Spec_Vol_1_W912PL-12-R-0018.PDF

PDF 7 MB Posted

Attached to
Design Build, FY 12 Water Treatment and Distribution System, Fort Irwin, San Bernardino County, CA
Solicitation number
W912PL-12-R-0018
Issued by

About this file

Table of Contents Specs and App. A - App. I

View the file

Other files

File Type Posted
Am8_W912PL-12-R-0018.pdf PDF
Am7_W912PL-12-R-0018.pdf PDF
FI WTP Bidder Site Visit 2_20120621.pdf PDF
Am6_W912PL-12-R-0018.pdf PDF
Am5_W912PL-12-R-0018.pdf PDF
Pre-Bid Site Visit No 2 Agenda_19June2012_W912PL-12-R-0018.pdf PDF
Am4_W912PL-12-R-0018.pdf PDF
Am3_W912PL-12-R-0018.pdf PDF
Civil Site4.zip ZIP file
Civil Site1.zip ZIP file
Civil Site3.zip ZIP file
Civil Site2.zip ZIP file
Ft Irwin WT Plant Industry Day QA Feb 2012.pdf PDF
Ft Irwin WT Plant Industry Day Attendees Feb 2012.pdf PDF
Ft Irwin WT Plant Site Visit Sign-in Sheet June 2012.pdf PDF
Am2_W912PL-12-R-0018.pdf PDF
Am1_W912PL-12-R-0018.pdf PDF
Spec_Vol_12_W912PL-12-R-0018.pdf PDF
Spec_Vol_10_2_W912PL-12-R-0018.pdf PDF
Spec_Vol_15_W912PL-12-R-0018.pdf PDF
Spec_Vol_2_W912PL-12-R-0018.pdf PDF
Spec_Vol_16_3_W912PL-12-R-0018.pdf PDF
J A_W912PL-12-R-0018.pdf PDF
Spec_Vol_5_2_W912PL-12-R-0018.pdf PDF
Spec_Vol_14_W912PL-12-R-0018.pdf PDF
DRWGS_W912PL-12-R-0018.pdf PDF
Spec_Vol_7_W912PL-12-R-0018.pdf PDF
Spec_Vol_16_1_W912PL-12-R-0018.pdf PDF
Spec_Vol_10_1_W912PL-12-R-0018.pdf PDF
Spec_Vol_9_W912PL-12-R-0018.pdf PDF
Spec_Vol_5_1_W912PL-12-R-0018.pdf PDF
Spec_Vol_4_W912PL-12-R-0018.pdf PDF
Spec_Vol_5_3_W912PL-12-R-0018.pdf PDF
Spec_Vol_11_2_W912PL-12-R-0018.pdf PDF
Spec_Vol_8_W912PL-12-R-0018.pdf PDF
Spec_Vol_3_W912PL-12-R-0018.pdf PDF
Spec_Vol_17_2_W912PL-12-R-0018.pdf PDF
Spec_Vol_11_1_W912PL-12-R-0018.pdf PDF
Spec_Vol_13_W912PL-12-R-0018.pdf PDF
Spec_Vol_17_1_W912PL-12-R-0018.pdf PDF
Spec_Vol_6_W912PL-12-R-0018.pdf PDF
Spec_Vol_16_2_W912PL-12-R-0018.pdf PDF
23-WTP_SurveyRpt.pdf PDF
05-DWG_Vol_5.pdf PDF
22-WTP_PipeExam.pdf PDF
04-SPEC_Vol_4.pdf PDF
14-EDR_Principles_CDPH_Oct09.pdf PDF
19-TankRpt_JPL-3_Dec07.pdf PDF
09-SPEC_Vol_9.pdf PDF
06-DWG_Vol_6.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS PROJECT IS ADVERTISED ON AN UNRESTRICTED BASIS

THIS PROJECT IS A REQUEST FOR PROPOSAL (RFP) “PERFORMANCE PRICE TRADE

OFF” SOLICITATION

SOLICITATION NO: W912PL-12-R-0018

P2 PROJECT NO: 352304

SPECIFICATIONS FILE NO: 1858

CADD NO: MB11YL58

VOLUME 1 OF 17

SPECIFICATIONS

FOR

DESIGN AND CONSTRUCTION OF

WATER TREATMENT AND DISTRIBUTION SYSTEM

FORT IRWIN, CALIFORNIA

(SAN BERNARDINO COUNTY)

“BUILDING STRONG”

U.S. ARMY ENGINEER DISTRICT, LOS ANGELES

915 Wilshire Boulevard Los Angeles, CA 90017

Los Angeles District

Sacramento District

This page was intentionally left blank for duplex printing.

FY12 WATER TREATMENT AND DISTRIBUTION SYSTEM SPECIFICATION NO.: 1858

FT. IRWIN, CA

Table of Contents Page 1

TABLE OF CONTENTS

VOLUME 1 OF 17

BIDDING REQUIREMENTS

STANDARD FORM 1442 – SOLICITATION, OFFER, AND AWARD

BIDDING SCHEDULE

EXPLANATION OF BID ITEMS

ATTACHMENT 1 TO EXPLANATION OF BID ITEMS: GE PROPOSAL, TERMS, AND

CONDITIONS

00 00 10 CERTIFICATE OF CORPORATE PRINCIPAL

00 01 00 INSTRUCTIONS TO OFFEREORS

00 01 10 PERFORMANCE/TECHNICAL-PRICE TRADE-OFF BEST VALUE

00 01 20 PERFORMANCE-PRICE TRADE-OFF BEST VALUE

00 06 00 REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

00 07 00 CONTRACT CLAUSES

00 08 00 SPECIAL CONTRACT REQUIREMENTS

00 08 50 WAGE RATES

00 08 50A WATER WELL DRILLING WAGE RATES

SPECIFICATIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 GENERAL REQUIREMENTS

