Appendix_1_to_Specifications_LEED_Checklist_071615.pdf

PDF 20 KB Posted

Attached to
Construct Training Support Center, FTIG Federal contract opportunity
Solicitation number
W912KC-16-R-0002
Issued by
Department of the Army Pennsylvania Army National Guard

About this file

Appendix 1 to Specifications LEED Checklist 071615

View the file

Other files for this federal contract opportunity

Other files attached to Construct Training Support Center, FTIG, newest first.
File Type Posted
EXHIBIT_E_-_Amend_0005.docx DOCX document
Solicitation_No._W912KC-16-R-0002_Amendment_0005.pdf PDF
TSC_Questions-Answers-AMENDED_FINAL-30AUG2016.pdf PDF
A12-tac2_-_topo.dwg DWG drawing
A12-tac2_-_site.dwg DWG drawing
M302.pdf PDF
Revised_Spec_TOC_Amend_4.pdf PDF
EXHIBIT_E_-_Amend_0004.docx DOCX document
P501.pdf PDF
Appendix_3_to_Specifications_Geothermal_Testing_Data.pdf PDF
TSC_Supplemental_Addendum_Items.pdf PDF
M104.pdf PDF
M401.pdf PDF
TSC_Questions-Answers-VER_FINAL_26AUG2016.pdf PDF
Q47-Sketch.pdf PDF
Solicitation_No._W912KC-16-R-0002_Amendment_0004.pdf PDF
Appendix_2_to_Specifciations_01_TAC_Spec_NPDES_Permit_Cover_Ltr.pdf PDF
M504.pdf PDF
Appendix_2_to_Specifications_02_TAC_Spec_NPDES_Permit.pdf PDF
EXHIBIT_E_-_Amend_0003.docx DOCX document
Solicitation_No._W912KC-16-R-0002_Amendment_0003.pdf PDF
TSC_Questions-Answers-VER_2.doc DOC document
EXHIBIT_E_-_Amend_0002.docx DOCX document
Solicitation_No._W912KC-16-R-0002_Amendment_0002.pdf PDF
Specifications_Division_01.pdf PDF
Solicitation_No._W912KC-16-R-0002.pdf PDF
Attachment_1_-_GFP.pdf PDF
EXHIBIT_A.doc DOC document
Volume_I_Specifications.pdf PDF
EXHIBIT_C.doc DOC document
TAC_Bid_Drawings.pdf PDF
EXHIBIT_E.docx DOCX document
EXHIBIT_D.doc DOC document
Volume_II_Specifications.pdf PDF
EXHIBIT_B.doc DOC document
TSC_Questions-Answers-VER_1.pdf PDF
Volume_II_Specifications_081016.pdf PDF
EXHIBIT_C_-_Amend_0001.doc DOC document
Conference_Slides_11_August_16.pdf PDF
G001_revised_Drawing_Cover_Sheet_06022016_Amend1_.pdf PDF
Spec_TOC_with_Tilt-Up_Concrete_Const_Amend1.pdf PDF
420522_TAC_Pre-Bid_Presentation_11Aug2016_ver2.pdf PDF
Spec_03_47_13_Tilt-Up_Concrete_Construction_Amend1.pdf PDF
Site_Visit_Sign_In_Sheet_TAC.pdf PDF
EXHIBIT_E_-_Amend_0001.docx DOCX document
Solicitation_No._W912KC-16-R-0002_Amendment_0001.pdf PDF
EXHIBIT_D_-_Amend_0001.doc DOC document
Volume_I_Specifications_081016.pdf PDF
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEED 2009 for New Construction and Major Renovations PAARNG Training Aids Center

Project Checklist updated on 7/16/15

12 2 12 Possible Points: 26 Y ? N Y ? N

Y Prereq 1 2 Credit 4 1 to 2 1 Credit 1 1 2 Credit 5 1 to 2

5 Credit 2 5 1 Credit 6 Rapidly Renewable Materials 1 1 Credit 3 Brownfield Redevelopment 1 1 Credit 7 1 6 Credit 4.1 6

1 Credit 4.2 1 11 2 2 Possible Points: 15 3 Credit 4.3 Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles 3 2 Credit 4.4 2 Y Prereq 1

