TSC_Supplemental_Addendum_Items.pdf

PDF 101 KB Posted

Attached to
Construct Training Support Center, FTIG Federal contract opportunity
Solicitation number
W912KC-16-R-0002
Issued by
Department of the Army Pennsylvania Army National Guard

About this file

TSC Supplemental Addendum Items

View the file

Other files for this federal contract opportunity

Other files attached to Construct Training Support Center, FTIG, newest first.
File Type Posted
EXHIBIT_E_-_Amend_0005.docx DOCX document
Solicitation_No._W912KC-16-R-0002_Amendment_0005.pdf PDF
TSC_Questions-Answers-AMENDED_FINAL-30AUG2016.pdf PDF
Revised_Spec_TOC_Amend_4.pdf PDF
EXHIBIT_E_-_Amend_0004.docx DOCX document
P501.pdf PDF
Appendix_3_to_Specifications_Geothermal_Testing_Data.pdf PDF
Appendix_1_to_Specifications_LEED_Checklist_071615.pdf PDF
M104.pdf PDF
M504.pdf PDF
Appendix_2_to_Specifications_02_TAC_Spec_NPDES_Permit.pdf PDF
M401.pdf PDF
TSC_Questions-Answers-VER_FINAL_26AUG2016.pdf PDF
Q47-Sketch.pdf PDF
Solicitation_No._W912KC-16-R-0002_Amendment_0004.pdf PDF
Appendix_2_to_Specifciations_01_TAC_Spec_NPDES_Permit_Cover_Ltr.pdf PDF
A12-tac2_-_topo.dwg DWG drawing
A12-tac2_-_site.dwg DWG drawing
M302.pdf PDF
Solicitation_No._W912KC-16-R-0002_Amendment_0003.pdf PDF
TSC_Questions-Answers-VER_2.doc DOC document
EXHIBIT_E_-_Amend_0003.docx DOCX document
Solicitation_No._W912KC-16-R-0002_Amendment_0002.pdf PDF
EXHIBIT_E_-_Amend_0002.docx DOCX document
EXHIBIT_C.doc DOC document
TAC_Bid_Drawings.pdf PDF
EXHIBIT_D.doc DOC document
Volume_II_Specifications.pdf PDF
EXHIBIT_B.doc DOC document
EXHIBIT_E.docx DOCX document
Specifications_Division_01.pdf PDF
Solicitation_No._W912KC-16-R-0002.pdf PDF
Attachment_1_-_GFP.pdf PDF
EXHIBIT_A.doc DOC document
Volume_I_Specifications.pdf PDF
TSC_Questions-Answers-VER_1.pdf PDF
Conference_Slides_11_August_16.pdf PDF
G001_revised_Drawing_Cover_Sheet_06022016_Amend1_.pdf PDF
EXHIBIT_D_-_Amend_0001.doc DOC document
Volume_I_Specifications_081016.pdf PDF
Spec_TOC_with_Tilt-Up_Concrete_Const_Amend1.pdf PDF
420522_TAC_Pre-Bid_Presentation_11Aug2016_ver2.pdf PDF
Spec_03_47_13_Tilt-Up_Concrete_Construction_Amend1.pdf PDF
Site_Visit_Sign_In_Sheet_TAC.pdf PDF
EXHIBIT_E_-_Amend_0001.docx DOCX document
Solicitation_No._W912KC-16-R-0002_Amendment_0001.pdf PDF
Volume_II_Specifications_081016.pdf PDF
EXHIBIT_C_-_Amend_0001.doc DOC document
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL GUARD BUREAU

US PROPERTY AND FISCAL OFFICE FOR PENNSYLVANIA

DEPARTMENT OF MILITARY AND VETERANS AFFAIRS

ANNVILLE, PENNSYLVANIA 17003-5003

AS OF AUGUST 26, 2016 Notice of Proposed Task Order: W912KC-16-R-0002

PROJECT TITLE: Training Support Center, PN 420522

ADDENDUM SUPPLEMENTAL INSTRUCTIONS

1. VAULT DOOR

Revise dimensions for A601 DOOR SCHEDULE, DOOR NO 114, as follows:

