Section_C.pdf

PDF 174 KB Posted

Attached to
MARFORRES SOUTHEAST FACILITIES MAINTENANCE
Solicitation number
W912HP13R0019
Issued by

About this file

Section C

View the file

Other files

File Type Posted
Award_Notice_MARFORRES_SE_Facilities_Maint.pdf PDF
scannedDoc.pdf PDF
proposaldatasheet.pdf PDF
J-0100000-01_MCRC_Locations.xls XLS spreadsheet
Amendment_2.pdf PDF
Schedule_B.xls XLS spreadsheet
Section_M_Revised.pdf PDF
Amendment_1.pdf PDF
Section_J_Part_1.pdf PDF
J-1502000-01__Huntsville _Drawings.pdf PDF
J-1502000-02__Montgomery _Drawings.pdf PDF
J-1502000-06__Eastover _Drawings.pdf PDF
J-1502000-05__Windy_Hill _Drawings.pdf PDF
J-1502000-03__Jacksonville _Drawings.pdf PDF
J-1502000-08__Service_Call_Report.pdf PDF
J-1502000-04__Tampa _Drawings.pdf PDF
J-1502000-07__Memphis _Drawings.pdf PDF
J-1502000-19__Equip_Inspection _Test_ _Certification_Program.xls XLS spreadsheet
J-1502000-11__Jacksonville __Preventative_Maintenance_Program_Index _Detail.xls XLS spreadsheet
J-1502000-12__Tampa __Preventative_Maintenance_Program_-_Index _Detail.xls XLS spreadsheet
Section_J__Documents _Exhibits _and_Other_Attachments.xls XLS spreadsheet
J-1502000-09__Huntsville _Preventative_Maintenance_Program_-_Index _Detail.xls XLS spreadsheet
J-1502000-14__Eastover _Preventative_Maintenance_Program_-_Index _Detail.xls XLS spreadsheet
SF_1449.pdf PDF
J-1502000-16__Preventative_Maintenance_Program_-_Checklist.xls XLS spreadsheet
Section_M.pdf PDF
J-1502000-13__Windy_Hill __Preventative_Maintenance_Program_-_Index _Detail.xls XLS spreadsheet
J-1502000-17__Repair_Work_Report.xls XLS spreadsheet
J-1502000-15__Memphis _Preventative_Maintenance_Program_-__Index _Detail.xls XLS spreadsheet
J-1502000-18__Equipment_Update_Report.xls XLS spreadsheet
Section_F__Deliveries_or_Performance.pdf PDF
J-1502000-10__Montgomery _Preventative_Maintenance_Program_-__Index _Detail.xls XLS spreadsheet
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0100000 – General Information Spec Item Title Description 1 General Information

1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at Marine Corps Reserve Centers and Marine Corps Reserve Facilities located in the United States by means of a combination firm-fixed price (FFP) contract and indefinite delivery-indefinite quantity (IDIQ) contract . The PWS is organized into annexes. Annex 1 is "General Information". Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements. The annex numbers are identified as 1 through 18 in the description column, but the full expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page

Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff - N/A Annex 4 Public Safety - N/A Annex 5 Air Operations - N/A Annex 6 Port Operations - N/A Annex 7 Ordnance - N/A Annex 8 Range Operations - N/A Annex 9 Health Care Support - N/A Annex 10 Supply - N/A Annex 11 Personnel Support - N/A Annex 12 Morale, Welfare and Recreation Support - N/A Annex 13 Galley - N/A Annex 14 Housing - N/A Annex 15 Facilities Support Sub-Annex 1502000 Facilities Investment Annex 16 Utilities - N/A Annex 17 Base Support Vehicles and Equipment - N/A Annex 18 Environmental - N/A

1.2 Project Location The work shall be performed at locations listed in J-0100000-01 and other locations designated by Note 1. The following is an example of the dispersion of work at the various locations.

