A07-404_Q&A_II_24_Jan_2018.docx

DOCX document 18 KB Posted

Attached to
XGFG132020 Add/Alter Building 404 Truax ANGB Madison WI
Solicitation number
W912J2-18-R-1001
Issued by

View the file

Other files

File Type Posted
281300.pdf PDF
095113.pdf PDF
062023.pdf PDF
A07-404_Q&A_IV_03_Feb_2018.pdf PDF
A07-W912J2-18-R-1001-0004_Amendment_ADAL_B404_03_Feb_18.pdf PDF
283176.pdf PDF
312000.pdf PDF
061053.pdf PDF
093000.pdf PDF
237450.pdf PDF
A07-404_Q&A_III_02_Feb_2018.pdf PDF
W912J2-18-R-1001-0003.pdf PDF
237433.pdf PDF
A07-EXHIBIT_C_Reference_Questionnaire_Package_18Jan18_NEW.docx DOCX document
A07-W912J2-18-R-1001-0002_Amendment_ADAL_B404_18_Dec_18.pdf PDF
A07-404_Q&A_I_18_Jan_2018.docx DOCX document
A07-W912J2-17-R-1001-1001_Conform_Copy_18_Jan_18.pdf PDF
EXHIBIT_A-Performance_Relevancy_Questionnaire_18_Jan_2018.doc DOC document
A07-W912J2-18-R-1001-0001_Amendment_ADAL_B404_18_Dec_18.pdf PDF
A07-Pre_Proposal_Site_Visit_Sign_In_Sheet_404.pdf PDF
A07-Pre_Proposal_Slides_404.ppt PPT presentation
00_General.pdf PDF
02_Landscaping.pdf PDF
05_Fire_Protection.pdf PDF
07_Mechanical.pdf PDF
04_Architectural.pdf PDF
06_Plumbing.pdf PDF
03_Structural.pdf PDF
01_Civil.pdf PDF
09_Technology.pdf PDF
08_Electrical.pdf PDF
A01-XGFG132020_Specifications_Vol_1.pdf PDF
EXHIBIT_C_-_Reference_Questionnaire_Package_NEW.docx DOCX document
A07-W912J2-18-R-1001_ADAL_B404_26_Dec_17.pdf PDF
A01-XGFG132020_Specifications_Vol_2.pdf PDF
EXHIBIT_B-Subcontractor_Information_and_Consent.doc DOC document
EXHIBIT_A-Performance_Relevancy_Questionnaire.doc DOC document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

404 Q&A II

24 Jan 2018

1. On sheet AD101 Keyed note 3.026, it states to “Remove concrete floor and previously fill in floor…” this is a concern, what wad this floor previously filled with? Concrete? Soils? Insulation? Please advise.

The "previously fill in floor" in keyed not 4.026 is a raised floor system in that area that sit atop a concrete floor. The raised floor system height is flush with the rest of the facility.

2. Sheet AD101 General Note 15 states to “Remove all gypsum board, vapor barrier, and batt insulation from existing exterior stud walls unless noted otherwise….” The plan only shows removal of exterior stud walls at the new openings of the existing wall for access to the additions and the patio. Based on General Note 15, are we to remove all of the exterior wall furring?

Yes, you are to remove all of the exterior wall furring and add in new vapor barrier, insulation and gypsum board.

3. Confirm if there is a required WIANG project document control software. Will we be required to use RMC/QCS similar to Corps of Engineers project? Nothing is stated in the RFP.

There is no specific project document control software.

4. Amendment 01 page 2 of 16 states “The number of offeror copies required has increased by 1 from 1 to 2” However, in the original solicitation, it stated “Prospective offerors shall submit the following volumes in two separate packages: 2.1.1. Submit Volume 1, Price proposal, pro forma documents, in original and (3) three hard copies, in accordance with instructions contained herein. Volume 2, Part 1 – Technical Capability Proposal, in original, (3) hard copies and one CD.” It is unclear how many originals, copies and CDs are required to be submitted. Please confirm.

Submit 1 CD which is considered the original and two hard copies.

5. Section 23 05 93 is a third party Testing and Balance subcontractor required or is the mechanical subcontractor allowed to self-perform their own TAB work?

No, the mechanical subcontractor is not allowed to self-perform their own TAB work. This must be done by a qualified third party.

6. Confirm that both CLIN 0001 and CLIN 0002 will be accepted upon award.

Yes, both CLINs will be accepted upon award.

7. What is the current Access Control System?

Andover

8. What is the current Fire Alarm System?

Monaco

9. What is the current Security System?

Advantor