Professional Consulting & Development, Inc.
P.O. BOX 52131 • KNOXVILLE, TN • 37950-2131
Phone 865.207.3825 • www.pcdtn.com
Mr. Victor Sanchez November 30, 2017 E. Luke Greene Company 10909 McBride Lane Knoxville, TN 37932
Report of Asbestos Survey Updates
Building M110 and M111 Tennessee Air National Guard Base
Alcoa, Tennessee PC&D Project PA-017-062B
Dear Mr. Sanchez:
Professional Consulting & Development, Inc., (PC&D) has completed asbestos related services for buildings MM110 and M111 located at the Tennessee Air National Guard Base (TANG) in Alcoa, Tennessee. This survey was conducted at your request and in general accordance with PC&D
Proposal #PA-017-062B dated October 11, 2017. The purpose of our services was as follows:
• Update the existing asbestos surveys of buildings M110 and M111.
• Identify, sample, and assess friable and non-friable asbestos containing materials (ACM) in the roof of building M111.
Find below our findings. We appreciate the opportunity to have provided these services. If you have any questions relative to this report please contact Mr. Padron at (239) 825.0044.
Sincerely, Professional Consulting & Development, Inc.
Eduardo J. Padron TN Accredited Asbestos Management Planner
Kenneth E. Johnson, Jr., P.G.
Principal
Attachments: Appendix A and Appendix B
TANG Buildings M110 and M111, Alcoa, Tennessee November 30, 2017
TABLE OF CONTENTS
Table of Contents Building Descriptions Summary of Services
Asbestos Survey of Building M110 Table 1 - Building M110 Asbestos Survey Update of Building M111 Table 2 - Building M111 Roof Asbestos Survey of Building M111 Table 3 - Building M111 Roof
Recommendations Appendix A
Laboratory analysis summary reports Chains of Custody
Appendix B Accreditation certificates
TANG Buildings M110 and M111, Alcoa, Tennessee November 30, 2017
BUILDING DESCRIPTIONS
The buildings addressed at the subject site includes the following:
Building M110: is a one-story structure, approximately 4,000 square feet in size, currently being used as an avionics shop. The building is of concrete slab on grade construction, with concrete block walls, aluminum framed windows and steel and aluminum storefront doors. The roof of this building is comprised of a built-up asphalt membrane (BUR). Interior finishes are comprised of vinyl floor tiles, wallboard and suspended acoustical ceiling tiles. The reported date of construction for the structure is 1952 according to the TANG Asbestos Management Plan (AMP).
Heating, ventilation and air conditioning (HVAC) is provided by central air conditioning units.
Building M111: is a multi-use building, containing a service hangar able to accommodate large airplanes, ancillary offices and service shops. The building is of slab on-grade construction, with steel and concrete block walls, and a steel structure supporting a standing seam steel roof over the hangar and offices. Windows are of aluminum frame and outside doors are storefront glass and aluminum, and steel. Interior finishes are comprised of vinyl floor tiles, wallboard and suspended acoustical ceiling tiles. The reported date of construction for the structure is 1953 according to the TANG AMP. Heating, ventilation and air conditioning (HVAC) is provided by central units feeding the offices, bathrooms and common areas.
TANG Buildings M110 and M111, Alcoa, Tennessee November 30, 2017
SUMMARY OF SERVICES
Our asbestos survey services outlined below are intended to supplement information contained in the TANG AMP. Prior to our surveys, we conducted a review the TANG AMP data and compared it to our observations of the current building conditions. The TANG AMP reviewed was dated September 2014. The asbestos surveys of buildings M110 and M111 were conducted by Mr. Eduardo Padron, a State of Tennessee Accredited Asbestos Management
Planner, on September 9, 2017.
The survey approach included a visual assessment of representative materials to locate, as far as practicable, suspect ACM. Suspect materials were divided into Homogeneous Areas (HA), building materials which were determined by our consultant to be homogeneous based on their color, texture, and age. A representative number of samples were collected from each HA.
The bulk material samples collected were placed in sealable plastic bags and sent under chain-of-custody protocol to Arrowhead Technologies, LLC, located in Clearwater, Florida for analysis.
