J-1502000-14__Eastover _Preventative_Maintenance_Program_-_Index _Detail.xls
XLS spreadsheet 99 KB Posted
- Attached to
- MARFORRES SOUTHEAST FACILITIES MAINTENANCE
- Solicitation number
- W912HP13R0019
About this file
Eastover Preventative Maintenance Index
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Admin-Index
| J-1502000-14 | |||||
| PREVENTATIVE MAINTENANCE PROGRAM INDEX | |||||
| MCRC EASTOVER, SC | |||||
| ADMINISTRATIVE BUILDING, HAZMAT LOCKER | |||||
| (For Manufacturer, model and serial number of equipment see Detail tab) | |||||
| Equipment | Designation | Quantity | Location | Contractor Developed PM Program Checklist Sheet (Note 2) | Frequency of Inspection |
| 1502000 Spec Item 3.2 - HVAC | |||||
| Air Filter (HVAC) | AF-1 through AF-9 | 9 | See Tab: Detail - Air Filter | Every Other Month | |
| Air Handling Unit | AHU-1 through AHU-4 | 4 | AHU-1 (Gear Locker 132), AHU-2 (Assembly Hall 134), AHU-3 (Gear Locker 132), AHU-4 (Supply Storage 150) | Semiannual | |
| Boiler | B-1 | 1 | Mechanical 113 | Monthly, during heating season | |
| Chiller - Air Cooled | CH-1 | 1 | Perimeter, adjacent to Mechanical 113 | X | As required by manufacturer, except coils shall be cleaned semiannually |
| Damper (Motorized) | D-1 | 1 | Fire Pump 151 | Quarterly | |
| Fan (duct) | EF-1 through EF-4, SF-1, SF-2 | 6 | EF-1, SF-2 (Mechanical 113), EF-2 (Med Toilet 120), SF-1, EF-3 (Gear Locker 132), EF-4 (Fire Pump 151) | Annual | |
| Fan Coil Unit | FCU-1 through FCU-3 | 3 | FCU-1 (Comm Rm 122), FCU-2 (Comm Tech 135), FCU-3 (Armory 131) | Annual (spring) | |
| Heater-Unit, Forced Air, Elect | EUH-1 | 1 | Fire Pump 151 | Annual (fall) | |
| System Water-Chilled | CW-1 | 1 | Mechanical 113 | X | Annual (Note 3) |
| System Water-Heating Hot Water | HW-1 | 1 | Mechanical 113 | X | Annual (Note 3) |
| Terminal-VAV | V-1 through V-16 | 16 | See Tab: Admin-VAV | Annual | |
| 1502000 Spec Item 3.2 - Electrical Systems | |||||
| Lighting (exterior) | Lighting | Lights attached to all buildings and pole lighting | Quarterly | ||
| Lighting (interior) | Lighting | Administrative | Quarterly | ||
| Panelboard | PB-A, PB-B, PB-C, PB-M, PB-MDP, PB-HA, PB-LA | 7 | PB-A (Hall 103), PB-B (Hall 102), PB-C (Assembly Hall 134), PB-M, PB-MDP (Mechanical 113), PB-HA, PB-LA (Supply Storage 150) | Annual | |
| 1502000 Spec Item 3.2 - Fire Protection | |||||
| Fire Detection and Alarm System | FA-1 | 1 | Administrative Building | Annual | |
| Fire Extinguisher (portable)-Monthly Inspection | FE-1 through FE-10 | 10 | FE-1, FE-2 (Hall 102), FE-3 (Hall 103), FE-4 (Mechanical 113), FE-5 (Gear Locker 132), FE-6 (Assembly Hall 134), FE-7, FE-8, FE-9 (Supply Storage 150), FE-10 (Fire Pump 151) | Monthly | |
| Fire Extinguisher (portable)-Annual Maintenance | FE-1 through FE-10 | 10 | FE-1, FE-2 (Hall 102), FE-3 (Hall 103), FE-4 (Mechanical 113), FE-5 (Gear Locker 132), FE-6 (Assembly Hall 134), FE-7, FE-8, FE-9 (Supply Storage 150), FE-10 (Fire Pump 151) | Annual | |
