J-1502000-13__Windy_Hill __Preventative_Maintenance_Program_-_Index _Detail.xls

XLS spreadsheet 272 KB Posted

Attached to
MARFORRES SOUTHEAST FACILITIES MAINTENANCE
Solicitation number
W912HP13R0019
Issued by

About this file

Windy Hill Preventative Maintenance Index

View the file

Other files

File Type Posted
Award_Notice_MARFORRES_SE_Facilities_Maint.pdf PDF
J-0100000-01_MCRC_Locations.xls XLS spreadsheet
scannedDoc.pdf PDF
proposaldatasheet.pdf PDF
Schedule_B.xls XLS spreadsheet
Amendment_2.pdf PDF
Section_M_Revised.pdf PDF
Amendment_1.pdf PDF
Section_J_Part_1.pdf PDF
J-1502000-01__Huntsville _Drawings.pdf PDF
J-1502000-02__Montgomery _Drawings.pdf PDF
J-1502000-07__Memphis _Drawings.pdf PDF
J-1502000-05__Windy_Hill _Drawings.pdf PDF
J-1502000-03__Jacksonville _Drawings.pdf PDF
J-1502000-06__Eastover _Drawings.pdf PDF
J-1502000-08__Service_Call_Report.pdf PDF
J-1502000-04__Tampa _Drawings.pdf PDF
J-1502000-14__Eastover _Preventative_Maintenance_Program_-_Index _Detail.xls XLS spreadsheet
J-1502000-12__Tampa __Preventative_Maintenance_Program_-_Index _Detail.xls XLS spreadsheet
J-1502000-11__Jacksonville __Preventative_Maintenance_Program_Index _Detail.xls XLS spreadsheet
J-1502000-18__Equipment_Update_Report.xls XLS spreadsheet
Section_C.pdf PDF
Section_F__Deliveries_or_Performance.pdf PDF
Section_J__Documents _Exhibits _and_Other_Attachments.xls XLS spreadsheet
J-1502000-19__Equip_Inspection _Test_ _Certification_Program.xls XLS spreadsheet
J-1502000-10__Montgomery _Preventative_Maintenance_Program_-__Index _Detail.xls XLS spreadsheet
J-1502000-09__Huntsville _Preventative_Maintenance_Program_-_Index _Detail.xls XLS spreadsheet
Section_M.pdf PDF
J-1502000-17__Repair_Work_Report.xls XLS spreadsheet
SF_1449.pdf PDF
J-1502000-16__Preventative_Maintenance_Program_-_Checklist.xls XLS spreadsheet
J-1502000-15__Memphis _Preventative_Maintenance_Program_-__Index _Detail.xls XLS spreadsheet
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1114-Index

