Text version
PRE-PROPOSAL CONFERENCE
11 August 2016
11 August 2016
USPFO Pennsylvania
INTRODUCTION
SSG Richard Weber: Contracting Officer Rep/Engineer
Gannett Fleming Inc: Architect & Engineer Firm
Michael V. Brown: Contracting Officer
Karen Finn: Contract Specialist
CPT Andrea Magee: Contract Specialist
Base + Options 1-14
547 Days after NTP
Construct Training Support
Center
Magnitude-$10,000,000-
$25,000,000
One Firm-Fixed Price
Contract Will Be Awarded
Project is being solicited 100% Small
Business Set Aside
The Contract Will Be Awarded Using
Lowest Price Technically Acceptable
Procedures
Evaluation Factors – Technical, Past
Performance and Price
On The Web - https://www.fbo.gov Solicitation
Exhibits Questions & Answers Document Amendments
Check Regularly & Refresh Web Page Plans & Specifications- must be registered and have password on FBO https://www.fbo.gov/
The Government Intends to Award
Without Discussions and There
May Not Be a Chance for
Discussions, Corrections, or
Revised Proposals
Offerors Are Strongly Cautioned To
Carefully Read The Requirements Of
The Solicitation And Comply
Accordingly
Section 00110 Of The RFP Details
The Required Information And
Format For The Proposal
2 Volumes Are Required
VOL 1 – Price/Cost Proposal
Pro forma documents
VOL 2 – Two Parts Part 1- Technical Capability Proposal
Part 2- Past/Present Performance Info
Offeror portion of SF 1442
Exhibit E-Pricing Info-All Line Items
Section 00600-Reps & Certs
• Complete Reps & Certs on the web at https://www.sam.gov/portal/public/SAM/
• Complete & return Reps & Certs in Section
00600
• Include Introductory Page-Section 00100 lists required information https://www.sam.gov/portal/public/SAM/
Exhibit D completed
Exhibit E completed
Bid Guarantee
Part I-Technical Capability
Comprised of three (3) sub factors:
Experience & Capability
Construction Schedule and
Commissioning Approach/timeline
LEED® Experience with building to US
Green Building Council (USGBC) LEED®
Standards
Technical Capability Ratings:
ACCEPTABLE: Proposal meets the minimum requirements.
UNACCEPTABLE: Proposal does NOT clearly meet the minimum requirements.
Subfactor 1
Limited to ten (10) pages Demonstrate offerors technical experience and capability to perform a project of this magnitude and complexity.
Discuss and provide experience of key construction personnel including, but not limited to, Project Manager, Site Superintendent(s), Quality Assurance Manager (on site), Site engineering personnel.
Subfactor 2
Construction Schedule and Commissioning
Approach/timeline (schedule no page limit;
narrative – no more than 5 pages)
Provide Construction Schedule using a critical path a (Critical Path Method (CPM)) scheduling approach considering a Notice to Proceed date of October 14, 2016 for the schedule.
Subfactor 3 – (USGBC) LEED® Experience building to (USGBC)
LEED® standards
Demonstrate that key construction personnel have experience in
LEED®
If no experience, offeror must explain how they will overcome the lack of experience
Exhibit A- Part 1- Performance Relevancy Questionnaires – Use Exhibit Format!
Complete not more than 3 forms for Relevant
Contracts Completed Or Substantially Completed (70%) In The Last Five Years
Exhibit A-Part 2 – Describe compliance with FAR 52.219-8, Utilization of Small Businesses
Send Questionnaires for the Exhibit A Projects to your references
“Do This Early” – must be rec’d by the Contracting Office by the closing date.
If You Do Not Have Relevant Past Performance And
Are Using Experience Of Key Personnel, Predecessor
Companies Or Subcontractors To Obtain This Ensure
You Clearly State This In The Proposal
To Be Considered Subcontractor Must Complete A
Consent Form - Exhibit B
• Proposal Due 1500 Hours (3:00 P.M.) on 30 August 2016
• Proposal Must Be Signed By Officer Of Your Company
• No Facsimile Or Electronic Offers
• Send or deliver to: (follow instructions in Sec
110)
USPFO - PA Purchasing & Contracting
Bldg 0-48, Fort Indiantown Gap
Annville, PA 17003
• LATE PROPOSALS DUE TO DELAYS AT
THE BASE ENTRANCE WILL NOT BE
AN EXCUSABLE DELAY
• PLAN ACCORDINGLY FOR BASE
ACCESS!!!