| Fire Hydrant | FH-1 | 1 | Perimeter | Annual | |
| Fire Pump | FP-1 | 1 | Fire Pump 151 | Monthly | |
| Pump (Jockey pump) | P-1 | 1 | Fire Pump 151 | Monthly | |
| Fire Sprinkler, Wet | FSW-1 | 1 | Administrative Building | Annual | |
| 1502000 Spec Item 3.2 - Miscellaneous Equipment | |||||
| Door-Overhead (motorized) | DR-1 | 1 | Supply Storge 150 | Semiannual | |
| Drinking Fountain | DF-1 through DF-4 | 4 | DF-1, DF-2 (Hall 102), DF-3, DF-4 (Assembly Hall 134) | Annual | |
| Gutters/Down Spouts Cleaning | G-1 | 1 | Vehicle Wah Facility | Annual | |
| Plumbing Fixtures (by room) | PF-1 through PF-6 | 6 | PF-1 (Med Toilet 120), PF-2 (Womens Toilet 125), PF-3 (Janitorial 126), PF-4 (Mens Toilet 128), PF-5 (Mens Locker Room 129), PF-6 (Shower 129A) | Semiannual | |
| Pump (chilled water) | CHWP-1, CHWP-2 | 2 | Mechanical 113 | Semiannual | |
| Pump (hot water) | HWP-1, HWP-2 | 2 | Mechanical 113 | Annual | |
| Pump-Sump | PS-1 | 1 | Supply Storge 150 | Semiannual | |
| Shutter-Roll-up (manual) | S-1 | 1 | Comm Tech 135 | Semiannual | |
| Shutter-Roll-up (motorized) | S-2 | 1 | Supply Storge 150 | Semiannual | |
| Water Heater-Electric | WHE-1 | 1 | Mechanical 113 | Annual | |
| Water Heater-Oil | WHG-1 | 1 | Mechanical 113 | Semiannual | |
| NOTES | |||||
| Note 1 - HVAC equipment shall be inspected in the spring or fall unless otherwise noted | |||||
| Note 2 - If blank, Government will provide PM Program checklist sheet | |||||
| Note 3 -Shall be treated/tested after repairs/leaks resulting in refilling of the system | |||||
| Note 4 - For quantity/size of air filters (HVAC) see Tab: Air Filters (HVAC) | |||||
| Note 5 - For quantity of plumbing fixtures see Tab: Plumbing Fixtures |
Page &P of &N
Admin-Detail
| J-1502000-14 | |||||
| PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL | |||||
| MCRC EASTOVER, SC | |||||
| ADMINISTRATIVE BUILDING | |||||
| Equipment | Designation | Manufacturer | Model | Serial Number | Remarks |
| 1502000 Spec Item 3.2 - HVAC | |||||
| Air Handling Unit | AHU-1 | McQuay | CAH 017 GDAC | Chw coil, supply and return fan, Condensate pump, VFD | |
| Air Handling Unit | AHU-2 | McQuay | LAH 010 A | Chw and reheat coils | |
| Air Handling Unit | AHU-3 | McQuay | LAH 005 ADH | TLN U 07 07 00003 | Chw and reheat coils, Condensate pump |
| Air Handling Unit | AHU-4 | McQuay | LAH 010 ADV | TLN U 07 07 00004 | Chw and reheat coils |
| Boiler | B-1 | Weil-McLain | Model 88, Series 1 | Oil | |
| Chiller - Air Cooled | CH-1 | McQuay | AGZ085BSS27-ER11 | STNU070600276 | |
| Fan Coil Unit | FCU-1 | Enviro-Tec | HLP-Horizontal Concealed Plenum Return | Chw and reheat coils | |
| Fan Coil Unit | FCU-2, FCU-3 | Enviro-Tec | HLE-Horizontal Ceiling Exposed Cabinet | Chw and reheat coils | |
| Terminal-VAV | V-1 through V-16 | Enviro-Tec | SDR-WC | Single duct, Hot water coil | |