Material identification was performed using Polarized Light Microscopy with Dispersion Staining
(PLM/DS) in accordance with the Environmental Protection Agency “Method for the Determination of Asbestos in Bulk Building Materials” (EPA/600/R-93/116). Laboratory analysis summary reports and the Chains of Custody are included in Appendix A. Arrowhead Technologies participates in the National Voluntary Laboratory Accreditation Program (NVLAP) as administered by the National Institute of Standards and Technology (NIST). PC&D is a State of Tennessee
Accredited Asbestos Firm. Accreditation certificates for Mr. Padron, Arrowhead Technologies, LLC, and PC&D are included in Appendix B.
Asbestos Survey of Building M110
During our survey of building M110 we identified nine (9) suspect HAs and collected and submitted a total of eighteen (18) bulk samples for laboratory analysis. Based on the laboratory data, asbestos-containing flooring was identified in the bulk samples collected and analyzed from building M110. The following table summarizes our sampling.
TANG Buildings M110 and M111, Alcoa, Tennessee November 30, 2017
Table 1 - Building M110
HA Material Material in AMP?
ACM? Location and Comments
1 12” x 12” floor tile, light blue and adhesive
No Yes
(see comments at right)
Floor tile and adhesive not found to contain asbestos.
However, they are adhered to ACM sheet flooring (HA-2), thus making them ACM.
2 Sheet Flooring, Beige (bottom layer) and adhesive
No Yes Bottom layer of flooring found in kitchen and locker room on North end of building M110. Likely present under light blue floor tile throughout the building.
Approximately 2,800 square feet of this flooring are estimated to be in M110.
3 Brown baseboard No No Throughout
4 Black baseboard No No Throughout
5 2’ x 2’ suspended acoustical ceiling tiles, worm holes and dots, yellowish
No No Most of building
6 1’ x 1’ concealed spline tiles, white with random holes
No No Above current suspended acoustical ceilings.
7 2’ x 2’ suspended acoustical ceiling tiles, directional worm holes and dots
No No Locker room, replacement tiles
8 Wall system (drywall, tape and joint compound)
No No Most interior walls of building
9 Stucco No No Exterior walls
HAs 1 and 2: Blue floor tile with sheet flooring underneath.
TANG Buildings M110 and M111, Alcoa, Tennessee November 30, 2017
Asbestos Survey Update of Building M111
Our review of the AMP found that the asbestos survey of building M111 identified several areas of ceiling and flooring finishes in the NW office and shop areas, which were incorrectly assumed to be present in the SW and SE offices. In addition, the AMP showed thermal insulation system materials that were identified as ACM and non-ACM; these were not re-sampled during our survey. During our survey we identified ten (10) suspect HAs and collected and submitted a total of twenty (20) bulk samples for laboratory analysis as described above. Based on the laboratory data, additional asbestos-containing flooring was identified in the bulk samples collected and analyzed from building M111. The following table summarizes our sampling.
Table 2 - Building M111
HA Material Material in AMP?
ACM? Location and Comments
1 Grey baseboard No No Throughout SW offices and shops
2 2’ x 4’ suspended acoustical ceiling tiles, dots and squiggles
No No Throughout SW offices and shops
3 12” x 12” Floor Tile and adhesive, off white, top layer
No Yes Found in SW offices and shops (Tire Shop). Floor tile and adhesive not found to contain asbestos. However, they are adhered to ACM floor tile (HA-4), thus making them ACM.
4 12” x 12” Beige Floor Tile and black adhesive, bottom layer
No Yes Bottom layer of flooring found in SW offices and shops. Likely present under flooring throughout the building. Approximately
11,500 square feet of this flooring are estimated to be in the SW and SE offices of building M111.
7 2’ x 4’ Suspended Acoustical
Ceiling Tiles, SE offices
No No SE offices
8 Wall and ceiling system (drywall, tape and joint compound)
No No SE offices
TANG Buildings M110 and M111, Alcoa, Tennessee November 30, 2017
HAs 3 and 4: Off white floor tile with beige floor tile beneath
Roof Asbestos Survey of Building M111
The roofs on building M111 were observed to be standing seam metal roofs and accessed for sampling from the ground by means of a 60’ articulated lift. The roof decking had been observed to be cementitious panels, which were accessible in the tool room of the building. Four (4) suspect HAs were identified during the roof survey and a total of eight (8) bulk samples were collected and submitted for laboratory analysis as described above. Based on the laboratory data, no asbestos-containing materials were found in the bulk samples collected and analyzed from the roofing materials of building M111.
