McGhee_Tyson_B3_Vol1_March_2018.pdf
PDF 6 MB Posted
- Attached to
- Replace KC-135 Maintenance Hangar and Shops
- Solicitation number
- W912L7-18-R-7002
About this file
Specifications Vol 1
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace KC-135 Maintenance Hangar and Shops
McGhee Tyson Air National Guard Base Knoxville, Tennessee
PN PSXE999132
Type B.3 Design Submittal
Specifications Volume 1 of 3
Burns & McDonnell Engineering Co., Inc.
Kansas City, Missouri March 2018
95368
This page was intentionally left blank for duplex printing.
Replace KC-135 Maintenance Hangar and Shops McGhee Tyson Air National Guard Base
Knoxville, Tennessee
PN PSXE999132
Specifications
March 2018 Burns & McDonnell 9400 Ward Parkway
Kansas City, MO 64114
CERTIFICATION PAGE
CERTIFICATION(S)
CIVIL ARCHITECTURAL STRUCTURAL
MECHANICAL ELECTRICAL FIRE PROTECTION
Repl ace KC- 135 Mai nt enance Hangar and Shops 95368 McGhee Tyson Ai r Nat i onal Guar d Base, Knoxvi l l e, TN
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 22 13. 00 20 SUPPLEMENTARY I NSTRUCTI ONS TO OFFERORS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 22 00. 00 10 PRI CE AND PAYMENT PROCEDURES
01 30 00 ADMI NI STRATI VE REQUI REMENTS
01 32 01. 00 10 PROJECT SCHEDULE
01 33 00 SUBMI TTAL PROCEDURES
01 33 29 SUSTAI NABI LI TY REPORTI NG
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 00 10 QUALI TY CONTROL
01 45 35 SPECI AL I NSPECTI ONS
01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMI TTALS
01 78 23 OPERATI ON AND MAI NTENANCE DATA
01 91 00. 15 TOTAL BUI LDI NG COMMI SSI ONI NG
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
02 82 13. 00 10 ASBESTOS ABATEMENT
02 82 33. 13 20 REMOVAL/ CONTROL AND DI SPOSAL OF PAI NT WI TH LEAD
02 83 13. 00 20 LEAD I N CONSTRUCTI ON
DI VI SI ON 03 - CONCRETE
03 11 13. 00 10 STRUCTURAL CAST- I N- PLACE CONCRETE FORMI NG
03 15 00. 00 10 CONCRETE ACCESSORI ES
03 20 00. 00 10 CONCRETE REI NFORCI NG
03 30 00. 00 10 CAST- I N- PLACE CONCRETE
03 30 53 MI SCELLANEOUS CAST- I N- PLACE CONCRETE
03 35 00. 00 10 CONCRETE FI NI SHI NG
03 39 00. 00 10 CONCRETE CURI NG
03 53 14. 00 20 LI GHT REFLECTI VE NONFERROUS METALLI C AGGREGATE FLOOR
SYSTEM
DI VI SI ON 04 - MASONRY
04 20 00 UNI T MASONRY
DI VI SI ON 05 - METALS
05 05 23. 16 STRUCTURAL WELDI NG
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOI ST FRAMI NG
05 30 00 STEEL DECKS
05 40 00 COLD- FORMED METAL FRAMI NG
05 51 33 METAL LADDERS
05 52 00 METAL RAI LI NGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
PROJECT TABLE OF CONTENTS Page 1
06 10 00 ROUGH CARPENTRY
06 41 16. 00 10 WOOD VENEER ARCHI TECTURAL CABI NETS
06 61 16 SOLI D SURFACI NG FABRI CATI ONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 PRESSURE TESTI NG AND AI R BARRI ER SYSTEM FOR AI R TI GHTNESS
07 11 13 BI TUMI NOUS DAMPPROOFI NG
07 21 13 BOARD AND BLOCK I NSULATI ON
07 21 16 MI NERAL FI BER BLANKET I NSULATI ON
07 21 19 SPRAYED POLYURETHANE FOAM I NSULATI ON
07 22 00 ROOF AND DECK I NSULATI ON
07 27 10. 00 10 BUI LDI NG AI R BARRI ER SYSTEM
07 27 26 FLUI D- APPLI ED MEMBRANE AI R BARRI ER
07 42 13 METAL WALL PANELS
07 42 63 FABRI CATED PANEL ASSEMBLI ES
07 60 00 FLASHI NG AND SHEET METAL
07 61 14. 00 20 STEEL STANDI NG SEAM ROOFI NG
07 72 01 ROOF ACCESSORI ES
07 72 13 PREFABRI CATED ROOF CURBS
07 81 01 I NTUMESCENT PAI NT FI REPROOFI NG
07 84 00 FIRESTOPPING
07 92 00. 00 06 JOI NT SEALANTS
07 95 00 EXPANSI ON CONTROL
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 13 COI LI NG COUNTER DOORS
08 34 16. 10 STEEL SLI DI NG HANGAR DOORS
08 34 19. 10 20 ROLLI NG SERVI CE AND FI RE DOORS
08 44 00 CURTAI N WALL AND GLAZED ASSEMBLI ES
08 60 45 TRANSLUCENT PANELS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 81 17 FI RE- RATED GLASS
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 06 90 SCHEDULES FOR PAI NTI NG AND COATI NG
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMI C TI LI NG
09 51 00 ACOUSTI CAL CEI LI NGS
09 65 00 RESI LI ENT FLOORI NG
09 67 23. 13 STANDARD RESI NOUS FLOORI NG
09 67 23. 15 FUEL RESI STI VE RESI NOUS FLOORI NG, 3- COAT SYSTEM
09 90 00 PAI NTS AND COATI NGS
09 96 00 HI GH- PERFORMANCE COATI NGS
DI VI SI ON 10 - SPECI ALTI ES
10 11 00 VI SUAL DI SPLAY UNI TS
10 14 00. 10 EXTERI OR SI GNAGE
10 14 00. 20 I NTERI OR SI GNAGE
10 21 13 TOI LET COMPARTMENTS
10 22 29 ACOUSTI CAL VERTI CAL FOLDI NG PANEL PARTI TI ONS
PROJECT TABLE OF CONTENTS Page 2
10 26 00 WALL AND DOOR PROTECTI ON
10 28 13 TOI LET ACCESSORI ES
10 42 10 DI MENSI ONAL LETTERS
10 51 13 METAL LOCKERS
DI VI SI ON 11 - EQUI PMENT
11 01 50 RI GI D RAI L FALL PROTECTI ON SYSTEMS
DI VI SI ON 12 - FURNI SHI NGS
12 21 00 WI NDOW BLI NDS
12 59 00 SYSTEMS FURNI TURE
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 48 00 SEI SMI C PROTECTI ON FOR MI SCELLANEOUS EQUI PMENT
13 48 00. 00 10 SEI SMI C PROTECTI ON FOR MECHANI CAL EQUI PMENT
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13. 00 10 WET PI PE SPRI NKLER SYSTEM, FI RE PROTECTI ON
21 13 25. 00 10 HI GH EXPANSI ON FOAM ( HI EX. HEF) FI RE PROTECTI ON SYSTEM
21 30 00 FI RE PUMPS
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBI NG, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS
23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC
23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS
23 09 00 I NSTRUMENTATI ON AND CONTROL FOR HVAC
23 09 13 I NSTRUMENTATI ON AND CONTROL DEVI CES FOR HVAC
23 09 23. 02 BACNET DI RECT DI GI TAL CONTROL FOR HVAC AND OTHER BUI LDI NG
CONTROL SYSTEMS
23 11 25 FACI LI TY GAS PI PI NG
23 35 19. 00 20 I NDUSTRI AL VENTI LATI ON AND EXHAUST
23 52 00 HEATI NG BOI LERS
23 64 10 WATER CHI LLERS, VAPOR COMPRESSI ON TYPE
23 64 26 CHI LLED, CHI LLED- HOT, AND CONDENSER WATER PI PI NG SYSTEMS
23 81 00. 00 20 UNI TARY AI R CONDI TI ONI NG EQUI PMENT
23 82 00. 00 20 TERMI NAL HEATI NG UNI TS
DI VI SI ON 26 - ELECTRI CAL
26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS
26 05 48. 00 10 SEI SMI C PROTECTI ON FOR ELECTRI CAL EQUI PMENT
26 12 19. 10 THREE- PHASE PAD- MOUNTED TRANSFORMERS
26 13 01 PAD- MOUNTED DEAD- FRONT AI R I NSULATED SWI TCHGEAR
26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM
26 24 13 SWITCHBOARDS
26 28 01. 00 10 COORDI NATED POWER SYSTEM PROTECTI ON
26 29 23 VARI ABLE FREQUENCY DRI VE SYSTEMS UNDER 600 VOLTS
26 35 43 400- HERTZ ( HZ) SOLI D STATE FREQUENCY CONVERTER
26 36 23. 00 20 MANUAL TRANSFER SWI TCHES
26 41 00 LI GHTNI NG PROTECTI ON SYSTEM
PROJECT TABLE OF CONTENTS Page 3
26 51 00 I NTERI OR LI GHTI NG
26 56 00 EXTERI OR LI GHTI NG
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM
27 41 11 AUDI O- VI SUAL SYSTEMS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARI NG AND GRUBBI NG
31 31 16. 13 CHEMI CAL TERMI TE CONTROL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 19 FI ELD MOLDED SEALANTS FOR SEALI NG JOI NTS I N RI GI D
PAVEMENTS
32 11 23 GRADED- CRUSHED AGGREGATE BASE COURSES
32 11 34 PORTLAND CEMENT- STABI LI ZED BASE OR SUBBASE COURSE
32 12 13 BI TUMI NOUS TACK AND PRI ME COATS
32 12 15. 13 HOT- MI X ASPHALT AI RFI ELD PAVI NG
32 12 16 HOT- MI X ASPHALT ( HMA) FOR ROADS
32 13 11 CONCRETE PAVEMENT FOR AI RFI ELDS AND OTHER HEAVY- DUTY
PAVEMENTS
32 13 13. 06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SI TE
FACILITIES
32 13 73 COMPRESSI ON JOI NT SEALS FOR CONCRETE PAVEMENTS
32 15 00 AGGREGATE SURFACI NG
32 16 13 CONCRETE SI DEWALKS AND CURBS AND GUTTERS
32 17 23 PAVEMENT MARKI NGS
32 31 13. 53 HI GH- SECURI TY CHAI N LI NK FENCES AND GATES
32 92 19 SEEDING
32 92 23 SODDING
DI VI SI ON 33 - UTI LI TI ES
33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG
33 30 00 SANI TARY SEWERS
33 32 13. 13 PACKAGED SEWAGE LI FT STATI ONS, WET WELL TYPE
33 34 00 FORCE MAI NS AND I NVERTED SI PHONS; SEWER
33 40 00 STORM DRAI NAGE UTI LI TI ES
33 46 16 SUBDRAI NAGE PI PI NG
33 51 15 NATURAL- GAS / LI QUI D PETROLEUM GAS DI STRI BUTI ON
33 61 13. 13 PREFABRI CATED UNDERGROUND HYDRONI C ENERGY DI STRI BUTI ON
33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON
33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)
DI VI SI ON 41 - MATERI AL PROCESSI NG AND HANDLI NG EQUI PMENT
41 22 23. 19 MONORAI L HOI STS
Appendix A SWPPP
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 4
Bid Sheet - B3 Submittal DATE 3/13/2018
PSXE999132 Replace KC-135 Maintenance Hangar & Shops
McGhee Tyson - TNANG
CONTRACTOR BID AMOUNT
CLIN 001 Base Bid -$
$/CY
$/CY
$/CY
Contaminated Soil Removal
BASE MILCON TOTAL
FIRE PROTECTION (high expansion foam fire suppression system, generators, double wall foam concentrate tank, indcutors, manual release stations, stop stations , test headers, triple IR flame detection system, surge arrestors, flow control valves, pressure reducing valves, basket strainer, fire pump system, valves, wet pipe system, piping, sprinklers, switches, inspector's test, riser, FDC, seismic bracing, fire alarm system, mass notification system, local operating consoles, NAC, AMP, batteries, smoke detection, manual pull stations, horns, strobes, beacons, speakers, temperature sensors, CO detection, textual signage.)
ELECTRICAL (medium voltage cable and ductbank, medium voltage switch, pad mounted transformer, 600v copper wire, ground rods/ring, EMT conduit, switchboards, surge protection, circuit breakers, generator enclosure/pad/connections, outlet boxes/devices, motor connections, receptacles, switches, interior lights, exterior lights, sensors, timers, ground bars, lightning protection, generator connection, necessary conduit, pull strings, outlet boxes)
COMMUNICATIONS (speakers/cable, antenna pad, EMT conduit, security infrastructure (Conduit), outlet boxes, pull string, cable tray, CAT 6 UTP, outlets, jacks, sound system, CATV system, communication racks, punchdown blocks, patch panels, protective entrance terminals fiber optic backbone cable, fiber and copper underground communication distribution cable, and conduit ductbank.)
SUPPORT FACILITY (rigid pavement, flexible pavement, concrete curbing, concrete sidewalks, gravel parking lot, chilled water piping, exterior fire protection, natural gas piping, concrete encased ductbank, 15kv cabling, equipment pads, manholes, water mains and meter, sanitary sewer and man holes, sanitary lift station, stormwater drains and manholes, communication ductbanks and manholes, fiber optic cable, copper comm cable, hazardous materials abatement, fences and gates, airfield pavement marking.)
