B08 - Unit Price Book 2026 DPW_Items Deleted-20260501.pdf

PDF 133 KB Posted

Attached to
PROJECT TITLE: JOB ORDER CONTRACT (JOC) - SATOC IDIQ
Solicitation number
W912PF26RA002
Issued by

About this file

Job Order Contract Unit Pricebook – Items Deleted to 2026 UPB

This document is a Job Order Contract (JOC) Unit Pricebook listing items that have been deleted and are no longer available for use in the 2026 Unit Price Book. The deletion list encompasses approximately 150 line items across multiple product and service categories, representing security infrastructure, detection systems, labor, and related equipment previously available under the JOC contract vehicle.

The deleted items span several functional categories: perimeter security devices (blast curtains, EMI/RFI shielding mesh, security bars, glass safety films); guard structures ranging from 2.0m x 2.0m to 2.4m x 6.0m standard and hardened construction booths, with some featuring ballistic resistance Level IV or IV+; surveillance equipment (high-speed cameras, infrared LED lights, heating units, vehicle scanning systems); traffic control infrastructure (automatic and manual traffic arms ranging from 3m to 10m blocking widths); vehicle barriers including M50 and M30 rated hydraulic systems with various blocking configurations and control packages; crash gates in galvanized and PVC-coated steel; pedestrian gates; electronic security systems with intrusion detection, overspeed detection, and traffic signals; and labor categories for electricians, equipment operators, and IDS technicians at various skill levels and clearance requirements. The document indicates these items are not designated for use with Standard JOC Contracts and should not be referenced for procurement in the current contract period.

View the file

Other files

File Type Posted
B08 - Unit Price Book 2026 DPW_Items Added-20260501.pdf PDF
B08_Conformed_Solicitation Amendment - W912PF26RA0020005-20260506.pdf PDF
B08_Solicitation Amendment W912PF26RA0020005-20260506.pdf PDF
B08_ATTACHMENT 2_Unit Price Book Europe 2026-20260429.pdf PDF
B08_Solicitation Amendment W912PF26RA0020004-20260429.pdf PDF
B08_Comformed_Solicitation Amendment-W912PF26RA0020004-20260429.pdf PDF
B08-Solicitation Amendment Conformed - W912PF26RA0020003-20260422.pdf PDF
B08-ATTACHMENT 3_JOC Pricing Schedule FY26 Italy(Updated) 20260421.xlsx XLSX spreadsheet
B08-Solicitation Amendment W912PF26RA0020003-20260422.pdf PDF
B08-Attachment 8-(JOC) Pre-Proposal Conference Slides-20260417.pptx PPTX presentation
B08-Attachment 7-JOC Pre-Propoaal Conferance Attendance List-20260417.pdf PDF
B08_Conformed_Solicitation Amendment - W912PF26RA0020002 20260416.pdf PDF
B08_Solicitation Amendment W912PF26RA0020002 SF 30 20260416 1.pdf PDF
B08_Confomed _Solicitation Amendment - W912PF26RA0020002 2020416.pdf PDF
B08_Solicitation Amendment W912PF26RA0020002 SF 30 20260416.pdf PDF
Notice for Pre-Proposal Conference alternate method .pdf PDF
B08_Conformed RFP Amendment - W912PF26RA0020001 20260323.pdf PDF
B08_Solicitation Amendment W912PF26RA0020001 SF 30 20260323.pdf PDF
B08-ATTACHMENT 2_Unit Price Book Europe 2025_Excel version_20251112.xlsx XLSX spreadsheet
B08-ATTACHMENT 3_JOC Pricing Schedule FY26 Italy.xlsx XLSX spreadsheet
B08-ATTACHMENT 5 Past Performance Questionnaire (Form PPQ-0)20260115.pdf PDF
B08_W912PF26RA002_Final_20260309.pdf PDF
B08_ATTACHMENT 1 SOW_20260108.pdf PDF
B08-ATTACHMENT 4 Construction Experience Project Data Sheet 20260115.pdf PDF
B08-ATTACHMENT 6 Example Project Statistics for individual task order_20251112.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Job Order Contract Unit Pricebook

Items deleted to 2026 UPB

• 100-00 0307 Does Not Exist in 2026 UPB -- This secƟon is NOT designated for use with a Standard JOC Contract in Europe

• 100-04 01A Does Not Exist in 2026 UPB -- Blast Curtain with MounƟng Devices (including rod, brackets, fasteners, anchors and storage trough)

