This document provides information on a federal contract opportunity for the renovation of Building 1600 at Scott Air Force Base. The U.S. Army Corps of Engineers Louisville District intends to issue a Request for Proposal for the complete interior and exterior renovation of the 314,000 square foot Air Mobility Command Headquarters facility. The scope of work includes replacement of all mechanical, electrical, plumbing, and communications systems. The contract duration will be 1260 calendar days. The solicitation will be posted on beta.sam.gov as a firm-fixed-price contract with an anticipated value between $100-250 million. The North American Industry Classification System code is 236220. This will be a full and open competition following a trade-off best value selection process. Offerors must have an active System for Award Management registration to be eligible for award. The proposal due date will be included in the posted solicitation.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR20R0087 for the Building 1600 renovation, AMC Headquarters, Scott Air Force Base, IL is hereby amended as follow s:
SEE CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912QR20R0087
X 9B. DATED (SEE ITEM 11)
05-Apr-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Jul-2021
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR20R0087-0005
W912QR20R0087
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0005
General Information:
1. The proposal due date has been revised to Monday, 26 July 2021 at 1400 HRS local time.
Specification and Plan Sections:
2. The following Specification Sections have been revised and replaced in their entirety:
27 10 00 Building Telecommuniciations Cabling System
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 23-Jul-2021 02:00 PM to 26-Jul-2021 02:00 PM.
(End of Summary of Changes)
RENOVATE BUILDING 1600Controlled Unclassified Information (CUI) W912QR-XX-R-XXXX
SCOTT AFB, IL AMENDMENT 0005 USACE - LOUISVILLE
SECTION TABLE OF CONTENTS
DIVISION 27 - COMMUNICATIONS
SECTION 27 10 00
BUILDING TELECOMMUNICATIONS CABLING SYSTEM
08/11 Revised 08/17 building telecommunications cabling systems using a physical star network topology for transporting telecommunications signals within a building.
PART 1 GENERAL
1.1 REFERENCES
1.2 RELATED REQUIREMENTS
1.3 DEFINITIONS
1.3.1 375th CS
1.3.2 Campus Distributor (CD)
1.3.3 Building Distributor (BD)
1.3.4 Cable Vault (CV)
1.3.5 Consolidation Points (CP)
1.3.6 Floor Distributor (FD)
1.3.7 Entrance Facility (EF) (Telecommunications)
1.3.8 Equipment Room (ER) (Telecommunications)
1.3.9 Open Cable
1.3.10 Open Office
1.3.11 OSP
1.3.12 Pathway
1.3.13 Telecommunications Room (TR)
1.3.14 WAO
1.3.15 Color Definitions
1.4 SYSTEM DESCRIPTION
1.4.1 General
1.4.1.1 Existing Cabling
1.4.2 Demolition
1.4.3 New Work
1.4.3.1 Seismic Requirements
1.4.4 Spaces
1.4.4.1 Building Entrance Facility (BEF)
1.4.4.2 Cable Vault (CV)
1.4.4.3 Telecom Room
1.4.5 Pathways
1.4.5.1 Conduits and Sleeves
1.4.5.2 Micro-duct
1.4.5.3 Horizontal Ladder Runway
1.4.5.4 Vertical Ladder Runway
1.4.5.5 Basket Tray
1.4.5.6 Consolidation Points (CP)
1.4.6 Cable
1.4.6.1 Outside Plant Copper Cable
1.4.6.2 Copper Riser Cable
1.4.6.3 Horizontal Copper Cabling
1.4.6.4 Air-Blown Fiber Optic Cable
SECTION 27 10 00 Page 1 Controlled Unclassified Information (CUI)
1.4.6.5 Conventional Fiber Optic Riser Cable
1.4.6.6 Horizontal Fiber Optic Cable
1.5 SUBMITTALS
1.6 QUALITY ASSURANCE
1.6.1 Shop Drawings
1.6.1.1 Telecommunications Drawings
1.6.1.2 Telecommunications Space Drawings
1.6.2 Telecommunications Qualifications
1.6.2.1 Telecommunications Contractor
1.6.2.2 Key Personnel
1.6.2.3 Minimum Manufacturer Qualifications
1.6.3 Test Plan
1.6.4 Regulatory Requirements
1.6.5 Standard Products
1.6.5.1 Alternative Qualifications
1.6.5.2 Material and Equipment Manufacturing Date
1.7 DELIVERY AND STORAGE
1.8 ENVIRONMENTAL REQUIREMENTS
1.9 WARRANTY
1.10 MAINTENANCE
1.10.1 Operation and Maintenance Manuals
1.10.2 Record Documentation
1.10.3 Spare Parts
PART 2 PRODUCTS
2.1 COMPONENTS
2.2 Seismic Hardware
2.3 CABLE VAULT HARDWARE
2.4 TELECOMMUNICATIONS PATHWAY
2.4.1 Telecommunications Communications Conduits
2.4.2 Telecommunications Cable Tray, Runway
2.4.2.1 Wire Mesh Basket Tray
2.4.2.2 Ladder Rack Cable Runway
2.4.2.3 Telecommunications Pathways Bonding Hardware
2.5 TELECOMMUNICATIONS CABLING
2.5.1 Backbone Cabling
2.5.1.1 Backbone Copper
2.5.1.2 Backbone Optical Fiber
2.5.2 Horizontal Cabling
2.5.2.1 Horizontal Copper
2.5.2.2 Horizontal Optical Fiber
2.6 TELECOMMUNICATIONS SPACES
