Volume_II_Specifications_081016.pdf
PDF 9 MB Posted
- Attached to
- Construct Training Support Center, FTIG Federal contract opportunity
- Solicitation number
- W912KC-16-R-0002
About this file
Volume II Specifications 08/10/2016
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAARNG Project No. 85636-420522
TRAINING AIDS CENTER BID FINAL SPECIFICATIONS - MAY 13, 2016
TABLE OF CONTENTS TOC-1
TABLE OF CONTENTS
NOTE: This Project Manual is arranged in the nationally recognized Construction Specification
Institute Format (CSI). However, only the applicable Sections of certain Divisions are included which results in the section numbering not being consecutive.
VOLUME I
DIVISION 01 – GENERAL REQUIREMENTS
01 10 00 SUMMARY
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 16 CONSTRUCTION PROGRESS SCHEDULE
01 35 14.01 LEED-NC 2009 CREDIT SUMMARY
01 35 15 LEED CERTIFICATION PROCEDURES
01 35 16 LEED SUBMITTAL FORMS
01 35 16.01 LEED TOTAL MATERIAL COST SUMMARY FORM
01 35 16.02 LEED WOOD-CONTAINING PRODUCT LIST
01 35 16.03 LEED METAL-CONTAINING PRODUCT LIST
01 40 00 QUALITY REQUIREMENTS
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 57 21 INDOOR AIR QUALITY CONTROLS
01 60 00 PRODUCT REQUIREMENTS
01 61 16 VOLATILE ORGANIC COMPOUND (VOC) CONTENT
RESTRICTIONS
01 61 16.01 ACCESSORY MATERIAL VOC CONTENT CERTIFICATION FORM
01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 75 16 STARTING OF SYSTEMS
01 78 00 CLOSEOUT SUBMITTALS
01 91 13 GENERAL COMMISSIONING
DIVISION 02 – EXISTING CONDITIONS
02 30 00 SUBSURFACE EXPLORATION
02 41 13 DEMOLITION
DIVISION 03 – CONCRETE
03 10 00 CONCRETE FORMS
03 20 00 CONCRETE REINFORCEMENT
03 30 00 CAST IN PLACE CONCRETE
03 47 13 TILT-UP CONCRETE CONSTRUCTION
03 60 00 GROUT
DIVISION 04 – MASONRY
04 26 16 ADHERED MASONRY VENEER
TABLE OF CONTENTS TOC-2
DIVISION 05 – METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 31 00 STEEL DECK
05 50 00 METAL FABRICATIONS
05 52 00 METAL RAILINGS
DIVISION 06 – WOOD AND PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 00 ARCHITECTURAL WOOD CASEWORK
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 14 00 FLUID APPLIED WATERPROOFING
07 21 00 THERMAL INSULATION
07 21 19 FOAMED-IN-PLACE INSULATION
07 25 00 WEATHER BARRIERS
07 41 13 METAL ROOF PANELS
07 42 14 INSULATED METAL WALL PANELS
07 54 23 THERMOPLASTIC-POLYOLEFIN ROOFING (TPO)
07 62 00 SHEET METAL FLASHING AND TRIM
07 71 00 ROOF SPECIALTIES
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALERS
DIVISION 08 – OPENINGS
08 11 13 HOLLOW METAL DOORS AND FRAMES
08 14 16 FLUSH WOOD DOORS
08 36 13 SECTIONAL DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES & STOREFRONTS
08 41 26 ALL-GLASS ENTRANCES AND STOREFRONTS
08 44 13 GLAZED ALUMINUM CURTAINWALLS
08 62 00 UNIT SKYLIGHTS
08 71 00 DOOR HARDWARE
08 80 00 GLAZING
08 91 00 LOUVERS
DIVISION 09 – FINISHES
09 21 16 GYPSUM BOARD ASSEMBLIES
09 30 00 TILING
09 51 00 ACOUSTICAL CEILINGS
09 84 00 ACOUSTIC ROOM COMPONENTS
09 91 13 EXTERIOR PAINTING
09 91 23 INTERIOR PAINTING
TABLE OF CONTENTS TOC-3
DIVISION 10 – SPECIALTIES
10 14 00 SIGNAGE
10 21 13.19 PLASTIC TOILET COMPARTMENTS
10 22 26 OPERABLE PARTITIONS
10 44 00 FIRE PROTECTION SPECIALTIES
10 56 00 STORAGE ASSEMBLIES
DIVISION 11 – EQUIPMENT
11 52 13 PROJECTION SCREENS
11 52 23 TELEVISION MOUNTS
11 52 26 PROJECTOR MOUNTS
11 52 45 MONITOR MOUNTS
DIVISION 12 – FURNISHINGS
12 21 13 HORIZONTAL LOUVER BLINDS
12 24 23 DUAL ROLLER WINDOW SCREENS
12 36 00 COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 93 13 SITE AMENITIES
TABLE OF CONTENTS TOC-4
VOLUME II
DIVISION 21 – FIRE SUPPRESSION
21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION
21 13 00 FIRE SUPPRESSION SPRINKLER SYSTEMS
21 31 00 PACKAGED FIRE PUMP SYSTEM
DIVISION 22 – PLUMBING
22 11 13 FACILITY WATER DISTRIBUTION
22 13 16 SANITARY WASTE AND VENT PIPING
22 15 00 COMPRESSED AIR SYSTEM
22 30 00 PLUMBING FIXTURES AND EQUIPMENT
DIVISION 23 – HEATING VENTILATION AND AIR CONDITIONING
23 05 00 BASIC MECHANICAL MATERIALS AND METHODS
23 05 29 HANGERS AND SUPPORTS
23 05 63 MECHANICAL IDENTIFICATION
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 MECHANICAL INSULATION
23 08 00 MECHANICAL COMMISSIONING
23 11 23 FACILITY NATURAL GAS PIPING
23 21 13 HYDRONIC PIPING
23 21 16 HYDRONIC PIPING SPECIALTIES
23 21 23 HYDRONIC PUMPS
23 23 00 REFRIGERANT PIPING
23 25 00 HVAC WATER TREATMENT
23 30 00 AIR DISTRIBUTION
23 34 00 HVAC FANS
23 38 00 VENTILATION HOODS
23 52 16 CONDENSING BOILERS
23 65 00 COOLING TOWERS
23 74 00 PACKAGED AIR CONDITIONING UNITS
23 81 00 AIR DISTRIBUTION
23 82 29 ELECTRIC HEATERS
DIVISION 25 – INTEGRATED AUTOMATION
25 00 00 INTEGRATED AUTOMATION
25 90 00 SEQUENCE OF OPERATION
DIVISION 26 – ELECTRICAL
26 05 00 COMMON WORK RESULTS FOR ELECTRICAL
26 05 03 EQUIPMENT WIRING CONNECTIONS
26 05 13 MEDIUM VOLTAGE CABLES
26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND
CABLES
TABLE OF CONTENTS TOC-5