PROJECT SIGNS

01 10 10 GENERAL DESIGN REQUIREMENTS

01 10 13 PLANT EQUIPMENT TESTING, FACILITY STARTUP AND COMMISSIONING

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

ENGINEERING FORM 4025R

SUBMITTAL REGISTER

01 33 16 DESIGN AFTER AWARD, GENERAL

01 42 00 REFERENCE PUBLICATIONS

01 45 00.00 QUALITY CONTROL

01 45 00.10 QUALITY CONTROOL SYSTEM (QCS)

01 78 00 CLOSEOUT SUBMITTALS

DIVISION 31 - EARTHWORK

31 31 16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL

APPENDICES

APPENDIX A – WATER TREATMENT PLANT AND SUPPORTING FACILITIES

APPENDIX B - BICYCLE LAKE/IRWIN BASIN TRANSMISSION LINE

APPENDIX C - REPLACEMENT OF EXPIRED WATER PIPE – BID OPTION 1

APPENDIX D - WATER SUPPLY AND DISTRIBUTION IMPROVEMENTS – BID OPTION 2

APPENDIX E - UPGRADES FOR IMPROVED FIRE FLOW – PHASE 1 – BID OPTION 3

APPENDIX F - CONNECT IRWIN WELLS – BID OPTION 4 AND 5

APPENDIX G - NEW WELL, LANGFORD LAKE – BID OPTION 6

APPENDIX H - REPAIR/REPLACE JPL-3 STORAGE TANK

APPENDIX I - REHABILITATE WATER STORAGE TANKS

Table of Contents Page 2

VOLUME 2 OF 17

APPENDICES

Appendix J - Environmental Assessment/Initial Study Appendix K - Fort Irwin Installation Design Guide

VOLUME 3 OF 17

APPENDICES

Appendix L - Comprehensive Energy & Water Masterplan, Fort Irwin, 27 April

Appendix M - Weather Data for Mechanical Design Appendix N - Well Data Appendix O - Southern California Edison (SCE) Savings By Design and Standard

Electrical Details Appendix P - COMM Standards, Army Networthiness Appendix Q - Geotechnical Reports and Survey

VOLUME 4 OF 17

Appendix Q - Geotechnical Reports and Survey: FIO (CONTINUED) Appendix R - Bench and Pilot Testing Investigations: FOR INFORMATION ONLY:

Fort Irwin Water Treatment Process Selection Based on Pilot Testing Results, CH2MHILL, February 2007, and Additional Bench Test Studies

VOLUME 5 OF 17

Appendix S - Ft. Irwin Water Supply Permit, Water Supply Engineering Report by CDHS (now CDPH), 2004, and Compliance Order No. 05-13-12CO-001 To US Army Fort Irwin For Arsenic And Fluoride MCL Exceedance (System No. 3610705)

Appendix T - FOR INFORMATION ONLY: Design Principles of Electrodialysis Reversal and Basis of Design of the Fort Irwin' Water Treatment Plant Technical Engineering Report CIP Project W4

Appendix U - FOR INFORMATION ONLY: DRAFT TECHNICAL MEMORANDUM: Domestic (DO) Water System Hydraulic Model Update, Evaluation, and Required Improvements, dated September 30, 2011 by CH2M Hill

Appendix V - FOR INFORMATION ONLY: Engineer’s Report for Corrosion Engineering Evaluation of the 1.0 MG Welded Steel Water Storage Tank, Harper & Assoc. Engineering, Inc., December 2007: JPL-1 Report, JPL-2 Report, and JPL-3 Report

Appendix W - FOR INFORMATION ONLY: Fort Irwin CIP Project WI Investigation for the Combination of the DO and RO Water Systems, FIO:

Technical Memorandum: Fort Irwin – Bicycle Basin Pipe Spool Examination, and FIO: Draft Water System Master Plan Fort Irwin CIP Project W21

Table of Contents Page 3

VOLUMES 6 - 15 OF 17

APPENDIX

Appendix X - FOR INFORMATION ONLY: Fort Irwin Water Treatment Plant Capital

Improvement Plan – Project W4: Volumes 1 – 10

VOLUME 16 OF 17

APPENDIX

Appendix Y - Ft. Campbell/Ft. Irwin Water and Wastewater Design and

Construction Standards, April 2010, CH2M HILL Constructors, Inc.

VOLUME 17 OF 17

APPENDIX

Appendix Z - FOR INFORMATION ONLY: Fort Irwin, Bicycle Lake Water Main and

Water Line Connections – Project W11: Drawings and Specifications

End of Project Table of Contents

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

9. FOR INFORMATION CALL

A. NAME B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):

11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12B. CALENDAR DAYS

YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

Designed using Perform Pro, WHS/DIOR, Oct 96

1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

W912PL-12-R-0018

X

24 MAY 2012 1 OF 1026

USACE, Los Angeles District Contracting Division, West Region Branch 915 Wilshire Blvd Los Angeles, CA 90017

See Item 7

Lucia A. Carvajal 213.452.3240

FY 12 WATER TREATMENT AND DISTRIBUTION SYSTEM, FORT IRWIN, SAN BERNARDINO COUNTY, CA. Project consists of design and construction services for a new Electro-Dialysis Reversal (EDR) Water Treatment Facility and water supply and distribution system infrastructure upgrades at Fort Irwin, California.

Offerors must submit both a technical proposal and a price proposal. The basis for award is Best Value "Trade-off" IAW FAR 15.101-1. The Government reserves the right to consider award to other than the lowest priced offeror or other than the highest technically rated offeror. The relative weighting of price and technical is as follows: all evaluation factors other than cost or price, when combined, are significantly more important than cost or price.

The Government intends to evaluate proposals and award a contract without discussions with offerors. Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them necessary. FAR 52.215-1(f)(4).

The estimated cost range of this procurement is $100,000,000 - $250,000,000.

The Notice of Price Evaluation Preference for HUBZone SBC will apply to this procurement. See Section 00 07 00, Contract Clause No. FAR 52.219-4.