(1) Preventative Maintenance

(2) Inspection, Testing, and Certification of Equipment

(3) Repair Work

(4) Janitorial Services

(5) Pest Control Services

(6) Grounds Maintenance

(7) Refuse, Collection and Recycling

(8) Street Sweeping and Snow Removal

(9) Control Inspection

(10) Fire Alarm Monitoring

(11) IDS Installation, Monitoring, and Repair

Note 1: It’s the intention of the Government to add additional locations within scope of this contract. Locations include Marine Corps Reserve Centers and Marine Corps Reserve Facilities within the continental United

Spec Item Title Description

States.

1.3 Acquisition of

Additional Work

The Government reserves the right to acquire additional services at additional locations in addition to the services and locations identified in the Firm-Fixed Price requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the indefinite delivery indefinite quantity provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.

1.4 Verification of

Workload and Conditions

Throughout the PWS, the workload data is generally referred to as being located in Section J. Section J provides data such as inventories, maps, floor plans, and tables to represent the type, quantity and location of services to be provided. However, offerors are encouraged to visit the project site during the site visit for offerors and to visit the technical library during posted hours as part of its due diligence to assess the nature of work and conditions under which work is to be performed.

1.5 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:

Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.

Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.

Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.

Requirement Information further describes client requirements associated with each Performance Objective.

1.6 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Marine Corps-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. Army Corps of Engineers intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Army

Spec Item Title Description

Corps of Engineers requirements and expectations.

The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract.

Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification item 1 will always contain General Information. Specification item 2 will always contain the management and administrative requirements. Specification item 3 will always contain the Firm Fixed-Price (FFP) requirements.

Specification item 4 will always contain the Indefinite Delivery-Indefinite Quantity (IDIQ) requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all firm fixed priced specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items. Specification Items 3.2 and 3.3 are not considered subordinate to 3.1. All costs associated with Annexes 1 and 2 and Specification items 1 and 2 must be priced and distributed within Specification Item 3 of Annexes 3 through 18.

1.7 Technical Proposal

Certification

The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.

0200000 - Management and Administration Spec Item Title Description 2 Management and

Administration

2.1 Definitions and Acronyms See J-0200000-01 for Acronyms.

2.1.1 Contracting Officer (KO) That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.

The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.

2.1.2 Contracting Officer

Representative

That individual designated by the KO to be responsible for the monitoring of Contractor performance.

2.1.3 Contractor That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.

2.1.4 Contractor Representative That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.

2.1.5 Direct Material Costs The actual vendor invoice charges for materials used for performance of work under this contract. Direct material costs shall include transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the Contractor. When questions arise concerning the cost of materials, material costs will be based on the lowest of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used.

2.1.6 Facility A building or structure designed and created to serve a particular function.

2.1.7 Frequency of Service Annual (A). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days.

Biennial (B). Services performed once during each 24-month period of the contract at internals of 670 to 790 days.

Daily (D5). Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.

Daily (D7). Services performed once each calendar day, seven days per week, including weekends and holidays.

Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days.

Quarterly (Q). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days.

Semiannual (SA). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.

Semimonthly (SM). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days.

Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday.

Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday.

Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days.

2.1.8 Inspector & Instructor

(I&I) The Officer designated by the Contracting Officer to provide for the on-site management of Facilities Support Contracts, to include insuring the Army’s requirements are satisfactorily met in compliance with the provisions of the contract.

2.1.9 Maintenance and Repair The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes. Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair.

2.1.10 Means Repair and

Remodeling Cost Data

A data collection and organization system developed by R. S. Means Company which can be used to prepare accurate, dependable construction estimates and budgets in a variety of ways. The Contractor shall use the latest edition. Material prices are based on a national average and computed labor costs are based on a 30-city national average. Data has been targeted for residential, commercial, and industrial repair/remodeling projects. An estimate prepared using this data is called a "Means estimate"; data may simply be referred to as "Means".