LEAF 1 (width) 3’-4”

HEIGHT 6’-6”

THICK 3 ¼”

Add to specification 08 11 13:

2.09 ARMORY VAULT DOOR

A. GSA-approved, Class 5A vault door, with standard (complete) hardware package, basis of design OVERLY model no. C5A-IIL-K / CLASS 5 ARMORY

DOOR AND FRAME ASSEMBLY TYPE IIL, STYLE K, DESIGN S, LEFT SWING

WITHOUT OPTICAL DEVICE.

B. Equivalent, approved equal door(s) may be provided by the following approved manufacturers: Brown Safe Manufacturing, Hamilton Products Group, International Vault, Will-Burt.

2. LEED CHECKLIST

Add to specification 01 35 14.01:

2.09 LEED CHECKLIST, SPECIFICATION APPENDIX #1

A. As a specification appendix, the design phase LEED checklist is provided on a for-information-only basis as one potential compliance path for the intended certification and total points earned.

The above referenced specification appendix is provided by attachment to this addendum.

3. NPDES PERMIT

The NPDES permit is provided by attachment, as SPECIFICATION APPENDIX #2. Site (sub)contractor will be co-permittee on the NPDES permit as required by the government.

4. SOIL CONDUCTIVITY TESTING

Per contractor request, soil conductivity testing results are provided by attachment, on a for-information-only basis, as SPECIFICATION APPENDIX #3.

5. ROLLER SHADES

Delete from specification 12 24 23 references to electrical operation of roller shades. Provide manually operated shades.

Delete “Surface mount outside of jambs…” from 12 24 23, 2.02, A, 2; replace text with “Surface mount inside window opening…”.

6. DUCTWORK INSULATION

Add text to specification item 23 07 00, 3.03, F, 1. “Heating-only ductwork exposed in the space it serves is not required to be insulated.”

7. REISSUED DRAWINGS

The following drawings are reissued by attachment, delete their previous versions: M104, M302, M401, M504, P501.

8. Add the following to specification 23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT:

R. Hydronic Unit Heaters:

1. Heating Coil: Constructed of seamless copper pressure tubing mechanically bonded to the collars of aluminum fins. Tubes brazed to steel headers and mounted to provide for expansion. Coils guaranteed for safe operation at steam or hot water pressure up to 150 pounds per square inch, or factory tested at 500 PSIG hydrostatic and 200 PSIG steam pressure.

2. Fans & Motors: Large face area blade style of aluminum and mechanically fastened to steel hubs or non-overloading fan wheel design and direct connected to motors. Fans factory tested and dynamically balanced. Fan blades protected with a fan guard of corrosion resistant metal. Guard may serve as motor mounting bracket. Motors UL Listed, thermal overload protected, and rated continuous duty by NEMA standards, but capable of operation in 104 degrees F.

ambient temperature and permanently lubricated. Motors resiliently mounted to prevent vibration transmission to the building and heat shielded from the heating coil. Motor controls manufacturer's standard for starting and limit control.

3. Horizontal Style Casing: Fabricated from 20 gauge steel minimum with internal reinforcing and threaded hanger rods or pipes for unit suspension mounting.

Casing back panel formed into a fan venturi. Casing air discharge fitted with horizontal one-way adjustable air delivery blades. Casing finished inside and out with baked-on primer and enamel after cleaning, bonderizing, phosphatizing treatments on the base metals. Final enamel in manufacturer's standard color.

4. Vertical Style Casing: Fabricated from 20 gauge steel minimum with internal reinforcing and threaded hanger rods or pipes for unit suspension mounting. Fan venturi formed in casing bottom and casing top depressed for motor and fan location. Casing air discharge fitted with down-flow two-way spread pattern air delivery blades. Casing finished inside and out with baked-on primer and enamel after cleaning, bonderizing, phosphatizing treatments on the base metals. Final enamel in manufacturer's standard color.