J-1502000-13
PREVENTATIVE MAINTENANCE PROGRAM INDEX
MCRC WINDY HILL, GA
BUILDING 1114 (ADMINISTRATIVE)
(For Manufacturer, model and serial number of equipment see Detail tab)
EquipmentDesignationQuantityLocationContractor Developed PM Program Checklist Sheet (Note 2)Frequency of Inspection
1502000 Spec Item 3.2 - HVAC
Air Conditioner - SplitACS-11Perimeter, adjacent to Telephone (NMCI) 121Semiannual
Air Filter (HVAC)AF-1 through AF-44See Tab: Detail - Air FilterEvery Other Month
Air Filter (HVAC)AF-5 through AF-1511See Tab: Detail - Air FilterQuarterly
Air Handling UnitAHU-1, AHU-2, AHU-33AHU-1 (Mechanical 107), AHU-2 (Mech 122), AHU-3 (overhead, above Armory 137)Semiannual
Boiler - ElectricHWB-11Mechanical 130Monthly, during heating season
Chiller - Air CooledCH-11Adjacent to Mech 130XAs required by manufacturer, except coils shall be cleaned semiannually
Damper (motorized)D-1, D-22D-1 (Mech 107), D-2 (Mech 130)Quarterly
Fan (duct)EF-1 (serves Womens Toilet 131, Women's Shower/Locker 132, Men's Toilet 135, Lockers 136), EF-2 (serves Lockers 113, Men's Toilet 114, Toilet 123), EF-3 (serves O2 Room 115), EF-8 (serves Room 127)4EF-1 (overhead, above Lockers 136), EF-2, EF-3 (overhead, above Room 112), EF-8 (overhead, above Room 127)Annual
Fan (wall)EF-4 through EF-63EF-4 (Mech 107), EF-5, EF-6 (Room 118), EF-7 (Mech 130)Semiannual
Fan Coil UnitFCU-11Telephone (NMCI) 121Annual
Heater-Unit, Forced Air, Steam/WaterUH-1 through UH-66UH-1 through UH-4 (Room 118), UH-5 (Mechanical 107), UH-6 (Mechanucal 130)Annual (fall)
System Water-Chilled WaterCW-11Mechanical 130XAnnual (Note 3)
System Water-Hot WaterHW-11Mechanical 130XAnnual (Note 3)
Terminal-VAVFPB-1 through FPB-1212See 1114-VAV tabAnnual
1502000 Spec Item 3.2 - Electrical Systems
Lighting (exterior)LightingAttached to Exterior of Building 1114Quarterly
Lighting (interior)LightingBuilding 1114Quarterly
PanelboardPB-HB, PB-LB1, PB-LB2, PB-DA, PB-HA, PB-LA1, PB-LA2, PB-MDP8PB-HB, PB-LB1, PB-LB2 (Room 121), PB-DA, PB-HA, PB-LA1, PB-LA2, PB-MDP (Mech 130)Annual
1502000 Spec Item 3.2 - Fire Protection
Fire Detection and Alarm SystemFA-11Building 1114Annual
Fire Extinguisher (portable)-Monthly InspectionFE-1 through FE-88FE-1 (Lobby 101), FE-2, FE-3 (Assembly 102), FE-3 (Administrative 106), FE-4 (Mech 107), FE-5, FE-6 (Corridor 119), FE-7 (Mech 122), FE-8 (Mech 130)Monthly
Fire Extinguisher (portable)-Annual MaintenanceFE-1 through FE-88FE-1 (Lobby 101), FE-2, FE-3 (Assembly 102), FE-3 (Administrative 106), FE-4 (Mech 107), FE-5, FE-6 (Corridor 119), FE-7 (Mech 122), FE-8 (Mech 130)Annual
Fire Sprinkler - Wet PipeFSW-11Mechanical 107Annual
1502000 Spec Item 3.2 - Miscellaneous Equipment
Air CompressorAC-11Mechanical 130Semiannual
Door-Overhead (motorized)DR-1 through DR-44DR-1, DR-2 (Assembly 102), DR-3, DR-4 (Room 118)Semiannual
Drinking FountainDF-1, DF-22Corridor 119Annual
Plumbing Fixtures (by room)PF-1 through PF-99PF-1 (Lockers 113), PF-2 (Men's Toilet 114), PF-3 (Toilet 123), PF-4 (Galley 129), PF-5 (Women's Toilet 131), PF-6 (Women's Shower/Locker 132), PF-7 (Men's Shower 133), PF-8 (Janitorial 134), PF-9 (Men's Toilet 135)Semiannual
Pump (chilled water)CHP-1, CHP-22Mechanical 130Semiannual
Pump (hot water)HWP-1, HWP-22Mechanical 130Annual
Pump (potw)P-11Mechanical 130Annual
Water Heater-ElectricWHE-11Mechanical 130Annual
NOTES
Note 1 - HVAC equipment shall be inspected in the spring or fall unless otherwise noted
Note 2 - If blank, Government will provide PM Program checklist sheet
Note 3 -Shall be treated/tested after repairs/leaks resulting in refilling of the system
Note 4 - For quantity/size of air filters (HVAC) see Tab: Air Filters (HVAC)
Note 5 - For quantity of plumbing fixtures see Tab: Plumbing Fixtures

Page &P of &N

1114-Detail

J-1502000-13
PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL
BUILDING 1114 (ADMINISTRATIVE)
MCRC WINDY HILL, GA
EquipmentDesignationManufacturerModelSerial NumberRemarks
1502000 Spec Item 3.2.1 - HVAC
Air Conditioner - SplitACS-1MitsubishiPUY-A12NHA42YU00682A
Air Handling UnitAHU-1YorkBuilt-up unit, VFD
Air Handling UnitAHU-2, AHU-3YorkBuilt-up unit, Constant volume
BoilerHWB-1Precision Boiler, LLCPCW1-105B-480-1508991070Electric, 105 KW, 358,260 BTUH
Chiller - Air CooledCH-1York
Fan Coil UnitFCU-1MitsubishiPKA-A12HA42YA05361A
Heater-Unit, Forced Air, Steam/WaterUH-1 through UH-6TraneUHSA02082EAA1T
Terminal-VAVFPB-1 through FPB-5, FPB-7 through FPB-12TitusDTQPFan powered, Heating coil, Filter
Terminal-VAVFPB-6TitusHeating coil
1502000 Spec Item 3.2.5 - Miscellaneous Equipment
Air CompressorAC-1Emglo
Pump (chilled water)CHP-1Bell & GossettSeries 153122207262 HP, 64 GPM, 61 feet, 1800 RPM
Pump (chilled water)CHP-2Bell & GossettSeries 153122207272 HP, 64 GPM, 61 feet, 1800 RPM
Pump (hot water)HWP-1Bell & GossettSeries 8022206292 HP, 38 GPM, 70 feet, 1800 RPM
Pump (hot water)HWP-2Bell & GossettSeries 8022206302 HP, 38 GPM, 70 feet, 1800 RPM
Water Heater-ElectricWHE-1State Industries3B6529IEEBH0030714

