Spec_Vol_16_1_W912PL-12-R-0018.pdf

PDF 82 KB Posted

Attached to
Design Build, FY 12 Water Treatment and Distribution System, Fort Irwin, San Bernardino County, CA
Solicitation number
W912PL-12-R-0018
Issued by

About this file

App. Y

View the file

Other files

File Type Posted
Am8_W912PL-12-R-0018.pdf PDF
Am7_W912PL-12-R-0018.pdf PDF
FI WTP Bidder Site Visit 2_20120621.pdf PDF
Am6_W912PL-12-R-0018.pdf PDF
Am5_W912PL-12-R-0018.pdf PDF
Pre-Bid Site Visit No 2 Agenda_19June2012_W912PL-12-R-0018.pdf PDF
Am4_W912PL-12-R-0018.pdf PDF
Am3_W912PL-12-R-0018.pdf PDF
Civil Site4.zip ZIP file
Civil Site1.zip ZIP file
Civil Site3.zip ZIP file
Civil Site2.zip ZIP file
Ft Irwin WT Plant Industry Day QA Feb 2012.pdf PDF
Ft Irwin WT Plant Industry Day Attendees Feb 2012.pdf PDF
Ft Irwin WT Plant Site Visit Sign-in Sheet June 2012.pdf PDF
Am2_W912PL-12-R-0018.pdf PDF
Am1_W912PL-12-R-0018.pdf PDF
Spec_Vol_12_W912PL-12-R-0018.pdf PDF
Spec_Vol_10_2_W912PL-12-R-0018.pdf PDF
Spec_Vol_15_W912PL-12-R-0018.pdf PDF
Spec_Vol_2_W912PL-12-R-0018.pdf PDF
Spec_Vol_1_W912PL-12-R-0018.PDF PDF
Spec_Vol_16_3_W912PL-12-R-0018.pdf PDF
J A_W912PL-12-R-0018.pdf PDF
Spec_Vol_5_2_W912PL-12-R-0018.pdf PDF
Spec_Vol_14_W912PL-12-R-0018.pdf PDF
DRWGS_W912PL-12-R-0018.pdf PDF
Spec_Vol_7_W912PL-12-R-0018.pdf PDF
Spec_Vol_10_1_W912PL-12-R-0018.pdf PDF
Spec_Vol_9_W912PL-12-R-0018.pdf PDF
Spec_Vol_5_1_W912PL-12-R-0018.pdf PDF
Spec_Vol_4_W912PL-12-R-0018.pdf PDF
Spec_Vol_5_3_W912PL-12-R-0018.pdf PDF
Spec_Vol_11_2_W912PL-12-R-0018.pdf PDF
Spec_Vol_8_W912PL-12-R-0018.pdf PDF
Spec_Vol_3_W912PL-12-R-0018.pdf PDF
Spec_Vol_17_2_W912PL-12-R-0018.pdf PDF
Spec_Vol_11_1_W912PL-12-R-0018.pdf PDF
Spec_Vol_13_W912PL-12-R-0018.pdf PDF
Spec_Vol_17_1_W912PL-12-R-0018.pdf PDF
Spec_Vol_6_W912PL-12-R-0018.pdf PDF
Spec_Vol_16_2_W912PL-12-R-0018.pdf PDF
23-WTP_SurveyRpt.pdf PDF
05-DWG_Vol_5.pdf PDF
22-WTP_PipeExam.pdf PDF
04-SPEC_Vol_4.pdf PDF
14-EDR_Principles_CDPH_Oct09.pdf PDF
19-TankRpt_JPL-3_Dec07.pdf PDF
09-SPEC_Vol_9.pdf PDF
06-DWG_Vol_6.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FINAL RFP SUBMITTAL

SOLICITATION NO:W912PL-12-R-0018

P2 PROJECT NO: 352304

SPECIFICATIONS FILE NO: 1858

CADD NO: MB11YL58

VOLUME 16 OF 17

SPECIFICATIONS

FOR

DESIGN AND CONSTRUCTION OF

WATER TREATMENT AND DISTRIBUTION SYSTEM

FORT IRWIN, CALIFORNIA

(SAN BERNARDINO COUNTY)

“BUILDING STRONG”

U.S. ARMY ENGINEER DISTRICT, LOS ANGELES

911 Wilshire Boulevard Los Angeles, CA 90017

Sacramento District

FY12 WATER TREATMENT AND DISTRIBUTION SYSTEM SPECIFICATION NO.: 1858

FT. IRWIN, CA

Table of Contents Page 1

TABLE OF CONTENTS

VOLUME 1 OF 17

BIDDING REQUIREMENTS

STANDARD FORM 1442 – SOLICITATION, OFFER, AND AWARD

BIDDING SCHEDULE

EXPLANATION OF BID ITEMS

ATTACHMENT 1 TO EXPLANATION OF BID ITEMS: GE PROPOSAL, TERMS, AND

CONDITIONS

00 00 10 CERTIFICATE OF CORPORATE PRINCIPAL

00 01 00 INSTRUCTIONS TO OFFEREORS

00 01 10 PERFORMANCE/TECHNICAL-PRICE TRADE-OFF BEST VALUE

00 01 20 PERFORMANCE-PRICE TRADE-OFF BEST VALUE

00 06 00 REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

00 07 00 CONTRACT CLAUSES

00 08 00 SPECIAL CONTRACT REQUIREMENTS

00 08 50 WAGE RATES

SPECIFICATIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 GENERAL REQUIREMENTS