• 100-04 01B Does Not Exist in 2026 UPB -- EMI/RFI Shielding Mesh (includes framing and mounƟng hardware)

• 100-04 01C Does Not Exist in 2026 UPB -- Rigid metal security bars

• 100-04 01D Does Not Exist in 2026 UPB -- Rigid metal bar frames (window)

• 100-04 01I Does Not Exist in 2026 UPB -- Furnish and install Glass Safety Film Type I

• 100-04 01J Does Not Exist in 2026 UPB -- Furnish and install Glass Safety Film Type II

• 100-04 01K Does Not Exist in 2026 UPB -- Furnish and install Glass Safety Film Type III

• 100-04 01L Does Not Exist in 2026 UPB -- Window Safety Film, Type IIIA, with sun protecƟon coaƟng

• 100-04 01M Does Not Exist in 2026 UPB -- Window Safety Film, Type IVA, with sun protecƟon coaƟng

• 100-04 01N Does Not Exist in 2026 UPB -- Window Safety Film, Type IV, with sun protecƟon coaƟng

• 100-04 03 A Does Not Exist in 2026 UPB -- Guard Booth, 2.0m x 2.0m, standard construcƟon without toilet, furnished and installed, not including foundaƟon and electrical, communicaƟon cable connecƟons

• 100-04 03 B Does Not Exist in 2026 UPB -- Guard Booth, 2.0m x 2.4m, standard construcƟon without toilet, furnished and installed, not including foundaƟon and electrical, communicaƟon cable

• 100-04 03 C Does Not Exist in 2026 UPB -- Guard Booth, 2.4m x 2.4m, standard construcƟon without toilet, furnished and installed, not including foundaƟon and electrical, communicaƟon cable

• 100-04 03 D Does Not Exist in 2026 UPB -- Guard Booth, 2.4m x 4.0m, standard construcƟon without toilet, furnished and installed, not including foundaƟon and electrical, communicaƟon cable

• 100-04 03 E Does Not Exist in 2026 UPB -- Guard Booth, 2.5m x 6.0m, standard construcƟon without toilet, furnished and installed, not including foundaƟon and electrical, communicaƟon cable

• 100-04 03 F Does Not Exist in 2026 UPB -- Guard Booth, 2.4m x 2.4m with overhang, standard construcƟon without toilet, furnished and installed, not including foundaƟon and electrical, communicaƟon cable

• 100-04 03 G Does Not Exist in 2026 UPB -- Guard Booth, 2.0m x 2.0m, harden construcƟon US Level V, without toilet, furnished and installed, not including foundaƟon and electrical, communicaƟon cable

• 100-04 03 H Does Not Exist in 2026 UPB -- Guard Booth, 2.0m x 2.4m, harden construcƟon US Level V, without toilet, furnished and installed, not including foundaƟon and electrical, communicaƟon cable

• 100-04 03 I Does Not Exist in 2026 UPB -- Guard Booth, 2.4m x 2.4m, harden construcƟon US Level V, without toilet, furnished and installed, not including foundaƟon and electrical, communicaƟon cable

• 100-04 03 J Does Not Exist in 2026 UPB -- Guard Booth, 2.4m x 4.0m, harden construcƟon US Level V, without toilet, furnished and installed, not including foundaƟon and electrical, communicaƟon cable

• 100-04 03 K Does Not Exist in 2026 UPB -- Guard Booth, 2.5m x 6.0m, harden construcƟon US Level V, without toilet, furnished and installed, not including foundaƟon and electrical, communicaƟon cable

• 100-04 03 L Does Not Exist in 2026 UPB -- Guard Booth, 2.4m x 2.4m with overhang, harden construcƟon US Level V, without toilet, furnished and installed, not including foundaƟon and electrical, communicaƟon cable

• 100-04 03 M Does Not Exist in 2026 UPB -- Guard Booth, 2.4m x 4.0m, harden construcƟon US Level V, with toilet, furnished and installed, not including foundaƟon and electrical, communicaƟon cable

• 100-04 03 N Does Not Exist in 2026 UPB -- Guard Booth and Overwatch, 1.5m x 1.5m x 2.5m, BallisƟc Resistance Level IV+, 12,0000 btu A/C, external roof lights as 4 corners

LED

• 100-04 03 O Does Not Exist in 2026 UPB -- Guard Booth 1.5m x 1.5m, BallisƟc Resistance Level IV or UL 9, 9.000 btu A/C, 15cmX10cm gun ports, furnished and installed, not including foundaƟon and electrical, communicaƟon cable.