Page &P of &N

1114-VAV

J-1502000-13
PREVENTATIVE MAINTENANCE PROGRAM DETAIL
VAV LOCATION
MCRC WINDY HILL, GA
BUILDING 1114 (ADMINISTRATIVE)
VAV DesignationLocation (overhead)Space Served
FPB-1Lobby 101Lobby 101
FPB-2Lobby 101Lobby 101
FPB-3Armory 137Armory 137
FPB-4Admin 106Admin 106
FPB-5Admin 106Admin 106
FPB-6Admin 106Mens Toilet 135, Lockers 136
FPB-7Room 109I&I 108, Room 109
FPB-8Corridor 119Corridor 119
FPB-9Classroom 110Classroom 110
FPB-10Classroom 111Classroom 111
FPB-11Medical 126Medical 126
FPB-12Room 128Room 128

Page &P of &N

1115-Index

J-1502000-13
PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL
MCRC WINDY HILL, GA
BUILDING 1115 (ADMINISTRATIVE)
EquipmentDesignationQuantityLocationContractor Developed PM Program Checklist Sheet (Note 2)Frequency of Inspection
1502000 Spec Item 3.2 - HVAC
Air Filter (HVAC)AF-11See Tab: Detail - Air FilterEvery Other Month
Air Filter (HVAC)AF-2 through AF-87See Tab: Detail - Air FilterQuarterly
Air Handling UnitAHU-11Equipment Mezzanine 144Semiannual
BoilerB-11Mechanical 131Monthly during heating season
Chiller - Air CooledCH-11PerimeterXAs required by manufacturer, except coils shall be cleaned semiannually
Fan (duct)AEF-11Gear Equipment Room 130Semiannual
System Water-Chilled WaterCW-11XAnnual (Note 3)
System Water-Hot WaterHW-11XAnnual (Note 3)
Terminal - VAVVAV-1 through VAV-1616See J-1502000-05Annual
1502000 Spec Item 3.2 - Electrical Systems
Lighting (exterior)LightingAttached to Exterior of Building 1115Quarterly
Lighting (interior)LightingBuilding 1115Monthly
PanelboardPB5PB-DP1 (Electrical 125), PB-PP1 (Mechanical 131), PB-PP2 (section 1), PB-PP2 (section 2), PB-PP3 (Electrical 139A)Annual
1502000 Spec Item 3.2 - Fire Protection
Fire Detection and Alarm SystemFA-1Annual
Fire Extinguisher (portable) - Monthly InspectionFE-1 through FE-1111FE-1 (Lobby 101), FE-2 (Admin 108), FE-3 (Sprinkler Riser 119), FE-4 (Corridor 124), FE-5 (Electrical 125), FE-6 (Mechanical 131), FE-7 (Shop-Comm Maint 133), FE-8 (Corridor 134), FE-9 (Supply/Embark Storage 136), FE-10 (Armory 138), FE-11 (Equipment Mezzanine 144)Monthly
Fire Extinguisher (portable) - Annual MaintenanceFE-1 through FE-1111FE-1 (Lobby 101), FE-2 (Admin 108), FE-3 (Sprinkler Riser 119), FE-4 (Corridor 124), FE-5 (Electrical 125), FE-6 (Mechanical 131), FE-7 (Shop-Comm Maint 133), FE-8 (Corridor 134), FE-9 (Supply/Embark Storage 136), FE-10 (Armory 138), FE-11 (Equipment Mezzanine 144)Annual
Fire Sprinkler - Wet PipeFSW-11Sprinkler Riser 119Annual
1502000 Spec Item 3.2 - Miscellaneous Equipment
Door-Overhead (manual)DR-1, DR-22DR-1 (Shop-Comm Maint 133), DR-2 (Supply/Embark Storage 136)Semiannual
Drinking FountainDF-1 through DF-44DF-1, DF-2 (Corridor 124), DF-3, DF-4 (Fittness Room 126)Annual
Emergency EyewashEE-11Shop-Comm Maint 133Monthly
Plumbing Fixtures (by room)PF-1 through PF-66PF-1 (Exam 103), PF-2 (Toilet 105), PF-3 Women's Locker Room 127), PF-4 (Men's Locker Room 128), PF-5 (Unisex Toilet 137), PF-6 (Janitor Closet 139)Semiannual
Pump (chilled water)CWP-11Mechanical 131Semiannual
Pump (hot water)WHP-11Mechanical 131Annual
Pump (potw)RP-11Mechanical 131Annual
Shutter-Roll-up, ManualSRM-11Supply/Embark Storage 136Semiannual
Water Heater-Gas/OilWH-11Mechanical 131Semiannual
NOTES
Note 1 - HVAC equipment shall be inspected in the spring or fall unless otherwise noted
Note 2 - If blank, Government will provide PM Program checklist sheet
Note 3 -Shall be treated/tested after repairs/leaks resulting in refilling of the system
Note 4 - For quantity/size of air filters (HVAC) see Tab: Air Filters (HVAC)
Note 5 - For quantity of plumbing fixtures see Tab: Plumbing Fixtures