| 1502000 Spec Item 3.2 - Fire Protection | |||||
| Fire Pump | FP-1 | Patterson Pump Company | 8x8 MJ | FP-C066745 | 1000 GPM, 40 psig, 30 HP |
| Pump (Jockey pump) | P-1 | Grundfos | CR1-7 A-FGJ-A-E-HQQE | .75 HP | |
| 1502000 Spec Item 3.2 - Miscellaneous Equipment | |||||
| Pump (chilled water) | CHWP-1, CHWP-2 | Taco | KV3009AE2KC8721M | 168 GPM, 70 hd ft, 7.5 HP | |
| Pump (hot water) | HWP-1, HWP-2 | Taco | 1919 | 40 GPM, 60 hd ft, 2 HP | |
| Water Heater-Electric | WHE-1 | State Select | P6301OMSX | 30 gal | |
| Water Heater-Oil | WHG-1 | AO Smith | COF 199-940 | K04M001630 | Oil, 86 gal |
Page &P of &N
Admin-VAV
| J-1502000-14 | ||
| PREVENTATIVE MAINTENANCE PROGRAM DETAIL | ||
| VAV LOCATION | ||
| MCRC EASTOVER, SC | ||
| VAV Designation | Location | Space Served |
| V-1 | Classroom 121 | Classroom 121 |
| V-2 | Classroom 121 | Classroom 121 |
| V-3 | Classroom 115 | Classroom 115 |
| V-4 | Classroom 115 | Classroom 115 |
| V-5 | Classroom 115 | Classroom 115 |
| V-6 | Med Office 116 | Med Office 116, Dentist 117, Med Exam 119, Med Toilet 120 |
| V-7 | Supply Office 114 | Supply Office 114 |
| V-8 | Hall 102 | Hall 102 |
| V-9 | Conference Room 104 | Conference Room 104 |
| V-10 | Lounge 123 | Lounge 123 |
| V-11 | Lounge 123 | Womens Toilet 125, Janitorial 126, Mens Toilet 128, Mens Locker Room 129 |
| V-12 | Office 106 | Office 105, Office 106 |
| V-13 | Office 107 | Office 107 |
| V-14 | Hall 103 | Hall 103, Office 108 |
| V-15 | Office 136 | Office 136 through Office 141 |
| V-16 | Hall 103 | Recruiting 110, Training and Storage 111 |
Page &P of &N
VMF-Index
| J-1502000-14 | |||||
| PREVENTATIVE MAINTENANCE PROGRAM INDEX | |||||
| MCRC EASTOVER, SC | |||||
| VMF, HAZMAT LOCKER, GROUNDS | |||||
| (For Manufacturer, model and serial number of equipment see Detail tab) | |||||
| Equipment | Designation | Quantity | Location | Contractor Developed PM Program Checklist Sheet (Note 3) | Frequency of Inspection |
| 1502000 Spec Item 3.2 - HVAC | |||||
| Air Filter (HVAC) | AF-1, AF-2 | 2 | See Tab: Detail - Air Filter | Every Other Month | |
| Damper (motorized) | D-1, D-2, D-3 | 3 | DM-1 (Tool Rm 101), DM-2 (Oil Drum Storage 103), DM-3 (Mechanical Rm 154) | Quarterly | |
| Fan (duct) | EF-3 through EF-5, EF-6 (vehicle exhaust) | 4 | EF-3 (Tool Rm 102), EF-4 (Oil Drum Storage 103), EF-5 (Restroom 153), EF-6 (Bay 150) | Semiannual | |
| Fan (roof) | EF-1, EF-2 | 2 | Roof | Quarterly | |
| Fan (wall) | EF-7 through EF-10 | 4 | EF-7 (Mechanical Rm 154), EF-8 (Battery Rm 155), EF-9 (Electrical 156), EF-10 (HazMat Locker 1) | Semiannual | |
| Fan Coil Unit | HP-1 (indoor unit) | 1 | Coridor 203 | Annual (spring) | |
| Heat Pump - Split | HP-1 (outdoor unit) | 1 | Perimeter, adj to Oil Drom Storage 103 | Semiannual | |
| Heat Pump - Package | HP-2 (thru wall) | 1 | Office 151 | Semiannual | |