2.6.1 Backboards
2.6.2 Equipment Support Frame
2.6.3 Connector Blocks
2.6.4 Copper Patch Panels
2.6.4.1 Modular to 110 Block Patch Panel
2.7 Fiber Optic Components
2.7.1 Fiber Optic Patch Panel
2.7.2 Optical Fiber Termination Cassettes
2.7.3 Optical Fiber Termination Adapter Plates
2.7.4 Fiber Optic Splice Panel
2.7.5 Fiber Optic Splice Hardware
2.7.6 Fiber Optic Backbone Terminations
2.8 Wire Management
2.8.1 Vertical Wire Managers
2.8.2 Horizontal Wire Managers
2.8.3 Wall Mounted 110 Wire Management
SECTION 27 10 00 Page 2
2.9 TELECOMMUNICATIONS OUTLET/CONNECTOR ASSEMBLIES
2.9.1 Copper Category 6 Connectors
2.9.2 Optical Fiber Adapters(Couplers)
2.9.3 Optical Fiber Connectors
2.9.4 Cover Plates
2.9.5 Surface Mount Boxes
2.10 CABLE ASSEMBLIES
2.10.1 Copper Assemblies
2.10.1.1 STP Red Copper Assemblies
2.10.2 Copper Cable Links
2.10.3 Fiber Optic Assemblies
2.11 GROUNDING AND BONDING PRODUCTS
2.11.1 Telecommunications Main Ground Bar (TMGB)
2.11.2 Telecommunications Ground Bar (TGB)
2.11.3 Telecommunications Conductor
2.11.3.1 Telecommunications Bonding Backbone (TBB) Conductor Sizing
2.12 FIRESTOPPING MATERIAL
2.13 Sub Title
2.13.1 MANUFACTURER'S NAMEPLATE
2.13.2 Field Fabricated Nameplates
2.13.3 Field Labeling Materials
2.14 TESTS, INSPECTIONS, AND VERIFICATIONS
2.14.1 Factory Reel Tests
2.15 Velcro Tie Wraps
PART 3 EXECUTION
3.1 INSTALLATION
3.2 TELECOMMUNICATIONS SPACES
3.2.1 Building Entrance Room
3.2.1.1 Primary Entrance Room (1418)
3.2.1.2 Secondary Entrance Room (1108)
3.2.2 Cable Vault (CV)
3.2.3 Building Distributor (BD)
3.2.4 Telecommunications Room (TR)
3.2.5 Telecommunications Space Termination
3.2.5.1 110 Connector Blocks
3.2.5.2 Copper Patch Panels
3.2.5.3 Fiber Optic Termination Panels
3.2.5.4 Equipment Support Frames
3.3 TELECOMMUNICATIONS PATHWAY INSTALLATIONS
3.3.1 Service Entrance Conduit, Underground
3.3.2 Telecommunications Conduits
3.3.2.1 Work Area Outlet Pathways
3.3.3 Micro-duct
3.3.4 Cable Tray, Runway Installation
3.3.4.1 Wire Basket Telecommunications Cable Tray
3.3.4.2 Consolidation Points (CPs)
3.3.4.3 Ladder Rack Type Cable Runway
3.3.4.4 Pull Cords
3.4 Cabling
3.4.1 Backbone Cable
3.4.2 Horizontal Cabling
3.4.2.1 Category 6 Horizontal Cabling
3.4.2.2 OM-4 Multi-Mode Fiber Optic Horizontal Cabling
3.5 Work Area Outlets (WAOs)
3.5.1 Consolidation Point (CP)Copper Cabling
3.5.2 WAO Configurations
3.5.3 Terminations
SECTION 27 10 00 Page 3
3.5.4 Cables
3.6 FIRE WALL PENETRATIONS
3.7 Grounding and Bonding
3.7.1 Building Earth Electrode Subsystem (EES)
3.7.2 Telecommunications Room Signal Ground
3.7.3 Telecommunications Rack and Supporting Structure Bonding
3.8 LABELING
3.8.1 Labels
3.8.1.1 Pathways
3.8.1.2 Backbone Cables
3.8.1.3 Cable
3.8.1.4 Patch Panels
3.8.1.5 Faceplates
3.8.1.6 Grounding and Bonding
3.8.1.7 Firestopping
3.9 FIELD APPLIED PAINTING
3.9.1 Painting Backboards
3.10 FIELD FABRICATED NAMEPLATE MOUNTING
3.11 TESTING
3.11.1 Telecommunications Cabling Testing
3.11.1.1 Inspection
3.11.1.2 Test Plan and Post Installation Test Results
3.11.1.3 Verification Tests
3.11.1.4 Performance Tests
3.11.1.5 Final Verification Tests
-- End of Section Table of Contents --
SECTION 27 10 00 Page 4
SECTION 27 10 00
BUILDING TELECOMMUNICATIONS CABLING SYSTEM
08/11
Revised 08/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D709 (2017) Standard Specification for Laminated Thermosetting Materials
ELECTRONIC COMPONENTS INDUSTRY ASSOCIATION (ECIA)
ECIA EIA/ECA 310-E (2005) Cabinets, Racks, Panels, and Associated Equipment
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms
INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)
ICEA S-83-596 (2016) Indoor Optical Fiber Cables
ICEA S-90-661 (2012) Category 3, 5, & 5e Individually Unshielded Twisted Pair Indoor Cables for Use in General Purpose and LAN Communications Wiring Systems Technical Requirements
NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION (NECA)
NECA/BICSI 568 (2006) Standard for Installing Building Telecommunications Cabling
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
ANSI/NEMA WC 66 (2013) Performance Standard for Category 6 and Category 7 100 Ohm Shielded and Unshielded Twisted Pairs
NEMA VE 1 (2017) Metal Cable Tray Systems
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;
TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;
SECTION 27 10 00 Page 5
TIA 17-11; TIA 17-12; TIA 17-13; TIA
17-14; TIA 17-15; TIA 17-16; TIA 17-17 )
National Electrical Code
TELECOMMUNICATIONS INDUSTRY ASSOCIATION (TIA)
TIA-1152 (2009) Requirements for Field Test Instruments and Measurements for Balanced Twisted-Pair Cabling