Page &P of &N

1115-Detail

J-1502000-13
PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL
MCRC WINDY HILL, GA
BUILDING 1115 (ADMINISTRATIVE)
EquipmentDesignationManufacturerModelSerial NumberRemarks
1502000 Spec Item 3.2.1 - HVAC
Air Handling UnitAHU-1YorkHW & CW coils, VFD
BoilerB-1FultonPHW-500110977Gas
Chiller - Air CooledCH-1YorkYCAL0066EE17XEASHWM686550
Terminal - VAVVAV-1 through VAV-4, VAV-6, VAV-11, VAV-12, VAV-15, VAV-16Johnson ControlsTSS SeriesHW coil
Terminal - VAVVAV-5, VAV-7 through VAV-10, VAV- 13, VAV-14Johnson ControlsTCS SeriesHW coil, Fan powered
1502000 Spec Item 3.2.6 - Miscellaneous Equipment
Pump (hot water)WHP-1Flo Fab2000 - F810A1655311 HP, 38 gpm
Water Heater-Gas/OilWH-1Bradford WhitePDV100S2003NGE13435059Gas

Page &P of &N

1113-Index

J-1502000-13
PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL
MCRC WINDY HILL, GA
BUILDING 1113
EquipmentDesignationQuantityLocationContractor Developed PM Program Checklist Sheet (Note 2)Frequency of Inspection
1502000 Spec Item 3.2 - HVAC
Air Conditioner - PackageBDU-1, BOAU-12PerimeterSemiannual
Air Conditioner - Split SystemBACCU-1, BACCU-22PerimeterSemiannual
Air Filter (HVAC)AF-1, AF-22See Tab: Detail - Air FilterMonthly
Air Filter (HVAC)AF-3, AF-42See Tab: Detail - Air FilterEvery Other Month
Fan (duct)BEF-11Toilet 111Semiannual
Fan Coil UnitBHP-1, BHP-22HVAC Room 110Annual (spring)
1502000 Spec Item 3.2 - Electrical Systems
Lighting (exterior)LightingAttached to Exterior of Building 1113Quarterly
Lighting (interior)LightingBuilding 1113Monthly
PanelboardPB-PP1, PB-PP22Parachute Folding Rm 101Annual
1502000 Spec Item 3.2 - Fire Protection
Fire Detection and Alarm SystemFA-11Annual
Fire Extinguisher (portable) - Monthly InspectionFE-1, FE-22Parachute Folding Rm 101Monthly
Fire Extinguisher (portable) - Annual MaintenanceFE-1, FE-22Parachute Folding Rm 101Annual
Fire Sprinkler - Wet PipeFSW-1Parachute Folding Rm 101Annual
1502000 Spec Item 3.2 - WHE
Hoist - ElectricH-1, H-2, H-33Parachute Drying Tower 113XAs required by the manufacturer
1502000 Spec Item 3.2 - Miscellaneous Equipment
Air CompressorAC-11Compressor RoomSemiannual
Door-Overhead (manual)DR-11Parachute Folding Rm 101Semiannual
Drinking FountainDF-11Parachute Folding Rm 101Annual
Gutters/Down Spouts CleaningG-11Annual
Plumbing Fixtures (by room)PF-1 through PF-44PF-1 (Oxygen Safe Room 105), PF-2 (Toilet 111), PF-3 (Vestibule 112), PF-4 (perimeter)Semiannual
Water Filtration - Reverse OsmosisWF-11Oxygen Safe Room 105Semiannual
Water Heater-ElectricWH-11Vestibule 112Annual
NOTES
Note 1 - HVAC equipment shall be inspected in the spring or fall unless otherwise noted
Note 2 - If blank, Government will provide PM Program checklist sheet
Note 3 - For quantity/size of air filters (HVAC) see Tab: Air Filters (HVAC)
Note 4 - For quantity of plumbing fixtures see Tab: Plumbing Fixtures