• 100-04 03 P Does Not Exist in 2026 UPB -- Guard Booth 1.5m x 2.4m, BallisƟc Resistance Level IV or UL 9, 9.000 btu A/C, 15cmX10cm gun ports, furnished and installed, not including foundaƟon and electrical, communicaƟon cable.

• 100-04 03 Q Does Not Exist in 2026 UPB -- Guard Booth 1.5m x 3.0m, BallisƟc Resistance Level IV or UL 9, 9.000 btu A/C, 15cmX10cm gun ports, furnished and installed, not including foundaƟon and electrical, communicaƟon cable.

• 100-04 03 R Does Not Exist in 2026 UPB -- Guard Booth 2.0m x 4.0m, BallisƟc Resistance Level IV or UL 9, 12.000 btu A/C, 15cmX10cm gun ports, furnished and installed, not including foundaƟon and electrical, communicaƟon cable.

• 100-04 03 S Does Not Exist in 2026 UPB -- Guard Booth 2.4m x 6.0m, BallisƟc Resistance Level IV or UL 9, 12.000 btu A/C, 15cmX10cm gun ports, furnished and installed, not including foundaƟon and electrical, communicaƟon cable. (TE - 0403N)

• 100-04 03 T Does Not Exist in 2026 UPB -- Guard Booth 1.5m x 1.5m, BallisƟc Resistance Level IV+ or UL 10, 9.000 btu A/C, 15cmX10cm gun ports, furnished and installed, not including foundaƟon and electrical, communicaƟon cable.

• 100-04 03 U Does Not Exist in 2026 UPB -- Guard Booth 1.5m x 2.4m, BallisƟc Resistance Level IV+ or UL 10, 9.000 btu A/C, 15cmX10cm gun ports, furnished and installed, not including foundaƟon and electrical, communicaƟon cable.

• 100-04 03 V Does Not Exist in 2026 UPB -- Guard Booth 1.5m x 3.0m, BallisƟc Resistance Level IV+ or UL 10, 9.000 btu A/C, 15cmX10cm gun ports, furnished and installed, not including foundaƟon and electrical, communicaƟon cable.

• 100-04 03 W Does Not Exist in 2026 UPB -- Guard Booth 2.0m x 4.0m, BallisƟc Resistance Level IV+ or UL 10, 12.000 btu A/C, 15cmX10cm gun ports, furnished and installed, not including foundaƟon and electrical, communicaƟon cable.

• 100-04 03 X Does Not Exist in 2026 UPB -- Guard Booth 2.4m x 6.0m, BallisƟc Resistance Level IV+ or UL 10, 12.000 btu A/C, 15cmX10cm gun ports, furnished and installed, not including foundaƟon and electrical, communicaƟon cable.

• 100-04 03 Y Does Not Exist in 2026 UPB -- Guard Booth, size not specified above, harden construcƟon US Level V, with toilet, furnished and installed, not including foundaƟon and electrical, communicaƟon cable

• 100-04 03 Z Does Not Exist in 2026 UPB -- Add KitcheneƩe

• 100-04 03AA Does Not Exist in 2026 UPB -- Add toilet and wash room facility

• 100-04 03AAA Does Not Exist in 2026 UPB -- Canopy Structure of Aluminum frame with a standing seam rolled sheet metal roof, fabric cladding on sides, minimum dimensions 6mx6m x 4.5m

• 100-04 03BB Does Not Exist in 2026 UPB -- Add Gun Port to Guard Shelter

• 100-04 03BBB Does Not Exist in 2026 UPB -- Canopy Structure of Aluminum frame with a standing seam rolled sheet metal roof, fabric cladding on sides, greater than 6m x 6m x 4.5m

• 100-04 03CC Does Not Exist in 2026 UPB -- Guard Booth, Refurbish ExisƟng up to 2.4m x 4m, paint and patch, replace lighƟng, repair electrical components, repair door and hardware

• 100-04 03CCC Does Not Exist in 2026 UPB -- Canopy Structure of Steel frame galvanized, standing seam rolled sheet metal roof

• 100-04 03DD Does Not Exist in 2026 UPB -- Prefabricated Concrete Storage Room 6,00m x3,00m x 2,46m

• 100-04 03DDD Does Not Exist in 2026 UPB -- Dismantle and retain Canopy Structure for reinstallaƟon, up to 10m x 15m x 4.5m, including rolled sheet metal roof and canvas sides.