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 28 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 33.13 CONDUITS FOR ELECTRICAL SYSTEMS
26 05 33.23 BOXES FOR ELECTRICAL SYSTEMS
26 05 36 CABLE TRAYS FOR ELECTRICAL SYSTEMS
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 05 63 ACCEPTANCE TESTING OF ELECTRICAL SYSTEMS
26 08 00 ELECTRICAL COMMISSIONING
26 12 19 PAD MOUNTED, LIQUID FILLED, MEDIUM VOLTAGE
TRANSFORMERS
26 24 13 SWITCHBOARDS
26 24 16 PANELBOARDS
26 24 19 ENCLOSED CONTROLLERS
26 27 26 WIRING DEVICES
26 28 16.13 LOW-VOLTAGE ENCLOSED SWITCHES
26 28 16.19 LOW-VOLTAGE ENCLOSED CIRCUIT BREAKERS
26 41 13 LIGHTNING PROTECTION FOR STRUCTURES
26 43 13 SURGE PROTECTIVE DEVICES FOR LOW-VOLTAGE ELECTRICAL
POWER CIRCUITS
26 50 00 LIGHTING
DIVISION 27 – COMMUNICATIONS
27 00 00 COMMUNICATIONS
27 51 16 PUBLIC ADDRESS SYSTEM
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 00 FIRE DETECTION AND ALARM
DIVISION 31 – EARTHWORK
31 10 00 SITE CLEARING
31 20 00 EARTHWORK UNCLSSIFIED)
31 22 00 GRADING
31 22 19 FINISHED GRADING
31 23 33 TRENCHING FOR SITE UTILITIES
31 25 00 EROSION AND SEDIMENT CONTROL
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 12 16 ASPHALT PAVING
32 16 13 CEMENT CONCRETE CURBS
32 16 50 SIDEWALKS
32 31 00 CHAIN LINK FENCES AND GATES
32 90 00 PLANTING
32 91 19 TOPSOIL
32 92 00 SEEDING AND SOIL SUPPLEMENTS
TABLE OF CONTENTS TOC-6
DIVISION 33 – UTILITIES
33 11 16 SITE WATER DISTRIBUTION PIPING
33 13 00 DISINFECTION OF WATER SUPPLY DISTRIBUTION SYSTEM
33 27 00 GROUND SOURCE HEAT PUMP WELLS
33 31 00 SITE SANITARY UTILITY SEWERAGE PIPING
33 40 00 STORM DRAINAGE
33 49 13 MANHOLES, FRAMES, AND COVERS
33 51 00 NATURAL GAS DISTRIBUTION
33 71 19 ELECTRICAL UNDERGROUND DUCTS AND MANHOLES
33 71 73 ELECTRICAL UTILITY SERVICES
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 1
SECTION 21 05 00
COMMON WORK RESULTS FOR FIRE SUPPRESSION
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Specialty Valves
2. Fire Protection Piping Underground
3. Fire Protection Piping Above Ground
B. Sprinkler Systems¨ Conforming to NFPA 13 Standards
C. Related Sections:
1. Trenching: Section 31 23 33.
2. Concrete: Section 03 30 00
3. Painting: 09 90 00
4. Fire Suppression Sprinkler Systems: Section 21 13 00.
5. Hangers and Supports: Section 23 05 29.
6. Testing, Adjusting, and Balancing: Section 23 05 93.
1.02 REFERENCES
A. American National Standards Institute (ANSI):
1. ANSI A21.4; Cement-Mortar Lining for Ductile-Iron and Gray-Iron Pipe and
Fittings for Water.
2. ANSI A21.10; Ductile-Iron and Gray-Iron Fittings, 3 through 48 in, for Water and
Other Liquids.
3. ANSI A21.11; Rubber Gasket Joints for Ductile-Iron and Gray-Iron Pressure Pipe and Fittings.
4. ANSI A21.50; Thickness Design of Ductile-Iron Pipe.
5. ANSI A21.51; Ductile-Iron Pipe, Centrifugally Cast, in Metal Molds or Sand-
Lined Molds for Water or Other Liquids.
6. ANSI B16.1; Cast Iron Pipe Flanges and Flanged Fittings, Class 25, 125, 250 and
800.
7. ANSI B16.4; Cast Iron Threaded Fittings Class 125 and 250 lb.
8. ANSI B16.21; Nonmetallic Flat Gaskets for Pipe Flanges.
9. ANSI B18.2.1; Square and Hex Bolts and Screws Inch Series Including Hex Cap
Screws, and Lag Screws.
10. ANSI B18.2.2; Square and Hex Nuts.
B. American Society for Testing and Materials (ASTM):
1. ASTM A 47; Specification for Malleable Iron Castings.
2. ASTM A 48; Standard Specification for Gray Iron Castings
3. ASTM A 53; Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated
Welded and Seamless.
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 2
4. ASTM A 135; Specification for Electrical Resistance Welded Steel Pipe
5. ASTM A 183; Specification for Heat-Treated Carbon Steel Track Bolts and Nuts.
6. ASTM A 126; Specification for Gray Iron Castings for Valves, Flanges and Pipe
Fittings.
7. ASTM A 307; Specification for Carbon Steel Externally Threaded Standard
Fasteners.
8. ASTM A 536; Specification for Ductile Iron Castings.
9. ASTM B 62; Specification for Composition Bronze or Ounce Metal Castings.
10. ASTM D 2000; Classification for Rubber Products in Automotive Applications.
11. American Water Works Association (AWWA).
12. Factory Mutual (FM) Approvals shall govern the quality and performance of certain Products as specified herein.
C. The National Fire Protection Association (NFPA):
1. NFPA No. 13: (Latest Edition) Standard for the Installation of Sprinkler Systems.
2. NFPA No. 24 (Latest Edition) Standard for Installation of Private Fire Service
Mains and Their Appurtenances.
3. NFPA No. 30, Flammable and combustible liquids code.
4. NFPA No. 101 Life Safety Code.
D. Underwriters' Laboratories, Inc. (UL)
1. UL 262 Gate Valves For Fire Protection Service.
2. UL 312 Check Valves For Fire Protection Service.
E. American Society of Sanitary Engineering, Standards:
1. ASSE 1015; Performance Requirements for Double Check Backflow Prevention
Assemblies and Double Check Fire Protection Backflow.