Page &P of &N

1113-Detail

J-1502000-13
PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL
MCRC WINDY HILL, GA
BUILDING 1113
EquipmentDesignationManufacturerModelSerial NumberRemarks
1502000 Spec Item 3.2 - HVAC
Air Conditioner - PackageBOAU-1AaonRQ-004-8-H-E60E-122201104-AYED00324Electric heat
1502000 Spec Item 3.2 - Miscellaneous Equipment
Air CompressorAC-1Bauer CompressorsDMT10-E3
Water Filtration - Reverse OsmosisWF-1WattsLC-200P
Water Heater-ElectricWH-1Bradfoed WhiteM250T6D5-1NCWWGD13306560

Page &P of &N

1102-Index

J-1502000-13
PREVENTATIVE MAINTENANCE PROGRAM INDEX
MCRC WINDY HILL, GA
BUILDINGS 1102 (ISMIT TRAINING)
(For Manufacturer, model and serial number of equipment see Detail tab)
EquipmentDesignationQuantityLocationContractor Developed PM Program Checklist Sheet (Note 2)Frequency of Inspection
1502000 Spec Item 3.2 - HVAC
Air Conditioner - PackageACP-11Perimeter, adj to building 1102Semiannual
Air Conditioner - Split SystemACS-11Perimeter, adj to building 1102Semiannual
Air Filter (HVAC)AF-1, AF-22See Tab: Detail - Air FilterEvery Other Month
Fan Coil UnitFCU-11OfficeAnnual (spring)
1502000 Spec Item 3.2 - Electrical Systems
Lighting (exterior)LightingAttached to Exterior of Building 1102Quarterly
Lighting (interior)LightingBuilding 1102Quarterly
PanelboardPB-A, PB-B2OfficeAnnual
1502000 Spec Item 3.2 - Fire Protection
Fire Detection and Alarm SystemFA-11Building 1102Annual
Fire Extinguisher (portable) - Monthly InspectionFE-1 through FE-33FE-1 (Office), FE-2 (Classroom), FE-3 (Compressor Room)Monthly
Fire Extinguisher (portable) - Annual MaintenanceFE-1 through FE-33FE-1 (Office), FE-2 (Classroom), FE-3 (Compressor Room)Annual
1502000 Spec Item 3.2 - Miscellaneous Equipment
Air Compressor - RotaryAC-11Compressor RoomXAs required by manufacturer
Drinking FountainDF-1, DF-22ClassroomAnnual
Gutters/Down Spouts CleaningG-11Building 1102Annual
Plumbing Fixtures (by room)PF-11ToiletSemiannual
NOTES
Note 1 - HVAC equipment shall be inspected in the spring or fall unless otherwise noted
Note 2 - If blank, Government will provide PM Program checklist sheet
Note 3- For quantity/size of air filters (HVAC) see Tab: Air Filters (HVAC)
Note 4 - For quantity of plumbing fixtures see Tab: Plumbing Fixtures

Page &P of &N

1102-Detail

J-1502000-13
PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL
MCRC WINDY HILL, GA
BUILDINGS 1102 (ISMIT TRAINING)
EquipmentDesignationManufacturerModelSerial NumberRemarks
1502000 Spec Item 3.2 - HVAC
Air Conditioner - PackageACP-1TraneTSC092E3R0A0HH0B000000100916101372L
Air Conditioner - Split SystemACS-1MitsubishiPUY-A18NHA2
Fan Coil UnitFCU-1Mitsubishi
1502000 Spec Item 3.2 - Miscellaneous Equipment
Air Compressor - RotaryAC-1Ingersoll RandUP6-7.5TAS-125 PSUQ0755U09149