5. Controls: Thermostat provided by automatic temperature control installer.

Thermostat shall cycle the fan on call for heat.

6. Electrical: Provide and install local disconnect switch for each unit.

7. Acceptable Manufacturers:

a. Trane

b. Modine

c. Reznor

d. Or Approved Equal e.

9. Add the following to specification 25 90 00 SEQUENCE OF OPERATION:

3.06 UNIT HEATERS

S. Run Conditions - Scheduled: The unit shall run according to a user definable time schedule in the following modes:

1. Occupied Mode: The unit shall maintain a heating setpoint of 18°C [65°F] (adj.).

2. Unoccupied Mode (night setback): The unit shall maintain a heating setpoint of

16°C [60°F] (adj.).

3. Alarms shall be provided as follows:

a. Low Zone Temp: If the zone temperature is less than the heating setpoint by a user definable amount (adj.).

T. Zone Setpoint Adjust: The occupant shall be able to adjust the zone temperature heating and cooling setpoints at the zone sensor.

U. Fan: The fan shall run anytime the zone temperature drops below heating setpoint, unless shutdown on safeties.

V. Heating Coil Valve: The controller shall measure the zone temperature and open the heating coil valve to maintain its heating setpoint.

1. The heating shall be enabled whenever:

a. Outside air temperature is less than 18°C [65°F] (adj.).

b. AND the zone temperature is below heating setpoint.

c. AND the fan is on.

Hardware Points Software Points

Point Name AI AO BI BO AV BV Sched Trend Alarm Show On Graphic

Zone Temp × × ×

Zone Setpoint Adjust × ×

Fan Start/Stop × × ×

Heating Valve × × ×

Schedule ×

Heating Setpoint × ×

Low Zone Temp ×

R. Hydronic Unit Heaters:
1. Heating Coil: Constructed of seamless copper pressure tubing mechanically bonded to the collars of aluminum fins. Tubes brazed to steel headers and mounted to provide for expansion. Coils guaranteed for safe operation at steam or hot water press...
2. Fans & Motors: Large face area blade style of aluminum and mechanically fastened to steel hubs or non-overloading fan wheel design and direct connected to motors. Fans factory tested and dynamically balanced. Fan blades protected with a fan guar...
3. Horizontal Style Casing: Fabricated from 20 gauge steel minimum with internal reinforcing and threaded hanger rods or pipes for unit suspension mounting. Casing back panel formed into a fan venturi. Casing air discharge fitted with horizontal one...
4. Vertical Style Casing: Fabricated from 20 gauge steel minimum with internal reinforcing and threaded hanger rods or pipes for unit suspension mounting. Fan venturi formed in casing bottom and casing top depressed for motor and fan location. Casi...
5. Controls: Thermostat provided by automatic temperature control installer. Thermostat shall cycle the fan on call for heat.
6. Electrical: Provide and install local disconnect switch for each unit.
7. Acceptable Manufacturers:
a. Trane
b. Modine
c. Reznor
d. Or Approved Equal
e.
3.06 Unit Heaters
S. Run Conditions - Scheduled: The unit shall run according to a user definable time schedule in the following modes:
1. Occupied Mode: The unit shall maintain a heating setpoint of 18 C [65 F] (adj.).
2. Unoccupied Mode (night setback): The unit shall maintain a heating setpoint of 16 C [60 F] (adj.).
3. Alarms shall be provided as follows:
a. Low Zone Temp: If the zone temperature is less than the heating setpoint by a user definable amount (adj.).
T. Zone Setpoint Adjust: The occupant shall be able to adjust the zone temperature heating and cooling setpoints at the zone sensor.
U. Fan: The fan shall run anytime the zone temperature drops below heating setpoint, unless shutdown on safeties.
V. Heating Coil Valve: The controller shall measure the zone temperature and open the heating coil valve to maintain its heating setpoint.
1. The heating shall be enabled whenever:
a. Outside air temperature is less than 18 C [65 F] (adj.).
b. AND the zone temperature is below heating setpoint.
c. AND the fan is on.

File details come from the government source that posted it. Updated .