1.03 SUBMITTALS
A. Product Data: Submittals required for the following items:
1. Pipe Specialties
2. Valves.
3. Mechanical Pipe Couplings.
4. Pipe and Fittings.
B. Shop Drawings:
1. Plans: Installation layouts; indicating pipe sizes and internal dynameters, pipe materials and valve locations and sizes.
2. Elevations: Riser diagrams; indicate pipe materials, pipe sizes and valve locations and sizes.
3. Details and Schedules: Indicating the following:
a. Jointing methods and piping connections
b. Floor and wall penetrations
c. Mounting and support details
C. Operation and Maintenance Manual
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 3
1. Include the following:
a. Product data
b. Product installation instructions
c. Maintenance requirements
d. Spare parts lists
e. Copies of the “Contractors Material and Test Certificates”
f. Copy of NFPA No. 24: Standard for the Inspection, Testing and Maintenance of Water Based Fire Protection Systems
1.04 QUALITY ASSURANCE
A. Manufacturers’ Qualifications: Minimum three (3) years of documented experience producing products of the types specified in this section.
B. Installer Qualifications:
1. The fire protection system installer performing the fire protection system work of this project shall be an acceptable, qualified installer of the types specified, with a minimum of five (5) years of documented experience.
2. Such installer shall submit evidence of such acceptability in the Submittals submission.
C. The contractor shall install and test the fire protection systems in accordance with the latest editions of the following Standards:
1. NFPA No. 13: Installation of Sprinkler Systems.
2. NFPA No. 30: Flammable and Combustible Liquids Code.
3. NFPA No. 101 Life Safety Code.
D. The contractor shall provide fire protection products in accordance with UL Standards;
provide UL label on each product.
E. The contractor shall provide fire protection products and installations in accordance with Factory Mutual (FM) Standards.
F. All products shall be listed for fire protection service.
1. Submit completed and signed copies of “Contractors Material and Test
Certificates” the Contracting Officer.
G. The fire protection systems shall be in conformance with all Federal, State, and Local requirements.
H. Hydraulic Design Information Sign: Contractor shall identify a hydraulically designed sprinkler system with a permanently marked weatherproof metal or rigid plastic sign secured with corrosion resistant wire or chain. Sign shall be placed at the alarm valve or deluge valve supplying the corresponding hydraulically designed area. The sign shall include the following information:
1. Location of the design area or areas
2. Discharge densities over the design area or areas
3. Required flow and residual pressure demand at the base of the riser
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 4
4. Occupancy classification or commodity classification and maximum storage height and configuration
5. Hose stream demand included in addition to the sprinkler demand
1.05 SEQUENCING/SCHEDULING
A. Interferences: Proposed locations and relationship of work under this Section of
Specifications shall be coordinated with the proposed locations and relationship of work of other trades.
B. The Contract Drawings do not show the locations of branch lines. The Contractor shall be responsible for modifying the work with offsets, bends or other fittings to avoid minor interferences and structural obstruction. Such modifications shall be accomplished at no additional cost to the Contracting Officer.
C. In cases where interferences develop which may require relocation of other trades work, the Contracting Officer shall decide, which work is to be relocated regardless of which was proposed to be or actually installed first.
1.06 DELIVERY, STORAGE AND HANDLING
A. Packing, Shipping, Handling and Unloading:
1. Provide temporary protective coating on cast iron and steel valves.
2. Provide temporary end closures on fittings.
3. Pack valves in shipping containers with labels in place.
B. Storage and Protection:
1. Store valves in shipping containers until installation.
2. Maintain temporary end closures on fittings in place until installation.
PART 2 PRODUCTS
2.01 SPECIALTY VALVES
A. Acceptable Manufacturers (Test and Drain Valve):
1. Guardian Fire Equipment
2. Potter – Roemer
3. Or Approved Equal
B. Test and Drain Valve: Designed to test water flow through the sprinkler system. Brass body, three-position ball valve (Off – Test – Drain), integral site glass, ½-inch restricted orifice for test position, FM approved. Model 9250
C. Acceptable Manufacturers (Hose End Gate Valve):
1. Standard Fire Equipment Division Zurn Company; No. 281 with No. 130-2-1/2 x
1-1/2 inch Reducer and No. 126 Cap/Chain.
2. Kennedy Valve Manufacturing Co., Inc.
3. Jenkins Corporation.
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 5
D. Hose End Gate Valve: Solid cast brass construction, UL Listed and FM Approved
175 pound cold water non-shock, non-rising stem and inside screw with solid wedge disc; rough brass finish.
E. Acceptable Manufacturers (Swing Check Valve):
1. Viking Corporation; Model D-1.
2. ITT Grinnell Corporation.
3. Stockham
4. Or Approved Equal
F. Swing Check Valve (At Siamese Fitting): Ductile iron with EPDM rubber faced, Teflon coated steel clapper; UL Listed and FM Approved, 250 pound cold water working pressure designed for vertical or horizontal installation, grounded or flanged inlet and outlet.
G. Acceptable Manufacturers (Backflow Preventer):
1. Watts Regulator Company
2. Zurn-Wilkins
3. Or Approved Equal
H. Backflow Preventer (Fire Protection): Double check valve 2-1/2-inch to 10-inch):
Flanged type, FDA approved epoxy coated, cast iron body construction, double check valve design, bronze check seats and bronze ball valve test cocks. Unit suitable for continuous operating pressure of 175 psi and operating temperatures up to 110 degrees
F.; Series 709 OS&Y-S
1. Equipped with bronze strainer, FM/UL resilient seated OS&Y gate valves and ball type test cocks. Can be installed horizontally or vertically.
2. Approved under ASSE Standard 1015.
2.02 FIRE PROTECTION PIPING SYSTEM, UNDERGROUND OUTSIDE STRUCTURE
AND UNDER ON-GRADE STRUCTURE SLAB.
A. Service Requirements:
1. Fire Protection Service: Maximum operating temperature of 100 degrees F and a maximum operating pressure of 100 psig or pressure and temperature available at the main.
B. Pipe: Cement Lined Ductile Cast Iron Class 50 ANSI A21.50, ANSI A21.51 and
ANSI A21.4.; 3-inch and larger.
1. Joints:Push-On Gasket ANSI A21.11, or Mechanical Gasket ANSI A21.11.
(Mixture of joint types not acceptable.)
2. Fittings: Cement Lined Gray Iron or Ductile Iron Class 250 ANSI A21.10 and
ANSI A21.4, Push-On Gasket or Mechanical Gasket.