Table 3 - Building M111 Roof
HA MATERIAL In AMP? ACM? Location and
Comments
5 Roof Deck Board (bottom) No No Throughout
6 Roof Deck Board (top) No No Throughout
9 Cementitious Deck Board Layer No No Under metal roof on SW corner of main hangar (upper metal roof)
10 Bituminous Layer No No Under metal roof on SW corner of main hangar (upper metal roof)
TANG Buildings M110 and M111, Alcoa, Tennessee November 30, 2017
Our consultants accessed the roof above the SW offices and shops (Tire Shop) and cut a section of the metal roof using a metal saw blade. Observations though the opening revealed insulation on the cementitious deck (HA 9) consisting of expanded polystyrene foam sheets (Styrofoam).
See picture below:
TANG Buildings M110 and M111, Alcoa, Tennessee November 30, 2017
Additional sampling locations were located near the SW corner of the upper (hangar) roof. Two access openings were cut in the upper roof to sample for possible roofing materials under the metal roof panels. Observations though the openings revealed fiberglass insulation bats adhered to a plastic vapor barrier located on top of the the cementitious deck. The deck was covered with a bituminous layer (non-ACM, HA 10). See picture below:
The roof openings were repaired with aluminum flashing fastened down with self-tapping screws and sealed with roofing cement. These repairs are temporary in nature and not guaranteed or
TANG Buildings M110 and M111, Alcoa, Tennessee November 30, 2017 warrantied to prevent water intrusion into the building. A qualified roofing contractor should be retained by others to conduct final repairs. A picture of the typical repaired location is shown below:
TANG Buildings M110 and M111, Alcoa, Tennessee November 30, 2017
RECOMMENDATIONS
Asbestos-containing materials (ACM) were identified in our survey of buildings M110 and M111, beyond those identified in the TANG AMP. Therefore, we recommend the following:
• The asbestos-containing containing flooring materials identified in the surveys should be properly managed in-place until their removal is forced by demolition or planned renovation of the building, in accordance with guidelines established in the TANG AMP.
These flooring materials are considered Category I non-friable materials. The flooring materials found during our survey to contain asbestos in buildings M110 and M111 are in good condition and effectively encapsulated by a layer of non-asbestos containing flooring.
• Due to the forces that may act on these materials during demolition of the building and removal of the floor slabs, these materials should be removed prior to demolition of the structure or renovations that may disturb them.
We understand that these buildings may be scheduled for renovation or demolition. The current
EPA regulation for the removal of asbestos in buildings i.e., the National Emission Standard for
Hazardous Air Pollutants (NESHAP, 40 CFR 61, Subpart M), requires that regulated asbestos-containing materials (RACM) be properly removed prior to performing renovation and demolition activities which would disturb them. RACM is generally defined as materials which contain greater than one percent asbestos and are one of the following:
1. Friable materials
2. Non-friable materials which have become friable.
3. Category I non-friable materials which have been sanded, ground, cut, or abraded.
4. Category II non-friable materials which are expected to become friable due to the forces expected to act on them during demolition.
A friable asbestos-containing material is defined as any material that contains more than one percent asbestos by weight that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure. The EPA categorizes non-friable materials into two categories:
1. Category I non-friable materials are specifically defined as resilient floor coverings;
asphalt-based bituminous roofing materials; packings; construction mastics; and gaskets.
2. Category II non-friable materials include all other non-friable materials such as asbestos cement products; vibration dampeners; caulking; putties; etc.
TANG Buildings M110 and M111, Alcoa, Tennessee November 30, 2017
If other suspect materials that are not referenced in this report or in the AMP are discovered or identified during renovation or demolition activities, PC&D recommends that the materials be sampled and analyzed to confirm the absence or presence of asbestos prior to disturbance of these materials.
Please note that prior to renovation or demolition of these buildings, a 10-Day Notification Form must be submitted to the Tennessee Department of Environment & Conservation. A copy of this report as well as pertinent portions of the AMP should be attached to the notification to provide a complete submission.
