W912HN-21-B-3003_DRAWINGS_VOL3_AMD3.PDF

PDF 11 MB Posted

Attached to
PN 55516 ADVANCED INDIVIDUAL TRANING (AIT) COMPLEX BARRACKS PHASE 3, FORT GORDON
Solicitation number
W912HN21B3003
Issued by

About this file

This document outlines a federal contract opportunity for construction services. The U.S. Army Corps of Engineers, Savannah District, is soliciting bids for a standard design battalion sized Advanced Individual Training Complex at Fort Gordon, Georgia. The project scope includes construction of barracks, headquarters, and supporting facilities for 600 soldiers, along with associated site work and utilities. Bidders must design and build to a minimum 40-year life standard outlined in the Unified Facilities Criteria, and incorporate sustainability, energy efficiency, and antiterrorism measures. The contract value is between $25-100 million. Bids will be evaluated using sealed bidding procedures in accordance with the Federal Acquisition Regulation Part 14. The period of performance is 720 calendar days.

View the file

Other files

File Type Posted
C.04. W912HN21B3003 AIT Abstract-s1_Page_2.jpg JPG image
C.04. W912HN21B3003 AIT Abstract-s1_Page_1.jpg JPG image
AIT Bid Opening Roster.jpg JPG image
B.08. W912HN21B30030004 Amendment.pdf PDF
B.08. 21B3003_Amd04_Specs_Vol5_BNHQ.PDF PDF
B.08. 21B3003_Amd04_Specs_Vol4_BCOF.PDF PDF
B.08. 21B3003_Amd04_Specs_Vol1_BCOF.PDF PDF
B.08. W912HN-21-B-3003_DRAWINGS_VOL2_AMD4.pdf PDF
B.08. 21B3003_Amd04_Specs_Vol2_BCOF.PDF PDF
B.08. 21B3003-Amd04_Specs_Vol6_BNHQ.PDF PDF
B.08. W912HN21B30030004 Conformed Copy.pdf PDF
21B3003_Amd03_Specs_Vol5_BNHQ Rev3.PDF PDF
21B3003_Amd03_Specs_Vol6_BNHQ Rev3.PDF PDF
W912HN-21-B-3003_DRAWINGS_VOL2_AMD3.pdf PDF
W912HN-21-B-3003_DRAWINGS_VOL4_AMD3.PDF PDF
W912HN-21-B-3003_DRAWINGS_VOL1_AMD3.pdf PDF
B.08. 21B3003_Amd03_Specs_Vol2_BCOF Rev3.PDF PDF
B.08. 21B3003_Amd03_Specs_Vol3_BCOF Rev2.PDF PDF
B.08. 21B3003_Amd03_Specs_Vol1_BCOF Rev3.PDF PDF
B.08. W912HN21B3003 0003 Conformed Copy.pdf PDF
B.08. 21B3003_Amd03_Specs_Vol4_BCOF Rev3.PDF PDF
B.08. W912HN21B3003 0003 AMD.pdf PDF
W912HN-21-B-3003_DRAWINGS_VOL4_AMD2.PDF PDF
21B3003_Specs_Vol6_BNHQ Rev2.PDF PDF
21B3003_Specs_Vol5_BNHQ Rev2.PDF PDF
21B3003_Specs_Vol3_BCOF Rev1.PDF PDF
W912HN-21-B-3003_DRAWINGS_VOL3_AMD2.PDF PDF
W912HN21B3003 0002 Conformed copy.pdf PDF
21B3003_Specs_Vol2_BCOF Rev2.PDF PDF
W912HN-21-B-3003_DRAWINGS_VOL2_AMD2.pdf PDF
21B3003_Specs_Vol4_BCOF Rev2.PDF PDF
W912HN21B3003 0002 Amendment.pdf PDF
21B3003_Specs_Vol1_BCOF Rev2.PDF PDF
W912HN-21-B-3003_DRAWINGS_VOL3_AMD1.PDF PDF
21B3003_Specs_Vol2_BCOF_Rev1.PDF PDF
B.08. W912HN21B30030001 Site Visit IMG_0858.JPG JPG image
W912HN21B30030001 Amendment.pdf PDF
W912HN-21-B-3003_DRAWINGS_VOL1_AMD1.pdf PDF
21B3003_Specs_Vol5_BNHQ_Rev1.PDF PDF
W912HN21B3003 0001 Conformed Copy.pdf PDF
21B3003_Specs_Vol6_BNHQ_Rev1.PDF PDF
20B3003_Specs_Vol1_BCOF_Rev1.PDF PDF
21B3003_Specs_Vol4_BCOF_Rev1.PDF PDF
AIT Phase III Site Visit Sign-In Sheet_02Mar2021.pdf PDF
AIT Phase III Site Plans.pdf PDF
W912HN-21-B-3003_DRAWINGS_VOL2_AMD1.pdf PDF
20B3003_Specs_Vol1_BCOF.PDF PDF
21B3003_Specs_Vol7_Apps.PDF PDF
21B3003_Specs_Vol5_BNHQ.PDF PDF
21B3003_Specs_Vol4_BCOF.PDF PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

J

H A

IR

E

J

M C

T

IE

R N

A N

S

B A

R B

IN

A

D E

C E

M B

E R

F O

R T G

O R

D O

N

G E

O R

G

IA

A

IT

B

A R

R A

C K

S C

O M

P L E

X P

H

F Y P

N

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps k6enxjlh

31-MAR-2021 10:34

C:\Users\k6enxjlh\Desktop\Projects\ProjectWise_Projects\Gor0409\08_AMD3\PDF\Volume 3 (BKS P,M,E & T)\gjdgi001V3ix.dgn

C A

T E

G O

R Y C

O D

E

-2

-0

GI001

IN

D

E X O

F D

R A

W

IN

G S g jd g i0

V ix .d g n

J

H A

IR

E V

O L

U M

E B

A R

R A

C K

S P

L U

M B

IN

G

M E

C H

A N

IC

A L

E L E

C T

R

IC

A L A

N D T

E L E

C O

M M

U N

IC

A T

IO

N

READY TO ADVERTISE (RTA)

W

H N -2

-B -3

M A

R

SHEET ID.

INDEX OF DRAWINGS

E

S C

R

IP

T

IO

N

W

O G

L E

T H

O R

P E A

V E

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

S A

V A

N N

A H D

IS

T R

IC

T

S A

V A

N N

A H

G A

SHEET ID.