• 100-04 03EE Does Not Exist in 2026 UPB -- Dismantle and dispose Canopy Structure, up to 10m x 15m x 4.5m, including rolled sheet metal roof and canvas sides.

• 100-04 03FF Does Not Exist in 2026 UPB -- Reassemble Canopy Structure of with a standing seam rolled sheet metal roof, fabric cladding on sides, minimum dimensions 10m x 15m x 4.5m

• 100-04 03GG Does Not Exist in 2026 UPB -- Transport Canopy Structure with a standing seam rolled sheet metal roof, fabric cladding on sides, minimum dimensions 10m x 15m x 4.5m

• 100-06 06A Does Not Exist in 2026 UPB -- High Speed Line Camera, 1024 Pixels, Day and Night operaƟons capable, with all cabling to processing unit

• 100-06 06B Does Not Exist in 2026 UPB -- Row of 200 infrared LED lights

• 100-06 06C Does Not Exist in 2026 UPB -- AutomaƟc HeaƟng Unit with temperature control sensor

• 100-06 06D Does Not Exist in 2026 UPB -- CompaƟble 20 LED flat screen monitor

• 100-06 06E Does Not Exist in 2026 UPB -- Under Vehicle Scanning System Server loaded with controlling soŌware, with Keyboard and Camera Control JoysƟck device

• 100-07 01F Does Not Exist in 2026 UPB -- Traffic Arm, Light Duty, automaƟcally operated, blocking width 3m, furnish and install

• 100-07 01G Does Not Exist in 2026 UPB -- Traffic Arm, Light Duty, automaƟcally operated, blocking width 4m, furnish and install

• 100-07 01H Does Not Exist in 2026 UPB -- Traffic Arm, Light Duty, automaƟcally operated, blocking width 6m, furnish and install

• 100-07 01I Does Not Exist in 2026 UPB -- Traffic Arm, Light Duty, automaƟcally operated, blocking width 8m, furnish and install

• 100-07 01J Does Not Exist in 2026 UPB -- Traffic Arm, Light Duty, automaƟcally operated, blocking width 10m, furnish and install

• 100-07 02 1 Does Not Exist in 2026 UPB -- AcƟve Rated Barrier, including internal controls and components, and remote control operaƟon device. Earthwork, FoundaƟon, electrical supply to barrier and repair paving not included. All AcƟve barriers must be on the approved DOD ANTI-RAM VEHICLE BARRIER LIST Dated: September 2018

• 100-07 02 2 Does Not Exist in 2026 UPB -- AcƟve M50 Rated Barriers Refer to Technical Exhibit "TE - 0702A"

• 100-07 02 A Does Not Exist in 2026 UPB -- AcƟve M50 Hydraulic Barrier Blocking Width 4M

• 100-07 02 B Does Not Exist in 2026 UPB -- AcƟve M50 Hydraulic Barrier Blocking Width 6M

• 100-07 02 C Does Not Exist in 2026 UPB -- AcƟve M50 Hydraulic Barrier Blocking Width 8M

• 100-07 02 D Does Not Exist in 2026 UPB -- M50 Hydraulic Beam 4 mtr

• 100-07 02 E Does Not Exist in 2026 UPB -- M50 Hydraulic Beam 6mtr

• 100-07 02 F Does Not Exist in 2026 UPB -- M50 Hydraulic Beam 8mtr

• 100-07 02 G Does Not Exist in 2026 UPB -- M50 Hydraulic Wedge 4 mtr

• 100-07 02 H Does Not Exist in 2026 UPB -- M50 Hydraulic Bollards 4 mtr set off 4

• 100-07 02 I Does Not Exist in 2026 UPB -- M50 Hydraulic Bollards 6 mtr set off 7

• 100-07 02 J Does Not Exist in 2026 UPB -- M50 Hydraulic Bollards 8 mtr set off 10

• 100-07 02 K Does Not Exist in 2026 UPB -- Shipping cost Port USA? Jobsite (40' Container

Door To Door)

• 100-07 02 L Does Not Exist in 2026 UPB -- Vehicle Arrestor ASTM M50 Net AVB 30'

• 100-07 02 M Does Not Exist in 2026 UPB -- Basic Control Package (Includes InstallaƟon)

• 100-07 02 N Does Not Exist in 2026 UPB -- InstallaƟon Package

• 100-07 02 O Does Not Exist in 2026 UPB -- TesƟng and Commissioning (Programming, adjustments, tesƟng, training)