APPENDIX A
LABORATORY ANALYSIS SUMMARY REPORTS
CHAINS OF CUSTODY
PLM REPORT SUMMARY
3151 San Bernadino St.
Clearwater, Florida 33759
NVLAP Lab Code 200703-0813-679-0720 / mhall005@tampabay.rr.com
Client : PCD, INC Lab Set No. : 005474
Project : TANG Bldgs. 110 & 111 17-5474AT Job No. :
N/AClient Project No.: Report Date : 11/17/2017
Identification : Asbestos, Bulk Sample Analysis Sample Date : 11/09/2017
Test Method : Polarized Light Microscopy / Dispersion Staining (PLM/DS)
Page 1 of 4EPA Method 600/R-93/116 / EPA Method 600/M4-82-020
On 11/14/2017, eighteen (18) bulk material samples were submitted by Eduardo Padron for asbestos analysis by PLM/DS.
Copies of Bulk Sample Analysis sheets are attached; additional information may be found therein. The results are summarized below:
Asbestos ContentSample Description / LocationLab Sample No.
None Detected-Floor Tile12"x12" Light Blue Floor Tile 110-1-A005474-001
None Detected-Yellow Mastic
None Detected-Floor Tile12"x12" Light Blue Floor Tile 110-1-B005474-002
None Detected-Yellow Mastic
None Detected-Vinyl Surface12"x12" Beige Floor Tile-Bottom 110-2-A005474-003
35% Chrysotile-Backing
None Detected-Yellow Mastic
None Detected-Vinyl Surface12"x12" Beige Floor Tile-Bottom 110-2-B005474-004
35% Chrysotile-Backing
None Detected-Yellow Mastic
None Detected-BaseboardBrown Baseboard 110-3-A005474-005
None Detected-Mastic
None Detected-BaseboardBrown Baseboard 110-3-B005474-006
None Detected-Mastic
None Detected-Black BaseboardBlack Baseboard 110-4-A005474-007
None Detected-White Mastic
These samples were analyzed by layers. Specific layer or component asbestos content is indicated when relevant. The EPA considers a material to be asbestos containing only if it contains more than one percent asbestos by Calibrated Visual Area Estimation (CVAE). EPA regulations also indicate that Regulated Asbestos
Containing Materials (RACM) -- materials which are friable or may become friable -- be further analyzed by point counting when the results indicate less than ten percent asbestos by CVAE. Arrowhead utilizes CVAE on a routine basis and does not include point counting unless specifically requested.
The results may not be reproduced except in full.
PLM Report Summary - Revision 3 - 05/11/2014 - Issuing Authority: Monte Hall
Clearwater, Florida 33759
NVLAP Lab Code 200703-0813-679-0720 / mhall005@tampabay.rr.com
Client : PCD, INC Lab Set No. : 005474
Project : TANG Bldgs. 110 & 111 17-5474AT Job No. :
N/AClient Project No.: Report Date : 11/17/2017
Identification : Asbestos, Bulk Sample Analysis Sample Date : 11/09/2017
Test Method : Polarized Light Microscopy / Dispersion Staining (PLM/DS)
Page 2 of 4EPA Method 600/R-93/116 / EPA Method 600/M4-82-020
On 11/14/2017, eighteen (18) bulk material samples were submitted by Eduardo Padron for asbestos analysis by PLM/DS.
Copies of Bulk Sample Analysis sheets are attached; additional information may be found therein. The results are summarized below:
Asbestos ContentSample Description / LocationLab Sample No.
None Detected-Black BaseboardBlack Baseboard 110-4-B005474-008
None Detected-White Mastic
None Detected-White Ceiling Tile2'x2' CT Worm Holes & Dots-Yellowish 110-5-A005474-009
None Detected-White Ceiling Tile2'x2' CT Worm Holes & Dots-Yellowish 110-5-B005474-010
None Detected-White Ceiling Tile2'x2' CT White w/Random Holes 110-6-A005474-011
None Detected-White Ceiling Tile2'x2' CT White w/Random Holes 110-6-B005474-012
None Detected-Ceiling Panel2'x2' CT-Directional Worm Hole & Dots 110-7-A005474-013
None Detected-Ceiling Panel2'x2' CT-Directional Worm Hole & Dots 110-7-B005474-014
None Detected-Joint Compound w/ Pt.Wall System 110-8-A005474-015
None Detected-DW Paper Backing
None Detected-Drywall Material
None Detected-Joint Compound w/ Pt.Wall System 110-8-B005474-016
None Detected-DW Paper Backing
None Detected-Drywall Material
None Detected-Lt. Grey StuccoStucco-EIFS 110-9-A005474-017
These samples were analyzed by layers. Specific layer or component asbestos content is indicated when relevant. The EPA considers a material to be asbestos containing only if it contains more than one percent asbestos by Calibrated Visual Area Estimation (CVAE). EPA regulations also indicate that Regulated Asbestos
Containing Materials (RACM) -- materials which are friable or may become friable -- be further analyzed by point counting when the results indicate less than ten percent asbestos by CVAE. Arrowhead utilizes CVAE on a routine basis and does not include point counting unless specifically requested.