TIA-455-21 (1988a; R 2012) FOTP-21 - Mating Durability of Fiber Optic Interconnecting Devices
TIA-526-14 (2015c) OFSTP-14A Optical Power Loss Measurements of Installed Multimode Fiber Cable Plant
TIA-526-7 (2015a) OFSTP-7 Measurement of Optical Power Loss of Installed Single-Mode Fiber Cable Plant
TIA-568-C.0 (2009; Add 1 2010; Add 2 2012) Generic Telecommunications Cabling for Customer Premises
TIA-568-C.1 (2009; Add 2 2011; Add 1 2012) Commercial Building Telecommunications Cabling Standard
TIA-568-C.2 (2001) Commercial Building Telecommunications Cabling Standard - Part 2: Balanced Twisted Pair Cabling Components
TIA-568-C.3 (2008; Add 1 2011) Optical Fiber Cabling Components Standard
TIA-569 (2015d) Commercial Building Standard for Telecommunications Pathways and Spaces
TIA-606 (2017c) Administration Standard for the Telecommunications Infrastructure
TIA-607 (2015c; Addendum 1 2017) Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises
TIA/EIA-598 (2014D; Add 2 2018) Optical Fiber Cable Color Coding
TIA/EIA-604-10 (2002a) FOCIS 10 Fiber Optic Connector Intermateability Standard - Type LC
TIA J-STD-607-A (2002) Commercial Building Grounding (Earthing)and Bonding Requirements for Telecommunications
TIA/EIA-598 (2014D; Add 2 2018) Optical Fiber Cable Color Coding
SECTION 27 10 00 Page 6
TIA/EIA-604-5-B (2015) FOCUS 5 Fiber Optic Connector Intermateability Standard - Type MPO
TIA/EIA-604-10 (2002a) FOCIS 10 Fiber Optic Connector Intermateability Standard - Type LC
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-STD-188-124 (1998; Rev B; Notice 2 1998; Notice 3 2000) Grounding, Bonding and Shielding for Common Long Haul/Tactical Communications Systems, Including Ground Based Communications - Electronics Facilities and Equipments
MIL-HDBK-419 (1987; Rev A) Grounding, Bonding, and Shielding for Electronic Equipments and Facilities Volumes 1 of 2 Basic Theory
UFC 3-580-01 (2016; Change 1) TELECOMMUNICATIONS
INTERIOR INFRASTRUCTURE PLANNING AND DESIGN
U.S. FEDERAL COMMUNICATIONS COMMISSION (FCC)
FCC Part 68 Connection of Terminal Equipment to the Telephone Network (47 CFR 68)
UNDERWRITERS LABORATORIES (UL)
UL 1286 (2008; R thru 2010) Office Furnishings
UL 1666 (2007) Test for Flame Propagation Height of Electrical and Optical-Fiber Cables Installed Vertically in Shafts
UL 1863 (2004; Rev thru Aug 2008) UL Standard for Safety Communication Circuit Accessories
UL 444 (2008; Reprint Apr 2010) Communications Cables
UL 467 (2013; Reprint Jun 2017) UL Standard for Safety Grounding and Bonding Equipment
UL 50 (2015) UL Standard for Safety Enclosures for Electrical Equipment, Non-Environmental Considerations
UL 514C (1996; R 1998 - R 2009) Nonmetallic Outlet Boxes, Flush-Device Boxes, and Covers
UL 723 (2018) UL Standard for Safety Test for Surface Burning Characteristics of Building Materials
UL 969 (2017; Reprint Mar 2018) UL Standard for Safety Marking and Labeling Systems
SECTION 27 10 00 Page 7
U.S. AIR FORCE (USAF)
AFSSI 7703 Air Force Systems Security Instruction (AFSSI) 7703 dated August 26, 2008 with ESIM 2009-1 Supplements
NATIONAL SECURITY TELECOMMUNICATIONS AND INFORMATION SYSTEMS
SECURITY (NSTISS)
NSTISSAM/2-95 National Security Telecommunications and Information Systems Security Advisory Memorandum
1.2 RELATED REQUIREMENTS
Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM and Section 33 82 00 TELECOMMUNICATIONS, OUTSIDE PLANT (OSP), apply to this section with additions and modifications specified herein.
1.3 DEFINITIONS
Unless otherwise specified or indicated, electrical and electronics terms used in this specification shall be as defined in TIA-568-C.1 , TIA-568-C.2 , TIA-568-C.3 , TIA-569 , TIA-606 and IEEE 100 and herein.
1.3.1 375th CS
375th Communications Squadron
1.3.2 Campus Distributor (CD)
A distributor from which the campus backbone cabling emanates.
(International expression for main cross-connect (MC).)
1.3.3 Building Distributor (BD)
A distributor in which the building backbone cables terminate and at which connections to the campus backbone cables may be made. (International expression for intermediate cross-connect (IC).)
1.3.4 Cable Vault (CV)
A below grade space use to transition from under ground cable ducts into ground level communications spaces.
1.3.5 Consolidation Points (CP)
CPs are intermediate termination points for UTP cabling, located in the ceiling, for termination of unclassified copper cables to form a permanent link. 48 port patch panels shall be bracket mounted to the horizontal basket tray system.