TITLESHEET ID.TITLETITLE

G-001 COVER SHEET

GI001 INDEX OF DRAWINGS

GI002 GENERAL NOTES, ABBREVIATIONS

P-001 PLUMBING LEGEND

PL101 DOMESTIC PLUMBING FLOOR PLAN

PL102 DOMESTIC PLUMBING 1ST FLOOR PLAN AREA A

PL103 DOMESTIC PLUMBING 1ST FLOOR PLAN AREA B

PL104 DOMESTIC PLUMBING 1ST FLOOR PLAN AREA C

PL105 DOMESTIC PLUMBING 1ST FLOOR PLAN AREA D

PL106 DOMESTIC PLUMBING 2ND FLOOR PLAN AREA A

PL107 DOMESTIC PLUMBING 2ND FLOOR PLAN AREA B

PL108 DOMESTIC PLUMBING 2ND FLOOR PLAN AREA C

PL109 DOMESTIC PLUMBING 3RD FLOOR PLAN AREA A

PL110 DOMESTIC PLUMBING 3RD FLOOR PLAN AREA B

PL111 DOMESTIC PLUMBING 3RD FLOOR PLAN AREA C

PL112 DOMESTIC PLUMBING 4TH FLOOR PLAN AREA A

PL113 DOMESTIC PLUMBING 4TH FLOOR PLAN AREA B

PL114 DOMESTIC PLUMBING 4TH FLOOR PLAN AREA C

PL115 DOMESTIC PLUMBING 5TH FLOOR PLAN AREA A

PL116 DOMESTIC PLUMBING 5TH FLOOR PLAN AREA B

PL117 DOMESTIC PLUMBING 5TH FLOOR PLAN AREA C

PL118 SANITARY PLUMBING FLOOR PLAN

PL119 SANITARY PLUMBING 1ST FLOOR PLAN AREA A

PL120 SANITARY PLUMBING 1ST FLOOR PLAN AREA B

PL121 SANITARY PLUMBING 1ST FLOOR PLAN AREA C

PL122 SANITARY PLUMBING 1ST FLOOR PLAN AREA D

PL123 SANITARY PLUMBING 2ND FLOOR PLAN AREA A

PL124 SANITARY PLUMBING 2ND FLOOR PLAN AREA B

PL125 SANITARY PLUMBING 2ND FLOOR PLAN AREA C

PL126 SANITARY PLUMBING 2ND FLOOR PLAN AREA D

PL127 SANITARY PLUMBING 3RD FLOOR PLAN AREA A

PL128 SANITARY PLUMBING 3RD FLOOR PLAN AREA B

PL129 SANITARY PLUMBING 3RD FLOOR PLAN AREA C

PL130 SANITARY PLUMBING 4TH FLOOR PLAN AREA A

PL131 SANITARY PLUMBING 4TH FLOOR PLAN AREA B

PL132 SANITARY PLUMBING 4TH FLOOR PLAN AREA C

PL133 SANITARY PLUMBING 5TH FLOOR PLAN AREA A

PL134 SANITARY PLUMBING 5TH FLOOR PLAN AREA B

PL135 SANITARY PLUMBING 5TH FLOOR PLAN AREA C

PL301 PLUMBING BUILDING SECTION

PL401 PLUMBING ENLARGED PLANS

PL402 PLUMBING ENLARGED PLANS

PL403 PLUMBING ENLARGED PLANS

PL404 PLUMBING ENLARGED PLANS

PL405 PLUMBING ENLARGED PLANS

PL406 PLUMBING ENLARGED PLANS

PL407 PLUMBING ENLARGED PLANS

PL501 PLUMBING DETAILS

PL502 PLUMBING DETAILS

PL503 PLUMBING DETAILS

PL504 PLUMBING DETAILS

PL601 PLUMBING SCHEDULES

PL901 DOMESTIC WATER PLUMBING ISOMETRIC

PL902 SANITARY SEWER PLUMBING ISOMETRIC

PL903 MECHANICAL ROOM WATER HEATING ISOMETRIC

PL904 PLUMBING ISOMETRIC -TWO PERSON ROOMS

PL905 PLUMBING ISOMETRIC - TWO PERSON ROOMS

PL906 PLUMBING ISOMETRIC - THREE PERSON ROOMS

PL907 PLUMBING ISOMETRIC - LAUNDRY ROOMS

PL908 DOMESTIC WATER PLUMBING ISOMETRIC - AREA B

PL909 SANITARY SEWER PLUMBING ISOMETRIC - AREA B

PL910 DOMESTIC WATER PLUMBING ISOMETRIC - AREA D

PL911 SANITARY SEWER PLUMBING ISOMETRIC - AREA D

M-001 HVAC LEGEND

MH101 HVAC FIRST FLOOR DUCTWORK PLAN AREA A

MH102 HVAC FIRST FLOOR DUCTWORK PLAN AREA B

MH103 HVAC FIRST FLOOR DUCTWORK PLAN AREA C

MH104 HVAC FIRST FLOOR DUCTWORK PLAN AREA D

MH111 HVAC SECOND FLOOR DUCTWORK PLAN AREA A

MH112 HVAC SECOND FLOOR DUCTWORK PLAN AREA B

MH113 HVAC SECOND FLOOR DUCTWORK PLAN AREA C

MH114 HVAC ROOF DUCTWORK PLAN AREA D

MH121 HVAC THIRD FLOOR DUCTWORK PLAN AREA A

MH122 HVAC THIRD FLOOR DUCTWORK PLAN AREA B

MH123 HVAC THIRD FLOOR DUCTWORK PLAN AREA C

MH131 HVAC FOURTH FLOOR DUCTWORK PLAN AREA A

MH132 HVAC FOURTH FLOOR DUCTWORK PLAN AREA B

MH133 HVAC FOURTH FLOOR DUCTWORK PLAN AREA C

MH141 HVAC FIFTH FLOOR DUCTWORK PLAN AREA A

MH142 HVAC FIFTH FLOOR DUCTWORK PLAN AREA B

MH143 HVAC FIFTH FLOOR DUCTWORK PLAN AREA C

MH151 HVAC ATTIC DUCTWORK PLAN AREA B

MH301 HVAC SECTIONS

MH302 HVAC SECTIONS

MH401 HVAC ENLARGED PLANS

MH402 HVAC ENLARGED CHASES

MH403 HVAC ENLARGED CHASES

MH404 HVAC ENLARGED PLANS

MH501 HVAC DETAILS

MH502 HVAC DETAILS

MH503 HVAC DETAILS

MH504 HVAC DETAILS

MH505 HVAC DETAILS

MH506 HVAC DETAILS

MH601 HVAC SCHEDULES

MH602 HVAC SCHEDULES

MH603 HVAC SCHEDULES

MH604 HVAC SCHEDULES

MH605 HVAC SCHEDULES

MH606 HVAC SCHEDULES

MH607 HVAC SCHEDULES

MH608 HVAC SCHEDULES

MH701 HYDRONIC WATER SCHEMATIC

MH702 HYDRONIC WATER SCHEMATIC

MI001 HVAC CONTROLS LEGEND

MI002 HVAC CONTROL GENERAL NOTES

MI003 HVAC CONTROL SCHEDULING INSTRUCTIONS

MI801 DOAS-1 AND DOAS-2 CONTROL SCHEMATIC

MI802 DOAS-1 AND DOAS-2 CONTROL SEQUENCE OF OPERATION

MI803 DOAS-1 AND DOAS-2 CONTROL POINTS SCHEDULE

MI804 DOAS-3 CONTROL SCHEMATIC

MI805 DOAS-3 CONTROL SEQUENCE OF OPERATION

MI806 DOAS-3 CONTROL POINTS SCHEDULE

MI807 WSHP CONTROLS

MI808 CONDENSER WATER LOOP CONTROLS

MI809 CONDENSER WATER LOOP CONTROL SEQUENCE OF OPERATION

MI810 CONDENSER WATER LOOP CONTROL POINTS SCHEDULE

MI811 MISCELLANEOUS CONTROL SCHEMATICS

MI812 MISCELLANEOUS CONTROL SEQUENCES OF OPERATION

MI813 MISCELLAENOUS CONTROL POINTS SCHEDULES

MI814 MISCELLANEOUS CONTROL POINTS SCHEDULES

MI815 MISCELLAENEOUS CONTROL POINTS SCHEDULE

MI816 DOMESTIC HOT WATER CONTROL SCHEMATIC

MI817 DOMESTIC HOT WATER CONTROL SEQUENCE OF OPERATION AND POINTS SCHEDULE

MP101 HVAC FIRST FLOOR HYDRONIC PIPING PLAN AREA A

MP102 HVAC FIRST FLOOR HYDRONIC PIPING PLAN AREA B

MP103 HVAC FIRST FLOOR HYDRONIC PIPING PLAN AREA C

MP104 HVAC FIRST FLOOR HYDRONIC PIPING PLAN AREA D

MP111 HVAC SECOND FLOOR HYDRONIC PIPING PLAN AREA A

MP112 HVAC SECOND FLOOR HYDRONIC PIPING PLAN AREA B

MP113 HVAC SECOND FLOOR HYDRONIC PIPING PLAN AREA C

MP114 HVAC ROOF HYDRONIC PIPING PLAN AREA D

MP121 HVAC THIRD FLOOR HYDRONIC PIPING PLAN AREA A

MP122 HVAC THIRD FLOOR HYDRONIC PIPING PLAN AREA B

MP123 HVAC THIRD FLOOR HYDRONIC PIPING PLAN AREA C

MP131 HVAC FOURTH FLOOR HYDRONIC PIPING PLAN AREA A

MP132 HVAC FOURTH FLOOR HYDRONIC PIPING PLAN AREA B

MP133 HVAC FOURTH FLOOR HYDRONIC PIPING PLAN AREA C

MP141 HVAC FIFTH FLOOR HYDRONIC PIPING PLAN AREA A

MP142 HVAC FIFTH FLOOR HYDRONIC PIPING PLAN AREA B

MP143 HVAC FIFTH FLOOR HYDRONIC PIPING PLAN AREA C

MP151 HVAC PIPING ATTIC PLAN AREA B

MP401 HVAC ENLARGED PIPING PLANS

MP901 HVAC PIPING ISOMETRICS

MP902 HVAC PIPING ISOMETRIC AREA D

MP903 HVAC PIPING SCHEMATICS

MP904 HVAC PIPING ISOMETRICS

MP905 HVAC PIPING ISOMETRICS

MP906 HVAC PIPING ISOMETRIC AREA D

E-001 ELECTRICAL LEGEND & GENERAL NOTES

EL101 LIGHTING PLAN - 1ST FLOOR-AREA A

EL102 LIGHTING PLAN - 1ST FLOOR-AREA B

EL103 LIGHTING PLAN - 1ST FLOOR-AREA C

EL104 LIGHTING PLAN - 1ST FLOOR-AREA D

EL105 LIGHTING PLAN - 2ND FLOOR-AREA A

EL106 LIGHTING PLAN - 2ND FLOOR-AREA B

EL107 LIGHTING PLAN - 2ND FLOOR-AREA C

EL108 LIGHTING PLAN - 3RD FLOOR-AREA A

EL109 LIGHTING PLAN - 3RD FLOOR-AREA B

EL110 LIGHTING PLAN - 3RD FLOOR-AREA C

EL111 LIGHTING PLAN - 4TH FLOOR-AREA A

EL112 LIGHTING PLAN - 4TH FLOOR-AREA B

EL113 LIGHTING PLAN - 4TH FLOOR-AREA C

EL114 LIGHTING PLAN - 5TH FLOOR-AREA A

EL115 LIGHTING PLAN - 5TH FLOOR-AREA B

EL116 LIGHTING PLAN - 5TH FLOOR-AREA C

EL117 LIGHTING PLAN - ATTIC-AREA A