Rock Removal
Unsuitable Fill
SUBSTRUCTURE (structural concrete walls, slabs, foundations, and waterproofing)
SHELL (metal decking, structural concrete slab on deck, steel floor grating, structural steel colums/beams/bracing, joists/trusses, metal stairs, metal roof decking, brick veneer, insulation, metal panel wall, signage, lighting, skylights, alluminum storefront, windows, doors, overhead doors, metal studs)
INTERIORS (CMU partitions, drywall partitions, wood doors, metal doors, alluminum storefront, steel railing, signage, toilet partitions and accessories, ceramic wall tile, paints/coatings, wall base, flooring ceramic tile/VCT/LVT/carpet/raised flooring, acoustical ceiling tiles, drywall ceilings, metal studs)
CONVEYING (hoists and cranes)
PLUMBING (seismic bracing, water heater, water closets, lavatories, sinks, showers, urinals, faucets, wall hydrants, emergency fixtures, pipe insulation, copper piping, pumps, cast iron pipe, clean outs, air compressor/dryer/receiver, compressed air piping, natural gas entry/meter, domestic water entrance/meter/backflow preventer, gaseous nitrogen piping)
HVAC (seismic bracing, air cooled chillers, condensing boilers, pumps, mini-split HVAC systems, refrigeration piping, hot water piping, chilled water piping, HVAC piping insulation, copper piping, black steel piping, ductwork and insulation, valves, pumps, air separator, fire dampers, security bar grilles, motorized dampers, flues, louvers, exhaust fans, air handlers, VAV terminal units, DDC control system, test & balance)
Bid Sheet - B3 Submittal DATE 3/13/2018
McGhee Tyson - TNANG
CONTRACTOR BID AMOUNT
OCLIN 1 -$
OCLIN 2 -$
OCLIN 5 -$
OCLIN 6 -$
OCLIN 7 -$
OCLIN 8 -$
OCLIN 9 -$
OCLIN 11 -$
OCLIN 12 Sodding all disturbed areas at hangar. Base bid is seeding -$
OCLIN 13 -$
Buildings 110 (3,996 SF) and 111 (33,954 SF) ACM & Lead Abatement. (Metal wall panels, transite board, steam fittings)
Decorative Fence at Mechanical Yard
Electronic Safety and Security - Advantor Security System
OCLIN 14
AV - O&M Funded (LED TVs, Projectors, HDMI, Speakers, and other cables, necessary conduit)
EQUIPMENT & FURNISHINGS - O&M Funded (floor mats, desks, marker boards, chairs, antenna tower)
5 Ton Overhead Crane
Metal Lockers
Exterior Facility Sign
Electronic Moveable Partition (Skyfold or similar)
Airfield Fence Barrier Cable
OCLIN 10
Buildings 110 (3,996 SF) and 111 (33,954 SF) shall be demolished and resulting area returned to natural conditions
-$ Asphalt upgrade for POV parking lot (All gravel in base bid)
OCLIN 4
Shake-On floor coating for hangar floor
Resinous floor for the shop areas (119, 120, 115, 114, 127)
Seamless Resinous Epoxy for the Toilet/Locker/Shower Rooms, Janitor Closet (106-110, 135, 136)
Resinous floor for the Offices (121-126, 111-113, 148, 128-130), Ready Room (104), Training/Testing (105), all Shop areas, and Corridors (102, 103)
3-Part Epoxy floor finish for MPE/Comm Rooms (116, 117, 118, 125, 137, 138, 139)
Shake-On floor coating for hydro/electro shops (140-147)
Hangar Access Apron - Concrete (+904 SY) and Asphalt Shoulder Expansion (-381 SY)
Hydro/Electric Shop (4,300 SF)
OCLIN 3
Main Apron Expansion - Concrete (+1912 SY) and Asphalt Shoulder Expansion (+1490 SY) &
Restriping Existing Apron Pavement Markings
DOCUMENT 00 22 13. 00 20
SUPPLEMENTARY I NSTRUCTI ONS TO OFFERORS
02/14
PART 1 GENERAL
1. 1 CONTRACT LI NE I TEMS
The t er ms Of f er or and Bi dder and ver si ons t her eof ( of f er / bi d) have t he same def i ni t i on as used wi t hi n t hi s cont r act .
Pr ovi de t he Cont r act Li ne I t em ( CLI N) l ump sum pr i ce f or t he i t ems shown on t he at t ached bi d schedul e.
1. 2 GENERAL BI D NOTES
a. Awar d wi l l be made on t he t ot al sum of Cont r act Li ne I t ems as r equi r ed and t he sum of t he ext ensi ons. For CLI Ns wi t h uni t pr i ces and ext ended t ot al s i n spaces pr ovi ded. I f t her e i s a di f f er ence bet ween a uni t pr i ce and t he ext ended t ot al , t he uni t pr i ce wi l l be hel d t o be t he i nt ended bi d and t he t ot al r ecomput ed accor di ngl y. I f an Of f er or pr ovi des a t ot al but f ai l s t o ent er a uni t pr i ce, t he t ot al di v i ded by t he speci f i ed quant i t y wi l l be hel d t o be t he i nt ended uni t pr i ce.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Document - -
DOCUMENT 00 22 13. 00 20 Page 1
SECTI ON 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1. 1 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y Not ebook, i n conf or mance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Ut i l i t y Out age Request s
Ut i l i t y Connect i on Request s
Bor r ow Per mi t s
Excavat i on Per mi t s
Wel di ng Per mi t s
Bur ni ng Per mi t s
Sal vage Pl an
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
The wor k i ncl udes const r uct i on of a 57, 400 SF si ngl e- bay mai nt enance hangar t o accommodat e a KC- 135 ai r cr af t and i nci dent al r el at ed wor k. I n addi t i on t o t he new si ngl e bay hangar , t he Pr oj ect wi l l demol i sh t wo f aci l i t i es t ot al i ng 37, 950 SF. Bui l di ngs 110 ( 3, 996 SF) and 111 ( 33, 954 SF) shal l be demol i shed and r esul t i ng ar ea r et ur ned t o nat ur al condi t i ons. The hangar wi l l al so pr ovi de f or appr oxi mat el y 19, 400 SF of gener al pur pose shops, 4, 600 SF of cor r osi on cont r ol ar ea, and 5, 400 SF of avi oni cs shop ar ea.
1. 2. 2 Location
The wor k i s l ocat ed at t he McGhee Tyson Ai r Nat i onal Guar d Base i n Al coa, TN f or t he 134t h Ai r Ref uel i ng Wi ng, appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .
1. 3 EXI STI NG WORK
I n addi t i on t o " FAR 52. 236- 9, Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s" :
a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.
SECTI ON 01 11 00 Page 1
b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.
1. 4 LOCATI ON OF UNDERGROUND UTI LI TI ES
Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.
Cont act l ocal ut i l i t y l ocat i ng ser vi ce a mi ni mum of 48 hour s pr i or t o excavat i ng, t o mar k ut i l i t i es, and wi t hi n suf f i c i ent t i me r equi r ed i f wor k occur s on a Monday or af t er a Hol i day. Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on Cont r act Dr awi ngs, wi t hi n ar ea of wor k.
I dent i f y and mar k al l ot her ut i l i t i es not managed and l ocat ed by t he l ocal ut i l i t y compani es. Scan t he const r uct i on s i t e wi t h Gr ound Penet r at i ng Radar ( GPR) , el ect r omagnet i c, or soni c equi pment , and mar k t he sur f ace of t he gr ound or paved sur f ace wher e exi st i ng under gr ound ut i l i t i es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound or encased obst r uct i on not i ndi cat ed, or speci f i ed t o be r emoved, t hat i s i ndi cat ed or di scover ed dur i ng scanni ng, i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be conduct ed or i nst al l ed. Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.