Reference Questionnaires Are Also Due By This Time And Date
Send Reference Questionnaires Out
EARLY!
Return to KO Via E-mail at:
Michael.v.brown60.civ@mail.mil mailto:Michael.v.brown60.civ@mail.mil
Exhibit A- Performance Relevancy
Questionnaire
PART 1 (NTE 3) PART 2 (1)
Exhibit B-Subcontractor/Teaming
Partner/Key Personnel Info & Consent Form
(if applicable)
Exhibit C- Reference Questionnaire Package
Exhibit D- Option Information Form
Exhibit E – Offeror’s Price Proposal
Process Is Detailed In RFP Section 00120
Carefully Review Section 00120 When Preparing Proposal
Comply With Section 00100 And 00110 Requirements
Failure To Furnish A Complete Proposal May Result In Elimination From Consideration
Best Value Is Defined As An Award
Based On The Greatest Overall Benefit
In Response To The Requirement.
Award Is Based On Price And Other
Non-cost Related Factors.
• Technical and Past/Present Performance are approximately equal to each other and when combined are approximately equal to the Price Factor.
1. Technical will be evaluated first, Price Factor second and Past Performance last.
2. If an offeror is deemed unacceptable, no further competition will take place.
3. If Price is determined to be reasonable & realistic, the offer will continue in the competition for a
PP evaluation.
Submit a Complete Proposal In
Accordance With Instructions – Use
Formats Provided
Prime Contractors are responsible for coordination among the divisions with subcontractors
• Award is contemplated to be made without discussions- Do Not anticipate a chance to make corrections or changes
• Your first proposal will probably be your only proposal!!
• Read the solicitation requirements carefully!!
• Consider using Section 00120 to “rate” yourself before submitting the proposal-is it complete??
When Using A Subcontractor To
Obtain/Enhance Relevancy Provide
Subcontractor Consent Form, Exhibit
B, Or it Will Not Be Considered
Award In This Process Does Not
Necessarily Mean The Lowest Price
Wins
All amendments will be posted on the FBO web site
Check site regularly for changes & refresh the page
After closing no information will be available until award Awards will be posted to the web Results should be announced in approximately 90 days FAR 52.219-14 Limitations on Subcontracting Apply-
Small Business must perform 15% of cost of contract, not including the cost of materials with its own employees
• Questions Must Be Submitted Via Email To:
michael.v.brown60.civ@mail.mil and karen.m.finn2.civ@mail.mil.
• Submit Questions NLT COB 23 August 2016
• Questions Received After 23 August 2016 May
Be Held And Addressed After RFP Closing With Those Offerors Determined To Be In The Competitive Range If Discussions Are Deemed Necessary
• Do Not Call Technical Personnel Or A&E- This Will Delay Getting An Answer mailto:michael.v.brown60.civ@mail.mil mailto:karen.m.finn2.civ@mail.mil
• All Questions, On A Non-Attribution Basis, And The Answers Will Be Posted To The Web Site https://www.fbo.gov/
• If Necessary Addendums, Issued By
An Amendment, Will Also Be Posted
• Check Web Site Regularly And Don’t
Forget To Refresh Web Page
• https://www.fbo.gov
• https://www.acquisition.gov/
• www.ccr.gov/
• http://orca.bpn.gov/
• http://www.wdol.gov/wdol/scafiles/ davisbacon.hi.html https://www.fbo.gov/ https://www.acquisition.gov/ http://www.ccr.gov/ http://orca.bpn.gov/ http://www.wdol.gov/wdol/scafiles/davisbacon.hi.html
3:00 p.m.
30 August 2016
DON’T FORGET TO HAVE REFERENCES SENT IN
BY THIS TIME & DATE
Important information to know before we begin our site visit.