EL118 LIGHTING PLAN - ATTIC-AREA B

EL119 LIGHTING PLAN - ATTIC-AREA C

EL120 LIGHTING PLAN - COVERED TRAINING SHELTERS

EL401 LIGHTING PLAN - TYPICAL ROOMS

EL402 LIGHTING PLAN - TYPICAL ROOMS-1ST FLOOR

EL403 LIGHTING PLAN - TYPICAL ROOMS-2ND FLOOR

EL501 LUMINAIRE DETAILS

EL502 LUMINAIRE DETAILS

EL503 LIGHTING CONTROL DETAILS

EL601 LIGHTING LUMINAIRE SCHEDULE

EL602 LIGHTING CONTROL STRATEGY SCHEDULE

EL603 LIGHTING CONTROL DIAGRAMS

EL604 LIGHTING CONTROL DIAGRAMS

EP101 POWER PLAN - 1ST FLOOR-AREA A

EP102 POWER PLAN - 1ST FLOOR-AREA B

EP103 POWER PLAN - 1ST FLOOR-AREA C

EP104 POWER PLAN - 1ST FLOOR-AREA D

EP105 POWER PLAN - 2ND FLOOR-AREA A

EP106 POWER PLAN - 2ND FLOOR-AREA B

EP107 POWER PLAN - 2ND FLOOR-AREA C

EP108 POWER PLAN - 2ND FLOOR-AREA D

EP109 POWER PLAN - 3RD FLOOR-AREA A

EP110 POWER PLAN - 3RD FLOOR-AREA B

EP111 POWER PLAN - 3RD FLOOR-AREA C

EP112 POWER PLAN - 4TH FLOOR-AREA A

EP113 POWER PLAN - 4TH FLOOR-AREA B

EP114 POWER PLAN - 4TH FLOOR-AREA C

EP115 POWER PLAN - 5TH FLOOR-AREA A

EP116 POWER PLAN - 5TH FLOOR-AREA B

EP117 POWER PLAN - 5TH FLOOR-AREA C

EP118 POWER PLAN - ATTIC-AREA B

EP119 POWER PLAN - COVERED TRAINING SHELTER

EP120 PUMPHOUSE POWER PLAN, RISER DIAGRAM, MOTOR FEEDER SCHEDULE & PANEL SCHEDULE

EP401 ENLARGED POWER PLAN - TYPICAL ROOMS

EP402 ENLARGED POWER PLANS

EP403 ENLARGED POWER PLANS

EP404 ENLARGED POWER PLANS

EP501 ELECTRICAL DETAILS

EP601 POWER RISER DIAGRAM

EP602 ELECTRICAL CONNECTION SCHEDULE

EP603 ELECTRICAL CONNECTION SCHEDULE

EP604 ELECTRICAL CONNECTION SCHEDULE

EP605 ELECTRICAL CONNECTION SCHEDULE

EP606 ELECTRICAL CONNECTION SCHEDULE

EP607 ELECTRICAL CONNECTION SCHEDULE

EP608 ELECTRICAL CONNECTION SCHEDULE

EP611 PANEL SCHEDULES - 1ST FLOOR

EP612 PANEL SCHEDULES - 1ST FLOOR

EP613 PANEL SCHEDULES - 1ST FLOOR

EP614 PANEL SCHEDULES - 1ST FLOOR

EP615 PANEL SCHEDULES - 1ST FLOOR

EP616 PANEL SCHEDULES - 1ST FLOOR

EP621 PANEL SCHEDULES - 2ND FLOOR

EP622 PANEL SCHEDULES - 2ND FLOOR

EP623 PANEL SCHEDULES - 2ND FLOOR

EP624 PANEL SCHEDULES - 2ND FLOOR

EP631 PANEL SCHEDULES - 3RD FLOOR

EP632 PANEL SCHEDULES - 3RD FLOOR

EP633 PANEL SCHEDULES - 3RD FLOOR

EP634 PANEL SCHEDULES - 3RD FLOOR

EP641 PANEL SCHEDULES - 4TH FLOOR

EP642 PANEL SCHEDULES - 4TH FLOOR

EP643 PANEL SCHEDULES - 4TH FLOOR

EP644 PANEL SCHEDULES - 4TH FLOOR

EP651 PANEL SCHEDULES - 5TH FLOOR

EP652 PANEL SCHEDULES - 5TH FLOOR

EP653 PANEL SCHEDULES - 5TH FLOOR

EP654 PANEL SCHEDULES - 5TH FLOOR

EG101 LIGHTNING PROTECTION PLAN

EG501 LIGHTNING PROTECTION DETAILS

EG502 GROUNDING DETAILS

T-001 TELECOMMUNICATIONS LEGEND AND GENERAL NOTES

T-101 TELECOMMUNICATIONS PLAN - 1ST FLOOR-AREA A

T-102 TELECOMMUNICATIONS PLAN - 1ST FLOOR-AREA B

T-103 TELECOMMUNICATIONS PLAN - 1ST FLOOR-AREA C

T-104 TELECOMMUNICATIONS PLAN - 1ST FLOOR-AREA D

T-105 TELECOMMUNICATIONS PLAN - 2ND FLOOR - AREA A

T-106 TELECOMMUNICATIONS PLAN - 2ND FLOOR - AREA B

T-107 TELECOMMUNICATION PLAN - 2ND FLOOR - AREA C

T-108 TELECOMMUNICATIONS PLAN - 3RD FLOOR - AREA A

T-109 TELECOMMUNICATIONS PLAN - 3RD FLOOR - AREA B

T-110 TELECOMMUNICATIONS PLAN - 3RD FLOOR - AREA C

T-111 TELECOMMUNICATIONS PLAN - 4TH FLOOR - AREA A

T-112 TELECOMMUNICATIONS PLAN - 4TH FLOOR - AREA B

T-113 TELECOMMUNICATIONS PLAN - 4TH FLOOR - AREA C

T-114 TELECOMMUNICATIONS PLAN - 5TH FLOOR - AREA A

T-115 TELECOMMUNCATIONS PLAN - 5TH FLOOR - AREA B

T-116 TELECOMMUNICATIONS PLAN - 5TH FLOOR - AREA C

T-117 TELECOMMUNICATIONS PLANS - COVERED TRAINING SHELTERS

T-118 TELECOMMUNICATIONS PLAN - ATTIC

T-401 ENLARGED TELECOMMUNICATIONS PLANS

T-402 ENLARGED TELECOMMUNICATIONS PLANS

T-403 ENLARGED TELECOMMUNICATIONS PLANS - SLEEPING MODULES

T-404 ENLARGED TELECOMMUNICATIONS PLANS - CATV CLOSETS

T-405 ENLARGED TELECOMMUNICATIONS PLANS - AV CLOSETS

T-501 TELECOMMUNICATIONS DETAILS

T-502 TELECOMMUNICATION DETAILS

T-503 INTRUSION DETECTION SYSTEM DETAILS

T-504 ACCESS CONTROL SYSTEM DETAILS

T-601 COMM RISER DIAGRAMS

T-602 COMM RISER DIAGRAMS

T-603 COMM RISER DIAGRAMS - BUILDING ACCESS CONTROL SYSTEM

T-604 COMM RISER DIAGRAMS - SECURITY CAMERAS

T-605 COMM RISER DIAGRAMS - AV

T-606 COMM ROOM DIAGRAMS

M-001X HVAC LEGEND

MH401X HVAC ENLARGED CLOSED CIRCUIT COOLER PIPING PLAN

MH501X HVAC DETAILS

MH601X MECHANICAL SCHEDULES

MH701X COOLING TOWER WATER PIPING SCHEMATIC

MI001X HVAC CONTROLS LEGEND

MI002X HVAC CONTROLS GENERAL NOTES

MI003X HVAC CONTROLS SCHEDULING INSTRUCTIONS

MI801X COOLING TOWER CONTROL SCEMATIC AND SEQUENCE OF OPERATION

MI802X COOLING TOWER CONTROL POINTS SCHEDULE

MI803X EXISTING CHILLED WATER CONTROL POINTS

MP101X PUMP HOUSE HYDRONIC PIPING PLAN

R E

V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M E

N D

M E

N T

FCO

1. SEE LEGEND AND GENERAL NOTES ON P-001.

2. REFER TO ENLARGED PLANS PL401, PL402, PL403, AND PL404 FOR PIPING LAYOUTS OF

SLEEPING ROOMS.

3. INSULATE FLOOR DRAINS AND ASSOCIATED PIPING FOR FLOOR DRAINS THAT RECEIVE

CONDENSATE ON THE 2ND THROUGH 5TH FLOORS OF AREAS A, B, AND C TO PREVENT

SWEATING. INSULATE WITH 1/2" FLEXIBLE ELASTOMERIC INSULATION.

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

C:\Users\k6endles\Desktop\Tele-Work Revit Projects\Gor0402 (PN55516)\FY20PN55516_BKS_PLUMB_R18_TW Current.rvt3/31/2021 1:34:40 PM

N O

VE

M

BE

R

W

2H N

-2 1-

B-

L.

S

AL

AS

L.

S

AL

AS

S.

B

AR

BI

N A

1-

-0

PL101

D O

M

ES

TI

C

P

LU

M

BI

N G

F

LO

O R

P

LA

N

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

FO

R

T G

O R

D O

N , G

EO

R

G

IA

AI

T

BA

R

R

AC

KS

C

O M

PL

EX

, P H

FY

, P

N

VO

LU

M E

-B

AR

R

AC

KS

(P

LU

M

BI

N G

, M

EC

H

AN

IC

AL

, E

LE

C

TR

IC

AL

, A N

D

TE

LE

C

O M

M U

N

IC

AT

IO

N

K.

D

IX

O

N

READY TO ADVERTISE (RTA)

PLAN NORTH

KEY PLAN

AREA CAREA BAREA A

AREA D

KEY PLAN - NORTH ARROWS & DRAWING SCALE

SHEET NOTES, GENERAL:

FIRST FLOOR DOMESTIC PLUMBING PLAN1

0'

SCALE: 3/64" = 1' - 0"

16' 32' 48' 64'

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

M

AR

2 1

4" CW

3" HW

4" CW

1 1/2"

HW

1 1/2"

CW

1" HW 1" CW1" HW 1" CW

1" HW

1109H

1109G

1109A

1109 1092 1090

1109C

1109D1109E

1109F

1108A

P-8

P-8

P-8

WH-1

1109B

P-8

P-8

P-8

P-8

P-8

P-8 P-8

P-8

P-8

3/4"

HWR

P-5A P-5A

P-5A

P-1 P-1

P-1 P-1

P-1

P-1 P-1

P-11A

P-5A P-5A

P-5A

WH-1

P-12

P-3 P-3 P-3

P-5A P-5A

P-5A

P-1 P-1

P-1 P-1

P-1

P-1 P-1

P-3 P-3

P-3

P-5A P-5A

P-5A

P-11A

3/4"

HWR

3/4"

HWR

3/4"

HWR

1. PROVIDE THERMAL EXPANSION LOOPS IN DOMESTIC HOT WATER AND DOMESTIC HOT WATER RECIRCULATION LINES, LOCATED AT THE MIDPOINT OF ANCHORS SPACED 50' APART. SIZE HW EXPANSION LOOPS AT 1' 1" WIDE BY 2' 1" TALL.