3. Gaskets: Styrene Butadiene Rubber (approx. 85 durometer hard.) ANSI A21.11.
4. Bolts:Carbon Steel Hex Bolts and Nuts ASTM A 307 Grade B and ANSI B18.2.1 and ANSI B18.2.2.
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 6
2.03 FIRE PROTECTION PIPING, ABOVE GRADE INSIDE STRUCTURE
A. Service Requirements:
1. Wet-pipe: Maximum operating temperature of 100 degrees F. and a maximum operating pressure of 100 psig.
2. Inspectors Test Connection: Maximum operating temperature of 100 degrees F and a maximum operating pressure of 100 psig.
B. Pipe (2-inch and smaller): Black Steel ASTM A 53, Schedule 40. UL listed for fire sprinkler applications with rated working pressure of 300 psi.
1. Joints: Threaded.
2. Nipples: Same as Pipe.
3. Fittings: Black Cast Iron 125 lb. Standard ANSI B16.4, UL Listed.
4. Thread Lubricant: Graphite/Oil Compound or Polytetrafluoroethylene (PTFE)
Tape. On Male Threads ONLY.
C. Pipe: (2 ½-inches up to 4-inches): UL Listed, ASTM ASTM A135; grooved pipe, welded and seamless steel Schedule 40, 300 psi rated working pressure.
1. Mechanical Pipe Coupling Joints: Self-centering gasketed couplings, grooved pipe ends, positive liquid-tight joint, ASTM A47; malleable iron or ASTM A536 ductile iron housings, ASTM D 2000; coupling gaskets of EPDM Grade E.
ASTM A183; bolts and nuts of heat treated carbon steel (minimum tensile
110,000 psi).
a. Nipples: Same as Pipe
2. Grooved Pipe Fittings: ASTM A47; malleable iron in manufacturer's standard finish, designed for use with mechanical pipe couplings. ANSI B16.1; grooved to thread adapters and grooved to flange adapters.
a. Flanges and Flanged Fittings: UL Listed, ANSI B16.1; Class 125 cast iron.
1) Thread Lubricant: Graphite/Oil Compound or Polytetrafluoroethylene
(PTFE) Tape, Male Threads ONLY.
D. Valves and Accessories
1. Acceptable Manufacturers:
a. Nibco
b. Tyco
c. Apollo
d. Or Approved Equal
2. Gate Valves: Meeting UL 262, working pressure 175 pis
a. Valve Identification: Bearing UL label or marking verifying compliance to
UL 262; manufacturer’s name and valve working pressure rating marked on valve.
b. Construction: Bronze body, bronze trim and solid wedge, rising stem, handwheel inside screw, threaded ends.
3. Check Valves: Meeting UL312, working pressure 175 psi.
a. Valve Identification: Bearing UL label or marking verifying compliance to
UL312; manufacturer’s name and valve working pressure rating marked on valve body.
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 7
b. Construction: Bronze body, bronze trim, bronze swing disc, rubber seat, threaded ends for steel or iron pipe connections, ends prepared for solder jointing to copper tubing or pipe.
4. Drain Valve: Working pressure 175 psi.
a. Valve Identification: Bearing UL label or marking; manufacturer’s name and valve working pressure rating marked on valve body.
b. Construction: Bronze body, screw-in bonnet, integral seat, threaded ends.
2.04 INDICATOR VALVE AND POST
A. Acceptable Manufacturers:
1. NIBCO; M-609/F-609
2. Kennedy Valve Manufacturing Co.
3. Or Approved Equal
B. Wall Indicator Post Valve: UL Listed/FM Approved; 175 pound cold water non-shock, iron body-bronze mounted, non-rising stem, solid wedge flanged or mechanical with indicator post pattern.
C. Wall Indicator Post: UL Listed/FM Approved wall mounted indicator post valve operator with indicator plate. The Post Head and Cover are cast iron per ASTM
1. The post head and cover; cast iron A126 (Grade B)
2. Handwheel; cast iron ASTM A48 (Class 20)
3. Operating nut; ductile iron ASTM A536.
4. The post head, cover and handwheel are painted red.
PART 3 EXECUTION
3.01 PREPARATION
A. Field Measurement: The Drawings are in general indicative of the Work, with symbols and notations for clarity. However, the Drawings are not an exact representation of all conditions involved, therefore, layout piping to suit actual field measurements.
1. No extra compensation will be made for Work due to difference between indicated and actual dimensions.
2. Submit to the Contracting Officer for approval, details of proposed departures necessitated by field conditions or other causes.
B. Interferences: Layout piping systems to compensate for structural interferences, to preserve headroom, and not to interfere with openings, passageways and equipment.
Do not install piping with joints and fittings over motors, switchboards, panels, or similar electrical apparatus.
3.02 PERFORMANCE
A. Perform sprinkler piping system installation in conformance with the requirements of
NFPA No. 13 as directly appropriate to the work.
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 8
B. Perform underground fire line installations in conformance with the requirements of
NFPA No. 24 as directly appropriate to the work.
3.03 INSTALLATION
A. The sprinkler system piping is to be provided with sway bracing.
B. General Requirements: The schematic drawings do not necessarily indicate every piping size or alignment. Provide the required pipe sizes, fittings, adapters, etc. as required to construct complete piping systems.
1. Install piping concealed in those areas of the structures having hung ceilings and exposed in all other areas, except where indicated otherwise on the Drawings.
2. Clean piping prior to installation and following installation to prepare for painting. Keep open ends of piping and pipe attachment openings on equipment capped or plugged until actual connections.
3. Construct pipe runs from full lengths of pipe using short sections only for runs of less than full pipe length. Make changes in directions of pipe runs with fittings only.
4. Cut pipe accurately to measurements established in the field and assemble in place without springing, forcing, excessive cutting or weakening of the structure.
5. Install unions and flanges in accessible locations and whether indicated or not, install union adjacent to equipment and wherever removal of equipment for repair or replacement is required.
6. Provide reducing fittings where reduction in pipe sizes is necessary. Bushings will not be accepted.
7. Install gate valves as indicated on the drawings and as required by NFPA No. 13.
8. Provide tamper switches on all valves associated with the fire suppression system.
9. Pipe Supports Installation: Place and support piping runs as specified in Section
23 05 63.
C. Exposed Piping: Install exposed piping parallel or perpendicular to the lines of the building structure and to compensate for structural interferences, to preserce headroom, and not to interfere with openings, passageways and equipment.
1. Install piping a sufficient distance from other work to permit clearance of not less than one inch between the piping or insulated piping and adjacent work.
2. Install piping as close as possible to walls, overhead construction, columns, and similar to facilitate insulating work and removal of piping later.
3. Paint exposed sprinkler piping red; refer to Section 09 90 00.
D. Buried Piping: Perform earthwork involving trenching for buried pipe runs as specified in Section 31 23 33.
1. Keep trenches dewatered until pipe joints have been made and concrete bedding and blocking, if any, have hardened. Under no circumstances lay pipe in water or on subgrade containing frost.
2. Rest each section of pipe on pipe bedding for the full length of its barrel, with recesses excavated for pipe bells so joints can easily be made. Backfill recesses with bedding material immediately following pipe joining operations.
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 9
3. Lay pipe proceeding upgrade true to line and grades given. Lay bell and spigot pipe with bell end upgrade.
4. Take up and relay pipe that is not laid true to required alignment or grade or has its joints disturbed after laying. No deviations from the required line and grade permitted, except with approval of the Contracting Officer.
5. Reaction or Thrust Backing: Install on underground lines at trees, plugs, caps and changes in direction.
a. Use 3000 lb. (Class B) concrete placed between solid undisturbed earth and fittings to be anchored. Perform concrete work as specified in Section 03 30
00.
b. Area bearing on pipe and on the ground shall be approximately nine square feet each.
3.04 PIPE JOINING
A. General Requirements: Exercise care when making pipe joints and make joints in accordance with the pipe material manufacturer's recommendations and the following additional requirements.
1. In each instance of pipe joining, those portions of pipes involved must be absolutely clean just prior to assembly.
2. If a joint is extremely difficult to assemble or is not completely sealed, disassemble the joint and correct the difficulty if possible. Remake the joint using new materials when necessary.
B. Ferrous Metal Piping Joints: Cut pipe ends square, deburr and ream to size of original bore.
1. Threaded: Cut threads to standard gauge depth and length and clean threads free of oil and cuttings. Provide thread lubricant as specified to aid in joint lubrication and sealing in joining operation.
2. Flanged: Face accurately, install gaskets and draw up square and tight to ensure full gasket flow and seal.
C. Ductile Cast Iron Pipe Joints:
1. Push-On Joints: Properly seat sealing gasket, evenly and sufficiently lubricate the spigot end of pipe, and fully enter joint until joint line is visible. Make deflection, if required, only after the joint has been assembled properly.
3.05 FIELD QUALITY CONTROL
A. General Requirements: Conduct tests specified under Piping System Specifications so that each piping system installed in the Project is tested to the Contracting Officer's satisfaction.
1. Flush entire system in accordance with NFPA 13.
2. Provide tools, materials (including clean water), apparatus and instruments necessary for piping system testing.
3. Conduct tests of every kind in the presence of and to the satisfaction of the
Contracting Officer.
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 10
4. Free piping systems of trapped air for tests involving water.
5. Perform tests involving water in the test only when there is no danger of water freezing during the test time period, and in accordance with NFPA No. 13 and
NFPA 24.
6. Repair and Retest: When a piping system fails to meet test requirements specified herein, conform to the following:
a. Determine source or sources of leakage.
b. Repair or replace defective material, and if a result of improper workmanship, correct such.
c. Conduct additional tests to demonstrate that piping system meets specified test requirements.
d. Perform repair and retest work at no increase in Contract Price.
7. Accuracy Proof: Furnish acceptable proof to the Contracting Officer that testing apparatus, pressure gauges, etc. have been recently checked and calibrated, as applicable, prior to use on this Project.
8. Notification: Give the Contracting Officer a minimum of three days advance notice of the times when piping system acceptance testing will be conducted.
END OF SECTION
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 13 00 - 1
SECTION 21 13 00
FIRE SUPPRESSION SPRINKLER SYSTEMS
PART 1 GENERAL
1.01 SUMMARY
A. Section Includes:
1. Piping System Specialties
2. Sprinkler Heads and Accessories
3. Alarm Valve Stations
4. Alarm Devices
5. Fire Department Connections
6. Air Compressor (dry pipe system)
B. Related Sections:
1. Paints and Coatings: Section 09 90 00.
2. Common Work Results for Fire Suppression: Section 21 05 00
3. Hangers and Supports: Section 23 05 29.
4. Mechanical Identification: Section 23 05 63.
1.02 SYSTEM DESCRIPTION
A. Sprinkler System to conform to the following criteria:
1. Coverage for entire building.
2. Design system hydraulically to NFPA 13.
3. System performance to achieve hazard classifications as noted on the Drawings.
1.03 REFERENCES
A. Factory Mutual (FM) Approvals shall govern the quality and performance of certain
Products as specified herein.
B. The National Fire Protection Association (NFPA):
1. NFPA No. 13: (Latest Edition) Standard for the Installation of Sprinkler Systems.
2. NFPA No. 24 (Latest Edition) Standard for Installation of Private Fire Service
Mains and Their Appurtenances.
3. NFPA 101 Life Safety Code.
C. Underwriters' Laboratories, Inc. (UL) Listings or Labels shall govern the quality and performance of certain Products as specified herein.
1.04 SUBMITTALS
A. A registered professional engineer licensed to practice fire protection engineering
Commonwealth of Pennsylvania must stamp the shop drawings prior to submitting the fire extinguishing system shop drawings.
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 13 00 - 2
B. Product Data: Submittals required for the following items:
1. Piping System Specialties.
2. Sprinkler Heads and Accessories.
3. Alarm Valve Station
4. Alarm Devices.
5. Fire Department Connections.
6. Air Compressor
C. Product Data: Submit manufacturers catalog data sheet indicating rough-in sizes, finishes and accessories.
D. Submit copies, to the Contracting Officer, of Working Plans as may be required by the approving authority having jurisdiction before the fire protection system work is performed.
E. Prepare copies of Contractor's Materials and Test Certificate for the approving authorities, and the Contracting Officer. Submit for approval along with the
Submittals in order to obtain prior approval to actual use.
F. Operation and Maintenance Manual:
1. Include the following:
a. Product Data Sheets
b. Product Installation Instructions
c. Maintenance Requirements
d. Spare Parts List
e. Contractor's Materials and Test Certificate
f. System Inspection Data
1.05 QUALITY ASSURANCE
A. Plans and Calculations: Construction drawings and calculations must be prepared by an individual that has obtained National Institute for Certification in Engineering
Technologies (NICET), Automatic Sprinkler Systems, Level III certified or Special
Hazards Suppression systems, Level IV certification in accordance with the applicable
NFPA code.
B. Approval Requirement: Contractor shall submit Working Plans for approval to the
Contracting Officer.
C. Installer Qualifications:
1. The fire protection system installer performing the fire protection system work of this Project shall be an acceptable, qualified installer of the fire protection system products manufacturer, with a minimum of five (5) years of documented experience.
2. Such installer shall submit evidence of such acceptability in the Submittals submission.
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 13 00 - 3
D. The contractor shall provide fire protection products in accordance with UL Standards;
provide UL label on each product.
E. The contractor shall provide fire protection products and installations in accordance with Factory Mutual (FM) Standards.
F. All products shall be listed for fire protection service.
G. The fire protection systems shall be in conformance with all Federal, State, and Local requirements.
H. Perform Work in accordance with:
1. Sprinkler Systems: NFPA 13.
I. Design fire suppression system under direct supervision of Professional Engineer experienced in design of this Work and licensed in State of Pennsylvania.
1.06 SEQUENCING/SCHEDULING
A. The Contractor shall coordinate the work with the Local Fire Department regarding the type of fire hose connections required for the fire department fire fighting equipment and the final location of the fire department connection.
B. Interferences: Proposed locations and relationship of work under this Section of
Specifications shall be coordinated with the proposed locations and relationship of work of other trades.
C. The Contract Drawings do not show the locations of branch lines. The Contractor shall be responsible for modifying the work with offsets, bends or other fittings to avoid minor interferences and structural obstruction. Such modifications shall be accomplished at no additional cost to the Contracting Officer.
D. In cases where interferences develop which may required necessary relocation of other trades work, the Contracting Officer shall decide, which work is to be relocated regardless of which was proposed to be or actually installed first.
1.07 STORAGE AND PROTECTION
A. Store all components in shipping containers until time of installation.
B. Protect all components from damage and weather.
1.08 DESIGN CRITERIA:
A. Hydraulically design automatic wet pipe and dry pipe sprinkler systems based on design criteria indicated on the drawings.
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 13 00 - 4
PART 2 PRODUCTS
2.01 SPRINKLER HEADS AND ACCESSORIES
A. Acceptable Manufacturers (Sprinkler Heads):
1. Tyco Fire and Building Products
2. Viking Corporation.
3. Star Sprinkler, Inc.
4. Or Approved Equal
B. Sprinkler Heads (Upright): Light, Ordinary and Extra Hazard, UL Listed, FM
Approved; standard spray, quick response, bronze body construction, brass deflector, glass bulb type, temperature classification of 155°F, nominal 5.6 K-factor, ½-inch orifice, maximum 175 psi, natural brass finish; Model TY-FRB.
C. Sprinkler Heads (Pendent): Light, Ordinary and Extra Hazard, UL Listed, FM
Approved; quick response, bronze body construction, brass deflector, glass bulb type, temperature classification of 155°F, nominal 5.6 K-factor, ½-inch orifice maximum
175 psi, natural chrome finish Model TY-FRB.
D. Sprinkler Heads (Recessed): Light, Ordinary and Extra Hazard, UL Listed, FM
Approved; quick response, bronze body construction, brass deflector, glass bulb type, temperature classification of 155°F, nominal 5.6 K-factor, ½-inch orifice maximum
175 psi, natural brass finish; Model TY-FRB.
2.02 SPRINKLER HEADS (SIDEWALL)
A. Acceptable Manufacturers (Sprinkler Heads):
1. Tyco Fire and Building Products
2. Viking Corporation.
3. Star Sprinkler, Inc.
4. Or Approved Equal
B. Sprinkler Heads (Recessed Sidewall): Light and ordinary hazard, UL Listed, FM
Approved; quick response, bronze body construction, copper deflector, fusible link assembly, stainless steel fusible link lever, temperature classification of 155°F, nominal 5.6 K-factor, ½-inch orifice, maximum 175 psi, white polyester finish; Model
TY-FRB.
2.03 SPRINKLER HEADS (IN-RACK)
A. Acceptable Manufacturers (Sprinkler Heads):
1. Tyco Fire and Building Products
2. Viking Corporation.
3. Reliable Sprinkler, Inc.
4. Or Approved Equal
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 13 00 - 5
B. Sprinkler Heads (In-Rack Upright and Pendant) UL Listed; standard or quick response, bronze body construction, brass deflector, glass bulb, temperature classification of 175 °F, maximum 175 psi, complete with water shields and guards, natural brass finish; Model M
2.04 RESERVE SPRINKLER CABINET
A. Acceptable Manufacturers (Reserve Sprinkler Cabinet and Sprinkler Guards):
1. Viking Corporation.
2. GEM Sprinkler Co.
3. Or Approved Equal
B. Reserve Sprinkler Cabinet: NFPA 13; Cold rolled steel cabinet, enamel interior and exterior finish, mounting holes, mounting assembly to hold sprinkler heads.
C. Sprinkler Wrench: NFPA 13; Ductile iron or steel construction.
2.05 SPRINKLER GUARDS
A. Acceptable Manufacturers (Reserve Sprinkler Cabinet and Sprinkler Guards):
1. Viking Corporation.
2. GEM Sprinkler Co.
3. Or Approved Equal
B. Sprinkler Guards: UL Listed, FM Approved; For use with standard and large orifice, standard and quick response, upright and pendant style sprinklers, hard steel wire cage designed to encase and protect sprinkler, clear chromate over zinc plating. Model D-1
C. Water shields and guards: UL Listed, FM Approved; Guards designed to encase and protect sprinkler. Water shields designed to protect heat sensing operating element from water spray discharge.
1. Guards: Hard steel wire cage, clear chromate over zinc plating. Shields: cold rolled steel, clear chromate over zinc plating, upright sprinkler water shield and guard assembly; Model B-1.
2. Guards: Hard steel wire cage, clear chromate over zinc plating. Shields: cold rolled steel, clear chromate over zinc plating, pendant sprinkler water shield and guard assembly; Model C-1.
2.06 WET TYPE ALARM VALVE STATION
A. Acceptable Manufacturers:
1. Viking Corporation
2. ITT Grinnell
3. Reliable
4. Or Approved Equal
B. (Sizes 3-inch, 4-inch, 6-inch and 8-inch): UL Listed, FM Approved; A complete assembly of equipment and devices including but not limited to a main clapper type
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 13 00 - 6
check valve, trim and accessories, designed for operation on a variable pressure operation water supply and for horizontal or vertical installation with flanged or groove inlet and outlet; Model J-1.
C. Alarm Check Valve: UL Listed, FM Approved; Designed for 250 psi. water working pressure. Ductile iron body with bolted hand-hole, Teflon coated hot rolled steel clapper with stainless steel accessories and EPDM rubber face. Valve housing tapped for inlet and outlet pressure gauges, alarm devices and main system drain.
D. Alarm Check Valve Trim: UL Listed, FM Approved; All trim components listed for
250 psi working pressure. All piping ¾-inch or less not provided shall be galvanized steel. Provide manufacturers standard trim package including but not limited to the following:
1. Inlet and outlet pressure gauges with drain ports.
2. Alarm shut-off valve
3. Alarm test valve
4. Drain valve
5. All required piping, pipe nipples and fittings.
E. Retard Chamber: UL Listed, FM Approved; Ductile iron body, cast iron bushings, painted red. Interior coating for corrosion resistance, designed to compensate for variable water pressure surges or water hammer; Model C-1.
F. Alarm Pressure Switch (Provide at the Alarm Valve Retard Chamber): UL listed, FM
Approved; adjustable between 4 and 20 psi, NEMA-4 rated, die-cast cover with red finish. Switch shall provide a signal to the fire alarm panel when the sprinkler system activates. Dual (SPDT) snap action switches, maximum system minimum service pressure rating of 250 psi, tamper resistant, ½-inch NPT male pressure connection;
Model Alarm Pressure Switch.
2.07 DRY TYPE ALARM VALVE STATION
A. Acceptable Manufacturers:
1. Viking Corporation
2. ITT Grinnell
3. Reliable
4. Or Approved Equal
B. Differential Type (Sizes 3-inch, 4-inch, and 6-inch): UL Listed, FM Approved; An assembly of equipment and devices including but not limited to: a main clapper differential type check valve, trim and accessories, 175 psi water working pressure.
Air check system flanged or grooved inlet and outlet; Model E.
C. Alarm Check Valve: Cast iron body with bolted hand hole, replaceable clapper and air plate rubbers, positive latching spring-loaded clapper and air plate assemble, tapped for inlet and outlet pressure gauges and main system drain.
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 13 00 - 7
D. Alarm check valve trim: UL Listed, FM Approved; All components listed for 250 psi working pressure, galvanized steel piping ¾-inch or less, manufacturers standard trim package including but not limited to the following:
1. Drip Check Valve
2. Drain Cup
3. Reset Bar
4. Alarm Test Shut-off Valve
5. Drain Check Valve
6. Pressure Gauges (Inlet and Outlet)
7. Primary Water Test Valve
8. All necessary piping, pipe nipples and fittings
E. Accelerator: UL Listed, FM Approved; Quick opening, integral anti-flood assembly, automatic reset, cast brass base housing and cover, brass and stainless steel internal parts, manufacturers standard trim package including but not limited to isolation valves, air pressure gauge, and all necessary piping, pipe nipples and fittings; Model
D-2.
F. Water Motor Gong (Alarm portion of alarm valve assembly): UL listed, FM
Approved; rated to 175 psi water working pressure, shall include water motor alarm with inlet and outlet tapping, drive shaft, inlet strainer, closure plate and red plated exterior gong Model F-1.
G. Alarm Pressure Switch (Provide at the Alarm Valve Retard Chamber): UL listed, FM
Approved; adjustable between 4 and 20 psi, NEMA-4 rated, die-cast cover with red finish. Switch shall provide a signal to the fire alarm panel when the sprinkler system activates. Dual (SPDT) snap action switches, maximum system minimum service pressure rating of 250 psi, tamper resistant, ½-inch NPT male pressure connection;
Model Viking Alarm Pressure Switch
H. Air Pressure Maintenance Device: UL listed, FM Approved; device, brass cover, body and housing, brass and stainless steel internal parts, replaceable air filter, adjustable air pressure setting. ¼-inch tapped inlet and outlet, rated to 175 psi. water working pressure, pre-assembled with by-pass trim, isolation valves; Model 07459.
2.08 MAINTENANCE AIR COMPRESSOR (FOR DRY PIPE SYSTEM)
A. Manufacturers
1. Viking Model E-1.
2. Gast Manufacturing Company
3. Or Approved Equal
B. UL listed, FM Approved; Automatic operation, compressor shall have the capacity to supply a constant volume and pressure to the system approximately 20 psi above the tripping pressure of the dry pipe valve and shall be capable of filling the system to 40 psi in 30 minutes, vertical or horizontal installation, high/low pressure switch, electric
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 13 00 - 8
motor, air cooled, oil-less, check valve, pressure relief valve, permanently lubricated bearings and stainless steel mounting bracket with adjustable straps.
2.09 WATER MOTOR GONG
A. Acceptable Manufacturers:
1. Viking Corporation
2. ITT Grinnell
3. Reliable
4. Or Approved Equal
B. Water Motor Gong: UL listed, FM Approved; rated to 175 psi water working pressure. System shall include water motor alarm with inlet and outlet tapping, drive shaft, inlet strainer, closure plate and red painted exterior gong; Model F-1.
2.10 ALARM DEVICES
A. Acceptable Manufacturers (Supervisory Tamper Switch):
1. Potter Electric Signal Co., ITT Grinnell Corporation
2. Guardian Fire Equipment, Inc.
3. Or Approved Equal
B. Supervisory (Tamper) Switch:
1. UL listed, FM approved, red baked enamel cover, j-bolt mounting, two single-pole double-throw microswitches. Use with OS&Y valves. Figure 6220
C. Supervisory (Tamper) Switch:
1. UL listed, FM approved, red baked enamel, tamperproof cover with collar and mounting bracket; one single pole, single throw microswitch. Use with rising stem valves. Figure 6221
D. Acceptable Manufacturers (Flow Switch):
1. Potter Electric Signal Co., ITT Grinnell Corporation
2. Guardian Fire Equipment, Inc.
3. Or Approved Equal
E. Flow Switch:
1. UL listed, FM approved, red, tamper proof switch housing with flow paddle, adjustable pneumatic retard setting from 0 to 20 seconds, two single-pole, double-throw microswitches, 120 volts. Model 6200 Series
2.11 FIRE DEPARTMENT CONNECTIONS
A. Acceptable Manufacturers:
1. Guardian Fire Equipment, Inc.
2. Elkhart Brass Manufacturing Co., Inc.
3. Potter Roemer.
4. Or Approved Equal.
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 13 00 - 9
B. Flush Design: Design for a minimum of 16 (250 gpm) flow per 64 mm (2 ½-inch) inlet, UL/FM. Cast brass body. Female hose thread swivel inlets, plugs with chains.
