A07-Pre_Proposal_Slides_404.ppt

PPT presentation 296 KB Posted

Attached to
XGFG132020 Add/Alter Building 404 Truax ANGB Madison WI
Solicitation number
W912J2-18-R-1001
Issued by

About this file

Pre Proposal Slides

View the file

Other files

File Type Posted
281300.pdf PDF
095113.pdf PDF
062023.pdf PDF
A07-404_Q&A_IV_03_Feb_2018.pdf PDF
A07-W912J2-18-R-1001-0004_Amendment_ADAL_B404_03_Feb_18.pdf PDF
283176.pdf PDF
312000.pdf PDF
061053.pdf PDF
093000.pdf PDF
237450.pdf PDF
A07-404_Q&A_III_02_Feb_2018.pdf PDF
W912J2-18-R-1001-0003.pdf PDF
237433.pdf PDF
A07-404_Q&A_II_24_Jan_2018.docx DOCX document
A07-EXHIBIT_C_Reference_Questionnaire_Package_18Jan18_NEW.docx DOCX document
A07-W912J2-18-R-1001-0002_Amendment_ADAL_B404_18_Dec_18.pdf PDF
A07-404_Q&A_I_18_Jan_2018.docx DOCX document
A07-W912J2-17-R-1001-1001_Conform_Copy_18_Jan_18.pdf PDF
EXHIBIT_A-Performance_Relevancy_Questionnaire_18_Jan_2018.doc DOC document
A07-W912J2-18-R-1001-0001_Amendment_ADAL_B404_18_Dec_18.pdf PDF
A07-Pre_Proposal_Site_Visit_Sign_In_Sheet_404.pdf PDF
00_General.pdf PDF
02_Landscaping.pdf PDF
05_Fire_Protection.pdf PDF
07_Mechanical.pdf PDF
04_Architectural.pdf PDF
06_Plumbing.pdf PDF
03_Structural.pdf PDF
01_Civil.pdf PDF
09_Technology.pdf PDF
08_Electrical.pdf PDF
A01-XGFG132020_Specifications_Vol_1.pdf PDF
EXHIBIT_C_-_Reference_Questionnaire_Package_NEW.docx DOCX document
A07-W912J2-18-R-1001_ADAL_B404_26_Dec_17.pdf PDF
A01-XGFG132020_Specifications_Vol_2.pdf PDF
EXHIBIT_B-Subcontractor_Information_and_Consent.doc DOC document
EXHIBIT_A-Performance_Relevancy_Questionnaire.doc DOC document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unclassified 115th Fighter Wing Truax Field ~ WI

ADAL B404

PRE-PROPOSAL CONFERENCE

10 January 2018 9:00am Pilot Briefing Room

Truax Field ~ WI

ADAL B404

Introduction

Main Point of Contact
SMSgt Katherine Pinnow-Contracting Officer
Katherine.m.Pinnow.mil@mail.mil
MSgt Katherine Fox-Contracting Officer
Katherine.i.fox.mil@mail.mil
Base Civil Engineer
Lt Col Michael Dunlap
Engineering Assistant
Mr. Dennis Wiitanen

Truax Field ~ WI

ADAL B404

Introduction

Who are the prime contractors in the room?

Identify yourself as a sub or prime on the sign in sheet.

Truax Field ~ WI

ADAL 404

Synopsis

Add alter B404
Magnitude of project is $5,000,000 to $10,000,000
A firm-fixed price contract will be awarded
Solicited as unrestricted
The contract will be awarded using source selection trade off procedures
Evaluation factors-Price, Technical & Past/Present Performance
Period of performance is 545 days after receipt of notice to proceed.

Truax Field ~ WI

ADAL B404

Questions

No site visits will be granted after today

Make sure you sign in

This slide show and sign in sheets will be posted to Federal Business Opportunities (FBO)

No questions will be answered today, must submit to SMSgt Pinnow and MSgt Fox via email

Truax Field ~ WI

ADAL B404

Questions

Format of question submission on page 9 of RFP
All questions, on a non-attribution basis, and answers will be posted to FBO
Only questions received prior to 5 business days of solicitation closing are guaranteed an answer.
Please consolidate all questions to one or two emails.
Do not contact AE firm. They will forward to government. May cause delay.
Submit Questions To KO Only Do Not Call Other Government Personnel

Truax Field ~ WI

ADAL B404

Milestones

RFP due date 25 January 2018 at 10am
Need to coordinate with SMSgt Pinnow to drop off
If mailing, make sure arrive by due date
No facsimile or electronic offers will be accepted
Proposals good for 120 days after solicitation closing
Project is currently unfunded
Scope of project will be explained by Lt Col Dunlap after this presentation

Truax Field ~ WI

ADAL B404

Disclaimer

The following is a brief overview of the proposal requirements

Offerors are cautioned to carefully read the requirements of the solicitation and comply accordingly

Truax Field ~ WI

ADAL 404

Proposal Submission Requirements Proposal preparation instructions start on page 12 of the RFP

Failure to furnish a complete proposal, at the time of proposal submission may result in the proposal being unacceptable to the Government and eliminated from consideration from award.