2. PROVIDE THERMAL EXPANSION LOOPS IN DOMESTIC HOT WATER AND DOMESTIC HOT WATER RECIRCULATION LINES, LOCATED AT THE MIDPOINT OF ANCHORS SPACED 50' APART. SIZE HWR EXPANSION LOOPS AT 6.5" WIDE BY 1' 1" TALL.

3. PROVIDE THERMAL EXPANSION LOOPS IN DOMESTIC HOT WATER AND DOMESTIC HOT WATER RECIRCULATION LINES, LOCATED AT THE MIDPOINT OF ANCHORS SPACED 50' APART. SIZE HW EXPANSION LOOPS AT 9" WIDE BY 1' 5.5" TALL. SIZE HWR EXPANSION LOOPS AT 6.5"

WIDE BY 1' 1" TALL.

4. PROVIDE THERMAL EXPANSION LOOPS IN DOMESTIC HOT WATER AND DOMESTIC HOT WATER RECIRCULATION LINES, LOCATED AT THE MIDPOINT OF ANCHORS SPACED 50' APART. SIZE HW EXPANSION LOOPS AT 7.5" WIDE BY 1' 3" TALL. SIZE HWR EXPANSION LOOPS AT 6.5"

WIDE BY 1' 1" TALL.

5. HWR BALANCING VALVE. BALANCE TO 1.33 GPM

6. TRAP PRIMER DISTRIBUTION BOX. REFER TO PL501 FOR DETAIL.

WH-A

WH-A

WH-A

WH-A

WH-A

WH-A

WH-BWH-BWH-BWH-B

WH-A

WH-A

WH-C

WH-A

WH-A

WH-A

WH-A

P-16

1. SEE LEGEND AND GENERAL NOTES ON P-001.

2. REFER TO ENLARGED PLANS PL401, PL402, PL403, AND PL404 FOR PIPING LAYOUTS OF

SLEEPING ROOMS.

3. INSULATE FLOOR DRAINS AND ASSOCIATED PIPING FOR FLOOR DRAINS THAT RECEIVE

CONDENSATE ON THE 2ND THROUGH 5TH FLOORS OF AREAS A, B, AND C TO PREVENT

SWEATING. INSULATE WITH 1/2" FLEXIBLE ELASTOMERIC INSULATION.

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

C:\Users\k6endles\Desktop\Tele-Work Revit Projects\Gor0402 (PN55516)\FY20PN55516_BKS_PLUMB_R18_TW Current.rvt3/31/2021 1:35:04 PM

N O

VE

M

BE

R

W

2H N

-2 1-

B-

L.

S

AL

AS

L.

S

AL

AS

S.

B

AR

BI

N A

1-

-0

PL105

D O

M

ES

TI

C

P

LU

M

BI

N G

ST

F

LO

O R

P

LA

N A

R

EA

D

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

FO

R

T G

O R

D O

N , G

EO

R

G

IA

AI

T

BA

R

R

AC

KS

C

O M

PL

EX

, P H

FY

, P

N

VO

LU

M E

-B

AR

R

AC

KS

(P

LU

M

BI

N G

, M

EC

H

AN

IC

AL

, E

LE

C

TR

IC

AL

, A N

D

TE

LE

C

O M

M U

N

IC

AT

IO

N

K.

D

IX

O

N

READY TO ADVERTISE (RTA)

164 8268

SCALE: 1/8"=1'-0"

PLAN NORTH

KEY PLAN

AREA CAREA BAREA A

AREA D

KEY PLAN - NORTH ARROWS & DRAWING SCALE

SHEET NOTES, GENERAL:

FIRST FLOOR DOMESTIC PLUMBING AREA D1

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

M

AR

2 1

KEY NOTES: #

1 1 22

1. SEE LEGEND AND GENERAL NOTES ON P-001.

2. REFER TO ENLARGED PLANS PL401, PL402, PL403, AND PL404 FOR PIPING LAYOUTS OF

SLEEPING ROOMS.

3. INSULATE FLOOR DRAINS AND ASSOCIATED PIPING FOR FLOOR DRAINS THAT RECEIVE

CONDENSATE ON THE 2ND THROUGH 5TH FLOORS OF AREAS A, B, AND C TO PREVENT

SWEATING. INSULATE WITH 1/2" FLEXIBLE ELASTOMERIC INSULATION.

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

C:\Users\k6endles\Desktop\Tele-Work Revit Projects\Gor0402 (PN55516)\FY20PN55516_BKS_PLUMB_R18_TW Current.rvt3/31/2021 1:35:34 PM

N O

VE

M

BE

R

W

2H N

-2 1-

B-

L.

S

AL

AS

L.

S

AL

AS

S.

B

AR

BI

N A

1-

-0

PL118

SA

N

IT

AR

Y

PL

U M

BI

N

G F

LO

O

R P

LA

N

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

FO

R

T G

O R

D O

N , G

EO

R

G

IA

AI

T

BA

R

R

AC

KS

C

O M

PL

EX

, P H

FY

, P

N

VO

LU

M E

-B

AR

R

AC

KS

(P

LU

M

BI

N G

, M

EC

H

AN

IC

AL

, E

LE

C

TR

IC

AL

, A N

D

TE

LE

C

O M

M U

N

IC

AT

IO

N

K.

D

IX

O

N

READY TO ADVERTISE (RTA)

PLAN NORTH

KEY PLAN

AREA CAREA BAREA A

AREA D

KEY PLAN - NORTH ARROWS & DRAWING SCALE

SHEET NOTES, GENERAL:

FIRST FLOOR SANITARY PLUMBING PLAN1

0'

SCALE: 3/64" = 1' - 0"

16' 32' 48' 64'

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

M

AR

2 1

1109H

1109G 1109B

1109A

1109C

10981109D1109E1099 1109F

8" RD

8" RD

8" RD

8" RD

8" RD

8" RD

8" RD

8" RD

4" GCO

4" FCO

4" FCO

FD-1FD-1

3" WCO 3" WCO

P-8

P-8

P-8

P-8

P-8

P-8

P-8

P-8

P-8 P-8

P-8

P-8

FD-1FD-1

P-1

P-1

P-3

P-3

P-3

FD-1

FD-1

P-5A P-5A

P-5A

P-5A P-5A

P-5A

P-1

P-1

P-1

P-1

P-1

P-11A

FD-1

FD-1

FD-1

FD-1

FD-1

4" SS

4" GCO

3" FCO

FD-1

FD-1

P-11A

P-1

P-1

P-3

P-3

P-3

P-1

P-1

P-1

P-1

P-1

P-5A P-5A

P-5A

P-5A P-5A

P-5A

2" SS

WSHP-1109C WSHP-1109F

WSHP-1109EWSHP-1109B

WSHP-1109A WSHP-1109D

1. DISCHARGE FROM ELEVATOR SUMP PUMP ROUTED TO FLOOR SINK IN MECHANICAL ROOM.

2. CONDENSATE LINE FROM WSHP-1109A, WSHP-1109D, AND WSHP-1092 ROUTED TO DISCHARGE JANITOR'S SINK IN ROOM 1107.

3. CONDENSATE LINE FROM WSHP-1108B, WSHP-1108A, WSHP-1105, AND WSHP-1108C ROUTED TO DISCHARGE JANITOR'S SINK IN ROOM 1107.

4. CONDENSATE LINE FROM WSHP-1109B, WSHP-1109C, AND WSHP-1102 ROUTED OUTSIDE EXTERIOR WALL TO DISCHARGE IN

GRAVEL PIT ABOVE GRADE.

5. CONDENSATE LINE FROM WSHP-1109F, WSHP-1109E, AND WSHP-1095 ROUTED TO DISCHARGE IN FLOOR DRAIN IN MECHANICAL

ROOM 1089.

6. FLOOR DRAINS IN MECHANICAL ROOM 1089 AND FIRE PUMP ROOM 1091 HAVE TRAP PRIMERS.

7. TRAP PRIMER DISTRIBUTION BOX. REFER TO PL501 FOR DETAIL.

8. ROUTE ICE MAKER DRAIN AND CONDENSATE DRAIN FROM ICE MAKER TO FLOOR DRAIN. PROVIDE WITH AIR GAP.

WSHP-1105

WSHP-1102

WSHP-1108B

WSHP-1095

WSHP-1092

WSHP-1108C

3/4" CD

3/4" CD

3/4" CD

3/4" CD

3/4" CD

3" WCO

3" WCO

3" WCO

3" WCO

3" FCO

FS-1

FD-1

3" WCO

P-12

1. SEE LEGEND AND GENERAL NOTES ON P-001.

2. REFER TO ENLARGED PLANS PL401, PL402, PL403, AND PL404 FOR PIPING LAYOUTS OF

SLEEPING ROOMS.

3. INSULATE FLOOR DRAINS AND ASSOCIATED PIPING FOR FLOOR DRAINS THAT RECEIVE

CONDENSATE ON THE 2ND THROUGH 5TH FLOORS OF AREAS A, B, AND C TO PREVENT

SWEATING. INSULATE WITH 1/2" FLEXIBLE ELASTOMERIC INSULATION.