Two-way or three-way inlet: angle or straight pattern with integral drop clapper inlets and female NPT outlets; back, bottom or top outlet Series 6000.
C. Storz Fire Department Connection: 106 mm (4 inch) NPT x 127 mm (5 inches) Storz , hard-coated aluminum construction, Storz connection with lock on inlet and female
NPT on outlet, straight design, hard-coated aluminum blind cap with lock and securing wire or chain, 6600 Series.
D. Identification for Storz Fire Department Connections: Cast brass construction , raised lettering. round design. Lettering “AUTO SPRINKLER” 6400 Series
PART 3 EXECUTION
3.01 PERFORMANCE
A. Perform hydrant flow test prior to the submission of shop drawings. Coordinate test requirements with water company. Perform test in the presence of the water company and /or the local authority.
B. Installation Instructions: Install those Products, as specified previously under PART 2 and not specifically covered for installation herein under PART 3, in strict accordance with manufacturer's installation instructions and at locations indicated on the
Drawings.
C. Provide and install all electrical wiring and conduit for a complete installation.
D. Perform sprinkler system installations in conformance with the requirements of NFPA
No. 13, as directly appropriate to the work.
E. Perform underground fire line installations and components in conformance with the requirements of NFPA No. 24, as directly appropriate to the work.
F. Coordinate the installation of the fire department connection with the local fire department. Verify hose thread and style.
G. Install tamper switches on all valves associated with the fire suppression systems.
H. Test all fire suppression systems in accordance with NFPA 13 requirements.
3.02 INSTALLATION
A. Install fire protection piping in accordance with Section 21 05 00- Common Work
Results for Fire Suppression
1. Provide UL and FM approved pipe hangers for piping system support. Pipe hangers as specified in Section 23 05 29.
COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 13 00 - 10
B. All system wiring shall be furnished and installed by the contractor.
C. Coordinate location of sensor and equipment with the work of other trades to ensure access to the devices for maintenance.
D. All wiring shall be installed in electrical metallic tubing or conduit, and must be installed and kept separate from all other building wiring.
1. Refer to Division 26 specifications for wire and conduit material requirements.
3.03 PAINTING
A. Piping system shall be made free from grease, oil, rust, and scale, and shall be made ready for the application of paint. Painting shall be accomplished as specified in
Section 09 90 00, PAINTING. Sprinkler head shall not be painted.
B. Exposed sprinkler piping - red except in office areas and open ceiling spaces which shall match surrounding ceiling color.
PACKAGED FIRE PUMP SYSTEM 21 31 00 - 1
SECTION 21 31 00
PACKAGED FIRE PUMP SYSTEM
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Packaged fire pump system and pump system.
B. Related Sections:
1. Painting: 09 90 00
2. Fire Suppression Sprinkler Systems: Section 21 13 00.
3. Hangers and Supports: Section 23 05 29.
4. Testing, Adjusting, and Balancing: Section 23 05 93
1.02 SYSTEM DESCRIPTION
A. Packaged Fire Pump System
1. Completely packaged fire pump system, electrical system, and controls. System is to be factory assembled and tested, disassembled for delivery, and reassembled in the building’s fire pump room and retested.
1.03 REFERENCES
A. The American Water Works Association (AWWA): AWWA C 502 Dry-Barrel Fire
Hydrants.
B. Factory Mutual (FM) Approvals shall govern the quality and performance of certain
Products as specified herein.
C. The National Fire Protection Association (NFPA):
1. NFPA 20: (Latest Edition) Standard for the Installation of Stationary Pumps for
Fire Protection
2. NFPA 101 Life Safety Code.
D. Underwriters' Laboratories, Inc. (UL) Listings or Labels shall govern the quality and performance of certain Products as specified herein.
1.04 SUBMITTALS
A. Submittals required:
1. Complete shop drawings and complete wiring diagrams.
2. Complete operating and maintenance instructions.
3. Furnish written certification of the manufacturer’s listing with Underwriters
Laboratories as an approved manufacturer of control panels.
4. Furnish written certification that the manufacturer is listed by E0TL/C-ETL as an approved manufacturer of factory assembled pumping systems.
PACKAGED FIRE PUMP SYSTEM 21 31 00 - 2
5. A complete, easily readable functional description of the proposed equipment.
6. Upon completion of the installation, the results of the field and acceptance tests as specified under this section of the specification shall be submitted to the
Contracting Officer.
7. Furnish written certification from the manufacturer’s representative of the proper installation of station.
8. Provide written certification that the pump system is manufactured by a nationally recognized manufacturer of packaged pump systems and signed by a corporate officer.
9. Operation and Maintenance manuals: Submit complete operations and maintenance information for this specific equipment. These manuals shall be reviewed for completeness. They shall include complete parts list including manufacturer’s reference and ordering numbers. Manuals shall include manufacturer’s name, address and phone number, the local representative’s name, address and phone number, the model number and serial number of system.
1.05 QUALITY ASSURANCE
A. All equipment or components of this specification section shall meet or exceed the requirements and quality of the items herein specified, or as denoted on the drawings.
B. The fire pump shall be assembled by the pump manufacturer. An assembler of fire pumps not engaged in the design and construction of fire pumps shall not be considered as a fire pump manufacturer. The manufacturer shall assume “Unit
Responsibility” for the complete fire pump system. Unit responsibility shall be defined as responsibility for the interface and successful operation of all system components supplied by the pump system manufacturer.
C. Ensure pump pressure ratings are at least equal the system’s maximum operating pressure at point where installed, but not less than specified.
D. The manufacturer shall have a minimum of 20 years experience in the design and construction of fire pump systems.
E. Equipment provided shall be responsible for providing certified equipment start-up and, when noted, and in field certified training session. This pump star-up shall be by the pump manufacturer or a certified factory-trained representative per NFPA 20, Section 11-2. This start-up shall included verification of proper installation, system initiation, adjustment and fine tuning. Start-up shall not be considered complete until the sequence of operation, including all alarms, has been sufficiently demonstrated to the Contracting Officer or the Contracting Officer’s designated representative. This job site visit shall occur only after all hood-ups, tie-ins, and terminations have been completed and signed off on the manufacturer’s start-up request form.
PACKAGED FIRE PUMP SYSTEM 21 31 00 - 3
1.06 WARRANTY
A. Warranty from failure due to defects in material and workmanship for a period of eighteen (18) months from date of shipment or twelve (12) months form date of startup, whichever occurs first.
PART 2 PRODUCTS
2.01 PUMP CONSTRUCTION
A. Acceptable Manufacturers for…