1. 4. 1 Not i f i cat i on Pr i or t o Excavat i on
Not i f y t he Cont r act i ng Of f i cer at l east 15 days pr i or t o st ar t i ng excavat i on wor k.
1. 5 GOVERNMENT- FURNI SHED MATERI AL AND EQUI PMENT
Pur suant t o Cont r act t er ms and condi t i ons t he Gover nment wi l l f ur ni sh t he f ol l owi ng mat er i al s and equi pment f or i nst al l at i on by t he Cont r act or :
a. Cont r act or t o r ef er t o Cont r act Dr awi ngs f or t he l i s t of Gover nment f ur ni shed mat er i al and equi pment . Cont r act Dr awi ngs t o i dent i f y whi ch i t ems wi l l be pr ovi ded by Gover nment or Cont r act or , whi ch i t ems wi l l be moved by Gover nment or Cont r act or and whi ch i t ems wi l l be i nst al l ed by Gover nment or Cont r act or .
b. Any r el ocat i on and i nst al l at i on of equi pment by t he cont r act or shal l be i ncl uded i n t he base bi d of t he cont r act .
1. 5. 1 Del i ver y Schedul e
Cont r act or shal l schedul e equi pment r el ocat i on and i nst al l at i on 60 days pr i or t o t he Benef i c i al Occupancy. Cont r act or shal l coor di nat e schedul e wi t h t he cont r act i ng of f i cer .
1. 5. 2 Del i ver y Locat i on
The equi pment ar e l ocat ed wi t hi n 1 mi l e of t he j obsi t e.
SECTI ON 01 11 00 Page 2
1. 6 GOVERNMENT- I NSTALLED WORK
Cont r act or t o r ef er t o Cont r act Dr awi ngs f or t he l i s t of Gover nment f ur ni shed mat er i al and equi pment . Cont r act Dr awi ngs t o i dent i f y whi ch i t ems wi l l be pr ovi ded by Gover nment or Cont r act or , whi ch i t ems wi l l be moved by Gover nment or Cont r act or and whi ch i t ems wi l l be i nst al l ed by Gover nment or Cont r act or .
1. 7 SALVAGE MATERI AL AND EQUI PMENT
I t ems desi gnat ed by t he Cont r act i ng Of f i cer t o be sal vaged r emai n t he pr oper t y of t he Gover nment . Segr egat e, i t emi ze, del i ver and of f - l oad t he sal vaged pr oper t y at t he Gover nment desi gnat ed st or age ar ea l ocat ed wi t hi n 2 mi l es of t he const r uct i on s i t e. Pr ovi de a sal vage pl an, l i s t i ng mat er i al and equi pment t o be sal vaged, and t hei r st or age l ocat i on. Mai nt ai n pr oper t y cont r ol r ecor ds f or mat er i al or equi pment desi gnat ed as sal vage.
Use a syst em of pr oper t y cont r ol t hat i s appr oved by t he Cont r act i ng Of f i cer . St or e and pr ot ect sal vaged mat er i al s and equi pment unt i l di sposi t i on by t he Cont r act i ng Of f i cer .
1. 8 SCOPE
The Cont r act or shal l pr ovi de al l per sonnel , equi pment , t ool s, mat er i al s, super vi s i on, and qual i t y cont r ol necessar y, t o per f or m t he Wor k as def i ned i n t he Speci f i cat i ons.
1. 9 PERI OD OF PERFORMANCE
The Per i od of Per f or mance shal l be 540 cal endar days.
1. 10 CONTRACT ADMI NI STRATI ON
1. 10. 1 Cont r act i ng Of f i ce
The Cont r act i ng Of f i ce of t he 134t h Ai r Ref uel i ng Wi ng, McGhee Tyson, TN ANG, i s t he of f i ce havi ng admi ni st r at i ve j ur i sdi ct i on over t hi s Cont r act f or al l mat t er s. A l i s t of t he names and t el ephone number s and mai l i ng addr ess of t he Gover nment t eam compr i s i ng t he Cont r act Admi ni st r at or , Cont r act i ng Of f i cer ’ s Repr esent at i ve ( COR) , consul t ant , and poi nt of cont act at t he Pr oj ect Si t e wi l l be pr ovi ded at t he post - awar d/ pr e- const r uct i on conf er ence.
1. 10. 2 Correspondence
Al l cor r espondence shal l be addr essed t o t he Cont r act i ng Of f i cer . A copy of al l cor r espondence shal l be f ur ni shed t o t he Cont r act i ng Of f i cer ’ s r epr esent at i ve. Encl osur es at t ached t o or t r ansmi t t ed wi t h t he cor r espondence shal l al so be f ur ni shed wi t h an or i gi nal and one copy. Each l et t er shal l make r ef er ence t o t he Cont r act name, Cont r act number , Pr oj ect number , and Pr oj ect t i t l e, and shal l have onl y one subj ect . For t r acki ng pur poses, a sequent i al number i ng syst em shoul d be used f or al l correspondence.
1. 10. 3 Cont r act i ng Of f i cer ’ s Repr esent at i ve ( COR)
The Cont r act i ng Of f i cer wi l l appoi nt a qual i f i ed Cont r act i ng Of f i cer ’ s Repr esent at i ve ( COR) f or t he pur poses of t echni cal l y admi ni st er i ng t he Cont r act ; however , al l mat t er s concer ni ng t hi s Cont r act or any wor k or der ed pl aced agai nst t hi s Cont r act must f i r st be appr oved by t he Cont r act i ng
SECTI ON 01 11 00 Page 3
Of f i cer . Thi s i n no way aut hor i zes anyone ot her t han t he Cont r act i ng Of f i cer t o commi t t he Gover nment t o changes i n t er ms of t he Cont r act .
1. 11 REGULATIONS
The Cont r act or shal l compl y wi t h al l appl i cabl e Feder al , St at e, l ocal , DoD, Nat i onal Guar d Bur eau, Ar my, and Ai r For ce r egul at i ons per t ai ni ng t o saf et y, t r af f i c cont r ol , and f i r e pr event i on.
1. 11. 1 Def ense Pr ocur ement and Acqui s i t i on Pol i cy
The Cont r act or may Def ense Pr ocur ement and Acqui s i t i on Pol i cy websi t e, http://www.acq.osd.mil/dpap/ , whi ch has l i nks f or sever al ot her s i t es wi t h avai l abl e publ i cat i ons, f or ms and Pr oj ect dat a i nf or mat i on. These may al so be acqui r ed f r om t he Gover nment Pr i nt i ng Of f i ce websi t e, http://www.gpoaccess.gov/index.html .
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTI ON
Not Used.