All Offerors MUST be registered in System for Award Management

Truax Field ~ WI

ADAL 404

Proposal Submission Requirements Section 00110 of the RFP details required information and format

3 Volumes in 2 binders are required, original (on CD) and 2 hard copies
Will be amending RFP to reflect

No facsimile or electronic offers

Truax Field ~ WI

ADAL 404

Proposal Submission Requirements

Binder 1
Volume 1 Price Proposal, Pro Forma Documents
Binder 2
Volume 2 Technical Capability Proposal
Volume 3 Past/Present Performance Information

Consider evaluating your proposal IAW Section 00120 before submitting

Truax Field ~ WI

ADAL 404

Volume 1-Price Propsal

ORIGNIAL (CD) AND 2 HARD COPIES

Introductory page
Offeror portion and acknowledgement of amendments (if applicable) of the SF 1442, top of page 2
SF 1442-Signed by individual who can bind company
Section 00010-Bid Summary, starting on page 6
Representations & Certifications-Section 00600
Joint Venture Requirements-if applicable

Truax Field ~ WI

ADAL 404

Volume 2 Part 1-Technical Capability Proposal

ORIGNIAL (CD) AND 2 HARD COPIES

Consists of 5 subfactors
Subfactor 1-Experience and Capability
Government will use Exhibit A Part 1 information in the evaluation of experience for subfactor 1
LIMITED to 10 single pages. Pages in excess will not be evaluated.
LIMIT resumes to 2 pages each
Discuss and provide experience of key construction personnel.
Exhibit B is for subcontractors not apart of a prime’s organization

Truax Field ~ WI

ADAL 404

Volume 2 Part 1-Technical Capability Proposal

Subfactor 2-Construction Schedule and Commissioning Approach/Timeline
No page limit on schedule
LIMITED to 5 single pages for narrative. Pages in excess will not be evaluated.
Subfactor 3-Quality Control
Read RFP for narrative requirements
Quality Control Plan is not required
Subfactor 4-LEED
Read RFP for narrative requirements

Truax Field ~ WI

ADAL 404

Volume 2 Part 1-Technical Capability Proposal

Subfactor 5-Subcontracting Plan/Small Business Participation
Subcontracting plan only required for large business offerors

Read RFP for narrative requirements Submit subcontracting plan IAW FAR Clause 52.219-9 Alt II and DFARS Clause 252.219-7003 Ineligible for award if subcontracting plan not submitted Small Business Participation Required for both small and large businesses Read RFP for narrative requirements

Truax Field ~ WI

ADAL 404

Volume 2 Part 2 Past/Present Performance Information

Read RFP for what needs to be submitted. Detailed instructions.
Includes Exhibit A Parts 1 and 2, Performance Relevancy Questionnaire
Includes Exhibit C, Reference Package
Must be sent to SMSgt Pinnow not to you NLT the closing date
If you have CCASS final evaluation for projects that are similar to 404, place behind Exhibit A

Truax Field ~ WI

ADAL 404

Section 01000 General Requirements

Offerors should carefully read section 01000/Division 01-General Requirements before preparing proposal
Important basic contract requirements and conditions are contained in this section

Truax Field ~ WI

ADAL 404

Proposal Evaluation

Detailed in Section 00120 of RFP
CAREFULLY review sections 00100, 00110, 00120, and 01000/Division 01 when preparing proposal
Comply with Sections 00100 and 00110 requirements
Inquire in writing if you have any questions
Failure to furnish a complete proposal may result in elimination from consideration

Truax Field ~ WI

ADAL 404

Basis of Award

Best Value-Trade Off
Best Value is defined as an award based on the greatest overall benefit in response to the requirement

Technical and Past Performance when combined are approximately equal to Price

Award is based on other factors in addition to price

Award may not be the lowest priced proposal

Truax Field ~ WI

ADAL 404

Basis of Award The Contractors whose proposals provide the best value to the Government, price and other non-price factors considered will be awarded the contract.

Truax Field ~ WI

ADAL 404

Wage Rates and Bonds Most current Construction Wage rates at time of award will be included in the award document.

Bid Bond
Submit with proposal package
20% of bid price or $3M, whichever is less
Performance and Payment Bonds
At time of award
100% of contract price

Truax Field ~ WI

ADAL 404

PROPOSALS ARE DUE NOT LATER THAN

10:00AM, 25 JANUARY 2018

DON’T FORGET TO HAVE REFERENCE SENT IN BY THIS TIME AND DATE

Truax Field ~ WI

ADAL 404

IMPORTANT REMINDERS

The Government intends to award without discussions and there may not be a chance for discussions, corrections, or corrections, or revised proposals.
Read the solicitation requirements carefully.
Consider using Section 00120 to “rate” yourself before submitting the proposal-is it complete.

Truax Field ~ WI

ADAL 404

IMPORTANT REMINDERS

All Amendments Will Be Uploaded Onto The FBO Web Site

Check Site Regularly For Changes & Refresh The Page

After Closing No Information Will Be Available Until Award Award will be posted to FBO

Truax Field ~ WI

ADAL 404

Websites Solicitation on FBO:

https://www.fbo.gov/index?s=opportunity&mode=form&id=643820fb7cee27ef8cd5f134d5242425&tab=core&_cview=1

System for Award Management-Primes companies must be registered:

www.sam.gov

Truax Field ~ WI

ADAL 404

QUESTIONS?

File details come from the government source that posted it.