Exhibit D Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Construct Training Support Center, FTIG, newest first.
File Type Posted
Solicitation_No._W912KC-16-R-0002_Amendment_0005.pdf PDF
TSC_Questions-Answers-AMENDED_FINAL-30AUG2016.pdf PDF
EXHIBIT_E_-_Amend_0005.docx DOCX document
M504.pdf PDF
Appendix_2_to_Specifications_02_TAC_Spec_NPDES_Permit.pdf PDF
Revised_Spec_TOC_Amend_4.pdf PDF
EXHIBIT_E_-_Amend_0004.docx DOCX document
P501.pdf PDF
Appendix_3_to_Specifications_Geothermal_Testing_Data.pdf PDF
TSC_Supplemental_Addendum_Items.pdf PDF
Appendix_1_to_Specifications_LEED_Checklist_071615.pdf PDF
M104.pdf PDF
A12-tac2_-_topo.dwg DWG drawing
A12-tac2_-_site.dwg DWG drawing
M302.pdf PDF
M401.pdf PDF
TSC_Questions-Answers-VER_FINAL_26AUG2016.pdf PDF
Q47-Sketch.pdf PDF
Solicitation_No._W912KC-16-R-0002_Amendment_0004.pdf PDF
Appendix_2_to_Specifciations_01_TAC_Spec_NPDES_Permit_Cover_Ltr.pdf PDF
Solicitation_No._W912KC-16-R-0002_Amendment_0003.pdf PDF
EXHIBIT_E_-_Amend_0003.docx DOCX document
TSC_Questions-Answers-VER_2.doc DOC document
Solicitation_No._W912KC-16-R-0002_Amendment_0002.pdf PDF
EXHIBIT_E_-_Amend_0002.docx DOCX document
EXHIBIT_D.doc DOC document
Volume_II_Specifications.pdf PDF
EXHIBIT_B.doc DOC document
EXHIBIT_C.doc DOC document
TAC_Bid_Drawings.pdf PDF
Specifications_Division_01.pdf PDF
Solicitation_No._W912KC-16-R-0002.pdf PDF
Attachment_1_-_GFP.pdf PDF
EXHIBIT_A.doc DOC document
Volume_I_Specifications.pdf PDF
EXHIBIT_E.docx DOCX document
TSC_Questions-Answers-VER_1.pdf PDF
Volume_I_Specifications_081016.pdf PDF
Conference_Slides_11_August_16.pdf PDF
G001_revised_Drawing_Cover_Sheet_06022016_Amend1_.pdf PDF
Volume_II_Specifications_081016.pdf PDF
EXHIBIT_C_-_Amend_0001.doc DOC document
Spec_TOC_with_Tilt-Up_Concrete_Const_Amend1.pdf PDF
420522_TAC_Pre-Bid_Presentation_11Aug2016_ver2.pdf PDF
Spec_03_47_13_Tilt-Up_Concrete_Construction_Amend1.pdf PDF
Site_Visit_Sign_In_Sheet_TAC.pdf PDF
EXHIBIT_E_-_Amend_0001.docx DOCX document
Solicitation_No._W912KC-16-R-0002_Amendment_0001.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRAINING AIDS CENTER

RFP# W912KC-16-R-0002

EXHIBIT D OPTION EXECUTION PERIOD (AMENDMENT 0001)

PLEASE REVIEW THE FOLLOWING AND INCLUDE COMPLETED FORM WITH VOLUME 1

To the maximum extent possible, the Government intends on awarding options at time of the Contract Award. In the event all options are not awarded at the time of contract award, the Government may award an option, provided it does not impact the performance period of the contract. The only exception is when an Option has its own performance period. Providing and/or receipt of this information will not be used for evaluation purposes and in no way guarantees that the Government will exercise the Option(s).

COMPLETE THE FOLLOWING WITH THE NUMBER OF DAYS AFTER NOTICE TO PROCEED (NTP) THE LISTED OPTION MAY BE EXERCISED AT THE PRICE PROPOSED AND NOT AFFECT THE CONTRACT PERFORMANCE PERIOD. USE OCTOBER 14, 2016 AS THE ESTIMATED DATE FOR NTP. ALL EXERCISED OPTIONS MUST BE COMPLETED WITHIN THE BASIC AWARD CONTRACT COMPLETION PERIOD.

BASIC AWARD CONTRACT COMPLETION PERIOD OF 547 DAYS AFTER NTP

CLIN 0003

Option 1 Milt Equip Parking, Add Permeable Pavers (Add) ____ days after NTP

CLIN 0004

Option 2 Warehouse Interior Paint (Add)

____ days after NTP

CLIN 0005

Option 3 Masonry All Ext Elevations (Add)

CLIN 0006

Option 4 Warehouse Skylights (Deduct)

CLIN 0007

Option 5 Enclose Gas Storage Building (Add)

____ days after NTP

CLIN 0008

Option 6 West Vestibule (Add)

CLIN 0009

Option 7 Showroom Work Desk (Deduct)

CLIN 0010

Option 8 Precast, Concrete Ext Sandwich Walls (Deduct) ____ days after NTP

CLIN 0011

Option 9 Alternate Exterior Wall System (Deduct)

____ days after NTP

CLIN 0012

Option 10 Restroom Wall Tile (Deduct)

CLIN 0013

Option 11 Air Compressor System (Deduct)

CLIN 0014

Option 12 Overhead Bus Bars (Deduct)

CLIN 0015

Option 13 Showroom Storefront Sign (Add)

CLIN 0016

Option 14 Welding Fume Extractor (Deduct)