• 100-07 02 P Does Not Exist in 2026 UPB -- Electric Drop Arm Gate 24' ASTM 50

• 100-07 02 Q Does Not Exist in 2026 UPB -- InstallaƟon Package Electric Drop Arm Gate

24'

• 100-07 02 S Does Not Exist in 2026 UPB -- Horizontal Crash Beam 28'

• 100-07 02 T Does Not Exist in 2026 UPB -- Advanced Control Package Horizontal Crash

Beam

• 100-07 02 U Does Not Exist in 2026 UPB -- Generator Backup Power Source

• 100-07 02 V Does Not Exist in 2026 UPB -- InstallaƟon Package Horizontal Crash Beam

28'

• 100-07 02 X Does Not Exist in 2026 UPB -- Barrier LiŌ System M50 10 meter

• 100-07 02 Y Does Not Exist in 2026 UPB -- Barrier LiŌ System M50; Advanced Controls

Package

• 100-07 02 Z Does Not Exist in 2026 UPB -- Barrier LiŌ System M50 6 meter

• 100-07 02BB Does Not Exist in 2026 UPB -- Biodegradable hydraulic fluid (Plantohyd 22S)

• 100-07 02CC Does Not Exist in 2026 UPB -- M50 P1 Post & Beam Gate 24'

• 100-07 02DD Does Not Exist in 2026 UPB -- Blocking Width 4M, automaƟcally operated, furnish and install

• 100-07 02EE Does Not Exist in 2026 UPB -- Blocking Width 6M, automaƟcally operated, furnish and install

• 100-07 02FF Does Not Exist in 2026 UPB -- Blocking Width 8M, automaƟcally operated, furnish and install

• 100-07 02GG Does Not Exist in 2026 UPB -- M30 Rated Barriers, Hand Operated

• 100-07 02HH Does Not Exist in 2026 UPB -- Blocking Width 4M, manually operated, furnish and install

• 100-07 02II Does Not Exist in 2026 UPB -- Blocking Width 6M, manually operated, furnish and install

• 100-07 02JJ Does Not Exist in 2026 UPB -- Blocking Width 8M, manually operated, furnish and install

• 100-07 02KK Does Not Exist in 2026 UPB -- M30 Shallow Mount Bollards 4m ?set of 3

• 100-07 02LL Does Not Exist in 2026 UPB -- M30 Shallow Mount Bollards 6m ?set of 5

• 100-07 02MM Does Not Exist in 2026 UPB -- M30 Shallow Mount Bollards 8m ? set of 7

• 100-07 02NN Does Not Exist in 2026 UPB -- M30 Hydraulic Bollards 4 mtr ? set of 4

• 100-07 02OO Does Not Exist in 2026 UPB -- M30 Hydraulic Bollards 6 mtr ? set of 7

• 100-07 02PP Does Not Exist in 2026 UPB -- M30 Hydraulic Bollards 8 mtr ? set of 10

• 100-07 02QQ Does Not Exist in 2026 UPB -- Electrical Operated Heavy Duty bollard, minimum blocking force of 100Kn, furnished and installed including foundaƟon

• 100-07 02RR Does Not Exist in 2026 UPB -- Electrical Operated Heavy Duty bollard, minimum blocking force of 200Kn, furnished and installed including foundaƟon

• 100-07 02SS Does Not Exist in 2026 UPB -- AddiƟonal Push BuƩon Controls

• 100-07 02TT Does Not Exist in 2026 UPB -- Remote Radio transmiƩed Controls

• 100-07 02UU Does Not Exist in 2026 UPB -- Vehicle Presence DetecƟon Sensor Loop, furnished and installed

• 100-07 02VV Does Not Exist in 2026 UPB -- Vehicle Speed Detector

• 100-07 02WW Does Not Exist in 2026 UPB -- Traffic Sign with post, foundaƟon included, furnished and installed

• 100-07 02XX Does Not Exist in 2026 UPB -- Barrier Refurbish, K Rated, to include hydraulic components, electrical components, and painƟng

• 100-07 02YY Does Not Exist in 2026 UPB -- Emplace Portable K Rated Mobile Barrier for

AutomaƟc OperaƟon, to include standard power connecƟon

• 100-08 04A Does Not Exist in 2026 UPB -- Crash Gate, Galvanized Steel, post to post opening of 4 M

• 100-08 04B Does Not Exist in 2026 UPB -- Crash Gate, Galvanized Steel, post to post opening of 6 M

• 100-08 04C Does Not Exist in 2026 UPB -- Crash Gate, Galvanized Steel, post to post opening of 8 M