10 *1095

X X *Section 00 08 00

X 10

7 2 PM

July 5, 2012

X

OFFER (Must be fully completed by offeror)

STANDARD FORM 1442 BACK (REV. 4-85)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24.SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BYCODE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and

(c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN

(Type or print)

30B. SIGNATURE 30C. DATE

31A. NAME OF CONTRACTING OFFICER (Type or print)

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

DUNS NO.: TAX ID NO.:

CAGE CODE NO.:

( ) - ; FAX ( ) -

SEE PRICING SCHEDULE

FY 12 WATER TREATMENT AND DISTRIBUTION SYSTEM W912PL-12-R-0018

FT IRWIN, CA SPECIFICATION NO.: 1858

00 00 10-0

CERTIFICATE OF OFFEROR’S PRINCIPAL

(1) IF THE OFFEROR IS PARTNERSHIP OR JOINT VENTURE, LIST FULL NAME OF ALL PARTNERS/ JOINT VENTURERS (Attach addendum as necessary):

(Company Name) (Signature) (Title)

(2) IF THE OFFEROR IS A CORPORATION, THE FOLLOWING CERTIFICATION SHOULD BE

COMPLETED:

CERTIFICATION AS TO CORPORATE PRINCIPAL

I, ________________________________, certify that I am the Secretary of the corporation named as principal in the within contract; that _________________________________, who signed the said contract on behalf of the principal, was the ____________________________________of the corporation; that I know his signature and that his signature is genuine; and that said contract was duly signed, sealed and attested for in behalf of said corporation by authority of its governing body.

CORPORATE PRINCIPAL

CORPORATE SEAL

SECRETARY

(3) IF THE OFFEROR IS A LIMITED LIABILITY COMPANY, LIST FULL NAME OF ALL MANAGERS

BELOW. SIGNATURES BY ALL MANAGERS HERE SIGNIFY THAT THAT THE INDIVIDUAL WHO

SIGNED THE OFFER IN BLOCK 20B OF THE SF 1442 HAS THE AUTHORITY TO BIND THE LIMITED

LIABILITY COMPANY.

(Signature) (Title)

(Signature) (Title)

FY12 WATER TREATMENT AND DISTRIBUTION SYSTEM W912PL-12-R-0018

FT. IRWIN, CA SPECIFICATION NO.: 1858

00 00 10 - 1

BID SCHEDULE

BIDDER’S NAME:

CLIN

Item No.

Item Description

Estimated Quantity

Unit

Estimate Amount

BASE BID

1.

EDR WATER TREATMENT MAIN PROCESS AND

SUPPORTING FACILITIES in APPENDIX A

1A.

Design of EDR Main Water Treatment Process and Supporting Facilities 1

Job

1B. EDR EQUIPMENT 1

1C.

Construction of EDR Main Water Treatment Process and Supporting Facilities 1

2.

WASTE STREAM PROCESSES AND SUPPORTING FACILITIES

In APPENDIX A

2A.

Design of Waste Stream Processes and Supporting Facilities 1

2B.

Construction of Waste Stream Processes and Supporting Facilities 1

3.

EVAPORATION PONDS In APPENDIX A

3A. Design of Evaporation Ponds 1

3b. Construction of Evaporation Ponds 1

4. RAW AND TREATED WATER TANKS In APPENDIX A

4A.

Design of Raw and Treated Water Tanks 1

4B.

Construct Raw and Treated Water Tanks 1

5. WATER TREATMENT PLANT (WTP) GENERATOR In APPENDIX A

5A.

Design of WTP Generator 1

5B. Construct WTP Generator 1

6. WTP SITEWORK In APPENDIX A

6A.

Design for WTP Sitework 1

00 00 10 - 2

6B.

Construct WTP Sitework 1

7.

BICYCLE LAKE/IRWIN BASIN TRANSMISSION LINE

In APPENDIX B

7A.

Design for Bicycle Lake/Irwin Basin Transmission Line 1

7B.

Construct Bicycle Lake/Irwin Basin Transmission Line 1

8.

REPLACE JPL-3 STORAGE TANK

In APPENDIX H

8A. Design for Replace JPL-3 Storage Tank 1

8B.

Construct Replace JPL-3 Storage Tank 1

9.

REHABILITATE WATER STORAGE TANKS

In APPENDIX I

9A.

Design for Rehabilitate Water Storage Tanks 1

9B. Construct Rehabilitate Water Storage

Tanks 1

10. COMMISSIONING OF WTP AND WATER SYSTEM

10.

Design for Commissioning Of WTP And Water System 1

10B.

Construction of Commissioning Of WTP And Water System 1

11. ENTIRE PROJECT SCADA SYSTEM

11A.

Design for SCADA System 1

11B.

Construct SCADA System 1

12. ENTIRE PROJECT TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

12A.

Design for Telecommunications OSP 1

12B.

Construct Telecommunications OSP 1

Total Base Bid Clin Items 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, and 12.

00 00 10 - 3

BID OPTIONS

13.

Bid Option 1 - REPLACEMENT OF EXPIRED WATER PIPE In APPENDIX C

13A.

Design for Replacement Of Expired Water Pipe 1

13B. Removal of Replacement Of Expired Water

Pipe 1

14.

Bid Option 2 - WATER SUPPLY AND DISTRIBUTION IMPROVEMENTS In APPENDIX D

14A.

Design for Water Supply And Distribution Improvements 1

14B. Removal of Water Supply And Distribution

Improvements 1

15.

Bid Option 3 - UPGRADES FOR IMPROVED FIRE FLOW PH1 In APPENDIX E

15A. Design for Upgrades For Improved Fire

Flow Ph1 1

15B.

Construction for Upgrades For Improved Fire Flow Ph1 1

16.

Bid Option 4 - CONNECT IRWIN WELL I-9 In APPENDIX F

16A.

Design for Connect Irwin Well I-9 1

16B.

Construction for Connect Irwin Well I-9 1

17.