1.3.6 Floor Distributor (FD)
A distributor used to connect horizontal cable and cabling subsystems or equipment. (International expression for horizontal cross-connect (HC).)
SECTION 27 10 00 Page 8
1.3.7 Entrance Facility (EF) (Telecommunications)
An entrance to the building for both private and public network service cables (including wireless) including the entrance point at the building wall and continuing to the equipment room.
1.3.8 Equipment Room (ER) (Telecommunications)
An environmentally controlled centralized space for telecommunications equipment that serves the occupants of a building. Equipment housed therein is considered distinct from a telecommunications room because of the nature of its complexity.
1.3.9 Open Cable
Cabling that is not run in a raceway as defined by NFPA 70 . This refers to cabling that is "open" to the space in which the cable has been installed and is therefore exposed to the environmental conditions associated with that space.
1.3.10 Open Office
A floor space division provided by furniture, moveable partitions, or other means instead of by building walls.
1.3.11 OSP
Referring to Outside Plant systems.
1.3.12 Pathway
A physical infrastructure utilized for the placement and routing of telecommunications cable.
1.3.13 Telecommunications Room (TR)
An enclosed space for housing telecommunications equipment, cable, terminations, and cross-connects. The room is the recognized cross-connect between the backbone cable and the horizontal cabling.
1.3.14 WAO
Work Area Outlet. Communications outlets which may include copper and or fiber optic cable to connect end devices.
1.3.15 Color Definitions
Space communications requirements are identified by color. The commnuications WAO type descriptions may be found on drawings and in section 3.5.2 WAO Configurations. WAOs to be included in each zone are as follows:
a. Green Zone: Spaces shall include Type 1 WAO.
b. Red Zone: Spaces shall include Type 2 WAO.
c. Yellow Zone: Spaces shall include Type 3 WAO.
Cafe Zone and miscellaneous outlets should be as described in Section
3.5.2 and as shown on drawings.
SECTION 27 10 00 Page 9
1.4 SYSTEM DESCRIPTION
1.4.1 General
Scott AFB 1600 building is a 3 story facility with 314,000 SF of work space and will support approximately 2,100 personnel. This building is to completely gutted and rebuilt from the existing building skeleton. The communications scope will be a complete replacement/upgrade of all communications infrastructure inside the building.
1.4.1.1 Existing Cabling
Currently there is a quantity of copper and fiber optic cabling that passes through or terminates within building 1600 which feeds building on base which are "down stream". The 375th Comm Squadron is taking measures to move all cabling and connection outside of building 1600 to mitigate any communications outages to buildings throughout the base due to the demolition which will take place within building 1600. The contractor shall closely coordinate with the 375th CS prior to proceeding with any work in the building to ensure there are no disruptions in service to any other buildings on base as a result of their work.
1.4.2 Demolition
As stated above, building 1600 will be demolished to the existing framework. All communications infrastructure shall be removed to the nearest existing man hole. Outside Plant pathways shall be preserved as noted on plans.
1.4.3 New Work
All new communications work included within this specification will follow references included within: UFC 3-580-01 , AFSSI 7703 , NSTISSAM/2-95 . The building telecommunications cabling and pathway system shall include permanently installed backbone and horizontal cabling, horizontal and backbone pathways, service entrance facilities, work area pathways, telecommunications outlet assemblies, conduit, raceway, and hardware for splicing, terminating, and interconnecting cabling necessary to transport telephone and data (including LAN) between equipment items in a building. The horizontal system shall be wired in a star topology from the telecommunications work area to the floor distributor or campus distributor at the center or hub of the star. The backbone cabling and pathway system includes intrabuilding and interbuilding interconnecting cabling, pathway, and terminal hardware. The intrabuilding backbone provides connectivity from the floor distributors to the building distributors or to the campus distributor and from the building distributors to the campus distributor as required. The interbuilding backbone system provides connectivity between the campus distributors and is specified in Section 33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP).
Provide telecommunications pathway systems referenced herein as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.
1.4.3.1 Seismic Requirements
The renovation to Building 1600 is being done in order to bring it up to current seismic standards. It has been determined that the building falls in a Category E area. All communications equipment installed within the building shall meet category E seismic reinforcement requirements and
UFC 3-580-01 .
SECTION 27 10 00 Page 10
1.4.4 Spaces
1.4.4.1 Building Entrance Facility (BEF)
There will be (2) EFs provided in building 1600. They will include a primary EF in room 1418 and a secondary in room 1108. EFs will contain lightning protection, equipment racks, copper and fiber optic distribution hardware, Telecommunications main grounding hardware, etc. required to distribute communications signals from incoming cabling to building systems infrastructure. The EF shall include plywood on all walls, free standing equipment racks with vertical wire management and an overhead ladder rack system to mount any associated communications hardware to make cable transitions. Pathways and fire stop sleeves shall provide a means to route cable into the building.
1.4.4.2 Cable Vault (CV)
There will be (2) 8'x8'x8' cable vaults provided for the facility. Cable vaults will be located beneath each of the (2) Entrance Facility spaces.
All OSP communications copper and fiber cable will enter/exit the facility via cable vaults.
1.4.4.3 Telecom Room
Unclassified and Classified TRs will be located throughout the building on each floor as shown on plans. TRs will be stacked from floor to floor as best as possible to keep routing of risers and utilities manageable. Sets of 7'x19" free standing equipment racks and cabinets shall be included to terminate and patch riser and horizontal copper and fiber optic cables.
All racks shall be equipped with vertical and horizontal wire management in each TR. A minimum of 8' of dedicated wall space shall be provided for wall security and ancillary equipment, and cable terminations.