- - End of Sect i on - -
SECTI ON 01 11 00 Page 4
SECTI ON 01 22 00. 00 10
PRI CE AND PAYMENT PROCEDURES
08/15
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s Speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
ASTM I NTERNATI ONAL ( ASTM)
ASTM A615/ A615M ( 2016) St andar d Speci f i cat i on f or Def or med and Pl ai n Car bon- St eel Bar s f or Concr et e Reinforcement
ASTM C127 ( 2015) St andar d Test Met hod f or Densi t y, Rel at i ve Densi t y ( Speci f i c Gr avi t y) , and Absor pt i on of Coar se Aggr egat e
ASTM C128 ( 2015) St andar d Test Met hod f or Densi t y, Rel at i ve Densi t y ( Speci f i c Gr avi t y) , and Absor pt i on of Fi ne Aggr egat e
ASTM D1250 ( 2008) St andar d Gui de f or Use of t he Pet r ol eum Measur ement Tabl es
1. 2 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y Not ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 03 Pr oduct Dat a
Schedul e of Val ues
Appl i cat i on f or Payment
Fi nal Appl i cat i on f or Payment
1. 3 SCHEDULE OF VALUES
a. Submi t Schedul e of Val ues wi t h each r equest f or payment , and wi t h t he mi d- mont h Pr ogr ess Repor t and Pr ogr ess Schedul e. Al so submi t a copy on a Compact Di sk ( CD) i n a spr eadsheet f or mat compat i bl e wi t h Excel 2000 or l ower ver si on.
b. Br eak down by di v i s i ons wi t h appr opr i at e subdi v i s i ons of each Speci f i cat i on and Subcont r act or s.
SECTI ON 01 22 00. 00 10 Page 1
c. An unbal anced schedul e wi l l not be accept abl e.
d. Summat i on of t he compl et e schedul e of val ues r epr esent i ng al l Wor k shal l equal t he Cont r act Pr i ce.
1. 4 APPLI CATI ON FOR PAYMENT
1. 4. 1 Invoices
Pr oper l y pr epar ed i nvoi ces, bear i ng t he Cont r act number , shal l be submi t t ed i n one copy t o t he Cont r act i ng Of f i ce: 134t h TN ANG, 134 MSC Cont r act i ng Of f i ce, 240 Br i scoe Dr i ve, Loui sv i l l e TN 37777- 6227, on desi gnat ed i nvoi ce f or ms pr ovi ded at t he pr e- const r uct i on meet i ng PRI OR t o upl oadi ng i n Wi de Ar ea Wor kf l ow ( WAWF) , t he DFAS payi ng syst em. Thi s submi ssi on wi l l be f or r evi ew pr i or t o submi t t i ng an el ect r oni c i nvoi ce t hr ough WAWF.
1. 4. 2 Payment
The Gover nment wi l l make payment t hr ough WAWF upon sat i sf act or y compl et i on of wor k AND r ecei pt of a pr oper cer t i f i cat i on f or payment . Do not i nput i nvoi ce i nt o WAWF unt i l t he pr e- appr oval of i nvoi ce i s r ecei ved f r om t he Cont r act i ng Of f i cer . Thi s wi l l l essen t he need f or r ej ect i ons i n WAWF.
Payment may be wi t hhel d unl ess al l Cont r act ual Requi r ement s, i ncl udi ng but not l i mi t ed t o: RECEI PT OF PROPER WEEKLY PAYROLLS I AW DAVI S BACON REQUI REMENTS have been t i mel y r ecei ved.
a. The Gover nment wi l l make payment upon sat i sf act or y compl et i on of wor k AND r ecei pt of a pr oper cer t i f i cat i on f or payment . Payment may be wi t hhel d unl ess al l Cont r act ual Requi r ement s, i ncl udi ng but not l i mi t ed t o: RECEI PT OF PROPER WEEKLY PAYROLLS I AW DAVI S BACON REQUI REMENTS have been t i mel y r ecei ved. Payr ol l s shal l i ndi cat e CLI N t o whi ch t hey ar e appl i cabl e.
b. A r el ease of c l ai ms i s r equi r ed f or al l f i nal payment r equest s and shal l be submi t t ed by t he Cont r act or wi t h t he f i nal i nvoi ce.
1. 5 NONPAYMENT FOR REJECTED OR UNUSED PRODUCTS
a. Payment wi l l not be made f or f ol l owi ng:
( 1) Loadi ng, haul i ng, and di sposi ng of r ej ect ed mat er i al .
( 2) Quant i t i es of mat er i al wast ed or di sposed of i n manner not cal l ed f or under Cont r act Document .
( 3) Rej ect ed l oads of mat er i al , i ncl udi ng mat er i al r ej ect ed af t er i t has been pl aced by r eason of f ai l ur e of Cont r act or t o conf or m t o pr ovi s i ons of Cont r act Document s.
( 4) Mat er i al not unl oaded f r om t r anspor t i ng vehi c l e.
( 5) Def ect i ve Wor k not accept ed by Cont r act i ng Of f i cer .
( 6) Mat er i al r emai ni ng on hand af t er compl et i on of Wor k.
1. 6 CONTRACT MODI FI CATI ON PROCEDURES
a. Fi el d Changes:
SECTI ON 01 22 00. 00 10 Page 2
( 1) Const r uct i on f i el d change i s a no cost change whi ch can be handl ed expedi t i ousl y i n t he f i el d. The si gnat ur es of t he Si t e Super i nt endent and t he Cont r act i ng Of f i cer must s i gn t he f i el d change f or m. The Cont r act i ng Of f i cer has been del egat ed t he aut hor i t y t o wr i t e a f i el d change. Al l par t i es r ecei ve a copy of t he Const r uct i on Fi el d Change For m.
b. Request s f or Pr oposal :
( 1) Gover nment - I ni t i at ed Request s f or Pr oposal : Cont r act i ng Of f i cer wi l l i ssue a det ai l ed descr i pt i on of pr oposed changes i n t he Wor k t hat may r equi r e adj ust ment t o t he Cont r act Sum or t he Cont r act Ti me vi a an RFP sequent i al l y number ed accor di ngl y. I f necessar y, t he descr i pt i on wi l l i nc l ude suppl ement al or r evi sed Dr awi ngs and Specifications.
( a) Request f or Pr oposal i ssued by Cont r act i ng Of f i cer ar e f or i nf or mat i on onl y. Do not consi der t hem i nst r uct i ons ei t her t o st op wor k i n pr ogr ess or t o execut e t he pr oposed change.
( b) Wi t hi n 20 days af t er r ecei pt of Request f or Pr oposal , submi t a quot at i on est i mat i ng cost adj ust ment s t o t he Cont r act Sum and t he Cont r act Ti me necessar y t o execut e t he change.
1. I ncl ude a l i s t of quant i t i es of pr oduct s r equi r ed or el i mi nat ed and uni t cost s, wi t h t ot al amount of pur chases and cr edi t s t o be made. I f r equest ed, f ur ni sh sur vey dat a t o subst ant i at e quant i t i es.
2. I ndi cat e appl i cabl e del i ver y char ges, equi pment r ent al , and amount s of t r ade di scount s.
3. I ncl ude cost s of l abor and super vi s i on di r ect l y at t r i but abl e t o t he change.
4. I ncl ude an updat ed Cont r act or ' s Const r uct i on Schedul e t hat i ndi cat es t he ef f ect of t he change, i ncl udi ng, but not l i mi t ed t o, changes i n act i v i t y dur at i on, st ar t and f i ni sh t i mes, and act i v i t y r el at i onshi p. Use avai l abl e t ot al f l oat bef or e r equest i ng an ext ensi on of t he Cont r act Ti me.