Bid Option 5 - CONNECT IRWIN WELL I-2A In APPENDIX F

17A. Design for Connect Irwin Well I-2A 1

17B.

Construction for Connect Irwin Well I-2A 1

18.

Bid Option 6 - NEW WELL, LANGFORD LAKE In APPENDIX G

18A. Design for New Well, Langford Lake 1

18B.

Construction for New Well, Langford Lake 1

00 00 10 - 4

19.

BID OPTION 7 – EXPANDABILITY OF WATER

TREATMENT PLANT - In APPENDIX A

19A.

Design for Expandability of Water Treatment Plant 1

19B.

Design for Expandability of Water Treatment Plant 1

20.

Bid Option 8 - EXPANDED WATER TREATMENT PLANT - In APPENDIX A

20A. Design for Expanded Water Treatment Plant 1

20B.

Construction for Expanded Water Treatment Plant 1

21.

Bid Option 9 - ADDITIONAL 10% ENERGY

SAVINGS COMPARED TO ASHRAE STANDARD 90.1

21A.

Design for Additional 10% Energy Savings Compared To ASHRAE Standard 90.1 1

21B.

Construction for Additional 10% Energy Savings Compared To ASHRAE Standard 90.1 1

Total Base Bid Clin Items 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, and 12 plus Bid Option Clin Items 13, 14, 15, 16, 17, 18, 19, 20, and 21.

00 00 10 - 5

NOTES FOR BIDDING SCHEDULE

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest bid schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to bid items, all bidders should state their revised prices for each item. The company name should be indicated on the face of the bidding schedule to preclude being misplaced.

NOTE NO. 2. Bidders must insert a price on all numbered items of the Bidding Schedule. Failure to do so will disqualify the bid.

NOTE NO. 3. If a modification to a bid is submitted and provides for a lump-sum adjustment to the total estimated cost, the application of the lump-sum adjustment to each unit price and/or lump-sum price, in the bid schedule must be stated or, if it is not stated, the bidder agrees that the lump-sum adjustment shall be applied on a prorata basis to every bid item in the bid schedule.

NOTE NO. 4. CONDITIONS GOVERNING EVALUATION OF BIDS AND AWARD OF CONTRACT.

Only one contract will be awarded on this Bid Schedule and award will be made on the Base Bid and selected Options. Evaluation of Base Bid and all Options shall be in accordance with the following clause:

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

(End of clause)

The Government may require the delivery of the numbered line items, identified in the schedule as option items, in the quantity and at the price stated in the schedule. Subject to the availability of funds, the Contracting Officer may exercise the option by written notice to the Contractor within 90 days of Notice of Award.

NOTE NO. 5. CHECKLIST FOR THE BIDDING SCHEDULE:

a. Is it completely filled out? Y__ NA__

b. It may not be altered either as to quantities or as to items offered. Y__ NA__

c. There can be no language of limitation either as to quantities or as to items offered. Y__ NA__

d. If you corrected your numbers, have you initialed these corrections? Y__ NA__

e. If the bidding schedule has been changed by Amendment, is the bidding schedule that you are submitting from the most recent amendment ? Y__ NA__

f. Do prices for each bid item include all costs, mark-ups and taxes (if any taxes are imposed)? Y__ NA__

g. Is the cost of obtaining your performance and payment bond included in the total bid price specified on the bid schedule? Y__ NA__

h. In preparing your bid, remember the Corps does not make advanced payments on its contracts Y__ NA__

00 00 10 - 6

NOTE NO. 6. ADDITIONAL SUBMISSION REQUIREMENTS:

a. Upon the Government’s request, the offeror shall submit a price breakdown of the bid items directly to the Los Angeles District Office. Details on where and how to send the breakdown will be provided by the requesting official making the request on behalf of the Government. The format of the breakdown will be left up to the offeror.

However, as a minimum, the offeror shall provide pricing for the major categories of work under each bid item, for example: site improvements, landscaping, electrical, mechanical, etc. This information will not be needed sooner than three (3) working days after the proposal submission due date.

b. This information may required for the initial and, if requested, for any revised proposals.

NOTE NO. 7. The construction cost limitation for this project is $104,043,000.00.

NOTE NO. 8. This procurement is a Request for Proposals. All references throughout the RFP to ‘bidder’ shall be deemed to mean ‘offeror’ or ‘proposer’, and ‘bid’ shall be deemed to mean ‘offer’ or ‘propose’ or ‘proposal’, as appropriate. Award will be made using the best value, tradeoff process.

-- END OF BID SCHEDULE --

00 00 10 - 7

EXPLANATION OF BID ITEMS

DESIGN-BUILD FOR WATER TREATMENT AND DISTRIBUTION SYSTEM

FORT IRWIN, CALIFORNIA

GENERAL:

This section comprises an explanation of the bid items identified in the Bidding Schedule. This section is a general scope of work for the bid items described in the Bidding Schedule and is not intended to be all encompassing in the description. All work specified herein shall be accomplished in accordance with the procedures prescribed in the technical provisions of the specifications and the plans/details as shown on the contract drawings. The contractor shall bid each type of work under the applicable bid item. Measurement for payment will not be made. Payment described for the various bid items will be full compensation for all labor, materials, and equipment required to complete the work. Compensation for any item of work described in the contract but not listed in the bid schedule shall be included in the payment for the item of work to which it is made subsidiary.

BASE BID

1. EDR WATER TREATMENT MAIN PROCESS AND SUPPORTING FACILITIES in

APPENDIX A

1A. Design of EDR Water Treatment Main Process And Supporting Facilities

Payment under Bid Item No. 1A "Design of EDR Water Treatment Main Process And Supporting Facilities" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design of the EDR Water Treatment Main Process And Supporting Facilities as described in Appendix A and Main Process Flow Diagram (Figure 2 of Appendix A) in accordance with the RFP requirements defined herein. Bid Item shall exclude effort associated with EDR Water Treatment Main Process and Supporting Facilities to be designed under Bid Items 4, 6, 10, 11, and 12. Bid item shall include all associated geotechnical, structural, architectural, process, mechanical, HVAC, plumbing, I&C, electrical, and all site work necessary.