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

C:\Users\k6endles\Desktop\Tele-Work Revit Projects\Gor0402 (PN55516)\FY20PN55516_BKS_PLUMB_R18_TW Current.rvt3/31/2021 1:35:57 PM

N O

VE

M

BE

R

W

2H N

-2 1-

B-

L.

S

AL

AS

L.

S

AL

AS

S.

B

AR

BI

N A

1-

-0

PL122

SA

N

IT

AR

Y

PL

U M

BI

N

G

ST

F

LO

O

R P

LA

N

A R

EA

D

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

FO

R

T G

O R

D O

N , G

EO

R

G

IA

AI

T

BA

R

R

AC

KS

C

O M

PL

EX

, P H

FY

, P

N

VO

LU

M E

-B

AR

R

AC

KS

(P

LU

M

BI

N G

, M

EC

H

AN

IC

AL

, E

LE

C

TR

IC

AL

, A N

D

TE

LE

C

O M

M U

N

IC

AT

IO

N

K.

D

IX

O

N

READY TO ADVERTISE (RTA)

164 8268

SCALE: 1/8"=1'-0"

PLAN NORTH

KEY PLAN

AREA CAREA BAREA A

AREA D

KEY PLAN - NORTH ARROWS & DRAWING SCALE

SHEET NOTES, GENERAL:

FIRST FLOOR SANITARY PLUMBING AREA D1

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

M

AR

2 1

KEY NOTES:

5043 5041

5047 5045

50465048

50015004 5003 5002

502503

WSHP-5000

WSHP-5002

WSHP-5001WSHP-5003WSHP-5004

3/4" CD

3/4" CD

FD-1 4" SS

4" V4" V

4" SS 4" SS

P-5P-5

P-10 P-10

P-2P-2 P-2 P-2

4" SS4" SS

WSHP-5041

P-5P-5

4" V 4" V

4" SS4" SS

FD-1

3/4" CD

FD-1

3/4" CD

4" SS4" SS

P-2 P-2

P-10P-10 P-5 P-5

4" V4" V

4" SS 4" SS

4" SS

4" SSFD-1

4" V

P-2

P-54" SS

P-5 P-10

P-2

4" V

4" SS

P-5

P-10

P-2

4" SS

FD-14" SS

P-10

P-2 P-5

4" SS4" SS

P-2 P-2

P-5 P-10P-10

P-5

4" V 4" V

4" SS4" SS

FD-1

4" V

P-5

4" SS4" SS

P-5 P-10 P-10

P-2P-2

4" SS 4" SSFD-1

3/4" CD

3/4" CD

FD-1

4" V4" V

4" SS4" SS

P-5 P-5

4" SSWSHP-5005

P-10P-10P-10P-10

1. ROUTE VENT PIPING HORIZONTALS THROUGHOUT ATTIC.

2. ROUTE CONDENSATE LINE FROM WATER SOURCE HEAT PUMPS TO FLOOR DRAIN SHOWN ON DRAWINGS.

3. WSHP-6001 IS LOCATED IN ATTIC. CONDENSATE LINE TO RUN DOWN TO CONNECT INTO CONDENSATE LINE ABOVE FIFTH FLOOR CEILING

SERVING WSHP-5000, WSHP-5001, WSHP-5002, ETC.

2 2

VTR VTR

4" V

4" SS

4" V

4" V

4" V

4" SS4" V

4" V 4" V

4" V

WSHP-6001

1. SEE LEGEND AND GENERAL NOTES ON P-001.

2. REFER TO ENLARGED PLANS PL401, PL402, PL403, AND PL404 FOR PIPING LAYOUTS OF

SLEEPING ROOMS.

3. INSULATE FLOOR DRAINS AND ASSOCIATED PIPING FOR FLOOR DRAINS THAT RECEIVE

CONDENSATE ON THE 2ND THROUGH 5TH FLOORS OF AREAS A, B, AND C TO PREVENT

SWEATING. INSULATE WITH 1/2" FLEXIBLE ELASTOMERIC INSULATION.

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

C:\Users\k6endles\Desktop\Tele-Work Revit Projects\Gor0402 (PN55516)\FY20PN55516_BKS_PLUMB_R18_TW Current.rvt3/30/2021 11:02:40 AM

N O

VE

M

BE

R

W

2H N

-2 1-

B-

L.

S

AL

AS

L.

S

AL

AS

S.

B

AR

BI

N A

1-

-0

PL134

SA

N

IT

AR

Y

PL

U M

BI

N

G

TH

F

LO

O

R P

LA

N

A R

EA

B

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

FO

R

T G

O R

D O

N , G

EO

R

G

IA

AI

T

BA

R

R

AC

KS

C

O M

PL

EX

, P H

FY

, P

N

VO

LU

M E

-B

AR

R

AC

KS

(P

LU

M

BI

N G

, M

EC

H

AN

IC

AL

, E

LE

C

TR

IC

AL

, A N

D

TE

LE

C

O M

M U

N

IC

AT

IO

N

K.

D

IX

O

N

READY TO ADVERTISE (RTA)

164 8268

SCALE: 1/8"=1'-0"

PLAN NORTH

KEY PLAN

AREA CAREA BAREA A

AREA D

KEY PLAN - NORTH ARROWS & DRAWING SCALE

SHEET NOTES, GENERAL:

FIFTH FLOOR SANITARY PLUMBING AREA B1

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

M

AR

2 1

KEY NOTES: #

1 1

3/4" CD

P-12 FD-1

3" SS

1 1/2" V

3" SS

3/4" CD

3/4" CD

3" FCO

1 1/4" V

FCO

2" V

FCO

3" SS

3" SS

2" V

4" V

4" SS

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

C:\Users\k6endles\Desktop\Tele-Work Revit Projects\Gor0402 (PN55516)\FY20PN55516_BKS_PLUMB_R18_TW Current.rvt3/31/2021 3:20:50 PM

N O

VE

M

BE

R

W

2H N

-2 1-

B-

L.

S

AL

AS

L.

S

AL

AS

S.

B

AR

BI

N A

1-

-0

PL407

PL

U

M

BI

N G

E N

LA

R

G

ED

P

LA

N S

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

FO

R

T G

O R

D O

N , G

EO

R

G

IA

AI

T

BA

R

R

AC

KS

C

O M

PL

EX

, P H

FY

, P

N

VO

LU

M E

-B

AR

R

AC

KS

(P

LU

M

BI

N G

, M

EC

H

AN

IC

AL

, E

LE

C

TR

IC

AL

, A N

D

TE

LE

C

O M

M U

N

IC

AT

IO

N

K.

D

IX

O

N

READY TO ADVERTISE (RTA)

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

M

AR

2 1

JANITOR'S CLOSET 1107 SANITARY PLANS1 ENLARGED LAUNDRY SANITARY RISER2

1/2 1 21

SCALE: 1"=1'-0"

0 0

SCALE: 3/4"=1'-0"

12 2

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

C:\Users\k6endles\Desktop\Tele-Work Revit Projects\Gor0402 (PN55516)\FY20PN55516_BKS_PLUMB_R18_TW Current.rvt3/31/2021 1:36:47 PM

N O

VE

M

BE

R

W

2H N

-2 1-

B-

L.

S

AL

AS

L.

S

AL

AS

S.

B

AR

BI

N A

1-

-0

PL601

PL

U

M

BI

N G

S C

H

ED

U

LE

S

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

FO

R

T G

O R

D O

N , G

EO

R

G

IA

AI

T

BA

R

R

AC

KS

C

O M

PL

EX

, P H

FY

, P

N

VO

LU

M E

-B

AR

R

AC

KS

(P

LU

M

BI

N G

, M

EC

H

AN

IC

AL

, E

LE

C

TR

IC

AL

, A N

D

TE

LE

C

O M

M U

N

IC

AT

IO

N

K.

D

IX

O

N

READY TO ADVERTISE (RTA)

DOMESTIC HOT WATER HEATER SCHEDULE

MARK LOCATION

RECOVERY

RATE (GPH)

FUEL SOURCE

INLET WATER TEMP (DEG F) OUTLET WATER TEMP (DEG F)

NET OUTPUT

(MBTUH)

MINIMUM

EFFICIENCY

DIRECT VENT (IN)

NOTESTYPE FLUE OUTDOOR AIR

DWH-1 MECHANICAL

ROOM

1197 NATURAL GAS 60 140 800 90 6 4 1,2,3,4

DWH-2 MECHANICAL

ROOM

1197 NATURAL GAS 60 140 800 90 6 4 1,2,3,4

PUMP SCHEDULE

MARK DESCRIPTION

CAPACITY

(GPM) HEAD (FT)

ELECTRICAL DATA NOTES

V/HZ/PH

DWBP-1 DOMESTIC WATER BOOSTER PUMP 338 51 SEE ELECTRICAL PACKAGED IN-LINE TRIPLEX PUMP, INCLUDES ONE TO ACT AS

BACKUP. PROVIDE WITH VFD.

SUMP PUMP SCHEDULE

MARK TYPE

GPM

(MINIMUM) HEAD (FT)

DISCHARGE PIPE SIZE

(IN) HP (MAX) NOTES

SP-1 FLOAT SWITCH 50 22 2" 1 OIL DETECTOR, HI/LOW LEVEL CONTROL, AUDIBLE AND VISUAL ALARM

CONTROLS, DUPLEX PUMP

RD ROOF DRAIN N/A 8" IN AREAS B AND D, SEE SANITARY PLANS FOR LOCATIONS

WCO WALL CLEANOUT WALL CONCURRENT SIZE WITH CONNECTED PIPE, MAX 6"

FCO FLOOR CLEANOUT FLOOR CONCURRENT SIZE WITH CONNECTED PIPE, MAX 6"

FS-1 FLOOR SINK FLOOR 3" 1 1/2" LOCATED IN MECHANICAL ROOM, ROUTE SUMP PUMP DISCHARGE TO FLOOR SINK.