1.4.5 Pathways
1.4.5.1 Conduits and Sleeves
Conduits will be used to route backbone cable, micro-duct and in certain instances horizontal cabling. Sleeves will be used primarily as wall & floor penetrations.
1.4.5.2 Micro-duct
Micro-Duct shall be provided from the OSP MHs to both East and West BEFs for the installation of OSP fiber optic cabling. Micro-Duct will terminate into the rack mounted fiber optic panels located in the BEF racks.
Micro-Duct shall be financed and installed by the Government.
1.4.5.3 Horizontal Ladder Runway
All communications spaces including the EF and TRs shall include a telecommunications ladder rack runway system installed above racks for routing of communications cable within each equipment space. Ladder rack runways will consist of two longitudinal side members connected by individual transverse members. Systems shall include splice assemblies, junction assemblies, connector plates, bends, supports, drop out and grounding straps as required in all equipment rooms.
SECTION 27 10 00 Page 11
1.4.5.4 Vertical Ladder Runway
Vertical ladder runway will be installed within each communications EF or TR to route copper and fiber optic riser cables vertically up walls where needed. Vertical ladder runway should be a minimum of 18" wide and be permanently attached to plywood.
1.4.5.5 Basket Tray
A Basket type cable tray system for all horizontal cable will be included for routing of cable from TRs to Work Area Outlets. Basket tray will be provided overhead throughout the building and under floor in spaces where raised access floor is provided. This allows for differing classifications and types of cables to be pulled in straight lines for ease and cross at primary locations. All basket trays shall be sized to accommodate cable quantities day 1 and allow for a 25% expansion. Total calculated cable tray fills shall not exceed a maximum 40% total fill. Separate basket trays shall be provided for unclassified and classified cable systems.
1.4.5.6 Consolidation Points (CP)
Consolidation Points will be used for horizontal cable distribution. CPs will include prefabricated brackets which will be mounted in horizontal basket tray above ceilings and include 48-port termination panels for unclassified copper cabling. CPs will be spaced per outlet density and provide for 10% growth. Permanent link cable will be installed from TR racks to ceiling CPs throughout the facility. CPs and Cat-6 trunk cabling from CPs to TRs shall be provided, installed and tested by the contractor.
1.4.6 Cable
1.4.6.1 Outside Plant Copper Cable
One each primary and secondary 200 pair OSP copper cable will be installed for the nearest existing site man hole on the east & west side of building 1600. In MHs these 200 pair cables shall be spliced into existing copper cables which were left with vacant pairs from the B1600 demolition. In each BEF incoming OSP cable shall be spliced through Lightning protection and terminate on wall mounted 110 blocks for cross connection to riser cables.
a. All incoming OSP copper cabling, splicing, lightning protection and wall mounted 110 building demarcation point shall be furnished, provided and installed by the Government.
b. Contractor shall provide wall mounted 110 building riser termination hardware and terminate contractor furnished and installed copper riser cable for cross connection.
1.4.6.2 Copper Riser Cable
Primary and Secondary 100 Pair copper cables will be installed from the each of the BEFs to floor distributors on the 1st floor. The copper cables which route in ducts below grade shall be rated for installation in wet spaces. These cables shall terminate on wall mounted 110 hardware on the first floor. From the first floor a 50 pair copper riser cable will be installed to each TR in the riser stack. these cable will terminate 48 port rack mount patch panels in TRs. Additionally, a 100-pair riser cable
SECTION 27 10 00 Page 12 shall be routed to the third 3rd floor secure TR space. This cable will be terminated within the secure TR on (2) rack mounted 1U 48-port patch panels. All unused pairs of copper cable on 110 hardware shall be bonded in the secure TR to the telecommunications grounding system to ensure no communications signal is carried outside of the secure TR.
1.4.6.3 Horizontal Copper Cabling
Horizontal unclassified copper cable shall consist of green 4-pair Category 6 cable. CP trunk and home run horizontal copper cabling shall be provided, installed and tested by the contractor. Work area link cabling shall be installed by the government.
a. In unclassified spaces Unshileded Twisted Pair (UTP)copper cable shall be provided.
b. In classified spaces Shileded Twisted Pair (STP)copper cable shall be provided for unclassified connections.
1.4.6.4 Air-Blown Fiber Optic Cable
Primary and Secondary sets of Single Mode Air-Blown fiber optic cable shall be installed in for incoming service to the facility. Building fiber optic feeds shall consist of primary and secondary feeds of 72-Strand single mode fiber optic cabling. All incoming OSP air blown fiber optic cabling shall be furnished and installed by the Government.
1.4.6.5 Conventional Fiber Optic Riser Cable
Building fiber optic riser cable shall consist of primary and redundant feeds of unclassified 24-strand single mode fiber optic cable. Primary and secondary fiber optic cable runs shall each be home run from BEF to each TR. All strands of each cable shall be terminated with LC connectors in rack mounted fiber optic termination panels.
1.4.6.6 Horizontal Fiber Optic Cable
All horizontal work area fiber optic cable will consist of OM-4 Multi-Mode cable, home run from rack or wall mounted fiber panels in classified spaces to Work Area Outlets in each dedicated space. Horizontal fiber cables will be terminated with duplex LC connectors on both ends.
Horizontal fiber optic cabling shall be Contractor furnished and installed. Horizontal 4-strand OM4 fiber optic cable may be used for green and red outlets. For yellow locations each fiber optic cable shall be individual 2-strand cables.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29.00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00.00 06 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Telecommunications drawings; G , AE
SECTION 27 10 00 Page 13
Telecommunications Space Drawings; G , AE
In addition to Section 01 33 00.00 06 SUBMITTAL PROCEDURES, provide shop drawings in accordance with paragraph SHOP DRAWINGS.