1B. EDR Equipment

Payment under Bid Item No. 1B “EDR Equipment” will constitute full compensation for furnishing all materials, plant, tools, labor costs, shipping, and other associated incidentals necessary to complete the installation of the EDR process unit operation as described in Appendix A. EDR skids with stacks, EDR power supplies, controls, and EDR interconnections (valves, dedicated instrumentation, piping, concentrate pumps, etc.) shall be purchased sole source from GE-Ionics, Inc. Flange to flange equipment cost (only) is $8,460,000, as quoted from GE-Ionics, Inc. See Attachment 1 to Explanation of Bid Items for quote, terms, and conditions for the EDR Equipment.

1C. Construction of EDR Water Treatment Main Process And Supporting Facilities

Payment under Bid Item No. 1C "Construction of EDR Water Treatment Main Process And Supporting Facilities" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of the EDR Water Treatment Main Process And Supporting Facilities as described in Appendix A and Main Process Flow Diagram (Figure 2 of Appendix A) in accordance with the RFP requirements defined herein. Bid Item shall exclude effort associated with EDR Water Treatment Main Process and Supporting Facilities to be constructed under Bid Items 1B, 4, 6, 10, 11, and 12. Bid item shall include all associated geotechnical, structural, architectural, process, mechanical, HVAC, plumbing, I&C, electrical, and all site work necessary.

00 00 10 - 8

2. WASTE STREAM PROCESS AND SUPPORTING FACILITIES in APPENDIX A

2A. Design of Waste Stream Processes and Supporting Facilities

Payment under Bid Item No. 2A "Design of Waste Stream Processes and Supporting Facilities" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design for the Waste Stream Processes and Supporting Facilities as described in Appendix A and Waste Stream Processes Flow Diagram (Figure 3 of Appendix A) in accordance with the RFP requirements defined herein. Bid Item shall exclude effort associated with Waste Stream Processes and Supporting Facilities to be designed under Bid Items 3, 6, 10, 11, and 12. Bid item shall include all associated geotechnical, structural, architectural, process, mechanical, HVAC, plumbing, I&C, electrical, and all site work necessary.

2B. Construct Waste Stream Processes and Supporting Facilities

Payment under Bid Item No. 2B "Construct Waste Stream Processes and Supporting Facilities” will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of the Waste Stream Processes and Supporting Facilities as described in Appendix A and Waste Stream Processes Flow Diagram (Figure 3 of Appendix A) in accordance with the RFP requirements defined herein. Bid Item shall exclude effort associated with Waste Stream Processes and Supporting Facilities to be constructed under Bid Items 3, 6, 10, 11, and 12. Bid item shall include all associated structural, architectural, process, mechanical, HVAC, plumbing, I&C, electrical, and all site work necessary.

3. EVAPORATION PONDS In APPENDIX A

3A. Design of Evaporation Ponds

Payment under Bid Item No. 3A "Design of Evaporation Ponds" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design of the Evaporation Ponds as described in Appendix A in accordance with the RFP requirements defined herein. Bid item shall include associated site work including, but not limited to, excavation, associated utilities, fill, grading, and compaction.

3B. Construction of Evaporation Ponds

Payment under Bid Item No. 3B "Construction of Evaporation Ponds" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the Construction of Evaporation Ponds as described in Appendix A in accordance with the RFP requirements defined herein. Bid item shall include associated site work including, but not limited to, excavation, associated utilities, fill, grading, and compaction.

4. RAW AND TREATED WATER TANKS In APPENDIX A

4A. Design of Raw and Treated Water Tanks

Payment under Bid Item No. 4A "Design of Raw and Treated Water Tanks" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design of the Raw and Treated Water Tanks as described in Appendix A in accordance with the RFP requirements defined herein. Bid item shall include associated site work including, but not limited to, excavation, foundations, associated utilities, fill, grading, and compaction.

00 00 10 - 9

4B. Construct Raw and Treated Water Tanks

Payment under Bid Item No. 4B "Construct Raw and Treated Water Tanks" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the Construction of the Raw and Treated Water Tanks as described in Appendix A in accordance with the RFP requirements defined herein. Bid item shall include associated site work including, but not limited to, excavation, foundations, associated utilities, fill, grading, and compaction.

5. WATER TREATMENT PLANT (WTP) GENERATOR In APPENDIX A

5A. Design of WTP Generator

Payment under Bid Item No. 5A "Design of WTP Generator" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design of WTP generator as described in Appendix A in accordance with the RFP requirements defined herein. Bid item shall include associated site work including, but not limited to, excavation, foundation, associated utilities, fill, grading, and compaction.

5B. Construct WTP Generator

Payment under Bid Item No. 5B "Construct WTP Generator" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of the WTP generator as described in Appendix A in accordance with the RFP requirements defined herein. Bid item shall include associated site work including, but not limited to, excavation, foundation, associated utilities, fill, grading, and compaction.

6. WTP SITEWORK In APPENDIX A

6A. Design for WTP Sitework

Payment under Bid Item No. 6A "Design for WTP Sitework" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design of the WTP Sitework not otherwise covered under other Appendix A BID ITEMS, as described in Appendix A and presented in the RFP requirements. This item shall include but not be limited to:

pavements, excavation, compacted fill in pavement areas and landscape areas, storm-drainage, water, sewer, gas, and COMM utilities for WTP, fencing, landscaping, erosion and sediment control and Best Management Practices (BMPs), demolition and removal of existing structures, topsoil, and site grading.

6B. Construct WTP Sitework

Payment under Bid Item No. 6B "Construct WTP Sitework" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of the WTP Sitework not otherwise covered under other Appendix A BID ITEMS, as described in Appendix A and presented in the RFP requirements. This item shall include but not be limited to: pavements, excavation, compacted fill in pavement areas and landscape areas, storm-drainage, water, sewer, gas, and COMM utilities for WTP, fencing, landscaping, erosion and sediment control and Best Management Practices (BMPs), demolition and removal of existing structures, topsoil, and site grading.

