EXHIBIT_C_-_Amend_0001.doc

DOC document 126 KB Posted

Attached to
Construct Training Support Center, FTIG Federal contract opportunity
Solicitation number
W912KC-16-R-0002
Issued by
Department of the Army Pennsylvania Army National Guard

About this file

Exhibit C Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Construct Training Support Center, FTIG, newest first.
File Type Posted
EXHIBIT_E_-_Amend_0005.docx DOCX document
Solicitation_No._W912KC-16-R-0002_Amendment_0005.pdf PDF
TSC_Questions-Answers-AMENDED_FINAL-30AUG2016.pdf PDF
Revised_Spec_TOC_Amend_4.pdf PDF
EXHIBIT_E_-_Amend_0004.docx DOCX document
P501.pdf PDF
Appendix_3_to_Specifications_Geothermal_Testing_Data.pdf PDF
TSC_Supplemental_Addendum_Items.pdf PDF
Appendix_1_to_Specifications_LEED_Checklist_071615.pdf PDF
M104.pdf PDF
A12-tac2_-_topo.dwg DWG drawing
A12-tac2_-_site.dwg DWG drawing
M302.pdf PDF
M504.pdf PDF
Appendix_2_to_Specifications_02_TAC_Spec_NPDES_Permit.pdf PDF
M401.pdf PDF
TSC_Questions-Answers-VER_FINAL_26AUG2016.pdf PDF
Q47-Sketch.pdf PDF
Solicitation_No._W912KC-16-R-0002_Amendment_0004.pdf PDF
Appendix_2_to_Specifciations_01_TAC_Spec_NPDES_Permit_Cover_Ltr.pdf PDF
Solicitation_No._W912KC-16-R-0002_Amendment_0003.pdf PDF
EXHIBIT_E_-_Amend_0003.docx DOCX document
TSC_Questions-Answers-VER_2.doc DOC document
EXHIBIT_E_-_Amend_0002.docx DOCX document
Solicitation_No._W912KC-16-R-0002_Amendment_0002.pdf PDF
EXHIBIT_C.doc DOC document
TAC_Bid_Drawings.pdf PDF
Specifications_Division_01.pdf PDF
Solicitation_No._W912KC-16-R-0002.pdf PDF
Attachment_1_-_GFP.pdf PDF
EXHIBIT_A.doc DOC document
Volume_I_Specifications.pdf PDF
EXHIBIT_D.doc DOC document
Volume_II_Specifications.pdf PDF
EXHIBIT_B.doc DOC document
EXHIBIT_E.docx DOCX document
TSC_Questions-Answers-VER_1.pdf PDF
Conference_Slides_11_August_16.pdf PDF
G001_revised_Drawing_Cover_Sheet_06022016_Amend1_.pdf PDF
Volume_II_Specifications_081016.pdf PDF
EXHIBIT_D_-_Amend_0001.doc DOC document
Volume_I_Specifications_081016.pdf PDF
Spec_TOC_with_Tilt-Up_Concrete_Const_Amend1.pdf PDF
420522_TAC_Pre-Bid_Presentation_11Aug2016_ver2.pdf PDF
Spec_03_47_13_Tilt-Up_Concrete_Construction_Amend1.pdf PDF
Site_Visit_Sign_In_Sheet_TAC.pdf PDF
EXHIBIT_E_-_Amend_0001.docx DOCX document
Solicitation_No._W912KC-16-R-0002_Amendment_0001.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRAINING AIDS CENTER

RFP# W912KC-16-R-0002

EXHIBIT C PACKAGE INFORMATION AND FORMS

EXHIBIT C PACKAGE INFORMATION AND FORMS - A “Final” Construction Performance Evaluation that is created in CPARS and reported in PPIRS that is issued for a project may be included in lieu of sending out reference package for the project. Place the CPARS form directly behind the Exhibit A it is applicable to.

Instructions to Offeror for sending Reference Questionnaire Forms: Prepare and submit to the owners of the projects listed in your Exhibit A “Performance Relevancy Questionnaires”, a Reference Package (Exhibit C). For Government contracts, send to Contracting Officer or Technical Representative. For commercial references send to personnel with duties similar to those for Government contracts. Offerors should follow-up and encourage references to get the questionnaires to the Contracting Officer in a timely manner. If you have multiple references at one location (Base etc.), send one cover letter and questionnaire for each contract you want a reference for. Your questionnaire package should contain the following:

Cover Letter (See SAMPLE) (Exhibit C1)

Respondent Info Rating Sheets (Exhibit C2)(the next 5 pages) - Offeror should put name in spaces indicated and ensure it is on every page for identification purposes.

OFFEROR SHOULD PLACE THEIR NAME ON TOP OF EACH QUESTIONNAIRE PAGE!!!

OFFEROR SHOULD DELETE THESE INSTRUCTIONS BEFORE SENDING OUT QUESTIONNAIRES

EXHIBIT C1

SAMPLE TRANSMITTAL LETTERAND PAST PERFORMANCE EVALUATION QUESTIONNAIRE

Your Company Letterhead

Date: _________________

To: ______________________________________

We have listed your firm as a reference for the work we have performed for you as listed below. Our firm has submitted a proposal under a project advertised by the Pennsylvania USPFO Contracting Office. In accordance with Federal Acquisition Regulations (FAR), they will evaluate our firm's past performance. Your candid response to the attached questionnaire will assist the evaluation team in this process. We understand that you have a busy schedule and your participation in this evaluation is greatly appreciated. Please complete the enclosed questionnaire as thoroughly as possible. Space is provided for comments. A completed CCASS Evaluation for a DoD project or similar Agency appraisal form may be substituted for this reference questionnaire. Understand that while the responses to this questionnaire may be released to the offeror, FAR 15.306 (e)(4) prohibits the release of the names of the persons providing the responses. Complete confidentiality will be maintained. Only one response from each office is required.