P-17 WASHING MACHINE WALL 3/4" 3/4" 1 1/2" 1 1/2"

P-16 ICE MAKER CONNECTION FLOOR 1/2" CW CONNECTION IN RECESSED WALL BOX.

P-12 MOP SINK FLOOR 1/2" 1/2" 3" 1 1/2" LOCATED IN JANITOR'S CLOSETS, MOP RECEPTOR TYPE, PRE-CAST, TERRAZO.

P-11A WATER COOLER (ADA) WALL 1/2" 1 1/2" 1 1/2" HI/LOW STYLE, PROVIDE WITH INTEGRATED BOTTLE FILLER

P-10A SHOWER (ADA) WALL 1/2" 1/2" 3"

P-10 SHOWER WALL 1/2" 1/2" 3"

P-8 UTILITY SINK (SCRUB ROOMS) WALL 1/2" 1/2" 1 1/4" 1 1/4" LOCATED IN SCRUB ROOMS P-6 UTILITY SINK (LAUNDRY ROOMS) WALL 1/2" 1/2" 1 1/4" 1 1/4" LOCATED IN LAUNDRY AREAS

P-5A LAVATORY (ADA) WALL 1/2" 1/2" 1 1/4" 1 1/4" HARDWIRED SENSOR

P-5 LAVATORY COUNTER 1/2" 1/2" 1 1/4" 1 1/4" MANUAL FAUCET

P-3 URINAL WALL 3/4" 2" 1 1/2" HARDWIRED SENSOR

P-2 WATER CLOSET FLOOR 1" 4" 2" FLUSH TANK, MANUAL DUAL FLUSH

P-1A WATER CLOSET (ADA) WALL 1" 4" 2" FLUSH VALVE, HARDWIRED SENSOR

P-1 WATER CLOSET WALL 1" 4" 2" FLUSH VALVE, HARDWIRED SENSOR

WH-1 WALL HYDRANT WALL 3/4" FREEZEPROOF

FD-1 FLOOR DRAIN FLOOR 3" 1 1/2" IN MECHANICAL ROOMS PROVIDE TRAP PRIMER, OTHERWISE PROVIDE TRAP GUARD.

MARK DESCRIPTION MOUNTING C.W. (IN) H.W. (IN) WASTE (IN) VENT (IN) NOTES

PLUMBING FIXTURE SCHEDULE

ST-4 2,500 DHW STORAGE, LOCATED IN MECHANICAL ROOM

ST-3 2,500 DHW STORAGE, LOCATED IN MECHANICAL ROOM

ST-2 2,500 DHW STORAGE, LOCATED IN MECHANICAL ROOM

ST-1 2,500 DHW STORAGE, LOCATED IN MECHANICAL ROOM

MARK STORAGE (GAL) NOTES

STORAGE TANK SCHEDULE

PLATE AND FRAME HEAT EXCHANGER SCHEDULE

MARK

CAPACITY

(MBH)

GROUND SOURCE HEAT LOOP STORAGE TANK LOOP

NOTES

FLOW RATE

(GPM)

EWT/LWT

(DEG F)

MAX P.D

(FT. WTR) FLUID

FLOW RATE

(GPM)

EWT/LWT

(DEG F)

MAX P.D

(FT WTR) FLUID

HX-1 2164 846 90/85 5 WATER 160 60/87 5 WATER 1

HX-2 2164 846 90/85 5 WATER 160 60/87 5 WATER 1

DOMESTIC WATER EXPANSION TANK SCHEDULE

MARK LOCATION

ACCEPTANCE

VOLUME (GAL)

MINIMUM TANK PRE-CHARGE

PRESSURE (PSI)

OPERATING PRESSURE

MAX. (PSI) NOTES

DET-1 MECHANICAL ROOM 317 70 80 1

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

M

AR

2 1

THERMOSTATIC MIXING VALVE SCHEDULE

MARK LOCATION FLOW RATE

(GPM)

COLD E.W.T.

(F)

HOT E.W.T.

(F)

RECIRCULATION

E.W.T. (F)

MIXED L.W.T.

(F)

MAX. PRESSURE

DROP (PSI) NOTES

TMV-1 MECHANICAL

ROOM

276 GPM 55 °F 140 °F 120 °F 120 °F 5.00 psi

NOTES:

1. PROVIDE FACTORY CONDENSATE NEUTRALIZER AND PIPE PER MANUFACTURER'S RECOMMENDATIONS TO FLOOR DRAIN.

2. PROVIDE PRESSURE REGULATOR DEVICE AS REQUIRED TO SUPPLY GAS AT MANUFACTURER'S RECOMMENDED PRESSURE FOR DEVICE AND VENT REGULATOR TO OUTSIDE OF BUILDING.

3. WATER HEATER MANUFACTURER SHALL VERIFY FLOW AND PRESSURE DROP REQUIREMENTS.

4. CONTRACTOR TO VERIFY MAX/MIN GAS PRESSURE WITH ACTUAL EQUIPMENT INSTALLED.

NOTES:

1. PRESSURE RELIEF VALVE SHALL BE SET TO 10 PSI ABOVE OPERATING PRESSURE OR 10 PSI BELOW THE MANUFACTURER'S

LISTED MAX PRESSURE FOR THE EQUIPMENT IN THE SYSTEM.

NOTES:

1. PROVIDE DOUBLE WALL HEAT EXCHANGERS.

CIRCULATING PUMP SCHEDULE

MARK SERVICE CAPACITY (GPM)

PUMP HEAD

(FT. WATER) HP (MAX) NOTES

CP-1 DOMESTIC HOT WATER HEATER CIRCULATION PUMP 19 34 1/5 IN-LINE

CP-2 DOMESTIC HOT WATER HEATER CIRCULATION PUMP 19 34 1/5 IN-LINE

RCP-1 RECIRCULATING PUMP 5.34 34 1/8 IN-LINE, LEAD-LAG

RCP-2 RECIRCULATING PUMP 5.34 34 1/8 IN-LINE, LEAD-LAG

SEE PL904 FOR

TYP. ENLARGED

RISER DIAGRAM

SEE PL905 FOR

TYP. ENLARGED

RISER DIAGRAM

SEE PL906 FOR

TYP. ENLARGED

RISER DIAGRAM

SEE PL907 FOR

TYP. ENLARGED

RISER DIAGRAM

SEE PL910 FOR

AREA D ENLARGED

RISER DIAGRAM

SEE PL908 FOR

AREA B ENLARGED

RISER DIAGRAM

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

C:\Users\k6endles\Desktop\Tele-Work Revit Projects\Gor0402 (PN55516)\FY20PN55516_BKS_PLUMB_R18_TW Current.rvt3/31/2021 1:37:16 PM

N O

VE

M

BE

R

W

2H N

-2 1-

B-

L.

S

AL

AS

L.

S

AL

AS

S.

B

AR

BI

N A

1-

-0

PL901

D O

M

ES

TI

C

W

AT

ER

P

LU

M

BI

N

G

IS

O M

ET

R

IC

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

FO

R

T G

O R

D O

N , G

EO

R

G

IA

AI

T

BA

R

R

AC

KS

C

O M

PL

EX

, P H

FY

, P

N

VO

LU

M E

-B

AR

R

AC

KS

(P

LU

M

BI

N G

, M

EC

H

AN

IC

AL

, E

LE

C

TR

IC

AL

, A N

D

TE

LE

C

O M

M U

N

IC

AT

IO

N

K.

D

IX

O

N

READY TO ADVERTISE (RTA)

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

M

AR

2 1

DOMESTIC WATER PLUMBING ISOMETRIC1

SEE PL904 FOR

TYP. ENLARGED

RISER DIAGRAM

SEE PL905 FOR

TYP. ENLARGED

RISER DIAGRAM

SEE PL906 FOR

TYP. ENLARGED

RISER DIAGRAM

SEE PL907 FOR

TYP. ENLARGED

RISER DIAGRAM

SEE PL911 FOR

AREA D ENLARGED

RISER DIAGRAM

VTR

VTR

VTR

VTR

VTR

VTR

VTR

SEE PL909 FOR

AREA D ENLARGED

RISER DIAGRAM

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

C:\Users\k6endles\Desktop\Tele-Work Revit Projects\Gor0402 (PN55516)\FY20PN55516_BKS_PLUMB_R18_TW Current.rvt3/31/2021 1:37:41 PM

N O

VE

M

BE

R

W

2H N

-2 1-

B-

L.

S

AL

AS

L.

S

AL

AS

S.

B

AR

BI

N A

1-

-0

PL902

SA

N

IT

AR

Y

SE

W

ER

P

LU

M

BI

N G

IS

O

M

ET

R

IC

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

FO

R

T G

O R

D O

N , G

EO

R

G

IA

AI

T

BA

R

R

AC

KS

C

O M

PL

EX

, P H

FY

, P

N

VO

LU

M E

-B

AR

R

AC

KS

(P

LU

M

BI

N G

, M

EC

H

AN

IC

AL

, E

LE

C

TR

IC

AL

, A N

D

TE

LE

C

O M

M U

N

IC

AT

IO

N

K.