Page &P of &N

1103, 1109,1112,Grds-Index

J-1502000-13
PREVENTATIVE MAINTENANCE PROGRAM INDEX
MCRC WINDY HILL, GA
BUILDINGS 1103 (GUARD SHACK), 1109, 1112, GROUNDS
(For Manufacturer, model and serial number of equipment see Detail tab)
EquipmentDesignationQuantityLocationContractor Developed PM Program Checklist Sheet (Note 2)Frequency of Inspection
1502000 Spec Item 3.2 - HVAC
Air Conditioner - PackageACP-1, ACP-2, ACP-33ACP-1 (Building 1112, Office 1), ACP-2 (Building 1112, Office 2), ACP-3 (Building 1109)Semiannual
Air Conditioner - Split SystemACS-11Perimeter, adj to Building 1112Semiannual
Air Filter (HVAC)AF-1 through AF-55See Tab: Detail - Air FilterEvery Other Month
Air Handling UnitAHU-11Building 1112, Storage 1Semiannual
Fan Coil UnitFCU-11Building 1103Annual (spring)
Heat Pump - SplitHPS-11Adjacent to Building 1103Semiannual
1502000 Spec Item 3.2 - Electrical Systems
Lighting (exterior)LightingAll pole 1lighting in compound not attached to any buildings; Lights attached to buildings 1103 and 1112Quarterly
Lighting (interior)LightingBuildings 1103, 1109, 1112Monthly
PanelboardPB-1, PB-2, PB-33PB-1 (Building 1103), PB-2 (Building 1109), PB-3 (Building 1112)Annual
1502000 Spec Item 3.2 - Fire Protection
Fire Detection and Alarm SystemFA-11Building 1112Annual
Fire Extinguisher (portable)-Monthly InspectionFE-1 through FE-55FE-1 (Building 1103), FE-2, FE-3 (Building 1112, Storage 1), FE-4, FE-5 (Building 1112, Storage 2)Monthly
Fire Extinguisher (portable)-Annual MaintenanceFE-1 through FE-55FE-1 (Building 1103), FE-2, FE-3 (Building 1112, Storage 1), FE-4, FE-5 (Building 1112, Storage 2)Annual
Fire HydrantFH-1, FH-22FH-1 (adj to building 1101), FH-2 (adj to building 1107)Annual
Fire Sprinkler - Wet PipeFSW-11Building 1112Annual
1502000 Spec Item 3.2 - WHE
Hydraulic Lift - Loading DockHLD-1, HLD-22Adj to Building 1114Semiannual
1502000 Spec Item 3.2 - Miscellaneous Equipment
Beam BarricadeBB-11Adjacent to 1103Quarterly
Door-Overhead (manual)DR-11Building 1112, Storage 1Semiannual
Door-Overhead (motorized)DR-2, DR-32DR-2 (Building 1112, Storage 1), DR-3 (Building 1112, Storage 2)Semiannual
Gutters/Down Spouts CleaningG-11Building 1112Annual
Plumbing Fixtures (by room)PF-11Building 1109Semiannual
Pump - Sanitary LiftPSL-1, PSL-22Adjacent to volley ball courtAnnual
Slide Gate Operator & Entry SystemSGO-11Gate by building 1114Semiannual
NOTES
Note 1 - HVAC equipment shall be inspected in the spring or fall unless otherwise noted
Note 2 - If blank, Government will provide PM Program checklist sheet
Note 3 - For quantity/size of air filters (HVAC) see Tab: Air Filters (HVAC)
Note 4 - For quantity of plumbing fixtures see Tab: Plumbing Fixtures

Page &P of &N

1103,1109,1112, Grds-Detail

J-1502000-13
PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL
BUILDINGS 1103 (GUARD SHACK), 1109, 1112, GROUNDS
MCRC WINDY HILL, GA
EquipmentDesignationManufacturerModelSerial NumberRemarks
1502000 Spec Item 3.2 - HVAC
Air Conditioner - PackageACP-1, ACP-2TranePTEE1201UABBSA28468Electric heat
Air Conditioner - PackageACP-3Bard Manufacturing Co140H981244859-02
Air Conditioner - Split SystemACS-1TraneRAUCC20ECZ130BD00009C09D13860
Air Handling UnitAHU-1PowrmaticTE-11HE0309-2103920 Tons, 40 HW heat
Fan Coil UnitFCU-1CarrierFB48NF0181104A85289
Heat Pump - SplitHPS-1Carrier38YCC0183400604E24353
1502000 Spec Item 3.2 - WHE
Hydraulic Lift - Loading DockHLD-1, HLD-2Poweramp McGuire SystemHSM535-1535,000 pounds capacity
1502000 Spec Item 3.2 - Miscellaneous Equipment
Beam BarricadeBB-1Delta ScientificTT212EC (H)5055-1
Slide Gate Operator & Entry SystemSGO-1LiftmasterSL580-50-11-601 07 04 N014