2.1.11 Performance Assessment A method used by the Government to provide some measure of control over the quality of purchased goods and services received.

2.1.12 Pre-expended Bin

Materials and Supplies

The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less. Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint.

2.1.13 Preventative Maintenance

(PM)

The recurring day-to-day, periodic or scheduled work required to preserve or restore equipment to such a condition that it may be effectively utilized for its designated purpose. Preventive maintenance includes, but is not limited to, replacement of belts, filters, refrigerant, motor and compressor oil, paint, cleaning of coils and equipment, and minor adjustments.

2.1.14 Quality Control (QC) A method used by the Contractor to control the quality of goods and services produced.

2.1.15 Response Time The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required.

2.1.16 Unit Priced Labor (UPL)

Hour

The unit price bid by the Contractor to perform one hour of work-in-place. With the exception of direct material and construction equipment costs, the unit price includes all indirect and direct costs associated with performing work. The price includes the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; costs for pre-expended bin materials, union agreements, crew sizes, hand tools, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, and profit. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included.

2.2 General Information

2.2.1 Government Regular

Working Hours The Government's regular working hours are from 0700-1600, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. The performance of work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior I&I approval.

2.2.1.1 Observed Federal

Holidays

The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.

2.2.1.2 Restriction to Contractor

Working Hours

If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours to the site I&I for approval at least seven calendar days prior to requested day.

2.2.2 Wage Determinations Refer to www.wdol.gov for wage determinations.

2.2.3 Requirements Hierarchy Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.

2.3 General Administrative

Requirements

2.3.1 Required Conferences and

Meetings

The Contractor may be required to attend administrative and coordination meetings.

2.3.2 Training for Maintenance

and Operation of New and Replacement Systems and Equipment

When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.

2.3.3 Permits and Licenses The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of permits and licenses per Section F.

2.3.4 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-05, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.

2.3.4.1 Certificate of Insurance The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.

2.3.4.2 Minimum Insurance

Amounts

The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

Comprehensive General Liability: $500,000 per occurrence

Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage

Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes

Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers

Other as required by state law

2.3.5 Protection of Government

Property During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.

2.3.6 Instructions, Directives, and References

Applicable Department of Defense (DoD), Secretary of the Army (SA), and other directives, instructions, and references are listed in J- 0200000-02. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.

2.3.7 Invoicing Procedures INVOICING INSTRUCTIONS. The Contractor shall submit, to U.S.

Army Corps of Engineers, Charleston (Attn: Project Management), 69A Hagood Avenue, Charleston, SC 29403, an original invoice that clearly states the Contractor’s name, address, zip code, phone number, USACE Contract number, location of the work, actual work items and frequencies completed during the month, as well as the amount charged for each work item. The Contractor shall submit the invoice at monthly intervals based on the term of the contract and unit prices bid or monthly prices bid (whichever is applicable). Included with the invoice shall be J-0200000-03, Certification Form, signed by the I&I, or representative designated by the I&I and digital photographs documenting service call work invoiced (where applicable). There shall be one Certification Form for each Activity where work was performed. Upon receipt, USACE will complete the certification of the amount to be paid the Contractor, that the services have been rendered, and process in accordance with the agency’s procedures. Payment will be made by U.S. Army Corps of Engineers Finance Center, CEFC-AO-P, 5720 Integrity Drive, Millington, TN 38054-5005.

Invoice shall be submitted on compact disk.

2.3.8 MARFORRES Mailing

Address

All reports submitted to MARFORRES shall be sent to Commander, Marine Forces Reserve (ATTN: Facilities – PM Program Manager), 4400 Dauphine Street, New Orleans, LA 70146-5400

2.3.9 US Army Corps of

Engineers Mailing Address

All reports submitted to US Army Corps of Engineers shall be sent to US Army Corps of Engineers, Charleston (Attention: Project Management), 69A Hagwood Ave, Charleston, SC 29403.