D

IX

O

N

READY TO ADVERTISE (RTA)

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

M

AR

2 1

SANITARY SEWER PLUMBING ISOMETRIC1

3" HW

4" CW

3/4"

HWR

3/4" CW

1/2" HW

SHUT OFF

VALVES (TYP)

P-12

WH-A

WH-A

P-8 P-8

P-8 P-8

P-8

P-8 WH-1

P-8 P-8

P-8 P-8

P-8

P-8

3" HW

4" CW

3/4"

HWR

WH-1

P-5A P-5A

P-5A

3/4" CW

3/4" HW

P-5A P-5A

P-5A

P-11A

P-1

P-1 P-3

P-1 P-3

P-1 P-3

P-5A P-5A

P-5A

WH-1

P-1 P-1

WH-A

WH-A

4" CW

3/4"

HWR

P-1

P-1

P-1

WH-A

TYP 5

WH-A

WH-A

1 1/2"

CW

1 1/2"

HW

3/4"

HWR

WH-B

WH-B

1" CW

3/4"

HWR

1" HW1 1/2"

HW

1 1/2"

CW

3/4"

HWR

3/4"

HWR

1" CW

1" HW

3/4" CW

3/4"

HWR

1" HW

1 1/2"

CW

P-5

WH-A

WH-A

WH-A

WH-A

3/4" HW

3/4" CW

3/4"HWR

3/4" HW

3/4" CW 3/4"HWR

3/4" HW3/4" CW

P-11A P-3

P-1 P-3

1 1/2"

CW

P-1 P-3

P-1

P-1

P-1

WH-C

WH-A

WH-A

P-5A

P-5A

P-5A

3/4"

HWR

3" HW

4" CW

3/4" CW

3/4" HW

P-16

SHUT OFF

VALVE (TYP)

1/2" CW

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

C:\Users\k6endles\Desktop\Tele-Work Revit Projects\Gor0402 (PN55516)\FY20PN55516_BKS_PLUMB_R18_TW Current.rvt3/31/2021 3:20:58 PM

N O

VE

M

BE

R

W

2H N

-2 1-

B-

L.

S

AL

AS

L.

S

AL

AS

S.

B

AR

BI

N A

1-

-0

PL910

D O

M

ES

TI

C

W

AT

ER

P

LU

M

BI

N

G

IS

O M

ET

R

IC

AR

EA

D

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

FO

R

T G

O R

D O

N , G

EO

R

G

IA

AI

T

BA

R

R

AC

KS

C

O M

PL

EX

, P H

FY

, P

N

VO

LU

M E

-B

AR

R

AC

KS

(P

LU

M

BI

N G

, M

EC

H

AN

IC

AL

, E

LE

C

TR

IC

AL

, A N

D

TE

LE

C

O M

M U

N

IC

AT

IO

N

K.

D

IX

O

N

READY TO ADVERTISE (RTA)

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

M

AR

2 1

DOMESTIC WATER PLUMBING ISOMETRIC - AREA D1

8" RD

8" RD

8" RD

8" RD

3" V2" V

2" V 2" V1 1/2" V

2" V

3" SS

2" SS

SP-1

P-12

FD-1

4" SS

3" SS

3" SS

3" SS

3" SS

FD-1

FD-1

FD-1

3" SS

2" V

4" SS

4" SS

FD-1

P-11A P-1

P-3 P-3

P-1

P-1

P-1

P-1

P-1

P-1

P-3

FD-1

FD-1 FD-1

P-5A P-5A

P-5A

3" SS

FD-1

FD-12" V

2" V

2" V

P-8 P-8

P-8

P-8 P-8

P-8

4" SS

3" SS

4" SS

2" V

FD-1

FD-1

P-8

P-8 P-8

P-8 P-8

P-8

8" RD

8" RD

8" RD

8" RD

1 1/4" V

1 1/4" SS

P-5

3" V

1 1/4" V 2" V

2" V 2" V

3" SS

3" SS

4" SS

P-11A

2" V

P-1

P-1

P-1 P-1

P-1

P-1 P-1 P-3

P-3

P-3

FD-1

FD-1 P-5A

P-5A

P-5AFCO

WCO

P-5A

P-5A P-5A

FCO

WCO

WCO

FCO

WCO

WCO

FCO

FCO

FCO

WCO

WCO

P-5A

P-5A

P-5A

4" SS

SEE CIVIL PLANS FOR

CONTINUATION

VTR

VTR

VTR

FS-1

2" V

FCO

1 1/4" V

1/

4" V

FD-1

WCO

1 1/2" V

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

C:\Users\k6endles\Desktop\Tele-Work Revit Projects\Gor0402 (PN55516)\FY20PN55516_BKS_PLUMB_R18_TW Current.rvt3/31/2021 1:38:18 PM

N O

VE

M

BE

R

W

2H N

-2 1-

B-

L.

S

AL

AS

L.

S

AL

AS

S.

B

AR

BI

N A

1-

-0

PL911

SA

N

IT

AR

Y

SE

W

ER

P

LU

M

BI

N G

IS

O

M

ET

R

IC

AR

EA

D

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

FO

R

T G

O R

D O

N , G

EO

R

G

IA

AI

T

BA

R

R

AC

KS

C

O M

PL

EX

, P H

FY

, P

N

VO

LU

M E

-B

AR

R

AC

KS

(P

LU

M

BI

N G

, M

EC

H

AN

IC

AL

, E

LE

C

TR

IC

AL

, A N

D

TE

LE

C

O M

M U

N

IC

AT

IO

N

K.

D

IX

O

N

READY TO ADVERTISE (RTA)

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

M

AR

2 1

SANITARY SEWER PLUMBING ISOMETRIC - AREA D1

2PN

2PN

CORRIDOR

2PN

STAIR 4

3PN

3PN

3PN

3PN

2PN

2PN

3PN

3PN

3PN

3PN

2PN

2PN

LEARNING LAB

DAY RM MEDIA

CORRIDOR

LAUNDRY

DRYER CLO

1071A

LAUNDRY

DAY RM GAMES

2PN

2PN

2PN

2PN

3PN

3PN

3PN

3PN

6ø OA 8ø OA 8ø OA 10/8 OA

6ø OA 8ø OA

10/10 OA 12/10 OA 12/12 OA

12/12 RA

12/12 SA12/12 RA

WSHP-1115

WSHP-1070

K 475

F 60

Y 60

W30W30

Y 60

T 475 K 475

F 60

T 475

W30

Y 110

F 115 F 95 F 115

Y 110

L 760

V 760

K 380

12/10 SA20/15 RA

14/14 SA

6ø OA 6ø OA

6ø OA

12/12 OA

4ø EA

6ø EA

6ø EA

6ø EA 4ø EA 6ø EA

4ø EA 4ø EA

12/12 RA

I 250 T 4754ø EA

4ø EA

6ø EA

CUH-4

MECH

1115K

ELEC CLO

1114A

WSHP-106816/10 EA

18/10 EA

12/10 EA10/10 EA10/8 EA8ø EA

B 30

C215

B 30

C215

B 35

C215

C215

B 35

B 30

C215

B 30

C215

W25W25

C215

C215C215

W25 W25

B 35B 35B 35

C215

B 35

C215

B 30

C215

N215 W25

N215 W25 W25

N215 N215

B 30 B 30

C215

N215 N215 N215

N215 N215 W25 W25

N215N215 W25 W25

N215

N215 W25W25 N215

W25 W25

B 30

C215

C215

B 30

B 35 B 35

C215 C215

W25 W25

N215 N215 N215

W25

C215

N570 N215 W25 W25

C215

B 30 B 30

C215 C215

B 35 B 35

N215 N215 W25 W25

N215

N215 W25

6ø OA 6ø OA 6ø OA 6ø OA

B 35 B 35

C215 C215

10/8 OA

10/8 SA 10/8 SA10/8 SA10/8 SA 10/8 SA 10/8 SA

6ø OA

4ø EA 4ø EA 4ø EA 4ø EA 4ø EA 4ø EA

6ø OA

6ø OA 6ø OA

10/8 10/8 SA

10/8 SA

6ø OA

8ø OA

10/8 SA 10/8 SA

6ø OA 6ø OA 6ø OA 6ø OA

10/8 SA 10/8 SA

6ø OA 6ø OA

4ø EA 4ø EA

6ø OA 6ø OA

6ø OA 6ø OA

10/8 SA

10/8 SA

10/8 SA

10/8 SA

12/12 OA

12/12 OA

10/8 SA

10/8 SA

4ø 4ø 4ø EA 4ø EA

6ø OA 6ø OA 6ø OA6ø OA

10/8 SA

10/8 SA

10/8 SA

10/8 SA

10/10 OA

WSHP-1088

WSHP-1085 WSHP-1083

WSHP-1086 WSHP-1084

WSHP-1060

WSHP-1061

N215

CORRIDOR

WSHP-1073

T 380

10/10 SA

WSHP-1072

WSHP-1082 WSHP-1080 WSHP-1078 WSHP-1076 WSHP-1074

WSHP-1064 WSHP-1062

WSHP-1081 WSHP-1079

4ø EA 4ø EA4ø EA4ø EA 4ø EA

WSHP-1077

WSHP-1075

WSHP-1067

4ø EA 4ø EA 4ø EA

WSHP-1065

WSHP-1063

4ø EA 4ø EA

WSHP-1066

4ø EA

L4A 1600 L4B 1600

6ø OA6ø OA

MH302

6ø OA6ø OA

MH404

WSHP-1071A

WSHP-1069WSHP-1071

I 225

8/8 SA

K 285

K 285

10/8 SA

W40

Y 50

6ø EA

14/10 EA

20/10 EA

12/8 SA

8/8 SA

8/8 SA

1. SEE LEGEND AND GENERAL NOTES ON M-001.

2. SEE MH401 FOR DUCT AND DIFFUSER SIZING FOR TYPICAL 2-PERSON AND

3-PERSON MODULES.