Page &P of &N

1105, 1107-Index

J-1502000-13
PREVENTATIVE MAINTENANCE PROGRAM INDEX
MCRC WINDY HILL, GA
BUILDINGS 1105, 1107
(For Manufacturer, model and serial number of equipment see Detail tab)
EquipmentDesignationQuantityLocationContractor Developed PM Program Checklist Sheet (Note 2)Frequency of Inspection
1502000 Spec Item 3.2 - HVAC
Air Conditioner - PackageACP-11Building 1105, OfficeSemiannual
Air Conditioner-WindowACW-11Building 1107, OfficeAnnual
Air Filter (HVAC)AF-1, AF-2, AF-33See Tab: Detail - Air FilterEvery Other Month
Air Handling UnitAHU-11Building 1105, Work AreaSemiannual
Fan (duct)EF-11Building 1105, Overhead, above ToiletAnnual
Fan (wall)EF-1, EF-22EF-2 (Building 1107, Supply)Semiannual
Heat Pump - SplitHPS-11Adjacent to building 1105Semiannual
1502000 Spec Item 3.2 - Electrical Systems
Lighting (exterior)LightingAttached to Exterior of Buildings 1105, 1107Quarterly
Lighting (interior)LightingBuildings 1105, 1107Monthly
PanelboardPB-1, PB-22PB-1 (Building 1105, Work area), PB-2 (Building 1107, Office)Annual
1502000 Spec Item 3.2 - Fire Protection
Fire Detection and Alarm SystemFA-11Building 1105Annual
Fire Extinguisher (portable)-Monthly InspectionFE-1 through FE- 44FE-1, FE-2 (Building 1105, Work area), FE-3 (Building 1107, Office), FE-4 (Building 1107, Supply)Monthly
Fire Extinguisher (portable)-Annual MaintenanceFE-1 through FE- 44FE-1, FE-2 (Building 1105, Work area), FE-3 (Building 1107, Office), FE-4 (Building 1107, Supply)Annual
1502000 Spec Item 3.2 - Miscellaneous Equipment
Door-Overhead (manual)DR-11Building 1107, SupplySemiannual
Drinking FountainDF-11Building 1105, Work AreaAnnual
Plumbing Fixtures (by room)PF-11Building 1105, ToiletSemiannual
NOTES
Note 1 - HVAC equipment shall be inspected in the spring or fall unless otherwise noted
Note 2 - If blank, Government will provide PM Program checklist sheet
Note 3 - For quantity/size of air filters (HVAC) see Tab: Air Filters (HVAC)
Note 4 - For quantity of plumbing fixtures see Tab: Plumbing Fixtures

Page &P of &N

1105, 1107-Detail

J-1502000-13
PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL
MCRC WINDY HILL, GA
BUILDINGS 1105, 1107
EquipmentDesignationManufacturerModelSerial NumberRemarks
1502000 Spec Item 3.2 - HVAC
Air Conditioner - PackageACP-1Inter-City ProductsTHA09K34STYL930111007Electric heat
Air Handling UnitAHU-1TraneTWE180B300BAH10179071Electric heat
Heat Pump - SplitHPS-1TraneTWA180B300BAH13198073

Page &P of &N

1108, HazMatLkr-Index

J-1502000-13
PREVENTATIVE MAINTENANCE PROGRAM INDEX
MCRC WINDY HILL, GA
BUILDINGS 1108 (VMF), HAZMAT LOCKER
(For Manufacturer, model and serial number of equipment see Detail tab)
EquipmentDesignationQuantityLocationContractor Developed PM Program Checklist Sheet (Note 3)Frequency of Inspection
1502000 Spec Item 3.2 - HVAC
Air Filter (HVAC)AF-11See Tab: Detail - Air FilterEvery Other Month
Damper-Motorized (OA Intake)DM-11Boat Engine Storage 100Quarterly
Fan (duct)EF-1 (vehicle Exhaust), EF-2 (serves Battery Rm)2EF-1 (Maintenance Bay), EF-2 (overhead, above Battery Rm)Semiannual
Fan (duct)EF-3 (serves Flammable Liquid Storage)1Overhead, above Flammable Storage LockerAnnual
Fan (wall)EF-4, EF-5, CEF-13EF-4 (Maintenance Bay), EF-5 (HazMat Locker), CEF-1 (Boat Engine Storage 100)Semiannual
Fan Coil UnitFCU-11Overhead, above CorridorAnnual (spring)
Heat Pump - SplitHPS-11Adj to Building 1108Semiannual
Heater-Unit, Forced Air, ElectricHUE-1, HUE-22Boat Engine Storage 100Annual (fall)
Heater-Unit, Infra-red, ElectricHUIE-1 through HUIE-44Maintenance BayAnnual (fall)
1502000 Spec Item 3.2 - Electrical Systems
Lighting (exterior)LightingAttached to Exterior of Building 1108Quarterly
Lighting (interior)LightingBuilding 1108, HazMat LockerMonthly
PanelboardPB-A, PB-B, PB-HAZMAT, PB-PP24PB-A, PB-B (Maintenance Bay), PB-HAZMAT (HazMat Locker), PB-PP2 (Boat Engine storage 100)Annual
1502000 Spec Item 3.2 - Fire Protection
Fire Detection and Alarm SystemFA-11Building 1108Annual
Fire Extinguisher (portable)-Monthly InspectionFE-1, FE-2, FE-33FE-1 (Corridor), FE-2, FE-3 (Maintenance Bay)Monthly
Fire Extinguisher (portable)-Annual MaintenanceFE-1, FE-2, FE-33FE-1 (Corridor), FE-2, FE-3 (Maintenance Bay)Annual
Fire Sprinkler - Chemical (dry/wet)FSC-11HazMat LockerMonthly
Fire Sprinkler - Wet PipeFSW-11StoreroomAnnual
1502000 Spec Item 3.2 - Miscellaneous Equipment
Air CompressorAC-11Maintenance BaySemiannual
Door-Overhead (manual)DR-11Boat Engine Storage 100Semiannual
Door-Overhead (motorized)DR-2 through DR-54Maintenance BaySemiannual
Drinking FountainDF-11Maintenance BayAnnual
Emergency EyewashEE-11Maintenance BayMonthly
Gutters/Down Spouts CleaningG-11Building 1108Annual
Oil Water SeparatorOWS-11Adj to Building 1108Semiannual
Plumbing Fixtures (by room)PF-11ToiletSemiannual
Water Heater-ElectricWHE-11Maintenance BayAnnual
NOTES
Note 1 - Equipment listed without a building name is located in building 1108 (VMF)
Note 2 - HVAC equipment shall be inspected in the spring or fall unless otherwise noted
Note 3 - If blank, Government will provide PM Program checklist sheet
Note 4 - For quantity/size of air filters (HVAC) see Tab: Air Filters (HVAC)
Note 5 - For quantity of plumbing fixtures see Tab: Plumbing Fixtures