( 2) Cont r act or - I ni t i at ed Pr oposal s: I f l at ent or unf or eseen condi t i ons r equi r e modi f i cat i ons t o t he Cont r act , Cont r act or may pr opose changes by submi t t i ng a r equest f or a change t o Cont r act i ng Of f i cer .
( a) I ncl ude a st at ement out l i ni ng r easons f or t he change and t he ef f ect of t he change on t he Wor k. Pr ovi de a compl et e descr i pt i on of t he pr oposed change. I ndi cat e t he ef f ect of t he pr oposed change on t he Cont r act Sum and t he Cont r act Ti me.
( b) I ncl ude a l i s t of quant i t i es of pr oduct s r equi r ed or el i mi nat ed and uni t cost s, wi t h t ot al amount of pur chases and cr edi t s t o be made. I f r equest ed, f ur ni sh sur vey dat a t o subst ant i at e quant i t i es.
( c) I ndi cat e appl i cabl e del i ver y char ges, equi pment r ent al , and amount s of t r ade di scount s.
SECTI ON 01 22 00. 00 10 Page 3
( d) I ncl ude cost s of l abor and super vi s i on di r ect l y at t r i but abl e t o t he change.
( e) I ncl ude an updat ed Cont r act or ' s Const r uct i on Schedul e t hat i ndi cat es t he ef f ect of t he change, i ncl udi ng, but not l i mi t ed t o, changes i n act i v i t y dur at i on, st ar t and f i ni sh t i mes, and act i v i t y r el at i onshi p. Use avai l abl e t ot al f l oat bef or e r equest i ng an ext ensi on of t he Cont r act Ti me.
( f ) Compl y wi t h r equi r ement s i n DI VI SI ON 01 Sect i on " Pr oduct Requi r ement s" i f t he pr oposed change r equi r es subst i t ut i on of one pr oduct or syst em f or pr oduct or syst em speci f i ed.
c. Change Or der Pr ocedur es:
( 1) On Cont r act i ng Of f i cer appr oval of a Pr oposal Request , Cont r act i ng Of f i cer wi l l i ssue a Change Or der f or s i gnat ur es of Owner and Cont r act or on SF For m 30, Amendment of Sol i c i t at i on/ Modi f i cat i on of Cont r act .
d. Const r uct i on Change Di r ect i ve:
( 1) Const r uct i on Change Di r ect i ve: Cont r act i ng Of f i cer may i ssue a Const r uct i on Change Di r ect i ve on SF For m 30, Amendment of Sol i c i t at i on/ Modi f i cat i on of Cont r act . Const r uct i on Change Di r ect i ve i nst r uct s Cont r act or t o pr oceed wi t h a change i n t he Wor k, f or subsequent i ncl usi on i n a Change Or der .
( a) Const r uct i on Change Di r ect i ve cont ai ns a compl et e descr i pt i on of change i n t he Wor k. The di r ect change or der modi f i cat i on wi l l s t at e t he amount of f undi ng avai l abl e t hat cannot be exceeded.
( 2) The modi f i cat i on wi l l al so i ncl ude t he t echni cal change t o t he St at ement of Wor k and t he Cont r act or must submi t a pr oposal f or t hat wor k wi t hi n t en ( 10) days.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTI ON
Not Used.
- - End of Sect i on - -
SECTI ON 01 22 00. 00 10 Page 4
Bid Sheet - B3 Submittal DATE 3/27/2018
McGhee Tyson - TNANG
CONTRACTOR BID AMOUNT
CLIN 001 Base Bid -$
$/CY
$/CY
$/CY
Unsuitable Fill
SUBSTRUCTURE (structural concrete walls, slabs, foundations, and waterproofing)
SHELL (metal decking, structural concrete slab on deck, steel floor grating, structural steel colums/beams/bracing, joists/trusses, metal stairs, metal roof decking, brick veneer, insulation, metal panel wall, signage, lighting, skylights, alluminum storefront, windows, doors, overhead doors, metal studs)
INTERIORS (CMU partitions, drywall partitions, wood doors, metal doors, alluminum storefront, steel railing, signage, toilet partitions and accessories, ceramic wall tile, paints/coatings, wall base, flooring ceramic tile/VCT/LVT/carpet/raised flooring, acoustical ceiling tiles, drywall ceilings, metal studs)
CONVEYING (hoists and cranes)
PLUMBING (seismic bracing, water heater, water closets, lavatories, sinks, showers, urinals, faucets, wall hydrants, emergency fixtures, pipe insulation, copper piping, pumps, cast iron pipe, clean outs, air compressor/dryer/receiver, compressed air piping, natural gas entry/meter, domestic water entrance/meter/backflow preventer, gaseous nitrogen piping)
HVAC (seismic bracing, air cooled chillers, condensing boilers, pumps, mini-split HVAC systems, refrigeration piping, hot water piping, chilled water piping, HVAC piping insulation, copper piping, black steel piping, ductwork and insulation, valves, pumps, air separator, fire dampers, security bar grilles, motorized dampers, flues, louvers, exhaust fans, air handlers, VAV terminal units, DDC control system, test & balance)
FIRE PROTECTION (high expansion foam fire suppression system, generators, double wall foam concentrate tank, indcutors, manual release stations, stop stations , test headers, triple IR flame detection system, surge arrestors, flow control valves, pressure reducing valves, basket strainer, fire pump system, valves, wet pipe system, piping, sprinklers, switches, inspector's test, riser, FDC, seismic bracing, fire alarm system, mass notification system, local operating consoles, NAC, AMP, batteries, smoke detection, manual pull stations, horns, strobes, beacons, speakers, temperature sensors, CO detection, textual signage.)
ELECTRICAL (medium voltage cable and ductbank, medium voltage switch, pad mounted transformer, 600v copper wire, ground rods/ring, EMT conduit, switchboards, surge protection, circuit breakers, generator enclosure/pad/connections, outlet boxes/devices, motor connections, receptacles, switches, interior lights, exterior lights, sensors, timers, ground bars, lightning protection, generator connection, necessary conduit, pull strings, outlet boxes)
COMMUNICATIONS (speakers/cable, antenna pad, EMT conduit, security infrastructure (Conduit), outlet boxes, pull string, cable tray, CAT 6 UTP, outlets, jacks, sound system, CATV system, communication racks, punchdown blocks, patch panels, protective entrance terminals fiber optic backbone cable, fiber and copper underground communication distribution cable, and conduit ductbank.)
SUPPORT FACILITY (rigid pavement, flexible pavement, concrete curbing, concrete sidewalks, gravel parking lot, chilled water piping, exterior fire protection, natural gas piping, concrete encased ductbank, 15kv cabling, equipment pads, manholes, water mains and meter, sanitary sewer and man holes, sanitary lift station, stormwater drains and manholes, communication ductbanks and manholes, fiber optic cable, copper comm cable, hazardous materials abatement, fences and gates, airfield pavement marking.)