| Heater - Unit, Forced Air, Elect | EUH-1 through EUH-4 | 4 | EUH-1 (Tool Rm 101), EUH-2 (Parts Rm 102), EUH-3 (Oil Drum Storage 103), EUH-4 (Battery Rm 155) | Annual (fall) | |
| Heater - Unit, Forced Air, Gas | GUH-1 through GUH-4 | 4 | GUH-1 (Bay 150), GUH-2, GUH-3 (Bay 100), GUH-4 (Bay 150) | Annual (fall) | |
| 1502000 Spec Item 3.2 - Electrical Systems | |||||
| Lighting (exterior) | Lighting | VMF (lights attached to building exterior), Pole lighting | Quarterly | ||
| Lighting (interior) | Lighting | VMF, HazMat Locker 1 | Monthly | ||
| Panelboard | PB-PA, PB-MDB, PB-PB, PB-HazMat1, PB-LA (Adj to Drum Storage Facility) | 5 | PB-PA, PB-MDB (Elect/Telecom 157), PB-PB (Electrical 156), PB-HazMat (HazMat Locker 1), PB-LA (Adj to Drum Storage Facility) | Annual | |
| 1502000 Spec Item 3.2 - Fire Protection | |||||
| Fire Detection and Alarm System | FA-1 | 1 | VMF | Annual | |
| Fire Extinguisher (portable) - Monthly Inspection | FE-1 through FE-6 | 6 | FE-1 (Oil Drum Storage 103), FE-2 (Bay 150), FE-3, FE-4 (Corridor 203), FE-5 (Mezzaine 250), FE-6 (Vehicle Fuel Dispensing Station) | Monthly | |
| Fire Extinguisher (portable) - Annual Maintenance | FE-1 through FE-6 | 6 | FE-1 (Oil Drum Storage 103), FE-2 (Bay 150), FE-3, FE-4 (Corridor 203), FE-5 (Mezzaine 250), FE-6 (Vehicle Fuel Dispensing Station) | Annual | |
| Fire Sprinkler, Dry Chemical | FSD-1 | 1 | FSD-1 (HazMat Locker 1) | Monthly | |
| Fire Sprinkler - Wet Pipe | FSW-1 | 1 | VMF | Annual | |
| 1502000 Spec Item 3.2 - WHE | |||||
| Crane - Overhead Bridge | COB-1 | 1 | Bay 100 | X | As required by the manufacturer |
| Hydraulic Lift - Auto | HLA-1 | 1 | Bay 150 | X | As required by the manufacturer |
| 1502000 Spec Item 3.2.5 - Miscellaneous Equipment | |||||
| Air Compressor | AC-1, AC-2 | 2 | Mezzaine 250 | Semiannual | |
| Air Dryer - Refrigerant | ADR-1 | 1 | Mezzaine 250 | Semiannual | |
| Door, Overhead (motorized) | DR-1 through DR-5 | 6 | DR-1 (Bay 100), DR-2 through DR-6 (Bay 150) | Semiannual | |
| Drinking Fountain | DF-1 | 1 | Bay 150 | Annual | |
| Emergency Eyewash & Shower | EES-1, EES-2 | 2 | EES-1 (Bay 100), EES-2 (Bay 150) | Monthly | |
| Plumbing Fixtures (by room) | PF-1, PF-2 | 2 | PF-1 (Bay 150), PF-2 (Restroom 153) | Semiannual | |
| Pump | DHWP-1 | 1 | Mezzaine 250 | Annual | |
| Slide Gate Operator & Entry System | SGO-1 | 1 | Entrance | Semiannual | |
| Water Heater-Electric | WH-1 | 1 | Mezzaine 250 | Annual | |
| NOTES | |||||
| Note 1 - Equipment listed without a building name is located in the VMF | |||||
| Note 2 - HVAC equipment shall be inspected in the spring or fall unless otherwise noted | |||||
| Note 3 - If blank, Government will provide PM Program checklist sheet | |||||
| Note 4 - For quantity/size of air filters (HVAC) see Tab: Air Filters (HVAC) | |||||
| Note 5 - For quantity of plumbing fixtures see Tab: Plumbing Fixtures |
Page &P of &N
VMF-Detail
| J-1502000-14 | |||||
| PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL | |||||
| MCRC EASTOVER, SC | |||||
| VMF, HAZMAT LOCKER, GROUNDS | |||||
| Equipment | Designation | Manufacturer | Model | Serial Number | Remarks |
| 1502000 Spec Item 3.2 - HVAC | |||||
| Fan (roof) | EF-1 | Greenheck | LB-24-7 | 11526293 0810 | |
| Fan (roof) | EF-2 | Greenheck | LB-24-7 | 11526292 0810 | |
| Fan Coil Unit | HP-1 (indoor unit) | Carrier | FX4CNF024 | 4508A69574 | |
| Heat Pump - Split | HP-1 (outdoor unit) | Carrier | 25HBB324A300 | 4608E11669 | |
| Heat Pump - Package | HP-2 | Carier | 52CQF207351AA | 2308X85595 | |
| Heater - Unit, Forced Air, Elect | HUE-1 | TPI Corporation | F1F5105N | Taskmaster | |
| Heater - Unit, Forced Air, Elect | HUE-2 | TPI Corporation | F1F5103N | Taskmaster | |
| Heater - Unit, Forced Air, Elect | HUE-3 | TPI Corporation | Taskmaster | ||
| Heater - Unit, Forced Air, Elect | HUE-1 | TPI Corporation | HF2B5103N | Taskmaster | |
| Heater - Unit, Forced Air, Gas | GUH-1 through GUH-4 | Reznor | F75-E-3 | ||
| 1502000 Spec Item 3.2 - WHE | |||||
| Crane - Overhead Bridge | COB-1 | Eastern Crane & Hoist Inc (Hoist: R&M Materials Handling Inc) | Hoist - SX50410080P56FDL04 | Hoist - HHW10803 | 15,000 pounds |
| Hydraulic Lift - Auto | HLA-1 | Rotary Lift | SP09-200 | AFL00A0099 | 9000 pounds |
| 1502000 Spec Item 3.2 - Miscellaneous Equipment | |||||
| Air Compressor | AC-1 | Compair Kellog | B335BL | 990431 | 3 HP |
| Air Compressor | AC-2 | Compair Kellog | 5 HP | ||
| Air Dryer - Refrigerant | ADR-1 | Ingersol-Rand | Model-ESSICC Description-DSS50-H IR | 3402860003 | |
| Slide Gate Operator & Entry System | SGO-1 | Osco | GSLG-A-111 | 0401531647E | |
| Water Heater-Electric | WH-1 | AO Smith | ECT 40 200 | 0816A031220 | 40 gallon |
Page &P of &N
Detail - AF
| J-1502000-14 | |||||||||
| PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL | |||||||||
| AIR FILTER (HVAC) | |||||||||
| MCRC EASTOVER, SC | |||||||||
| (FILTER SIZE/QUANTITY SHALL BE FIELD VERIFIED BEFORE PURCHASING REPLACEMENT FILTERS) | |||||||||
| DESIGNATION | EQUIPMENT | FILTER 1 | FILTER 2 | FILTER 3 | FILTER 4 | ||||
| SIZE | QUANTITY | SIZE | QUANTITY | SIZE | QUANTITY | SIZE | QUANTITY | ||
| ADMINISTRATIVE | |||||||||
| AF-1 | AHU-1 | 24x24x2 | 9 | ||||||
| AF-2 | AHU-2 | 16x20x2 | 6 | ||||||
| AF-3 | AHU-3 | 16x20x2 | 4 | ||||||
| AF-4 | AHU-4 | 20x25x2 | 3 | ||||||
| AF-5 | FCU-1 | 8x30x1 | 2 | ||||||
| AF-6 | FCU-2 | 8x30x1 | 2 | ||||||
| AF-7 | FCU-3 | 8x30x1 | 2 | ||||||
| AF-8 | SF-1 | ||||||||
| AF-9 | SF-2 | ||||||||
| VMF | |||||||||
| AF-1 | HP-1 (indoor unit) | 20x20x1 | 2 | ||||||
| AF-2 | HP-2 (indoor unit) | 20x20x1 | 2 |
Page &P of &N
Detail - PF
| J-1502000-14 | ||
| PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL | ||
| PLUMBING FIXTURE | ||
| MCRC EASTOVER, SC | ||
| FIXTURE | QUANTITY | |
| Sink | 13 | |
| Shower Head | 7 | |
| Toilet | 6 | |
| Urinal | 3 |