Control No: 18-7003
FOR OFFICIAL USE ONLY
Justification and Approval for Other Than Full and Open Competition
1. Contracting Activity: 134 Air Refueling Wing (ARW), Mission Support Contracting (MSC) 123 Briscoe Drive, McGhee Tyson Air National Guard (ANG) Base, TN 37777.
2. Description of Action: This justification is prepared for a new firm fixed price construction contract to construct a new KC-135 Maintenance Hangar and Shops located at the McGhee Tyson ANG Base, Louisville, TN. This project includes for one brand name component along with the sole source for the installation of the component. The project is solicited under Request for Proposal (RFP) Number W912L7-18-R-7002. ANG MILCON ANG funds are appropriated for this action.
3. Description of Supplies/Services: As part of the construction of the New KC-135 Maintenance Hangar and Shops, the contractor is required to:
a. Procure the Schneider Electric “SmartStruxure” Energy Management Control System (EMCS). This system is a single source solution for HVAC and electronic access control.
b. Procure the services of Schneider Electric EMCS for the installation of the SmartStruxure System.
4. Authority Cited: The statutory authority permitting Other than Full and Open Competition is 10 U.S.C.
2304(c)(1) as implemented by FAR 6.203-1, Only one responsible source and no other supplies or services will satisfy agency requirements. It is likely that any other source would result in substantial duplication of cost to the Government that will not be recovered through competition.
5. Reason for Authority Cited:
a. Schneider Electric TAC Building Controls is required to be utilized on all 134th ARW facilities in order to comply and integrate with the current system utilized by the Base Civil Engineering Office for the buildings across the Base. The use of a single EMCS vendor for the Wing enables the installation to systematically manage the energy consumption of the Wing. Controls system will be of the same manufacturer as the front end system currently provided in Civil Engineering, Building
320. Providing a single controls vendor for all the buildings allows for seamless integration between the facilities, simplified controls system maintenance and upkeep, and less expensive control service contracts for the Wing. Utilizing the common product line for our controls system within our facilities allow for reduced staff to operate and maintain our system as well as the equipment the system interfaces with. This results in reduced maintenance and training costs for the 134th BCES over the lifecycle of the building. This building will be an independent stand-alone facility. Given the geographic dispersion of the facilities, individuals are able to monitor and control the building systems of several facilities separated by several hundred yards. In order to do this effectively, a single building control line has been established. Departing from the standardization would not be sustainable, and would be detrimental to the organization. The estimate to purchase the equipment is approximately $182,748.00
b. Regional factory representative in East Tennessee Area for the SmartStruxure product line are the only authorized installers of this product. If this product line is distributed and/or installed by an unauthorized company, Schneider Electric explicitly voids the warranty on the equipment and installation of the equipment. The estimate to install the equipment is approximately $23,138.00
6. Efforts to Obtain Competition: The solicitation for the construction of the KC-135 Maintenance Hangar and Shops will be a competitive Request for Proposal (RFP) issued on an unrestricted basis. The brand
FOR OFFICIAL USE ONLY
name components represent a small portion, 1% of the overall construction project that is being competed.
7. Actions to Increase Competition: This J&A will be posted to FedBizOpps with the solicitation and potential suppliers may have the opportunity to propose compatible products for consideration.
8. Market Research: The following market research techniques were conducted within the previous 12 months:
a. The base wide TAC building controls at McGhee Tyson ANG Base is based on the Schneider Electric brand control system. There are no known alternative control systems that are fully compatible with this system based on lesson learned and experience of the Architect of Record and design team.
b. No additional market research was conducted for the TAC building control system. This document will be posted to FedBizOpps during the solicitation of the construction project. Any firms will have the opportunity to provide a substitute for this equipment for consideration.
9. Interested Sources: To date, no other sources have written to express an interest. There are no known alternative systems that are fully compatible with the aforementioned systems based upon lessons learned and experience of the 134th Air National Guard.
10. Other Facts: The following facts are identified:
a. McGhee Tyson ANG Base Civil Engineering has set the base standard for these systems for existing facilities base wide. It is in the best interest of the Government to procure the Schneider Electric brand TAC controls for new facilities being built so that there will not be a duplication of cost by having to replace the fire alarm system with a Schneider Electric control system at a later date.
b. The maintenance and repair training for these systems is brand name specific, and it is necessary to keep the systems the same for communicating with each other, as allow for spare parts compatibility and reduce storage and efficient training requirements. With multiple brand names, the end user of the facility would need to be trained on how to utilize, maintain, and repair all the different systems.
The costs over the lifecycle of the facility would also be increased for service and annual maintenance.
c. The Facilities Management spare parts inventory will remain manageable with all systems of the specified brand name. For each different brand name specified, a different software system would be required, resulting in additional costs to the Government for the maintenance of each system. By using the aforementioned systems listed, communication and compatibility issues will be alleviated and result in a fully integrated and functioning base wide system. Having the same brand name on all required systems would be the most cost effective solution for the government.
d. The selection of the Schneider Electric product line ensures facility safety on the installation and seamless integration and communication of McGhee Tyson ANG Base facilities. While providing reduced maintenance costs over the lifecycle of the facility, training costs & requirements for end users, response time in emergency situations, and spare parts stock costs for the Tennessee Air National Guard.
11. Technical Certification: I certify that the supporting data under my cognizance, which are included in the justification are accurate and complete to the best of my knowledge and belief.
Typed Name: Jon D. Barrett, Major Date: 16 April 2018
Title: Deputy Civil Engineer Signature: BARRETT.JON.DAVID.
1260087009
Digitally signed by
BARRETT.JON.DAVID.1260087009
Date: 2018.04.16 10:53:17 -04'00'
FOR OFFICIAL USE ONLY
12. Requirements Certification: I certify that the supporting data under my cognizance,which are included in the justification are accurate and complete to the best of my knowledge and belief.
Typed Name: Jon D. Barrett, Major Date: 16 April 2018
Title: Deputy Civil Engineer Signature:
13. Fair and Reasonable Cost Determination: This procurement is a Request for Proposal (RFP), resulting in a firm-fixed price contract award. The contracting officer, IAW FAR 13.106-3(a)(1), anticipates the offered price to be fair and reasonable based on adequate price competition. Certified cost or pricing data and audits are not required.
Typed Name: Randal D. Halbrooks Date:
Title: Contracting Officer Signature:
14. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.
Typed Name: Randal D. Halbrooks Date:
Title: Contracting Officer Signature:
BARRETT.JON.DA
VID.1260087009
Digitally signed by
BARRETT.JON.DAVID.1260087009
Date: 2018.04.16 10:53:31 -04'00'
HALBROOKS.RANDAL
.DEWAYNE.11073481
Digitally signed by
HALBROOKS.RANDAL.DEWAYNE
.1107348111 Date: 2018.04.17 07:22:26 -05'00'
HALBROOKS.RAN
DAL.DEWAYNE.11
07348111
Digitally signed by
HALBROOKS.RANDAL.DEWAY
NE.1107348111
Date: 2018.04.17 07:23:01 -05'00'
| Schneider Signature Page |
| 5 - J and A Brand Name Schneider DDC 18-7003_18R7002 |
File details come from the government source that posted it.