Rock Removal
Contaminated Soil Removal
BASE MILCON TOTAL
Bid Sheet - B3 Submittal DATE 3/27/2018
McGhee Tyson - TNANG
CONTRACTOR BID AMOUNT
OCLIN 1 -$
OCLIN 2 -$
OCLIN 5 -$
OCLIN 6 -$
OCLIN 7 -$
OCLIN 8 -$
OCLIN 12 Sodding all disturbed areas at hangar. Base bid is seeding -$
OCLIN 13 Antenna Tower and tower concrete pad (Conduit base bid) -$
OCLIN 14 -$
TOTAL OCLIN -$
Hangar Access Apron - Concrete (+904 SY) and Asphalt Shoulder Expansion (-381 SY)
Hydro/Electric Shop (4,300 SF)
Asphalt upgrade for POV parking lot (All gravel in base bid)
OCLIN 4
Shake-On floor coating for hangar floor
Resinous floor for the shop areas (119, 120, 115, 114, 127)
Seamless Resinous Epoxy for the Toilet/Locker/Shower Rooms, Janitor Closet (106-110, 135, 136)
Resinous floor for the Offices (121-126, 111-113, 148, 128-130), Ready Room (104), Training/Testing (105), all Shop areas, and Corridors (102, 103)
3-Part Epoxy floor finish for MPE/Comm Rooms (116, 117, 118, 125, 137, 138, 139)
Shake-On floor coating for hydro/electro shops (140-147)
OCLIN 3
Main Apron Expansion - Concrete (+1912 SY) and Asphalt Shoulder Expansion (+1490 SY) &
Restriping Existing Apron Pavement Markings
OCLIN 15
AV - O&M Funded (LED TVs, Projectors, HDMI, Speakers, and other cables, necessary conduit)
-$ EQUIPMENT & FURNISHINGS - O&M Funded (floor mats, desks, marker boards, chairs)
5 Ton Overhead Crane
Metal Lockers
Exterior Facility Sign
Electronic Moveable Partition (Skyfold or similar)
Airfield Fence Barrier Cable
OCLIN 10
Buildings 110 (3,996 SF) and 111 (33,954 SF) shall be demolished and resulting area returned to natural conditions
Concrete Patio & seating for outside break area
OCLIN 11
2 Personnel gates with pin pads and crash bollards.
OCLIN 9
Buildings 110 (3,996 SF) and 111 (33,954 SF) ACM & Lead Abatement. (Metal wall panels, transite board, steam fittings)
Decorative Fence at Mechanical Yard
Electronic Safety and Security - Advantor Security System
SECTI ON 01 30 00
ADMI NI STRATI VE REQUI REMENTS
08/15
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s Speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)
NFPA 241 ( 2013; Er r at a 2015) St andar d f or Saf eguar di ng Const r uct i on, Al t er at i on, and Demol i t i on Oper at i ons
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual
U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)
15 CFR 772 Def i ni t i on of Ter ms
15 CFR 773 Speci al Li censi ng Pr ocedur es
1. 2 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y Not ebook, i n conf or mance wi t h Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Pr ogr ess and Compl et i on Pi ct ur es; G
Envi r onment al Pol l ut i on Cont r ol Pl an; G
SD- 04 Sampl es
Col or Boar ds; G
1. 3 COLOR BOARDS
Submi t f i ve set s of col or boar ds wi t hi n 90 cal endar days af t er Cont r act Awar d. Each set of boar ds must i ncl ude sampl es of col or s and f i ni shes of i nt er i or sur f aces, such as wal l s, f l oor s, and cei l i ngs. Pr esent t he sampl es on 8 by 10- 1/ 2 i nch boar ds ( modul es) wi t h a maxi mum spr ead of 24 by 31- 1/ 2 i nches f or f ol dout s. Desi gn modul es t o f i t i n a st andar d l oose- l eaf , t hr ee- r i ng bi nder . Wher e speci al f i ni shes such as
SECTI ON 01 30 00 Page 1 ar chi t ect ur al concr et e, car pet , or pr ef i ni shed t ext ur ed met al panel s ar e r equi r ed, submi t sampl es not l ess t han 12 i nches squar e wi t h t he boar d. I f mor e space i s needed, mor e t han one boar d per set may be submi t t ed.
Cer t i f y t hat t he col or sampl es have been r evi ewed i n det ai l , and t hat t he col or sampl es ar e i n st r i c t accor dance wi t h Cont r act Dr awi ngs and Speci f i cat i ons, except as may be ot her wi se expl i c i t l y st at ed. Submi t t al of col or sampl es does not r el i eve t he Cont r act or of t he r esponsi bi l i t y t o submi t sampl es r equi r ed el sewher e her ei n.
1. 4 PROGRESS AND COMPLETI ON PI CTURES
Phot ogr aphi cal l y document s i t e condi t i ons pr i or t o st ar t of const r uct i on oper at i ons. Pr ovi de mont hl y, and wi t hi n one mont h of t he compl et i on of wor k, di gi t al phot ogr aphs, 1600 by 1200 by 24 bi t t r ue col or f i l e f or mat showi ng t he sequence and pr ogr ess of wor k. Take a mi ni mum of 20 di gi t al phot ogr aphs each week t hr oughout t he ent i r e Pr oj ect f r om a mi ni mum of t en v i ews f r om poi nt s l ocat ed by t he Cont r act i ng Of f i cer . Submi t wi t h t he mont hl y i nvoi ce t wo set s of di gi t al phot ogr aphs, each set on a separ at e compact di sc ( CD) or dat a ver sat i l e di sc ( DVD) , cumul at i ve of al l phot os t o dat e. I ndi cat e phot ogr aphs demonst r at i ng envi r onment al pr ocedur es.
Pr ovi de phot ogr aphs f or each mont h i n a separ at e mont hl y di r ect or y and name each f i l e t o i ndi cat e i t s l ocat i on on t he v i ew l ocat i on sket ch. Al so pr ovi de t he v i ew l ocat i on sket ch on t he CD or DVD as a di gi t al f i l e.
I ncl ude a dat e desi gnat or i n f i l e names. Cr oss r ef er ence submi t t al s i n t he appr opr i at e dai l y r epor t . Phot ogr aphs pr ovi ded ar e f or unr est r i c t ed use by t he Gover nment .
1. 5 MI NI MUM I NSURANCE REQUI REMENTS
Pr ovi de t he mi ni mum i nsur ance cover age r equi r ed by t er ms of Cont r act dur i ng t he ent i r e per i od of per f or mance. Pr ovi de ot her i nsur ance cover age as r equi r ed by St at e l aw.
1. 6 FI RST TI ER CONTRACTOR REQUI REMENTS FOR ASBESTOS CONTAI NI NG MATERI ALS
Accompl i sh al l Cont r act Requi r ement s of Sect i on 02 82 16. 00 20 ENGI NEERI NG
CONTROL OF ASBESTOS CONTAI NI NG MATERI ALS, 02 82 13. 00 10 ASBESTOS
ABATEMENT, assi gned t o t he Pr i vat e Qual i f i ed Per son, Desi gnat ed Compet ent Per son, di r ect l y wi t h a f i r st t i er Subcont r act or .