2.4 Government-Furnished In accordance with FAR 52.245, GOVERNMENT PROPERTY and

Property, Materials and Services

NAVFAC Clause 5252.245-9300, GOVERNMENT-FURNISHED PROPERTY, MATERIALS AND SERVICES, and the following paragraphs, the Government will furnish or make available to the Contractor certain Government-owned facilities, utilities, materials, and equipment for use in connection with this contract

2.4.1 Government-Furnished

Facilities (GFF)

None provided.

2.4.2 Government-Furnished

Utilities

All reasonable amounts of electric service will be made available to the Contractor by the Government from the nearest suitable and available connection. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.

2.4.3 Government-Furnished

Materials (GFM)

None provided.

2.4.4 Government-Furnished

Equipment (GFE)

None provided.

2.5 Contractor-Furnished

Items

Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government.

Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Material Safety Data Sheets (MSDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.

2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.

2.6.1 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.

2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and status reports shall be provided when requested by the KO. A written status report of any item of work must be provided within 24 hours.

2.6.3 Work Schedule The Contractor's work shall not interfere with normal Government business. In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference.

The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the I&I of any difficulty in scheduling work due to Government controls.

2.6.4 Deliverables Records and reports are specified in Section C and listed as deliverables in Section F. The Contractor shall submit accurate and complete documents within the required timeframes as specified in Section F.

2.6.5 Service Interruptions If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the I&I, within five working days prior to the interruption. If the discontinued service is due to an emergency breakdown the Contractor shall notify the I&I as soon as practicable.

2.6.6 Quality Management

System (QMS)

The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:

Accurate documentation of work processes, procedures, and output measures.

A systematic procedure for assessing compliance with performance objectives and standards.

Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.

Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.

2.6.6.1 Quality Management

(QM) Plan

The Contractor shall develop and submit a QM Plan per Section F.

The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.

2.6.6.2 Quality Inspection and

Surveillance

The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions.

The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be turned over to the KO within five calendar days of termination of the contract.

2.6.6.3 Quality Inspection and

Surveillance Report

The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.

2.6.7 System and Equipment

Replacement

The Contractor shall maintain the integrity and performance of existing equipment in the performance of repair and replacement work. Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced. Substitutes for replacement components must be accepted by the KO prior to use. The KO will furnish available information for the existing systems and equipment.

2.7 Personnel Requirements The Contractor shall comply with the personnel requirements stated below.

2.7.1 Key Personnel The Contractor shall submit a List of Key Personnel and

Qualifications per Section F. The Contractor shall provide any additional information requested by the KO necessary to certify their qualifications.

The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality Manager, and SSHO and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.

2.7.1.1 Project Manager (PM) The Contractor shall provide a PM who has relevant experience at a comparable level of responsibility in projects of similar size, scope and complexity. The PM or alternate shall have full authority to act for the Contractor on all contract matters relating to this contract. The PM may act as the Contractor Quality Manager for this contract.

2.7.1.2 Quality Manager The Contractor shall provide a Quality Manager who shall have full authority and responsibility for assuring performance objectives and standards identified in this contract are met.

2.7.1.3 Site Safety and Health

Officer (SSHO)

The Contractor shall provide a SHO whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract. The SHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SHO under this contract:

The SSHO shall have satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past, and have completed the OSHA 30-hour construction safety class or equivalent within the last three years. The SSHO may be the same person as the project manager but shall have fulfilled the pre-requisite qualification and experience.

2.7.2 Employee Requirements The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety and environmental requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures.

2.7.2.1 Employee Appearance The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.

2.7.2.2 Employee Conduct Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.

2.7.2.3 Identification as

Contractor Employee

Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as

Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. All Contractor employees shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.

2.7.2.4 Site Debrief After completion of onsite work, contractor personnel, including subcontractor personnel, shall meet with the I&I or someone designated by the I&I, to review work performed and provide status of any trouble ticket investigations.