00 00 10 - 10

7. BICYCLE LAKE/IRWIN BASIN TRANSMISSION LINE In APPENDIX B

7A. Design for Bicycle Lake/Irwin Basin Transmission Line

Payment under Bid Item No. 7A "Design for Bicycle Lake/Irwin Basin Transmission Line" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design of the Bicycle Lake/Irwin Basin Transmission Line as described in Appendix B and presented in the RFP requirements herein. Bid item shall include associated site work including, but not limited to, excavation, fill, grading, and compaction.

7B. Construct Bicycle Lake/Irwin Basin Transmission Line

Payment under Bid Item No. 7B "Construct Bicycle Lake/Irwin Basin Transmission Line" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to construct the Bicycle Lake/Irwin Basin Transmission Line as described in Appendix B and presented in the RFP requirements herein. Bid item shall include associated site work including, but not limited to, excavation, fill, grading, and compaction.

8. REPLACE JPL-3 STORAGE TANK In APPENDIX H

8A. Design for Replace JPL-3 Storage Tank

Payment under Bid Item No. 8A "Design for Replace JPL-3 Storage Tank" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design for Replacing the JPL-3 Storage Tank as described in Appendix H and presented in the RFP requirements herein. Bid item shall include associated site work including, but not limited to, excavation, foundation, fill, grading, and compaction.

8B. Construct Replace JPL-3 Storage Tank

Payment under Bid Item No. 8B "Construct Replace JPL-3 Storage Tank" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to construct the replacement of the JPL-3 Storage Tank as described in Appendix H and presented in the RFP requirements herein. Bid item shall include associated site work including, but not limited to, excavation, foundation, fill, grading, and compaction.

9. REHABILITATE WATER STORAGE TANKS In APPENDIX I

9A. Design for Rehabilitate Water Storage Tanks

Payment under Bid Item No. 9A "Design for Rehabilitate Water Storage Tanks" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design for Rehabilitating Water Storage Tanks JPL-1 and JPL-2 as described in Appendix I and presented in the RFP requirements herein. Bid item shall include any associated site work.

9B. Construct Rehabilitate Water Storage Tanks

Payment under Bid Item No. 9B "Construct Rehabilitate Water Storage Tanks" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction for Rehabilitating Water Storage Tanks JPL-1 and JPL-2 as described in Appendix I and presented in the RFP requirements herein. Bid item shall include any associated site work.

00 00 10 - 11

10. COMMISSIONING OF WTP AND WATER SYSTEM

10A. Design for Commissioning Of WTP And Water System

Payment under Bid Item No. 10A "Design for Commissioning Of WTP And Water System" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design for Commissioning Of WTP And Water System as described in the RFP requirements herein.

10B. Construction of Commissioning Of WTP And Water System

Payment under Bid Item No. 10B "Construction of Commissioning Of WTP And Water System" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the Commissioning Of WTP And Water System as described in the RFP requirements herein.

11. ENTIRE PROJECT SCADA SYSTEM

11A. Design for SCADA System

Payment under Bid Item No. 11A "Design for SCADA System" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design for the entire project SCADA system in accordance with the RFP requirements defined herein. Bid item shall include any associated site work.

11B. Construction of SCADA System

Payment under Bid Item No. 11B "Construction of SCADA System " will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to construct the entire project SCADA system in accordance with the RFP requirements defined herein. Bid item shall include any associated site work.

12. ENTIRE PROJECT TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

12A. Design for Entire Project Telecommunications Outside Plant (OSP)

Payment under Bid Item No. 12A "Design for Entire Project Telecommunications Outside Plant (OSP)" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design of the Entire Project Telecommunications Outside Plant (OSP) in accordance with the RFP requirements defined herein. Bid item shall include associated site work including, but not limited to, excavation, fill, grading, and compaction.

12B. Construct Entire Project Telecommunications Outside Plant (OSP)

Payment under Bid Item No. 12B "Construct Entire Project Telecommunications Outside Plant (OSP)" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to construct the Entire Project Telecommunications Outside Plant (OSP) in including, but not limited to, excavation, fill, grading, and compaction.

00 00 10 - 12

BID OPTIONS

13. BID OPTION 1 - REPLACEMENT OF EXPIRED WATER PIPE In APPENDIX C

13A. Design for Replacement Of Expired Water Pipe

Payment under Bid Item No. 13A "Design for Replacement Of Expired Water Pipe" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design for the Replacement Of Expired Water Pipe as described in Appendix C and in accordance with the RFP requirements defined herein. Bid item shall include associated site work including, but not limited to, excavation, fill, grading, and compaction.

13B. Construction of Replacement Of Expired Water Pipe

Payment under Bid Item No. 13B "Construction of Replacement Of Expired Water Pipe" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to construct the Replacement Of Expired Water Pipe as described in Appendix C and in

14. BID OPTION 2 - WATER SUPPLY AND DISTRIBUTION IMPROVEMENTS

In APPENDIX D

14A. Design for Water Supply And Distribution Improvements

Payment under Bid Item No. 14A "Design for Water Supply And Distribution Improvements" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design for the Water Supply And Distribution Improvements as described in Appendix D and in accordance with the RFP requirements defined herein. Bid item shall include associated site work including, but not limited to, excavation, fill, grading, and compaction.

14B. Construction of Water Supply And Distribution Improvements

Payment under Bid Item No. 14B "Construction of Water Supply And Distribution Improvements" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to construct the Water Supply And Distribution Improvements as described in Appendix D and in accordance with the RFP requirements defined herein. Bid item shall include associated site work including, but not limited to, excavation, fill, grading, and compaction.