Clearwater, Florida 33759
NVLAP Lab Code 200703-0813-679-0720 / mhall005@tampabay.rr.com
Client : PCD, INC Lab Set No. : 005474
Project : TANG Bldgs. 110 & 111 17-5474AT Job No. :
N/AClient Project No.: Report Date : 11/17/2017
Identification : Asbestos, Bulk Sample Analysis Sample Date : 11/09/2017
Test Method : Polarized Light Microscopy / Dispersion Staining (PLM/DS)
Page 3 of 4EPA Method 600/R-93/116 / EPA Method 600/M4-82-020
On 11/14/2017, eighteen (18) bulk material samples were submitted by Eduardo Padron for asbestos analysis by PLM/DS.
Copies of Bulk Sample Analysis sheets are attached; additional information may be found therein. The results are summarized below:
Asbestos ContentSample Description / LocationLab Sample No.
None Detected-Lt. Grey StuccoStucco-EIFS 110-9-B005474-018
These samples were analyzed by layers. Specific layer or component asbestos content is indicated when relevant. The EPA considers a material to be asbestos containing only if it contains more than one percent asbestos by Calibrated Visual Area Estimation (CVAE). EPA regulations also indicate that Regulated Asbestos
Containing Materials (RACM) -- materials which are friable or may become friable -- be further analyzed by point counting when the results indicate less than ten percent asbestos by CVAE. Arrowhead utilizes CVAE on a routine basis and does not include point counting unless specifically requested.
Clearwater, Florida 33759
NVLAP Lab Code 200703-0813-679-0720 / mhall005@tampabay.rr.com
Client : PCD, INC Lab Set No. : 005474
Project : TANG Bldgs. 110 & 111 17-5474AT Job No. :
N/AClient Project No.: Report Date : 11/17/2017
Identification : Asbestos, Bulk Sample Analysis Sample Date : 11/09/2017
Test Method : Polarized Light Microscopy / Dispersion Staining (PLM/DS)
Page 4 of 4EPA Method 600/R-93/116 / EPA Method 600/M4-82-020
SCOPE OF THIS REPORT
These samples were obtained as a part of a building survey; this report is only intended to be used as a part of the survey report issued by the surveyor. This report explains the laboratory analysis and results. The surveyor's report explains the sampling protocol used, when the samples were obtained, the location(s) of the samples, where the materials were observed in the building, quantities of materials observed, condition of the materials and the extent of his/her survey. Sample locations and material descriptions are given by the surveyor on the chain of custody but included here (possibly abbreviated) only as a convenience for the reader.
This report may not be reproduced without written permission of Arrowhead and must be reproduced in full.
STATEMENT OF LABORATORY ACCREDITATION
The samples were analyzed in general accordance with the procedures outlined in the Method for the Determination of
Asbestos in Bulk Building Materials, EPA/600/R-93/116, and the Interim Method for the Determination of Asbestos in Bulk
Insulation Samples, EPA 600/M4-82-020. The results of each bulk sample relate only to the material tested and the results shall not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Floor tile and other resinously bound materials, when analyzed by the EPA method, may yield false negative results because of limitations in separating closely bound fibers and in detecting fibers of small length and diameter. When a definitive result is required, Arrowhead recommends utilizing alternative methods of identification, including Transmission Electron Microscopy.
Specific questions concerning bulk sample results shall be directed to the Laboratory Director.
Analyst : Monte Hall, P.G.