SD-03 Product Data
Telecommunications cabling (backbone and horizontal); G , AE
Copper Patch panels; G , AE
Telecommunications outlet/connector assemblies; G , AE
Equipment support frame; G , AE
Connector Blocks; G , AE
Fiber Optic Components; G, AE
Cable Assemblies; G, AE
Telecommunications Main Ground Bar (TMGB); G, AE
Telecommunications Ground Bar (TGB); G, AE
Spare Parts; G
Submittals shall include the manufacturer's name, trade name, place of manufacture, and catalog model or number. Include performance and characteristic curves. Submittals shall also include applicable federal, military, industry, and technical society publication references. Should manufacturer's data require supplemental information for clarification, the supplemental information shall be submitted as specified in paragraph REGULATORY REQUIREMENTS and as required in Section
01 33 00.00 06 SUBMITTAL PROCEDURES.
SD-06 Test Reports
Test Plan and Post Installation Test Results; G
Telecommunications cabling testing; G
SD-07 Certificates
Telecommunications Contractor Qualifications; G , AO
Key Personnel Qualifications; G, AO
Manufacturer Qualifications; G, AO
Test plan; G
SD-09 Manufacturer's Field Reports
Factory reel tests; G
SD-10 Operation and Maintenance Data
SECTION 27 10 00 Page 14
Telecommunications cabling and pathway system Data Package 5; G
SD-11 Closeout Submittals
Record Documentation; G
1.6 QUALITY ASSURANCE
1.6.1 Shop Drawings
In exception to Section 01 33 00.00 06 SUBMITTAL PROCEDURES, submitted shop drawings shall be a minimum of 14 by 20 inches in size using a minimum scale of 1/8 inch per foot, except as specified otherwise.
Include wiring diagrams and installation details of equipment indicating proposed location, layout and arrangement, control panels, accessories, piping, ductwork, and other items that must be shown to ensure a coordinated installation. Wiring diagrams shall identify circuit terminals and indicate the internal wiring for each item of equipment and the interconnection between each item of equipment. Drawings shall indicate adequate clearance for operation, maintenance, and replacement of operating equipment devices. Submittals shall include the nameplate data, size, and capacity. Submittals shall also include applicable federal, military, industry, and technical society publication references.
1.6.1.1 Telecommunications Drawings
Provide registered communications distribution designer (RCDD) approved, drawings in accordance with TIA-606 . The identifier for each termination and cable shall appear on the drawings. Drawings shall depict final telecommunications installed wiring system infrastructure in accordance with TIA-606 . The drawings should provide details required to prove that the distribution system shall properly support connectivity from the EF telecommunications and ER telecommunications, CD's, BD's, and FD's to the telecommunications work area outlets. Provide a plastic laminated schematic of the as-installed telecommunications cable system showing cabling, CD's, BD's, FD's, and the EF and ER for telecommunications keyed to floor plans by room number. Mount the laminated schematic in the EF telecommunications space as directed by the Contracting Officer. The following drawings shall be provided as a minimum:
a. T1 - Layout of complete building per floor - Building Area/Serving Zone Boundaries, Backbone Systems, and Horizontal Pathways. Layout of complete building per floor. The drawing indicates location of building areas, serving zones, vertical backbone diagrams, telecommunications rooms, access points, pathways, consolidation points, grounding system, and other systems that need to be viewed from the complete building perspective.
b. T2 - Serving Zones/Building Area Drawings - Drop Locations and Cable Identification (ID’S). Shows a building area or serving zone. These drawings show drop locations, telecommunications rooms, access points and detail call outs for common equipment rooms and other congested areas.
c. T4 - Typical Detail Drawings - Faceplate Labeling, Firestopping, Americans with Disabilities Act (ADA), Safety, Department of Transportation (DOT). Detailed drawings of symbols and typicals such as faceplate labeling, faceplate types, faceplate population
SECTION 27 10 00 Page 15 installation procedures, detail racking, and raceways.
1.6.1.2 Telecommunications Space Drawings
Provide T3 drawings in accordance with TIA-606 that include telecommunications rooms plan views, pathway layout (cable tray, racks, ladder-racks, etc.), mechanical/electrical layout, and cabinet, rack, backboard and wall elevations. Drawings shall show layout of applicable equipment including incoming cable stub or connector blocks, building protector assembly, outgoing cable connector blocks, patch panels and equipment spaces and cabinet/racks. Drawings shall include a complete list of equipment and material, equipment rack details, proposed layout and anchorage of equipment and appurtenances, and equipment relationship to other parts of the work including clearance for maintenance and operation. Drawings may also be an enlargement of a congested area of T1 or T2 drawings.
1.6.2 Telecommunications Qualifications
Work under this section shall be performed by and the equipment shall be provided by the approved telecommunications contractor and key personnel.
Qualifications shall be provided for: the telecommunications system contractor, the telecommunications system installer, and the supervisor (if different from the installer). A minimum of 30 days prior to installation, submit documentation of the experience of the telecommunications contractor and of the key personnel.
1.6.2.1 Telecommunications Contractor
The telecommunications contractor shall be a firm which is regularly and professionally engaged in the business of the applications, installation, and testing of the specified telecommunications systems and equipment.
The telecommunications contractor shall demonstrate experience in providing successful telecommunications systems within the past 3 years of similar scope and size. Submit documentation for a minimum of three and a maximum of five successful telecommunication system installations for the telecommunications contractor. Contractor and contractor's personnel shall be factory trained and certified by manufacturer of proposed system and be capable of providing extended warranty for project.