15. BID OPTION 3 - UPGRADES FOR IMPROVED FIRE FLOW PH1 In APPENDIX E

15A. Design for Upgrades For Improved Fire Flow Ph1

Payment under Bid Item No. 15A "Design for Upgrades For Improved Fire Flow Ph1" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design of Upgrades For Improved Fire Flow Ph1 as described in Appendix E and in accordance with the RFP requirements defined herein. Bid item shall include associated site work

00 00 10 - 13

15B. Construction for Upgrades For Improved Fire Flow Ph1

Payment under Bid Item No. 15B "Construction for Upgrades For Improved Fire Flow Ph1" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to construct the Upgrades For Improved Fire Flow Ph1 as described in Appendix E and in

16. BID OPTION 4 - CONNECT IRWIN WELL I-9 In APPENDIX F

16A. Design for Connect Irwin Well I-9

Payment under Bid Item No. 16A "Design for Connect Irwin Well I-9" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design to Connect Irwin Well I-9 as described in Appendix F and in accordance with the RFP requirements defined herein. Bid item shall include all associated site work.

16B. Construction for Connect Irwin Well I-9

Payment under Bid Item No. 16B "Construction for Connect Irwin Well I-9" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to construct the Connect Irwin Well I-9 as described in Appendix F and in accordance with the RFP requirements defined herein. Bid item shall include all associated site work.

17. BID OPTION 5 - CONNECT IRWIN WELL I-2A In APPENDIX F

17A. Design for Connect Irwin Well I-2A

Payment under Bid Item No. 17A "Design for Connect Irwin Well I-2A" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design to Connect Irwin Well I-2A as described in Appendix F and in accordance with the RFP requirements defined herein. Bid item shall include all associated site work.

17B. Construction for Connect Irwin Well I-2A

Payment under Bid Item No. 17B "Construction for Connect Irwin Well I-2A" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to construct the Connect Irwin Well I-2A as described in Appendix F and in accordance with the RFP requirements defined herein. Bid item shall include all associated site work.

18. BID OPTION 6 - NEW WELL, LANGFORD LAKE In APPENDIX G

18A. Design for New Well, Langford Lake

Payment under Bid Item No. 18A "Design for New Well, Langford Lake" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design for the New Well at Langford Lake as described in Appendix G and in accordance with the RFP requirements defined herein. Bid item shall include all associated site work.

18B. Construction for New Well, Langford Lake

Payment under Bid Item No. 18B "Construction for New Well, Langford Lake" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals

00 00 10 - 14 necessary to complete construction for the New Well at Langford Lake as described in Appendix G and in accordance with the RFP requirements defined herein. Bid item shall include all associated site work.

19. BID OPTION 7 – EXPANDABILITY OF WATER TREATMENT PLANT - In APPENDIX A

19A. Design for Expandability of Water Treatment Plant

Payment under Bid Item No. 19A "Design for Expandability of Water Treatment Plant" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design for the Expandability of Water Treatment Plant as described in Appendix A and in accordance with the RFP requirements defined herein. Bid item shall include all associated geotechnical, structural, architectural, process, mechanical, HVAC, plumbing, I&C, communications, electrical, and all site work necessary.

19B. Construction for Expandability of Water Treatment Plant

Payment under Bid Item No. 19B "Construction of Expandability of Water Treatment Plant" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to construct the Expandability of Water Treatment Plant as described in Appendix A and in accordance with the RFP requirements defined herein. Bid item shall include all associated geotechnical, structural, architectural, process, mechanical, HVAC, plumbing, I&C, communications, electrical, and all site work necessary.

20. BID OPTION 8 – EXPANDED WATER TREATMENT PLANT - In APPENDIX A

20A. Design for Expanded Water Treatment Plant

Payment under Bid Item No. 20A "Design for Expanded Water Treatment Plant" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design for the Expandabed Water Treatment Plant as described in Appendix A and in accordance with the RFP requirements defined herein. Bid item shall include all associated geotechnical, structural, architectural, process, mechanical, HVAC, plumbing, I&C, communications, electrical, and all site work necessary.

20B. Construction for Expanded Water Treatment Plant

Payment under Bid Item No. 20B "Construction of Expanded Water Treatment Plant" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to construct the Expanded Water Treatment Plant as described in Appendix A and in accordance with the RFP requirements defined herein. Bid item shall include all associated geotechnical, structural, architectural, process, mechanical, HVAC, plumbing, I&C, communications, electrical, and all site work necessary.

21. BID OPTION 9 – ADDITIONAL 10% ENERGY SAVINGS COMPARED TO ASHRAE

STANDARD 90.1

21A. Design for Additional 10% Energy Savings Compared To ASHRAE Standard 90.1

Payment under Bid Item No. 21A "Design for Additional 10% Energy Savings Compared To ASHRAE Standard 90.1" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the design for the additional 10% energy savings for a

00 00 10 - 15 total of 50% energy consumption savings compared to ASHRAE Standard 90.1 as required in accordance with the RFP requirements defined herein.

21B. Construction for Additional 10% Energy Savings Compared To ASHRAE Standard 90.1

Payment under Bid Item No. 21B " Construction for Additional 10% Energy Savings Compared To ASHRAE Standard 90.1" will constitute full compensation for furnishing all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction for the additional 10% energy savings for a total of 50% energy consumption savings compared to ASHRAE Standard 90.1 as required in accordance with the RFP requirements defined herein.

-- END OF EXPLANATION OF BID ITEMS --

ATTACHMENT 1

TO EXPLANATION OF BID ITEMS

GE PROPOSAL, TERMS, AND CONDITIONS

GE Confidential and Proprietary Information

Proposal No. 113259, Revision #1, March 23rd, 2012 - Valid until December 1st, 2012 Page 1

Proposal For:

Bidding Contractors US Army Corps of Engineers

Fort Irwin Project EDR WTP System

Proposal No. 113259, Revision 1 March 23rd, 2012

Proposal No. 113259, Revision #1, March 23rd, 2012 - Valid until December 1st, 2012 Page 2

GE Water& Process Technologies Confidential and Proprietary Information

GE Water & Process Technologies (“Seller”) submits the information contained in this document for evaluation by Buyer only. Buyer agrees not to reveal its contents except to those in Buyer’s organization necessary for evaluation. Copies of this document may not be made without the prior written consent of Seller’s Management. If the preceding is not acceptable to Buyer, this document shall be returned to Seller.