1. 7 SUPERVISION
1. 7. 1 Mi ni mum Communi cat i on Requi r ement s
Have at l east one qual i f i ed super i nt endent , or compet ent al t er nat e, capabl e of r eadi ng, wr i t i ng, and conver si ng f l uent l y i n t he Engl i sh l anguage, on t he Job Si t e at al l t i mes dur i ng t he per f or mance of Cont r act Wor k. I n addi t i on, i f a Qual i t y Cont r ol ( QC) r epr esent at i ve i s r equi r ed on t he Cont r act , t hen t hat i ndi v i dual must al so have f l uent Engl i sh communi cat i on skills.
1. 7. 2 Super i nt endent Qual i f i cat i ons
The Pr oj ect Super i nt endent must have a mi ni mum of 10 year s exper i ence i n const r uct i on wi t h at l east 5 of t hose year s as a Super i nt endent on pr oj ect s s i mi l ar i n s i ze and compl exi t y. The i ndi v i dual must be f ami l i ar wi t h t he r equi r ement s of EM 385- 1- 1 and have exper i ence i n t he ar eas of hazar d i dent i f i cat i on and saf et y compl i ance. The i ndi v i dual must be capabl e of i nt er pr et i ng a cr i t i cal pat h schedul e and Const r uct i on Dr awi ngs. The
SECTI ON 01 30 00 Page 2
Qual i f i cat i on Requi r ement s f or t he al t er nat e Super i nt endent ar e t he same as f or t he Pr oj ect Super i nt endent . The Cont r act i ng Of f i cer may r equest pr oof of t he Super i nt endent ' s qual i f i cat i ons at any poi nt i n t he Pr oj ect i f t he per f or mance of t he Super i nt endent i s i n quest i on.
1. 7. 2. 1 Duties
The Pr oj ect Super i nt endent i s pr i mar i l y r esponsi bl e f or managi ng and coor di nat i ng day- t o- day pr oduct i on and schedul e adher ence on t he Pr oj ect .
The Super i nt endent i s r equi r ed t o at t end par t ner i ng meet i ngs, and qual i t y cont r ol meet i ngs. The Super i nt endent or qual i f i ed al t er nat i ve must be on- si t e at al l t i mes dur i ng t he per f or mance.
1. 7. 3 Non- Compl i ance Act i ons
The Pr oj ect Super i nt endent i s subj ect t o r emoval by t he Cont r act i ng Of f i cer f or non- compl i ance wi t h r equi r ement s speci f i ed i n t he Cont r act and f or f ai l ur e t o manage t he Pr oj ect t o i nsur e t i mel y compl et i on. Fur t her mor e, t he Cont r act i ng Of f i cer may i ssue an or der st oppi ng al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken. No par t of t he t i me l ost due t o such st op or der s i s accept abl e as t he subj ect of c l ai m f or ext ensi on of t i me f or excess cost s or damages by t he Cont r act or .
1. 8 ELECTRONI C MAI L ( E- MAI L) ADDRESS
Est abl i sh and mai nt ai n el ect r oni c mai l ( e- mai l ) capabi l i t y al ong wi t h t he capabi l i t y t o open var i ous el ect r oni c at t achment s as t ext f i l es, pdf f i l es, and ot her s i mi l ar f or mat s. Wi t hi n 10 days af t er Cont r act Awar d, pr ovi de t he Cont r act i ng Of f i cer a s i ngl e ( onl y one) e- mai l addr ess f or el ect r oni c communi cat i ons f r om t he Cont r act i ng Of f i cer r el at ed t o t hi s Cont r act i ncl udi ng, but not l i mi t ed t o Cont r act Document s, i nvoi ce i nf or mat i on, r equest f or pr oposal s, and ot her cor r espondence. The Cont r act i ng Of f i cer may al so use e- mai l t o not i f y t he Cont r act or of base access condi t i ons when emer gency condi t i ons war r ant , such as hur r i canes or t er r or i st t hr eat s.
Mul t i pl e e- mai l addr esses ar e not al l owed.
I t i s t he Cont r act or ' s r esponsi bi l i t y t o make t i mel y di st r i but i on of al l Cont r act i ng Of f i cer i ni t i at ed e- mai l wi t h i t s own or gani zat i on i ncl udi ng f i el d of f i ce( s) . Pr ompt l y not i f y t he Cont r act i ng Of f i cer , i n wr i t i ng, of any changes t o t hi s e- mai l addr ess.
1. 9 PRECONSTRUCTI ON CONFERENCE
Af t er awar d of t he Cont r act but pr i or t o commencement of any wor k at t he s i t e, meet wi t h t he Cont r act i ng Of f i cer t o di scuss and devel op a mut ual under st andi ng r el at i ve t o t he admi ni st r at i on of t he val ue engi neer i ng and saf et y pr ogr am, pr epar at i on of t he schedul e of pr i ces or ear ned val ue r epor t , Shop Dr awi ngs, and ot her submi t t al s, schedul i ng pr ogr ammi ng, pr osecut i on of t he wor k, and cl ear expect at i ons of t he " I nt er i m DD For m 1354" Submi t t al . Maj or Subcont r act or s who wi l l engage i n t he wor k must al so at t end.
1. 10 HAZARDOUS MATERI ALS USAGE
a. The Cont r act or shal l est abl i sh a hazar dous mat er i al s ( HM) st or age and di st r i but i on syst em when HM i s t o be used. Al l HM r equi r ed t o suppor t t he Cont r act shal l be r epor t ed t o t he Hazar dous Mat er i al Phar macy ( HMP) usi ng t he Cont r act or HM I dent i f i cat i on For m, whi ch wi l l be pr ovi ded t o t he Cont r act or at or pr i or t o t he Pr e- Const r uct i on meet i ng. Addi t i onal
SECTI ON 01 30 00 Page 3
HM needed by t he Cont r act or shal l be i dent i f i ed t o t he Cont r act i ng Of f i cer f or appr oval by t he HMP. ( See At t achment DOD I nst al l at i ons or Faci l i t i es St andar d Oper at i ng Pr ocedur e Cont r act or Hazar dous Mat er i al Usage f or addi t i onal r equi r ement s and Tr acki ng For ms) .
b. The Cont r act or pl anni ng t o use HM f or t he wor k shal l r egi st er wi t h t he i nst al l at i on HMP pr i or t o st ar t of wor k i n or der t o suppor t t he i nst al l at i on' s compl i ance wi t h Execut i ve Or der 12856, Feder al Compl i ance wi t h Ri ght - t o- Know Laws and Pol l ut i on Pr event i on Requirements.
c. The Cont r act or shal l mai nt ai n a Cont r act or HM I dent i f i cat i on For m f or al l HM on t he Job Si t e f or i nspect i on/ ver i f i cat i on.
d. The Cont r act i ng Of f i cer wi l l ver i f y t hat t he HM i dent i f i ed t he HMP i s t he onl y HM i n use on t he Job Si t e.
e. The Cont r act or shal l pr ovi de t he f ol l owi ng t o t he HMP:
( 1) Pr ovi de a l i s t of each mat er i al and quant i t y of mat er i al f or al l pr oposed HM Hazar dous Mat er i…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.