1.6.2.2 Key Personnel
Provide key personnel who are regularly and professionally engaged in the business of the application, installation and testing of the specified telecommunications systems and equipment. There may be one key person or more key persons proposed for this solicitation depending upon how many of the key roles each has successfully provided. Each of the key personnel shall demonstrate experience in providing successful telecommunications systems within the past 3 years.
Supervisors and installers assigned to the installation of this system or any of its components shall be Building Industry Consulting Services International (BICSI) Registered Cabling Installers, Technician Level.
Submit documentation of current BICSI certification for each of the key personnel.
Supervisors and installers assigned to the installation of this system or any of its components shall have a minimum of 5 years experience in the installation of the specified copper and fiber optic cable and
SECTION 27 10 00 Page 16 components. They shall have factory or factory approved certification from each equipment manufacturer indicating that they are qualified to install and test the provided products. Certifications shall not be older than 12 months and shall remain current during the project. Submit documentation for a minimum of three and a maximum of five successful telecommunication system installations for each of the key personnel.
Documentation for each key person shall include at least two successful system installations provided that are equivalent in system size and in construction complexity to the telecommunications system proposed for this solicitation. Include specific experience in installing and testing telecommunications systems and provide the names and locations of at least two project installations successfully completed using optical fiber and copper telecommunications cabling systems. All of the existing telecommunications system installations offered by the key persons as successful experience shall have been in successful full-time service for at least 18 months prior to the issuance date for this solicitation.
Provide the name and role of the key person, the title, location, and completed installation date of the referenced project, the referenced project owner point of contact information including name, organization, title, and telephone number, and generally, the referenced project description including system size and construction complexity.
Indicate that all key persons are currently employed by the telecommunications contractor, and have been working for the telecommunications contractor for at least 12 months. All key persons shall be employed by the telecommunications contractor at the date of issuance of this solicitation.
Note that only the key personnel approved by the Contracting Officer in the successful proposal shall do work on this solicitation's telecommunications system. Key personnel shall function in the same roles in this contract, as they functioned in the offered successful experience. Any substitutions for the telecommunications contractor's key personnel requires approval from The Contracting Officer.
1.6.2.3 Minimum Manufacturer Qualifications
Cabling, equipment and hardware manufacturers shall have a minimum of 5 years experience in the manufacturing, assembly, and factory testing of components which comply with TIA-568-C.1 , TIA-568-C.2 and TIA-568-C.3 .
All materials used shall be certified under the Buy American Act.
1.6.3 Test Plan
Provide a complete and detailed test plan for the telecommunications cabling system including a complete list of test equipment for the components and accessories for each cable type specified, 60 days prior to the proposed test date. Include procedures for certification, validation, and testing.
1.6.4 Regulatory Requirements
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer. Equipment, materials, installation, and workmanship shall be in accordance with the mandatory and advisory provisions of NFPA 70 unless more stringent requirements are
SECTION 27 10 00 Page 17 specified or indicated.
1.6.5 Standard Products
Provide materials and equipment that are products of manufacturers regularly engaged in the production of such products which are of equal material, design and workmanship. Products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year period shall include applications of equipment and materials under similar circumstances and of similar size. The product shall have been on sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2-year period. Where two or more items of the same class of equipment are required, these items shall be products of a single manufacturer; however, the component parts of the item need not be the products of the same manufacturer unless stated in this section.
1.6.5.1 Alternative Qualifications
Products having less than a 2-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturers' factory or laboratory tests, is furnished.
1.6.5.2 Material and Equipment Manufacturing Date
Products manufactured more than 1 year prior to date of delivery to site shall not be used, unless specified otherwise.
1.7 DELIVERY AND STORAGE
Provide protection from weather, moisture, extreme heat and cold, dirt, dust, and other contaminants for telecommunications cabling and equipment placed in storage.
1.8 ENVIRONMENTAL REQUIREMENTS
Connecting hardware shall be rated for operation under ambient conditions of 32 to 140 degrees F and in the range of 0 to 95 percent relative humidity, noncondensing.
1.9 WARRANTY
The equipment items shall be supported by service organizations which are reasonably convenient to the equipment installation in order to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
1.10 MAINTENANCE
1.10.1 Operation and Maintenance Manuals
Commercial off the shelf manuals shall be furnished for operation, installation, configuration, and maintenance of products provided as a part of the telecommunications cabling and pathway system, Data Package
5. Submit operations and maintenance data in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA and as specified herein not later than 2 months prior to the Contract Completion Date. In addition to requirements of Data Package 5, include the requirements of paragraphs
SECTION 27 10 00 Page 18
TELECOMMUNICATIONS DRAWINGS, TELECOMMUNICATIONS SPACE DRAWINGS, and RECORD DOCUMENTATION. Ensure that these drawings and documents depict the as-built configuration.
1.10.2 Record Documentation
Provide T5 drawings including documentation on cables and termination hardware in accordance with TIA-606 . T5 drawings shall include schedules to show information for cut-overs and cable plant management, patch panel layouts and cover plate assignments, cross-connect information and connecting terminal layout as a minimum. T5 drawings shall be provided in hard copy format and on electronic media using Windows based computer cable management software. Provide the following T5 drawing documentation as a minimum:
a. Cables - A record of installed cable shall be provided in accordance with TIA-606 . The cable records shall include only the required data fieldsin accordance with TIA-606 . Include manufacture date of cable with submittal.
b. Termination Hardware - A record of installed patch panels, cross-connect points, distribution frames, terminating block arrangements and type, and outlets shall be provided in accordance with TIA-606 . Documentation shall include the required data fields as a minimum in accordance with TIA-606 .