2.7.2.5 Removal of Employees The Contractor shall remove from the site any individual whose continued employment is deemed by the KO to be contrary to the public interest or inconsistent with the best interests of National Security.

2.7.2.6 Proof of Legal Residency No employee or representative of the Contractor will be admitted to the site of work unless satisfactory proof of citizenship is furnished, or, if an alien, legal residency within the United States is confirmed.

2.8 Security Requirements The Contractor shall comply with all Federal, state, and local security statutes, regulations, and requirements. The Contractor shall become acquainted with and comply with all Government regulations as posted, or as requested by the KO when required to enter a Government site. The Contractor shall ensure that all security/entrance clearances are obtained.

2.8.1 Employee Listing The Contractor shall maintain a current Employee List and submit per Section F. The list shall include employee’s name, position, and social security number.

2.8.2 Vehicles The company name shall be displayed on each of the Contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid state license plate that complies with State Vehicle Code. Vehicles shall meet all other requirement of the State Vehicle Code, such as safety standards, and shall carry proof of insurance and state registration, if applicable.

2.8.3 Passes and Badges All Contractor employees shall obtain employee and vehicle passes as required by the I&I. The Government will issue badges without charge. Each employee shall wear the Government issued badge over the front of the outer clothing. When an employee leaves the Contractor's service, the employee's pass and badge shall be returned within 10 calendar days.

2.8.4 Access to Installation All Contractor personnel shall obtain access to the installation by obtaining passes each day from the Base Pass and Identification Office. Passes will be furnished without charge.

Contractor personnel may be subject to daily mandatory vehicle inspection and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections.

2.8.5 Access to Buildings The Contractor shall monitor and control access into restricted areas under their responsibility, allowing only those individuals who have been properly cleared into restricted areas or other controlled access areas. The Contractor shall comply with security requirements, plus those imposed by the installation Commander at all times. Contractor shall consent to a search of all persons and equipment prior to entering and exiting restricted spaces as deemed necessary by unit personnel. Personnel with access to special areas will have the appropriate screening and/or security clearance, and personnel requiring routine access to restricted areas will wear special badges authorizing access for those areas. Contractor personnel shall not enter restricted or controlled areas or installation facilities unless specifically authorized in performance of their duties. The Contractor shall secure all buildings and facilities entered during non-duty hours and will secure all building and facilities under the Contractor’s cognizance at the end of each work day or shift period.

2.8.6 Access Arrangements The Contractor shall make all arrangements through the I&I necessary to obtain access to buildings, facilities and other work areas, and when necessary, arrange for them to be opened and closed by the controlling authority. The Government may issue keys to the Contractor. The Contractor shall use due diligence and be responsible for compromised security systems to include replacement costs that result from its action or inaction.

2.9 Contractor Safety Program The Contractor shall develop and implement a Safety Program detailing how the Contractor plans, staffs, performs, and controls all safety practices while delivering best value services to the Government without any accidents or mishaps. The Contractor’s safety program shall comply with all safety standards identified in the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 and Public Law 91-596, Occupational Safety and Health Act.

2.9.1 Accident Prevention Plan

(APP)

The Contractor shall develop and implement a site Accident Prevention Plan (APP). The APP shall be prepared by the Contractor’s SSHO and shall be followed by all Contractor employees, subcontractors, and vendors at each service site.

The APP shall follow the format and include all elements addressed in Appendix A of EM 385-1-1. The APP shall incorporate applicable occupational risks and compliance plans that are relevant to the site specific hazards and controls for each activity and type of work that may be encountered in the performance of this contract.

The Contractor shall submit an APP for acceptance per Section F.

The Contractor shall review, update, and submit revisions to the APP whenever a change in work conditions, hazards, or activities occur.

Submittal of the APP shall include Activity Hazard Analyses (AHAs) as specified below.