Monte Hall, P.G.Laboratory Director :
Florida Registration No. 1658
Approved Signatory :
Clearwater, Florida 33759
NVLAP Lab Code 200703-0813-679-0720 / mhall005@tampabay.rr.com
Client : PCD, INC Lab Set No. : 005473
Project : TANG Bldgs. 110 and 111 17-5473AT Job No. :
PA-017-0Client Project No.: Report Date : 11/17/2017
Identification : Asbestos, Bulk Sample Analysis Sample Date : 11/09/2017
Test Method : Polarized Light Microscopy / Dispersion Staining (PLM/DS)
Page 1 of 4EPA Method 600/R-93/116 / EPA Method 600/M4-82-020
On 11/14/2017, twenty (20) bulk material samples were submitted by Eduardo Padron for asbestos analysis by PLM/DS.
Copies of Bulk Sample Analysis sheets are attached; additional information may be found therein. The results are summarized below:
Asbestos ContentSample Description / LocationLab Sample No.
None Detected-BaseboardGrey Baseboard HA-111-1-A005473-001
None Detected-Cream Mastic
None Detected-BaseboardGrey Baseboard HA-111-1-B005473-002
None Detected-Cream Mastic
None Detected-White Ceiling Tile2'x4' Ceiling Tile-Dots & Squiggles 111-2-A005473-003
None Detected-White Ceiling Tile2'x4' Ceiling Tile-Dots & Squiggles 111-2-B005473-004
None Detected-Floor Tile12"x12" Floor Tile-Off White -Top Layer 111-3-A005473-005
None Detected- Adhesive
None Detected-Floor Tile12"x12" Floor Tile-Off White -Top Layer 111-3-B005473-006
None Detected- Adhesive
2% Chrysotile-Floor Tile12"x12" Floor Tile-Beige -Bottom Layer 111-4-A005473-007
5% Chrysotile-Black Mastic
2% Chrysotile-Floor Tile12"x12" Floor Tile-Beige -Bottom Layer 111-4-B005473-008
5% Chrysotile-Black Mastic
None Detected-Deck BoardRoof Deck Board (Bottom) 111-5-A005473-009
These samples were analyzed by layers. Specific layer or component asbestos content is indicated when relevant. The EPA considers a material to be asbestos containing only if it contains more than one percent asbestos by Calibrated Visual Area Estimation (CVAE). EPA regulations also indicate that Regulated Asbestos
Containing Materials (RACM) -- materials which are friable or may become friable -- be further analyzed by point counting when the results indicate less than ten percent asbestos by CVAE. Arrowhead utilizes CVAE on a routine basis and does not include point counting unless specifically requested.
Clearwater, Florida 33759
NVLAP Lab Code 200703-0813-679-0720 / mhall005@tampabay.rr.com
Client : PCD, INC Lab Set No. : 005473
Project : TANG Bldgs. 110 and 111 17-5473AT Job No. :
PA-017-0Client Project No.: Report Date : 11/17/2017
Identification : Asbestos, Bulk Sample Analysis Sample Date : 11/09/2017
Test Method : Polarized Light Microscopy / Dispersion Staining (PLM/DS)
Page 2 of 4EPA Method 600/R-93/116 / EPA Method 600/M4-82-020
On 11/14/2017, twenty (20) bulk material samples were submitted by Eduardo Padron for asbestos analysis by PLM/DS.
Copies of Bulk Sample Analysis sheets are attached; additional information may be found therein. The results are summarized below:
Asbestos ContentSample Description / LocationLab Sample No.
None Detected-Deck BoardRoof Deck Board (Bottom) 111-5-B005473-010
None Detected-Off White Deck BoardRoof Deck Board (Topping) 111-6-A005473-011
None Detected-Off White Deck BoardRoof Deck Board (Topping) 111-6-B005473-012
None Detected-White Ceiling Tile2'x4' Ceiling Tiles 111-7-A005473-013
None Detected-White Ceiling Tile2'x4' Ceiling Tiles 111-7-B005473-014
None Detected-Joint Compound w/ Pt.Wall System 11-8-A005473-015
None Detected-DW Paper Backing
None Detected-Drywall Material
None Detected-Joint Compound w/ Pt.Wall System 11-8-B005473-016
None Detected-DW Paper Backing
None Detected-Drywall Material
None Detected-Deck Material Commentitious Deck Layer 111-9-A005473-017
None Detected-Deck Material Commentitious Deck Layer 111-9-B005473-018
None Detected-Bitumen MoppingsBituminous Layer 111-10-A005473-019
None Detected-Roofing Felt Cellulose
These samples were analyzed by layers. Specific layer or component asbestos content is indicated when relevant. The EPA considers a material to be asbestos containing only if it contains more than one percent asbestos by Calibrated Visual Area Estimation (CVAE). EPA regulations also indicate that Regulated Asbestos
Containing Materials (RACM) -- materials which are friable or may become friable -- be further analyzed by point counting when the results indicate less than ten percent asbestos by CVAE. Arrowhead utilizes CVAE on a routine basis and does not include point counting unless specifically requested.