Page &P of &N

1108, HazMatLkr-Detail

J-1502000-13
PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL
MCRC WINDY HILL, GA
BUILDINGS 1108 (VMF), HAZMAT LOCKER
EquipmentDesignationManufacturerModelSerial NumberRemarks
1502000 Spec Item 3.2 - HVAC
Fan Coil UnitFCU-1Carrier40AQ030300804688A10375Electric heat
Heat Pump - SplitHPS-1RuddUPKA-025JAZ6388 M4998 10852
1502000 Spec Item 3.2 - Miscellaneous Equipment
Air CompressorAC-1Saylor-Beall7055-A-161-C89

Page &P of &N

Detail - AF

J-1502000-13
PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL
AIR FILTER (HVAC)
MCRC WINDY HILL, GA
(FILTER SIZE/QUANTITY SHALL BE FIELD VERIFIED BEFORE PURCHASING REPLACEMENT FILTERS)
DESIGNATIONEQUIPMENTFILTER 1FILTER 2FILTER 3FILTER 4
SIZEQUANTITYSIZEQUANTITYSIZEQUANTITYSIZEQUANTITY
BUILDING 1114
AF-1AHU-120x20x28
AF-2AHU-224x24x21
AF-3AHU-316x20x24
AF-4FCU-1Reusable
AF-5FPB-118x20x11
AF-6FPB-218x20x11
AF-7FPB-318x20x11
AF-8FPB-418x20x11
AF-9FPB-518x20x11
AF-10FPB-718x20x11
AF-11FPB-818x20x11
AF-12FPB-918x20x11
AF-13FPB-1018x20x11
AF-14FPB-1118x20x11
AF-15FPB-1218x20x11
BUILDING 1115
AF-1AHU-120x24x2424x24x2420x24x4424x24x44
AF-2VAV-5
AF-3VAV-7
AF-4VAV-8
AF-5VAV-9
AF-6VAV-10
AF-7VAV-13
AF-8VAV-14
BUILDING 1113
AF-1BDU-120x20x24
AF-2BOAU-116x20x22
AF-3BHP-120x20x11
AF-4BHP-220x20x11
BUILDING 1102
AF-1ACP-120x25x24
AF-2FCU-120x20x11
BUILDINGS 1103, 1109, 1112
AF-1ACP-1Reusable
AF-2ACP-2Reusable
AF-3ACP-320x20x11
AF-4AHU-1Reusable
AF-5FCU-120x20x11
BUILDINGS 1105, 1107
AF-1ACP-1Reusable
AF-2AHU-115x20x28
AF-3ACW-1
BUILDING 1108
AF-1FCU-`120x20x11

Page &P of &N

Detail - PF

J-1502000-13
PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL
PLUMBING FIXTURE
MCRC WINDY HILL, GA
FIXTUREQUANTITY
Sink25
Shower Head24
Toilet21
Urinal14

Page &P of &N

File details come from the government source that posted it. Updated .