2.9.2 Activity Hazard Analysis

(AHA)

The Contractor shall prepare Activity Hazard Analyses (AHAs) for all applicable common recurring work activities performed under this contract. AHAs for recurring work shall be submitted with the APP and shall be updated as work activities or conditions change and additional AHAs prepared as new work activities are required. AHAs for non-recurring and one-time (e.g., IDIQ task orders) work occurrences shall be submitted at least two working days prior to start of work. Specifically:

For FFP contract modifications where changes are germane to the original contract, the Contractor shall revise applicable AHAs within 15 calendar days after modification is signed.

For combination FFP/IDIQ contracts, the Contractor shall submit an AHA on task orders, with the associated proposal, whenever the service environment or required task is different from the firm-fixed-priced services.

For construction (including renovation or alteration) task orders placed on the IDIQ portion of contract, the Contractor shall submit a separate AHA for each task order with the associated proposal.

AHAs shall follow format of Figure 1-2 of EM 385-1-1 and shall explain the following as detailed in the EM 385-1-1:

The steps of the service process;

Identify potential hazards that exist as a result of the

Contractor’s service process within the environment;

Measures or plans of actions to safely remove potential hazards away from people in and around the service process and environment;

Specific materials and equipment necessary to safely remove potential hazards away from people in and around the service process and environment;

Inspection requirements to assure service activity is safe; and Training of service personnel to be aware of potential hazards and measures or plans of actions to be used to remove hazards from service environment.

During performance of services, the SSHO shall periodically review the AHA at each service site and for each sub-annex to assess the effectiveness of the Contractor’s overall APP. If changes to the AHAs are required, such changes shall be submitted to the KO for review and acceptance.

2.9.3 Accident and Damage

Reporting

The Contractor shall notify the KO of all damages, accidents, mishaps, and near misses that occur on or related to Government property as soon as practical, but not later than four hours.

For recordable injuries and illnesses, property damage accidents resulting in at least $2,000 in damages, and Weight Handling Equipment (WHE) accidents, the Prime Contractor shall conduct an accident investigation to establish the root cause(s) of the accident.

(a) For recordable injuries and illnesses and property damage accidents resulting in at least $2,000 in damages complete USACE Accident Investigation Report (J-0200000-04) and provide the report to the KO within 1 calendar day of the accident. The KO will provide a blank copy of any required or special forms.

(1) Recordable Injuries or Illnesses. Any work-related injury or illness that results in:

(i) Death, regardless of the time between the injury and death, or the length of the illness;

(ii) Days away from work (any time lost after day of injury/illness onset);

(iii) Restricted work;

(iv) Transfer to another job;

(v) Medical treatment beyond first aid;

(vi) Loss of consciousness; or

(vii) A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (6) above.

(b) For WHE accidents (including rigging gear accidents) complete the USACE Accident Investigation Report and provide the report to the KO within 30 calendar days of the accident.

(1) WHE Accident. A WHE accident occurs when any one or more of the eight elements in the operating envelope fails to perform correctly during operation, including operation during maintenance or testing resulting in personnel injury or death; material or equipment damage; dropped load;

derailment; two-blocking; overload; or collision, including unplanned contact between the load, crane, or other objects.

A dropped load, derailment, two-blocking, overload and collision are considered accidents even though no material damage or injury occurs. A component failure (e.g., motor burnout, gear tooth failure, bearing failure) is not considered an accident solely due to material or equipment damage unless the component failure results in damage to other components (e.g., dropped boom, dropped load, roll over, etc.)

Comply with current 29CFR1904 for OSHA/HIOSH record keeping and reporting requirements.

2.9.3.1 Accident Reporting

Notification

The Contractor shall report all accidents, mishaps, and near misses to the KO in a timely manner as described below:

An Initial Accident Reporting Notification Report shall be developed by the Contractor and provided to the KO immediately after that an accident, or near miss, has occurred. The Contractor may not have all the facts and information regarding the actual incident or near miss at the time of the initial report. However, it is the Government’s desire to receive notification of all mishap situations as early as possible.