Proposal No. 113259, Revision #1, March 23rd, 2012 - Valid until December 1st, 2012 Page 3

Table of Contents

1 Technical and Engineering Details

1.1 Basis of Design

1.2 Feed Water Quality Constraints

1.3 EDR Feed, Product and Waste Water Quality

1.4 Influent Water Variability

1.5 System Summary

2 Seller’s Scope of Supply

2.1 Summary of Seller’s Scope of Supply

2.2 EDR Train

2.3 Technical Advisory Services for Commissioning & Startup

3 Buyer’s Scope of Supply

3.1 Summarized Equipment Supply by Buyer

3.2 Safety and Environmental

3.3 Jobsite and Installation Review

3.4 Start-Up and Commissioning

3.5 Facility Management

4 Commercial Offer

4.1 Pricing Table

4.2 Price Validity

4.3 Taxes

4.4 Order Confirmation Centre

4.5 Freight

4.6 Bonds

4.7 Invoicing and Payment Terms

4.8 Equipment Shipment and Delivery

4.9 Terms and Conditions

4.10 Exceptions and Clarifications

Appendix A

Terms and Conditions of Sale

Commercial Terms and Conditions

Appendix B

Standard Seller’s Warranty: Electrodialysis Reversal (EDR) Cation & Anion Membranes

Introduction

Mechanical Warranty

EDR Cation and Anion membranes Warranty

Appendix C

EDR Systems References

Proposal No. 113259, Revision #1, March 23rd, 2012 - Valid until December 1st, 2012 Page 4

1 Technical and Engineering Details

1.1 Basis of Design

The design solution proposed is based on the values below provided in the tender document.

Product water capacity per train 1,500,000 USGPD Hours per day of operation 24 Days per year of operation 365 Maximum expected product water fluoride content, mg/l 1.3 Maximum expected product water arsenic content, µg/l 7.5 Maximum expected product water nitrate content, mg/l 7.5 Minimum water recovery 92%

1.2 Feed Water Quality Constraints

The EDR feed water must comply with the following parameters at all times. The EDR equipment has been designed on the understanding that contaminants and fouling constituents will be removed from the raw feedwater by pretreatment processes installed upstream of the EDR trains.

Parameters ,unit Limit pH (Continuous) 1-9 Iron (dissolved) 0.3 mg/l max Manganese (dissolved) 0.1 mg/l max H2S 0.1 mg/l max Aluminum 0.1 mg/l max Free Chlorine (Max-continuous) 0.5 mg/l Free Chlorine (Max, Shock) 30.0 mg/l Oil and Grease 2.0 mg/l (Infrared Method) COD 50.0 mg/l (as O2) TOC 15.0 mg/l Turbidity (Max, Continuous) 0.5 NTU Turbidity (Max, Intermittent) 2.0 NTU SDI5 (Max, Continuous) 10-12 SDI5 (Max, Intermittent) 15 MBAS < 1 ppm Anionic Dispersant 0 ppm

Proposal No. 113259, Revision #1, March 23rd, 2012 - Valid until December 1st, 2012 Page 5

1.3 EDR Feed, Product and Waste Water Quality

The following water quality performance parameters are expected upon equipment start-up and will be demonstrated during the equipment performance test, carried out during the commissioning of the plant.

Feed Water Quality Data

Constituent Unit Ambient Scenario Low TDS

Scenario 1C Moderately High TDS Scenario 5A

High TDS Scenario

Calcium mg/l 24.75 7.03 68 31.6 Magnesium mg/l 4.2 1.97 10 5.4 Sodium mg/l 167.8 139 168.9 213.4 Potassium mg/l 8.9 2.5 9.4 10.3 Strontium mg/l 0.4 0.4 0.65 0.4 Barium mg/l 0.02 0.02 0.04 0.02 Ammonium mg/l <0.05 <0.05 <0.05 <0.05 Bicarbonate mg/l 178.6 201 140 227.9 Sulfate mg/l 123.9 75.4 130 158.7 Chloride mg/l 104.6 38 211 133.4 Fluoride mg/l 5.1 10 5.5 8.75 Nitrate mg/l 20.3 4.4 20.3 32.4 Ortho PO4 mg/l <0.05 <0.05 <0.05 <0.05 Arsenic µg/l 25 40 40 30 Silica mg/l 52.3 20.5 20.3 66.7 pH IU 7.79 8.2 8.1 7.79 TDS mg/l 690 510 790 890 Conductivity µS/cm 1006 750 1237 1273

Projected Product Water Quality

Constituent Unit Ambient Scenario

Low TDS Scenario 1C

Moderately High TDS Scenario 5A

High TDS Scenario

Calcium mg/l 1.79 0.42 4.52 1.96 Magnesium mg/l 0.36 0.14 0.79 0.39 Sodium mg/l 21.94 14.23 21.44 23.26 Potassium mg/l 0.87 0.19 0.9 0.84 Strontium mg/l 0.02 0.02 0.0 0.02 Barium mg/l 0.0 0.0 0.0 0.0 Ammonium mg/l 0.02 0.01 0.0 0.02 Bicarbonate mg/l 30.28 25.14 22.32 31.49 Sulfate mg/l 9.45 4.32 9.18 9.89 Chloride mg/l 11.38 3.0 21.57 11.67 Fluoride mg/l 0.89 1.28 0.92 1.26 Nitrate mg/l 2.38 0.37 2.24 3.06 Ortho PO4 mg/l 0.0 0.0 0.0 0.0 Arsenic µg/l 2.72 3.16 4.09…