This document contains questions and answers regarding two seed projects. The first seed project involves lead abatement in the office area and breakroom of a building, but not in the bathroom or mechanical room. All loose and flaking lead paint must be removed rather than encapsulated. The building will be unoccupied during construction. An accurate reflected ceiling plan is unavailable. The contractor may use an on-site dumpster and must dispose of waste at an approved off-base facility. Substantial completion is required within 90 calendar days.

The second seed project also involves an unoccupied building during construction. The performance period for substantial completion is 180 calendar days. Electrical requirements for a future kitchen oven are detailed in the project specifications. Emergency egress doors separating the project area from the secured side of the building must remain operational during construction.

RFI dated 2 MAR 2019

View the file

Other files

File Type Posted
Bldg_59_Roof.pdf PDF
Amendment_5.pdf PDF
Exterior_photos_of_bldg_59.docx DOCX document
Bldg_59_Roof.pdf PDF
RFI_dated_2_MAR_2019.docx DOCX document
Exterior_photos_of_bldg_59.docx DOCX document
SEED__2_-_2nd_Sign_in_Sheet.pdf PDF
SEED__1_-_2nd_Sign_in_Sheet.pdf PDF
AF3064.pdf PDF
Amendment_4.pdf PDF
RFI's_dated_28_FEB_2019.docx DOCX document
MATOC_2019_Preproposal_Conference_Slides.pptx PPTX presentation
SOW_LTUY172059_-_Repair_Bldg_59_Rev27FEB19.docx DOCX document
Attendance_Sheet_SEED__1.pdf PDF
Air_Guard_Bldg_59_&_290_LBP_ACM_report.pdf PDF
Meeting_Minutes_Jefferson_Barracks_SEED_1.docx DOCX document
AATTCA501-AW.pdf PDF
AATTCE401W.pdf PDF
AATTCA201-AW.pdf PDF
RFI_SEED__1docx.docx DOCX document
Meeting_Minutes_St_Joseph_SEED_2.docx DOCX document
59_Flr_Plan.pdf PDF
Attendance_sheet_SEED__2.pdf PDF
Bldg_20_Details.pdf PDF
RFI_questions_and_answers_from_site_visit.docx DOCX document
AATTCP302W.pdf PDF
Amendment_3.pdf PDF
AATTCM302-AW.pdf PDF
QA_for_MATOC.docx DOCX document
Meeting_Minutes_Jefferson_Barracks_SEED_1.docx DOCX document
Second_site_visit_docx.pdf PDF
Second_site_visit_docx.pdf PDF
Amendment_2.pdf PDF
W912NS19R0001_Amendment_1.pdf PDF
Exhibit_D-1._Proposal_Form_(SEED__1).pdf PDF
Exhibit_D-2._Proposal_Form_(SEED__2).pdf PDF
Exhibit_B_-_SUBCONTRACTOR_INFORMATION_AND_CONSENT_FORM.doc DOC document
Attachment_4_Wage_Determination_SEED_2.pdf PDF
Attachment_5_Section__01000.pdf PDF
Attachment_1_Plans_and_Specifications_(SEED_Project__1)_(2).pdf PDF
Exhibit_A_-_PERFORMANCE_RELEVANCY_QUESTIONNAIRE.doc DOC document
MATOC_SOLICITATION_6FEB2019.pdf PDF
Exhibit_C_-_PAST_PERFORMANCE_REFERENCE_QUESTIONNAIRE.doc DOC document
Exhibit_D-2._Proposal_Form_(SEED__2).pdf PDF
Attachment_2_Plans_and_Specifications_(SEED_Project__2)_(1).pdf PDF
Exhibit_D-1._Proposal_Form_(SEED__1).pdf PDF
Attachment_3_Wage_Determination_SEED_1.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEED #1

QUESTION: Please advise if in SEED project 1 lead abatement needs to be completed in the breakroom, mechanical room and bathroom.

ANSWER: Lead abatement is limited to office area and breakroom. Not in bathroom or mechanical room.

QUESTION: Please advise if on SEED project, the lead abatement scope of work should in the contractor removing the entire plaster ceiling or scraping the loose paint and encapsulating.

ANSWER: Scraping to remove all lead paint is what government wants. We do not want to encapsulate and keep lead paint. Successful contractor will coordinate with our base environmental office to sign manifests and provide reports.

QUESTION: Please confirm if the building will be occupied during construction on both seed projects.

ANSWER: SEED #1 – will not be occupied. SEED #2 – will not be occupied.

QUESTION: For seed project 1 can you please provide a reflective ceiling plan?

ANSWER: No. An accurate reflected ceiling plan is not available.

QUESTION: According to Attachment_1_Plans_and _Specifications (SEED_Project_1) on page 1 of 9 under general requirements it states “Contractor will not use Government dumpsters. All refuse, debris, and construction waste will be legally disposed of off base at a licensed landfill or approved recycling facility. Accumulation of waste on site will not be permitted”. Please clarify if the contractor may have a dumpster on site.

ANSWER: Yes contractor may absolutely have a dumpster on site. Coordinate with Base Engineering on location.

QUESTION: Please confirm if the performance period of 90 days is for substantial completion or until final for SEED project 1.

ANSWER: 90 calendar days for completion.

QUESTION: Would you consider providing a time extension taking in consideration that the second site visit was yesterday for SEED 2 and today for SEED 1. Please allow additional time extension for the RFI’s.

ANSWER: Due date for proposals remains unchanged.

QUESTION: Please provide the signing sheets for the second site visit.

ANSWER: Posted on FBO.

SEED #2

QUESTION: Please confirm if the performance period of 180 days is for substantial completion or until final for SEED project 2.

ANSWER: 180 calendar days for completion

QUESTION: What are the electrical requirements for the future oven in the kitchen in SEED project 2?

ANSWER: The electrical requirements are called out in the PWS (new work - Item 1.

Kitchen)

QUESTION: Please advise if the existing double doors of the lobby leading to the exterior are emergency egress doors and need to be maintained operational during the construction.

ANSWER: If they are referring to the double doors that separate the Sam Graves project area from the secured side of the building then yes, those need to remain operational for the remainder of the building.

File details come from the government source that posted it. Updated .