The Contractor shall develop a Follow-on Accident Reporting Notification Report and shall and provide a copy to the KO by close of business the day of the accident, or if the accident occurs after hours, at start of business the following morning. Follow-on reports shall be required daily until the Contractor can send a final, conclusive report of the nature, cause, and outcome of the accident.

The Contractor shall provide a Final Accident Reporting Notification Report of the accident to the KO within 24 hours after completing the investigation of the accident.

2.9.4 Fire Protection The Contractor shall know where fire alarms are located and how to activate them. The Contractor shall handle and store all combustible supplies, materials, waste and trash in a manner that prevents fire or hazards to persons, facilities, and materials.

2.9.5 Monthly On-Site Labor

Report

The Contractor shall submit a monthly On-Site Labor Report per Section F. This report is a compilation of employee-hours worked each month for all site workers, both prime and subcontractor.

2.9.6 OSHA Citations and

Violations

The Contractor shall correct violations and citations promptly and provide a copy of each OSHA citation and OSHA report with written

OSHA Citations and Violations Corrective Action Report to the KO within 48 hours after receiving a citation.

2.9.7 Safety Inspections and

Monitoring

The Contractor shall conduct inspections of its work areas, job sites, and work crews every day work is being performed to ensure that all Contractor operations are being conducted safely. These inspections shall ensure:

The site is safe and free of job-site hazards Proper PPE is being utilized and worn.

Safe work practices and processes are being followed.

Workers are familiar with the hazards covered in the respective AHA for that work activity.

All equipment and tools are in good condition and being used safely.

The Government reserves the right to inspect and monitor Contractor operations for safety compliance. In general, the Government approach will be to conduct Performance Assessment on the quality and effectiveness of the Contractor’s safety program. The Government reserves the right to stop any work activity when it deems danger is imminent. Contractor personnel shall work in a safe manner and comply with all applicable safety regulations. The Contractor shall be subject to safety inspections of its work sites by the Government. Contractor safety records shall be available to the KO upon request.

Whenever the KO becomes aware of any safety noncompliance or any condition which poses a serious or imminent danger or hazard to the health or safety of the public or Government Personnel, the KO will notify the Contractor orally, with written confirmation, and request immediate corrective action. This notice, when delivered to the Contractor’s representative or SSHO, shall be deemed sufficient notice of noncompliance and that corrective action is required. After receiving this notice, the Contractor shall immediately take corrective action. If the Contractor fails, delays, or refuses to promptly take corrective action, the KO may issue a stop work order for all or part of the services or work until satisfactory corrective action has been taken. Whenever such a stop work order has been issued, the Contractor shall waive all equitable adjustments to the contract related to the stop work ordered issued. The Contractor shall include this requirement in all of its subcontracts and vendor contracts in support of contract safety.

2.9.8 Safety Certification The Contractor shall submit copies of all the required Federal, state, county, city, and industry safety related Safety Certifications for work performed under this contract per Section F. These certifications shall be kept up to date by the Contractor. The Contractor shall submit new versions of certifications as the old certifications expire.

No work, that requires a certification, shall start without a valid and approved certification.

2.10 Environmental Protection The Contractor shall comply with all applicable federal, state, and local laws. All environmental protection matters shall be coordinated with the Government. Inspection of any of the facilities operated by the Contractor may be accomplished by the Activity Environmental Protection Coordinator, or authorized officials on a no-notice basis during Government regular working hours. In the event that a regulatory agency assesses a monetary fine against the Government for violations caused by Contractor negligence, the Contractor shall reimburse the Government for the amount of that fine and other costs.

The Contractor shall comply with the instructions of the cognizant Marine Medical Department with respect to avoidance of conditions which create a nuisance or which may be hazardous to the health of military or civilian personnel.

2.10.1 Disposal

2.10.1.1 Non-Hazardous Waste The Contractor shall dispose of debris and rubbish resulting from work under this contract by removing from Government property.

