
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .