420522_TAC_Pre-Bid_Presentation_11Aug2016_ver2.pdf

PDF 1 MB Posted

Attached to
Construct Training Support Center, FTIG Federal contract opportunity
Solicitation number
W912KC-16-R-0002
Issued by
Department of the Army Pennsylvania Army National Guard

About this file

Engineering - Pre-Proposal Conference Slides

View the file

Other files for this federal contract opportunity

Other files attached to Construct Training Support Center, FTIG, newest first.
File Type Posted
EXHIBIT_E_-_Amend_0005.docx DOCX document
Solicitation_No._W912KC-16-R-0002_Amendment_0005.pdf PDF
TSC_Questions-Answers-AMENDED_FINAL-30AUG2016.pdf PDF
Revised_Spec_TOC_Amend_4.pdf PDF
EXHIBIT_E_-_Amend_0004.docx DOCX document
P501.pdf PDF
Appendix_3_to_Specifications_Geothermal_Testing_Data.pdf PDF
TSC_Supplemental_Addendum_Items.pdf PDF
Appendix_1_to_Specifications_LEED_Checklist_071615.pdf PDF
M104.pdf PDF
A12-tac2_-_topo.dwg DWG drawing
A12-tac2_-_site.dwg DWG drawing
M302.pdf PDF
M401.pdf PDF
TSC_Questions-Answers-VER_FINAL_26AUG2016.pdf PDF
Q47-Sketch.pdf PDF
Solicitation_No._W912KC-16-R-0002_Amendment_0004.pdf PDF
Appendix_2_to_Specifciations_01_TAC_Spec_NPDES_Permit_Cover_Ltr.pdf PDF
M504.pdf PDF
Appendix_2_to_Specifications_02_TAC_Spec_NPDES_Permit.pdf PDF
Solicitation_No._W912KC-16-R-0002_Amendment_0003.pdf PDF
EXHIBIT_E_-_Amend_0003.docx DOCX document
TSC_Questions-Answers-VER_2.doc DOC document
EXHIBIT_E_-_Amend_0002.docx DOCX document
Solicitation_No._W912KC-16-R-0002_Amendment_0002.pdf PDF
EXHIBIT_C.doc DOC document
TAC_Bid_Drawings.pdf PDF
Specifications_Division_01.pdf PDF
Solicitation_No._W912KC-16-R-0002.pdf PDF
Attachment_1_-_GFP.pdf PDF
EXHIBIT_A.doc DOC document
Volume_I_Specifications.pdf PDF
EXHIBIT_E.docx DOCX document
EXHIBIT_D.doc DOC document
Volume_II_Specifications.pdf PDF
EXHIBIT_B.doc DOC document
TSC_Questions-Answers-VER_1.pdf PDF
Conference_Slides_11_August_16.pdf PDF
G001_revised_Drawing_Cover_Sheet_06022016_Amend1_.pdf PDF
Volume_II_Specifications_081016.pdf PDF
EXHIBIT_C_-_Amend_0001.doc DOC document
Spec_TOC_with_Tilt-Up_Concrete_Const_Amend1.pdf PDF
Spec_03_47_13_Tilt-Up_Concrete_Construction_Amend1.pdf PDF
Site_Visit_Sign_In_Sheet_TAC.pdf PDF
EXHIBIT_E_-_Amend_0001.docx DOCX document
Solicitation_No._W912KC-16-R-0002_Amendment_0001.pdf PDF
EXHIBIT_D_-_Amend_0001.doc DOC document
Volume_I_Specifications_081016.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Orientation Pre-Bid Meeting / Bidders’ Site Visit

Training Aid Center

Fort Indiantown Gap (New Construction)

Federal Project #: 420522

11 August 2016 SSG Richard A. Weber, Jr.

Contracting Officer Representative (COR)

Agenda

• Purpose / Ground Rules

• Project Overview

• Construction Area: Access Orientation

• Base / Bid Options Construction Overview

• Site Walk

Pre-Bid Meeting Purpose

1. This prebid meeting allows all firm’s to get acquainted with procurement officials and to orientate themselves to the project and construction site.

Ground Rules

1. All questions must be submitted in writing so that every firm has the benefit of the same knowledge.

2. All questions must go through the proper channels, USPFO contracting. They will route questions for answers and provide official answers via solicitation addendum.