When the debris and rubbish is removed from the site, the Contractor shall determine whether any of the material is recyclable and segregate it from the non-recyclable. Both materials shall then be disposed of properly.

2.10.1.2 Hazardous Waste The Contractor shall dispose of all hazardous waste in accordance with the Resource Conservation and Recovery Act and all other applicable federal, state and local laws and regulations. No on-installation disposal of hazardous waste is allowed.

2.10.2 Spill Prevention, Containment, and Clean-up

The Contractor shall prevent, contain, clean up, and report all spills on Government property, caused by the Contractor, in a manner that complies with applicable Federal, state, and local laws and regulations or otherwise stated herein, and the installation spill control plan at no cost to the Government.

2.10.3 Hazardous Material

Management

The Contractor shall ensure that procedures are in place to deal with hazardous materials, pursuant to the FAR Clause 52.223-3, HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL

SAFETY DATA.

2.10.4 Protection of Endangered

and Threatened Species (Flora and Fauna)

The Contractor shall not disturb endangered and threatened species and their habitat. The Contractor shall carefully protect in-place and report immediately to the KO endangered and threatened species discovered in the course of work. The Contractor shall stop work in the immediate area of the discovery until directed by the KO to resume work.

2.10.5 Noise Control The Contractor shall comply with all applicable Federal, state and local laws, ordinances, and regulations relative to noise control.

2.10.6 Salvage All salvageable materials and equipment disconnected or removed during the course of the work and not indicated or specified for reuse in the new work shall become the property of the Contractor and shall be removed from the Government property.

2.10.7 Asbestos Containing

Material (ACM)

Asbestos containing insulation, flooring, and other building materials may be encountered by the Contractor during the performance of work under this contract, and the Contractor shall remain alert to this possibility. If ACM is encountered or suspected in the performance of work, the Contractor shall avoid removing, sanding, abrading, or disturbing the material. The Contractor shall verbally notify the KO within one hour and follow-up with written ACM Notification within 24 hours.

2.10.8 Refrigerant Recycling The Contractor shall not knowingly vent or otherwise dispose of any refrigerant in a manner, which would permit their release into the environment. Refrigerants shall be captured and recycled in conformance with all applicable federal, state, and local laws and regulations.

2.11 Disaster Preparedness The Contractor shall comply with the installation's Contingency

Response Plan as directed by the KO.

2.12 Warranty Management Prior to performing repair work, the Contractor shall report to the KO all defects in workmanship, material, parts, or improper installation and found by the Contractor to be covered by a warranty. The Contractor is responsible for knowing which equipment and components are covered by the original warranty and the warranty duration.

2.13 FFP Work Procedures

2.13.1 Work Reception Contractor shall establish a work reception function with the capability to receive, classify, issue, correspond, and respond to service calls. This may be in the form of the Project Manager carrying a cell phone or an answering service.

2.13.2 Notification to the

Government for Work Above the FFP Limitations

The Contractor is fully responsible for work up to the FFP limits.

FFP limits are specified in subsequent annexes or sub-annexes. When work is expected to exceed the FFP limits, the Contractor shall notify the KO within twenty four hours of identification for further direction. The Government may issue a task order in accordance with the IDIQ portion of the contract detailed below or accomplish the work by means other than this contract.

2.13.2 FFP Contract Line Item

Numbers (CLINs)

Refer to Section B, CLINs, for FFP CLINs.

2.14 IDIQ Work IDIQ work is identified in each applicable annex or sub-annex. IDIQ work may consist of Unit Priced Non Negotiated Tasks (UPNNT) Work and of Unit Priced Negotiated Tasks (UPNT) Work. The Contractor shall perform all IDIQ task work as ordered by the KO per the contract. IDIQ work may be ordered by the Government as separate items or in combinations of items from the Schedule of Indefinite Quantity Work in Section B on an as needed basis.