Please send your completed questionnaire to the following address to arrive NOT LATER THAN August 30, 2016. Do not return them to our company.

USPFO CONTRACTING

Bldg. 0-48, Rm 242 Attn. P&C

Fort Indiantown Gap

Annville, PA 17003-5003

Email: michael.v.brown60.civ@mail.mil If you have questions regarding the attached questionnaire, or require assistance, please contact _________ or email to: _____________ Thank you for your assistance. E-Mail is preferred.

Signature and Title

RATING DESCRIPTIONS: Use the following descriptions as guidance in providing ratings.

RATING
DEFINITION
Outstanding (O)
Performance meets contractual requirements and exceeds many requirements that benefit the end user. Work was accomplished with few, if any, minor problems for which corrective actions taken by the contractor were highly effective.
Good:
Performance meets contractual requirements and exceeds some requirements that benefit the end user. Work was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Acceptable
Performance meets contractual requirements. Work was accomplished with some minor problems for which corrective actions taken by the contractor were satisfactory.
Marginal (M)
Performance does not meet some contractual requirements. Serious problems with contractor performance were experienced for which the contractor has either not yet identified corrective actions or the corrective actions taken appear only marginally effective.
Unacceptable (U)
Performance does not meet most contractual requirements. Serious problems with contractor performance were experienced for which the corrective actions were ineffective.
Unknown or Not Applicable (N/A)
The question does not apply. No performance record identifiable within the area of evaluation.

THE QUESTIONNAIRE SHOULD BE SUBMITTED BY THE FOLLOWING MEANS:

Return via email to the email address shown above.

Mark cover sheet: (Attention: RFP W912KC-16-R-0002 “Source Selection Sensitive Information”)

SOURCE SELECTION SENSITIVE WHEN COMPLETED

*****NOT TO BE RELEASED OUTSIDE GOVERNMENT CHANNELS*****

(Exhibit C2) RESPONDENT IDENTIFICATION AND RATINGS

(Part 1 Contractor submitting Proposal fill-in)

RESPONDENT IDENTIFICATION AND RATINGS

(Part 1 Contractor submitting Proposal fill-in) Reference is provided for:

Contract Number:

Project Title:

Date of Award:

Project Completion Date:

Project Location:

Dollar Value:
$

Brief Description of Proj:

Your role in referenced contract:

(Part 2 Person providing Reference) Reference is provided by:

Company/Agency:

Business Address:

Telephone Number:

Email Address:

Project Completion Date:

Relationship to Contract:

If information in Part I is not accurate please indicate.

SOURCE SELECTION SENSITIVE WHEN COMPLETED

*****NOT TO BE RELEASED OUTSIDE GOVERNMENT CHANNELS*****

OFFEROR NAME ________________________________Please circle the appropriate rating.

Please provide evaluation of the following Subfactors by placing an X in the appropriate column that corresponds to the rating definitions on the previous page.

QUALITY CONTROL

Outstanding
Good
Acceptable
Marginal
Unsatisfactory
Not Applicable
(O)
(G)
(A)
(M)
(U)
(N/A)

Quality of Workmanship

Adequacy of the quality control plan

Implementation of the Quality Control Plan

Quality of the Quality Control Documentation

Storage of Materials

Adequacy of Materials

Adequacy of Submittals

Adequacy of Quality Control Testing

Adequacy of As-Builts

Use of Specified Materials

Identification/Correction of Deficient work in a timely manner

Comments on Quality Control:

TIMELY PERFORMANCE

(O)
(G)
(A)
(M)
(U)
(N/A)

Adequacy of Initial Progress Schedule

Adherence to Approved Schedule

Resolution of Delays

Submission of Required Documentation

Completion of Punchlist Items

Submission of Updated and Revised Progress Schedules

Warranty Response

Comments on Timely Performance:

EFFECTIVENESS OF MANAGEMENT

(O)
(G)
(A)
(M)
(U)
(N/A)

Cooperation and Responsiveness

Management of Resources/Personnel

Coordination and Control of Subcontractors

Adequacy of Site Clean Up

Effectiveness of Job-Site Supervision

Compliance with Laws and Regulations

Professional Conduct

Review/Resolution of Subcontractor Issues

Comments on Effectiveness of Management:

COMPLIANCE WITH LABOR STANDARDS

(O)
(G)
(A)
(M)
(U)
(N/A)

Correction of Noted Deficiencies

Payrolls Properly Completed and Submitted

Comments on Compliance With Federal Laws and regulations including Construction Wage Requirements, payrolls, compliance with Drug Free Work Place requirements; Compliance with Executive Order 16393 –Planning for Federal Sustainability in the Next Decade.

COMPLIANCE WITH SAFETY STANDARDS

(O)

(G)

(A)

(M)

(U)

(N/A)

Adequacy of Safety Plan Safety History Comments on Safety Standards:

OVERALL RATING of PERFORMANCE
(O)
(G)
(A)
(M)
(U)
(N/A)

Please provide any additional information you feel is important and not covered elsewhere in this evaluation:

How effective was the contractor in meeting the contract’s sustainability requirements?

IF USGBC LEED® rating was required indicated level specified and level achieved in remarks.

Thank you for your remarks. Be sure to return to the Contracting Agency and not to the Contractor you are providing a reference for.

NAME__________________________________Contact Phone Number:____________________________

Respondent Signature ______________________________________Date Completed:_______________

SOURCE SELECTION SENSITIVE WHEN COMPLETED