Contacts

Points of Contact (AFTER PROJECT AWARD):

1. Staff Sergeant (SSG) Rick Weber - Construction Project Manager (Contracting Officer Representative for USPFO) Work: (717) 861-6550, email: c-rweber@state.pa.us

2. 1st Lieutenant (1LT) James Goslin – Assistant Construction Project Manager (Assistant Contracting Officer Representative for USPFO) Work: (717) 861-8100, email: c-jgoslin@pa.gov

3. Lieutenant Colonel (LTC) Daneen Hutton – FTIG, Director of Public Works Work: (717)861-9349, email: daneen.r.hutton.mil@mail.mil

Department of Military and Veterans Affairs (DMVA) Bureau of Facilities and Engineering

Bldg 0-10, Fort Indiantown Gap Annville, PA 17003 mailto:c-rweber@state.pa.us mailto:c-jgoslin@pa.gov mailto:daneen.r.hutton.mil@mail.mil

Contacts

Point of Contact (AFTER PROJECT AWARD)

Mr. Steve Knaub, Project Manager, sknaub@gfnet.com

A/E Designer of Record

Ganflec Architects & Engineers, Inc.

207 Senate Avenue, Camp Hill, PA 17011 Work Phone: (717)763-7211 mailto:sknaub@gfnet.com

Training Aid Center: Overview Project: New Construction (MILCON, Congressionally Funded) Federal Project #: 420522 Location: Fort Indiantown Gap, Training Area 5

Description: Refer to Bid Documents

Bid Due Date: Tuesday, Aug 30, 2008 at 3PM

Construction Period: 547 Calendar Days

Existing Site Orientation:

Access from South

I81, Exit #85

Pre Bid Meeting Bldg 11-64

Construction site North

Fire Station

Access from North or East

I81, Exit #90

Construction site

North

Overall Access

I81, Exit #85

Construction site

North

- FTIG is currently an “open post” and will remain so during your construction (end of construction should be no later than May 2018)

- Process is under way to make it a closed post (current road blocks marked with an “X”)

- Current major access roads are identified with red arrows

- Complete post closure is currently scheduled for end of 2018 to 2019

X

X

X

X

X

X

Military Operations

-Construction will not be hampered by military operations; or, will be communicated and mitigated to minimal -Construction will not hamper military training either -This slide is depicting a known military exercise that will occur between Oct2016 and the first week of Dec2016.

-Any contractor issues with military operations needs to be communicated thru the Contracting Officer Representative (COR) (SSG Weber) or USPFO Contracting Officer (CO) for resolution.

-Contractor is responsible for their security site.

-Depending on contractors construction schedule for site/civil work and mobilization, this street closure could be a challenge?

Training Aid Center: Base Bid

Include all work indicated on the RFP drawings and as described in the project narrative and specifications.

Training Aid Center: Bid Option 1

Training Aid Center: Bid Option 2

Spec Section 09 91 23: Interior Painting

Training Aid Center: Bid Option 3

Training Aid Center: Bid Option 4

Training Aid Center: Bid Option 5

Training Aid Center: Bid Option 6

Training Aid Center: Bid Option 7

Training Aid Center: Bid Option 8

Note: this bid option and option #9 will be one or the other; not both

Tilt Up Wall Spec Section 03 47 13 Bid Addendum #1

Training Aid Center: Bid Option 9

Note: this bid option and option #8 will be one or the other; not both

Tilt Up Wall Spec Section 03 47 13 Bid Addendum #1

Training Aid Center: Bid Option 10

Training Aid Center: Bid Option 11

Training Aid Center: Bid Option 12

Training Aid Center: Bid Option 13

Training Aid Center: Bid Option 14

Known, Forthcoming Addendum Items (Nothing is Official until you receive information in

Solicitation Addendum)

•NPDES Preliminary Permit has been obtained, notice will be provided

•A revised Drawing Cover Sheet, with corrections to Bid Options will be published. Bid Option #2 in this Power Point presentation is correct (add work); Initial Cover with solicitation is wrong (states delete warehouse painting)

•Specification Section 03 47 14 for Tilt Up Concrete, Exterior Walls was omitted in the solicitation, it will be provided

•Proposed LEED Checklist will be provided

•Drawing FP101 incorrectly states 3,000 ft2, it will be corrected to reflect approximately 30,000 ft2

Questions

Construction Site Walk

Slide Number 1
Slide Number 2
Slide Number 3
Contacts�
Contacts
Training Aid Center: Overview
Existing Site Orientation:�Access from South
Existing Site Orientation:�Access from North or East
Existing Site Orientation:�Overall Access
Military Operations
Training Aid Center: Base Bid
Training Aid Center: Bid Option 1
Training Aid Center: Bid Option 2
Training Aid Center: Bid Option 3
Training Aid Center: Bid Option 4
Training Aid Center: Bid Option 5
Training Aid Center: Bid Option 6
Training Aid Center: Bid Option 7
Training Aid Center: Bid Option 8
Training Aid Center: Bid Option 9
Training Aid Center: Bid Option 10
Training Aid Center: Bid Option 11
Training Aid Center: Bid Option 12
Training Aid Center: Bid Option 13
Training Aid Center: Bid Option 14
Known, Forthcoming Addendum Items�(Nothing is Official until you receive information in Solicitation Addendum)
Questions
Construction Site Walk

File details come from the government source that posted it. Updated .