PROJECT SIGNS

01 10 10 GENERAL DESIGN REQUIREMENTS

01 10 13 PLANT EQUIPMENT TESTING, FACILITY STARTUP AND COMMISSIONING

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

ENGINEERING FORM 4025R

SUBMITTAL REGISTER

01 33 16 DESIGN AFTER AWARD, GENERAL

01 42 00 REFERENCE PUBLICATIONS

01 45 00.00 QUALITY CONTROL

01 45 00.10 QUALITY CONTROOL SYSTEM (QCS)

01 78 00 CLOSEOUT SUBMITTALS

DIVISION 31 - EARTHWORK

31 31 16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL

APPENDICES

APPENDIX A – WATER TREATMENT PLANT AND SUPPORTING FACILITIES

APPENDIX B - BICYCLE LAKE/IRWIN BASIN TRANSMISSION LINE

APPENDIX C - REPLACEMENT OF EXPIRED WATER PIPE – BID OPTION 1

APPENDIX D - WATER SUPPLY AND DISTRIBUTION IMPROVEMENTS – BID OPTION 2

APPENDIX E - UPGRADES FOR IMPROVED FIRE FLOW – PHASE 1 – BID OPTION 3

APPENDIX F - CONNECT IRWIN WELLS – BID OPTION 4 AND 5

APPENDIX G - NEW WELL, LANGFORD LAKE – BID OPTION 6

APPENDIX H - REPAIR/REPLACE JPL-3 STORAGE TANK

APPENDIX I - REHABILITATE WATER STORAGE TANKS

Table of Contents Page 2

VOLUME 2 OF 17

APPENDICES

Appendix J - Environmental Assessment/Initial Study Appendix K - Fort Irwin Installation Design Guide

VOLUME 3 OF 17

APPENDICES

Appendix L - Comprehensive Energy & Water Masterplan, Fort Irwin, 27 April

Appendix M - Weather Data for Mechanical Design Appendix N - Well Data Appendix O - Southern California Edison (SCE) Savings By Design and Standard

Electrical Details Appendix P - COMM Standards, Army Networthiness Appendix Q - Geotechnical Reports and Survey

VOLUME 4 OF 17

Appendix Q - Geotechnical Reports and Survey: FIO (CONTINUED) Appendix R - Bench and Pilot Testing Investigations: FOR INFORMATION ONLY:

Fort Irwin Water Treatment Process Selection Based on Pilot Testing Results, CH2MHILL, February 2007, and Additional Bench Test Studies

VOLUME 5 OF 17

Appendix S - Ft. Irwin Water Supply Permit, Water Supply Engineering Report by CDHS (now CDPH), 2004, and Compliance Order No. 05-13-12CO-001 To US Army Fort Irwin For Arsenic And Fluoride MCL Exceedance (System No. 3610705)

Appendix T - FOR INFORMATION ONLY: Design Principles of Electrodialysis Reversal and Basis of Design of the Fort Irwin' Water Treatment Plant Technical Engineering Report CIP Project W4

Appendix U - FOR INFORMATION ONLY: DRAFT TECHNICAL MEMORANDUM: Domestic (DO) Water System Hydraulic Model Update, Evaluation, and Required Improvements, dated September 30, 2011 by CH2M Hill

Appendix V - FOR INFORMATION ONLY: Engineer’s Report for Corrosion Engineering Evaluation of the 1.0 MG Welded Steel Water Storage Tank, Harper & Assoc. Engineering, Inc., December 2007: JPL-1 Report, JPL-2 Report, and JPL-3 Report

Appendix W - FOR INFORMATION ONLY: Fort Irwin CIP Project WI Investigation for the Combination of the DO and RO Water Systems, FIO:

Technical Memorandum: Fort Irwin – Bicycle Basin Pipe Spool Examination, and FIO: Draft Water System Master Plan Fort Irwin CIP Project W21

Table of Contents Page 3

VOLUMES 6 - 15 OF 17

APPENDIX

Appendix X - FOR INFORMATION ONLY: Fort Irwin Water Treatment Plant Capital

Improvement Plan – Project W4: Volumes 1 – 10

VOLUME 16 OF 17

APPENDIX

Appendix Y - Ft. Campbell/Ft. Irwin Water and Wastewater Design and

Construction Standards, April 2010, CH2M HILL Constructors, Inc.

VOLUME 17 OF 17

APPENDIX

Appendix Z - FOR INFORMATION ONLY: Fort Irwin, Bicycle Lake Water Main and

Water Line Connections – Project W11: Drawings and Specifications

End of Project Table of Contents

APPENDIX Y

FT. CAMPBELL/FT. IRWIN WATER AND WASTEWATER

DESIGN AND CONSTRUCTION STANDARDS, APRIL

2010, CH2M HILL CONSTRUCTORS, INC.

COVER
TOC
APPENDIX Y COVER