1 Credit 5.1 Site Development—Protect or Restore Habitat 1 Y Prereq 2

1 Credit 5.2 Site Development—Maximize Open Space 1 1 Credit 1 1 1 Credit 6.1 Stormwater Design—Quantity Control 1 1 Credit 2 1 1 Credit 6.2 Stormwater Design—Quality Control 1 1 Credit 3.1 1 1 Credit 7.1 Heat Island Effect—Non-roof 1 1 Credit 3.2 1 1 Credit 7.2 1 1 Credit 4.1 1 1 Credit 8 Light Pollution Reduction 1 1 Credit 4.2 1

1 Credit 4.3 1 6 3 1 Possible Points: 10 1 Credit 4.4 1

1 Credit 5 1 Y Prereq 1 1 Credit 6.1 Controllability of Systems—Lighting 1 4 Credit 1 Water Efficient Landscaping 2 to 4 1 Credit 6.2 1

2 Credit 2 Innovative Wastewater Technologies 2 1 Credit 7.1 1 2 1 1 Credit 3 2 to 4 1 Credit 7.2 Thermal Comfort—Verification 1

1 Credit 8.1 1 20 8 7 Possible Points: 35 1 Credit 8.2 1

Y Prereq 1 2 4 Possible Points: 6 Y Prereq 2

Y Prereq 3 1 Credit 1.1 1 10 2 7 Credit 1 1 to 19 1 Credit 1.2 1 3 4 Credit 2 1 to 7 1 Credit 1.3 1 2 Credit 3 2 1 Credit 1.4 1

2 Credit 4 2 1 Credit 1.5 1 3 Credit 5 3 1 Credit 2 1 2 Credit 6 2

4 Possible Points: 4 7 7 Possible Points: 14

1 Credit 1.1 1 Y Prereq 1 1 Credit 1.2 1

3 Credit 1.1 1 to 3 1 Credit 1.3 1 1 Credit 1.2 Building Reuse—Maintain 50% of Interior Non-Structural Elements 1 1 Credit 1.4 1

2 Credit 2 1 to 2 2 Credit 3 1 to 2 62 19 29 Possible Points: 110Materials Reuse

Storage and Collection of Recyclables

Materials and Resources

Fundamental Commissioning of Building Energy Systems

Construction Waste Management

Enhanced Commissioning On-Site Renewable Energy

Enhanced Refrigerant Management Measurement and Verification Green Power

Materials and Resources, Continued

Water Efficiency

Building Reuse—Maintain Existing Walls, Floors, and Roof

Alternative Transportation—Parking Capacity

Heat Island Effect—Roof

Recycled Content Regional Materials

Certified Wood

Alternative Transportation—Bicycle Storage and Changing Rooms

Stormwater Design - Quantity Control On-Site Renewable Energy Water Efficient Landscaping

TBD

Innovation in Design: Specific Title Innovation in Design: Specific Title Innovation in Design: Specific Title

Sustainable Sites

Alternative Transportation—Public Transportation Access

Site Selection Development Density and Community Connectivity

Construction Activity Pollution Prevention

Water Use Reduction—20% Reduction

Low-Emitting Materials—Composite Wood and Agrifiber Products Low-Emitting Materials—Flooring Systems

Indoor Chemical and Pollutant Source Control

Thermal Comfort—Design Controllability of Systems—Thermal Comfort

Water Use Reduction

Minimum Energy Performance Fundamental Refrigerant Management

Daylight and Views—Views

LEED Accredited Professional

Daylight and Views—Daylight

Optimize Energy Performance

Energy and Atmosphere

Innovation in Design: Specific Title

Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110

Construction IAQ Management Plan—During Construction

Outdoor Air Delivery Monitoring

Indoor Environmental Quality

Minimum Indoor Air Quality Performance Environmental Tobacco Smoke (ETS) Control

Increased Ventilation

Regional Priority Credits

Innovation and Design Process

Low-Emitting Materials—Adhesives and Sealants Low-Emitting Materials—Paints and Coatings

Construction IAQ Management Plan—Before Occupancy

Total

Innovative Wastewater Technologies

File details come from the government source that posted it. Updated .