Clearwater, Florida 33759
NVLAP Lab Code 200703-0813-679-0720 / mhall005@tampabay.rr.com
Client : PCD, INC Lab Set No. : 005473
Project : TANG Bldgs. 110 and 111 17-5473AT Job No. :
PA-017-0Client Project No.: Report Date : 11/17/2017
Identification : Asbestos, Bulk Sample Analysis Sample Date : 11/09/2017
Test Method : Polarized Light Microscopy / Dispersion Staining (PLM/DS)
Page 3 of 4EPA Method 600/R-93/116 / EPA Method 600/M4-82-020
On 11/14/2017, twenty (20) bulk material samples were submitted by Eduardo Padron for asbestos analysis by PLM/DS.
Copies of Bulk Sample Analysis sheets are attached; additional information may be found therein. The results are summarized below:
Asbestos ContentSample Description / LocationLab Sample No.
None Detected-Bitumen MoppingsBituminous Layer 111-10-B005473-020
None Detected-Roofing Felt Cellulose
These samples were analyzed by layers. Specific layer or component asbestos content is indicated when relevant. The EPA considers a material to be asbestos containing only if it contains more than one percent asbestos by Calibrated Visual Area Estimation (CVAE). EPA regulations also indicate that Regulated Asbestos
Containing Materials (RACM) -- materials which are friable or may become friable -- be further analyzed by point counting when the results indicate less than ten percent asbestos by CVAE. Arrowhead utilizes CVAE on a routine basis and does not include point counting unless specifically requested.
Clearwater, Florida 33759
NVLAP Lab Code 200703-0813-679-0720 / mhall005@tampabay.rr.com
Client : PCD, INC Lab Set No. : 005473
Project : TANG Bldgs. 110 and 111 17-5473AT Job No. :
PA-017-0Client Project No.: Report Date : 11/17/2017
Identification : Asbestos, Bulk Sample Analysis Sample Date : 11/09/2017
Test Method : Polarized Light Microscopy / Dispersion Staining (PLM/DS)
Page 4 of 4EPA Method 600/R-93/116 / EPA Method 600/M4-82-020
SCOPE OF THIS REPORT
These samples were obtained as a part of a building survey; this report is only intended to be used as a part of the survey report issued by the surveyor. This report explains the laboratory analysis and results. The surveyor's report explains the sampling protocol used, when the samples were obtained, the location(s) of the samples, where the materials were observed in the building, quantities of materials observed, condition of the materials and the extent of his/her survey. Sample locations and material descriptions are given by the surveyor on the chain of custody but included here (possibly abbreviated) only as a convenience for the reader.
This report may not be reproduced without written permission of Arrowhead and must be reproduced in full.
STATEMENT OF LABORATORY ACCREDITATION
The samples were analyzed in general accordance with the procedures outlined in the Method for the Determination of
Asbestos in Bulk Building Materials, EPA/600/R-93/116, and the Interim Method for the Determination of Asbestos in Bulk
Insulation Samples, EPA 600/M4-82-020. The results of each bulk sample relate only to the material tested and the results shall not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
Floor tile and other resinously bound materials, when analyzed by the EPA method, may yield false negative results because of limitations in separating closely bound fibers and in detecting fibers of small length and diameter. When a definitive result is required, Arrowhead recommends utilizing alternative methods of identification, including Transmission Electron Microscopy.
Specific questions concerning bulk sample results shall be directed to the Laboratory Director.
Analyst : Monte Hall, P.G.
Monte Hall, P.G.Laboratory Director :
Florida Registration No. 1658
Approved Signatory :
APPENDIX B
ACCREDITATION CERTIFICATES