1.10.3 Spare Parts
In addition to the requirements of Section 01 78 23 OPERATION AND MAINTENANCE DATA, provide a complete list of parts and supplies, with current unit prices and source of supply, and a list of spare parts recommended for stocking.
PART 2 PRODUCTS
2.1 COMPONENTS
Components shall be UL or third party certified. Where equipment or materials are specified to conform to industry and technical society reference standards of the organizations, submit proof of such compliance. The label or listing by the specified organization will be acceptable evidence of compliance. In lieu of the label or listing, submit a certificate from an independent testing organization, competent to perform testing, and approved by the Contracting Officer. The certificate shall state that the item has been tested in accordance with the specified organization's test methods and that the item complies with the specified organization's reference standard. Provide a complete system of telecommunications cabling and pathway components using star topology. Provide support structures and pathways, complete with outlets, cables, connecting hardware and telecommunications cabinets/racks.
Cabling and interconnecting hardware and components for telecommunications systems shall be UL listed or third party independent testing laboratory certified, and shall comply with NFPA 70 and conform to the requirements specified herein.
2.2 Seismic Hardware
Provide all necessary mounting and bracing hardware to ensure that communications systems meet category E seismic reinforcement code
SECTION 27 10 00 Page 19 requirements. This shall include but not be limited to racks/cabinets, ladder and basket type trays.
2.3 CABLE VAULT HARDWARE
Cable racks shall be provided in MHs, HHs, or cable vaults and shall be located on the each wall of the cable vault. Cable racks shall be 37-hole or 8-hole. Cable support hooks shall be provided to manage cable routing within each vault. The cable hooks shall be secured using cable rack locking clips. Racking clips, cable racks, and cable hooks shall support all splice enclosures. Cable Vaults shall have 3'x3' ceiling mounted hatches for access with safety gate and ladder. Cable vaults shall also include sump, ventilation, pulling eyes, bonding hardware, lighting equipment. All metallic components and cable sheaths in the cable vaults shall be bonded to the lightning protection ground IAW MIL-STD-188-124B.
2.4 TELECOMMUNICATIONS PATHWAY
Provide telecommunications pathways in accordance with TIA-569 and as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Provide system furniture pathways in accordance with UL 1286 .
2.4.1 Telecommunications Communications Conduits
Provide EMT type conduit shall be provided for riser and horizontal distribution as shown on plans.
2.4.2 Telecommunications Cable Tray, Runway
Cable trays and runways shall consist of two type of systems.
2.4.2.1 Wire Mesh Basket Tray
Provide wire mesh basket type tray, with cable dividers, in sizes and quantities as shown on plans. Basket trays shall be sized to accommodate a maximum calculated fill ratio of 50 percent to a maximum inside depth of 4 inches. Basket tray should be manufactured with .196 inch diameter steel wire with "T" welded edges to protect cable. UL classified splicing hardware from the same manufacturer as basket tray shall be used for bonding purposes. Manufacturer shall provide test reports witnessed by an independent testing laboratory of the "worst case" loading conditions outlined in this specification and performed in accordance with the latest revision of NEMA VE 1.
2.4.2.2 Ladder Rack Cable Runway
Provide Ladder Rack, with cable retaining posts, in all telecommunications rooms in sizes and quantities as shown on plans. Provide ladder type tubular stringer cable runway with all associated accessories including splice clamps, horizontal and vertical bends, support kits, drop-outs, cable retaining posts, support pans and other common accessories within all equipment rooms as shown on plans. Tubular stringers and rungs shall be constructed of 3/8 inch x 1-1/2 inch x 0.065 inch wall rectangular steel tubing. Rungs shall be spaced 12" apart on center. Mounting supports shall be based upon the building conditions of the space. Provide all associated joining and mounting hardware for a complete and operational system.
SECTION 27 10 00 Page 20
2.4.2.3 Telecommunications Pathways Bonding Hardware
Provide all necessary hardware required to ensure all cable trays and runways are bonded to the building telecommunications bonding system in accordance with the NFPA 70 , TIA J-STD-607-A and MIL-STD-188-124 .
2.5 TELECOMMUNICATIONS CABLING
Cabling shall be UL listed for the application and shall comply with TIA-568-C.0 , TIA-568-C.1 , TIA-568-C.2 , TIA-568-C.3 and NFPA 70 . Provide a labeling system for cabling as required by TIA-606 and UL 969 . Ship cable on reels or in boxes bearing manufacture date for for unshielded twisted pair (UTP) in accordance with ICEA S-90-661 and optical fiber cables in accordance with ICEA S-83-596 for all cable used on this project. Cabling manufactured more than 12 months prior to date of installation shall not be used.
2.5.1 Backbone Cabling
2.5.1.1 Backbone Copper
Copper backbone cable shall be solid conductor, 24 AWG, 100 ohm, 100-pair and 50-pair, Category 3, UTP, in accordance with ICEA S-90-661 , TIA-568-C.1 , TIA-568-C.2 and UL 444 , formed into 25 pair binder groups covered with a thermoplastic jacket and overall metallic shield. Cable shall be imprinted with manufacturers name or identifier, flammability rating, gauge of conductor, transmission performance rating (category designation) at regular length marking intervals in accordance with ICEA S-90-661 . Provide plenum (CMP), riser (CMR), or general purpose (CM or CMG)communications rated cabling in accordance with NFPA 70 .
Substitution of a higher rated cable shall be permitted in accordance with NFPA 70 . Copper Cable that will be installed below grade in conduit shall be rated for use in a wet environment.
2.5.1.2 Backbone Optical Fiber
Provide in accordance with ICEA S-83-596 , TIA-568-C.3 , UL 1666 and NFPA 70 .
Cable shall be imprinted with fiber count,…