• 100-08 04D Does Not Exist in 2026 UPB -- Crash Gate, Galvanized Steel, post to post opening of 10 M

• 100-08 04E Does Not Exist in 2026 UPB -- Crash Gate, Galvanized Steel, post to post opening of 12 M

• 100-08 04F Does Not Exist in 2026 UPB -- Crash Gate, PVC Coated Steel, post to post opening of 4 M

• 100-08 04G Does Not Exist in 2026 UPB -- Crash Gate, PVC Coated Steel, post to post opening of 6 M

• 100-08 04H Does Not Exist in 2026 UPB -- Crash Gate, PVC Coated Steel, post to post opening of 8 M

• 100-08 04I Does Not Exist in 2026 UPB -- Crash Gate, PVC Coated Steel, post to post opening of 10 M

• 100-08 04J Does Not Exist in 2026 UPB -- Crash Gate, PVC Coated Steel, post to post opening of 12 M

• 100-08 05B Does Not Exist in 2026 UPB -- Enhanced Security Pedestrian Gate and Electrical operated Personnel TurnsƟle, compaƟble w/ Hirsch Controls

• 100-09 01A Does Not Exist in 2026 UPB -- Electronic Security System (ESS) - includes Intrusion DetecƟon System (IDS), duress alarm and tamper switches.

• 100-09 01B Does Not Exist in 2026 UPB -- Point Overspeed DetecƟon in both Inbound and Outbound Lanes

• 100-09 01C Does Not Exist in 2026 UPB -- Wrong-way DetecƟon i# of locaƟons (LOC) on Outbound Lanes

• 100-09 01D Does Not Exist in 2026 UPB -- ConƟnuous Overspeed DetecƟon - One Zone

• 100-09 01E Does Not Exist in 2026 UPB -- ConƟnuous Overspeed DetecƟon - Two Zones

• 100-09 01F Does Not Exist in 2026 UPB -- Traffic Signals

• 100-10 06A Does Not Exist in 2026 UPB -- Electrician - US Cleared

• 100-10 06B Does Not Exist in 2026 UPB -- IDS technician - US Cleared

• 100-10 06C Does Not Exist in 2026 UPB -- Heavy equipment operator - US Cleared

• 100-10 06D Does Not Exist in 2026 UPB -- Electricians - ApprenƟce

• 100-10 06E Does Not Exist in 2026 UPB -- Electricians - Inside Foreman

• 100-10 06F Does Not Exist in 2026 UPB -- Electricians - Outside Foreman

• 100-10 06G Does Not Exist in 2026 UPB -- Electricians

• 100-10 06H Does Not Exist in 2026 UPB -- Equipment Operators, Medium Equipment - ApprenƟce

• 100-10 06I Does Not Exist in 2026 UPB -- Equipment Operators, Medium Equipment - Inside Foreman

• 100-10 06J Does Not Exist in 2026 UPB -- Equipment Operators, Medium Equipment - Outside Foreman

• 100-10 06K Does Not Exist in 2026 UPB -- Equipment Operators, Crane or Shovel - ApprenƟce

• 100-10 06L Does Not Exist in 2026 UPB -- Equipment Operators, Crane or Shovel - Inside Foreman

• 100-10 06M Does Not Exist in 2026 UPB -- Equipment Operators, Crane or Shovel - Outside Foreman

• 100-10 06N Does Not Exist in 2026 UPB -- Equipment Operators, Crane or Shovel

• 100-10 06O Does Not Exist in 2026 UPB -- Equipment Operators, Light Equipment -

ApprenƟce

• 100-10 06P Does Not Exist in 2026 UPB -- Equipment Operators, Light Equipment - Inside

Foreman

• 100-10 06Q Does Not Exist in 2026 UPB -- Equipment Operators, Light Equipment -

Outside Foreman

• 100-10 06R Does Not Exist in 2026 UPB -- Equipment Operators, Light Equipment

• 100-10 06S Does Not Exist in 2026 UPB -- Equipment Operators, Master Mechanics -

ApprenƟce

• 100-10 06T Does Not Exist in 2026 UPB -- Equipment Operators, Medium Equipment

• 100-10 06U Does Not Exist in 2026 UPB -- Equipment Operators, Master Mechanics -

Inside Foreman

• 100-10 06V Does Not Exist in 2026 UPB -- Equipment Operators, Master Mechanics

• 100-10 06W Does Not Exist in 2026 UPB -- Equipment Operators, Master Mechanics -

Outside Foreman

File details come from the government source that posted it. Updated .