3. PROVIDE BALANCING DAMPERS FOR ALL SUPPLY, RETURN AND EXHAUST DIFFUSERS,

REGISTERS AND GRILLES. SEE DETAIL 7, SHEET M-501 AND DETAIL 8, SHEET M-501.

4. PROVIDE ACCESS PANEL WITH LOCKING DOORS FOR ALL DAMPERS AND VALVES

LOCATED ABOVE HARD CEILINGS.

5. INSTALLATION OF HORIZONTAL WSHP's ABOVE CEILING TO BE NO MORE THAN 2' ABOVE CEILING. FOR WSHP's LOCATED ABOVE 12' AFF, ENSURE THAT WSHP's ARE

LOCATED ABOVE CLEARABLE AREAS IN ROOM BELOW (NO PERMANENT BLOCKAGES)

FOR LADDER, SCAFFOLDING, ET. AL., TO BE USABLE FOR ACCESS TO WSHP.

1. 4" DIA. DRYER EXHAUST, TYP. 16. SEE DETAIL 5/MH501.

SEE ARCHITECTURAL PLANS FOR EXACT LOCATIONS

AND TERMINATION CAP REQUIREMENTS.

2. INDICATES CHANGE IN ELEVATION IN DUCTWORK TO

AVOID STRUCTURAL (TYP.)

3. EQUIPMENT CLEARANCE (TYP.)

4. LOUVER WITH MOTORIZED DAMPER. DAMPER(S) ARE

FULL OPEN WHEN A MINIMUM OF ONE DRYER IS

ACTIVATED, FULL CLOSED WHEN ALL DRYERS ARE

FULLY DE-ACTIVATED (TYP. OF 2).

5. 2' x 2' CEILING ACCESS PANEL (TYP.)

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

C:\Users\K6ENXSWW\Desktop\Tele-Work Revit Projects\Gor0402 (PN55516) BKS\FY20PN55516_BKS_HVAC_R18_TW Current.rvt3/30/2021 1:52:55 PM

D

EC

EM

BE

R

W

2H N

-2 1-

B-

S.

W

YL

LI

E

S.

W

YL

LI

E

S.

B

AR

BI

N A

1-

-0

MH101

H

VA

C F

IR

ST

F

LO

O R

D U

C

TW

O R

K

PL

AN

A

R

EA

A

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

FO

R

T G

O R

D O

N , G

EO

R

G

IA

AI

T

BA

R

R

AC

KS

C

O M

PL

EX

, P H

FY

, P

N

VO

LU

M E

-B

AR

R

AC

KS

(P

LU

M

BI

N G

, M

EC

H

AN

IC

AL

EL

EC

TR

IC

AL

A N

D T

EL

EC

O M

M U

N

IC

AT

IO

N

K.

D

IX

O

N

READY TO ADVERTISE (RTA)

164 8268

SCALE: 1/8"=1'-0"

PLAN NORTHTRUE NORTH

HVAC FIRST FLOOR DUCTWORK PLAN AREA A1

KEY PLAN - NORTH ARROWS & DRAWING SCALE

SHEET NOTES, GENERAL:

KEY PLAN

AREA CAREA BAREA A

AREA D

SHEET KEY NOTES: #

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

M

AR

3PN

3PN

3PN

3PN

1056 2PN

2PN

2PN

PLT SGT

CORRIDOR

WOMENS

G. STO

1012A

1ST SGT

XO SGT

CO

WAITING ROOM

VESTIBULE

LOBBY

WAITING ROOM

CO

1003 XO SGT

1ST SGT

G. STO

1002A

MENS

PLT SGT

1016 2PN

TR

PROFILE REC.

STAIR 3

ESS

1108A

RECYCLE

ELEVATOR

PROFILE REC.

TR

STAIR 2

2PN

2PN

3PN

3PN

CORRIDOR

20/10 EA

3PN

3PN

WSHP-1010

WSHP-1007

MH401

CUH-7

WSHP-1015 WSHP-1003

40/20 EA

WSHP-1009

WSHP-1008

CUH-3 CUH-2

MH301

MH301

H80

F 30

F 30 H80 F 30

H80

/2

O

A

/2

16/12 OA 12/12 OA

12/12 OA

8/8 SA

/2

O

A

/2

6ø

W65

I 175

R175

J 160

I 155

R175

I 175

W30 W70

W30 W30 W70 W30

F 35

H80 F 30

F 30

Q80 Q80Q80 O80

H80 F 30

Q80

4ø EA

6ø EA

4ø EA

6ø OA

6ø O

A

F 70 F 70

4ø EA

WSHP-1108A

J 200

10/10 SA

S 200

S 215

M215

WSHP-1052

12/12 OA 16/12 OA

WSHP-1016

Q80

34/24 EA

22/12 EA

28/20 OA30/24 OA

B 35

C215C215

B 35

W25 W25 N215N215

12/12 OA

20/10 EA

12/12 OA

B 35 B 35

B 30 B 30

C215 C215

C215C215

N215 N215 N215

N215 N215 N215 W25 W25

W25W25

C215 C215 C215

C215

B 30B 30

B 35B 35

6ø OA 6ø OA

6ø OA 6ø OA

10/8 SA 10/8 SA

10/8 SA 10/8 SA

4ø EA 4ø EA

4ø EA

4ø EA

6ø OA 6ø OA

10/8 SA

10/8 SA

6ø OA 6ø OA

10/8 SA

10/8 SA

14/12 OA

12/12 OA

W25

W25 W25

4ø EA

4ø EA

10/8 RA

9/9 RA

28/20 OA 34/22 OA

32/24 EA

24/20 OA

4ø EA 4ø EA

6ø OA

6ø OA

6ø OA

6/6 SA

14/14 SA

6/6 RA

12/12 RA

6/6 RA6/6 SA

6/6 SA

8/8 SA

6ø OA

6ø OA

6ø OA

/2

10/10 RA

B 30 B 30

C215 C215

M215

N215

C215 C215

C215 C215

B 30 B 30

B 35 B 35

N215 W25 W25 W25

N215 N215

10/8 SA

6ø OA 6ø OA

12/12 OA14/12 OA

6/6 SA

6/6 RA

6/6 RA8/8 RA

F 35

14/14 SA

6ø OA

6/6 SA

6/6 SA

6ø OA

6ø OA

4ø EA

28/20 OA

24/20 OA

26/24 EA

6ø EA

/2

EA

8/8 RA

4ø OA

/2

6ø OA 6ø OA 6ø OA

10/8 SA

10/8 SA

10/8 SA

8/8 RA

W25 W25

4ø EA

W25 4ø EA

9/9 RA

10/8 RA

10/8 SA

4ø EA

4ø EA 4ø EA

12/12 OA

6ø OA 6ø OA

10/8 SA

10/8 SA

10/8 SA

6ø OA

WSHP-1058

WSHP-1059

WSHP-1023

WSHP-1017

CORRIDOR

WSHP-1053

WSHP-1054

WSHP-1056

WSHP-1055

WSHP-1057

8/8 RA

WSHP-1019

WSHP-1021

4ø EA

WSHP-1018

WSHP-1020

W25

8/8 SA

8/8 RA

I 155

J 160

6ø OA

8/8 RA

6/6 RA

4ø EA4ø EA

36/24 EA

6/6 RA

C160

C160

10/8 SA

8/8 SA

8/8 SA

34/22 OA

R315

(TYP. OF 3)

10/10 RA

14/10 RA

10/10 RA

H80

8/8 SA

12/12 RA

S 215

E 455

P 455

12/9 SA

12/9 RA

E 455 P 455

12/9 SA

12/9 RA

12/9 SA

AA15

4ø OA

AA15

22/12 EA

22/12 EA

16/14 SA

10/8 SA 8/8 SA

8/8 SA

12/8 SA

8/8 SA

10/10 RA

14/14 RA

12/8 SA

8/8 SA WSHP-1001

6ø OA

1. AIR FLOW MEASURING STATION FOR

DOAU-1 OUTSIDE AIR. UNOBSTRUCTED

STRAIGHT DUCT RUN UPSTREAM AND

DOWNSTREAM OF AFMS SHALL BE

PROVIDED PER MANUFACTURER'S

RECOMMENDATIONS.

2. PROVIDE MEANS FOR EXPANSION WHERE

HVAC DUCTWORK CROSSES BUILDINGS

EXPANSION JOINT. SEE DETAIL 5/MH501.

BUILDING MOVEMENT SHALL ALLOW FOR

UP TO 2 INCHES AT EXPANSION JOINT.

3. EQUIPMENT CLEARANCE (TYP.)

4. 2' x 2' CEILING ACCESS PANEL (TYP.)

1. SEE LEGEND AND GENERAL NOTES ON M-001.

2. SEE MH401 FOR DUCT AND DIFFUSER SIZING FOR TYPICAL 2-PERSON AND

3-PERSON MODULES.

3. PROVIDE BALANCING DAMPERS FOR ALL SUPPLY, RETURN AND EXHAUST DIFFUSERS,

REGISTERS AND GRILLES. SEE DETAIL 7, SHEET M-501 AND DETAIL 8, SHEET M-501.

4. PROVIDE ACCESS PANEL WITH LOCKING DOORS FOR ALL DAMPERS AND VALVES

LOCATED ABOVE HARD CEILINGS.

5. INSTALLATION OF HORIZONTAL WSHP's ABOVE CEILING TO BE NO MORE THAN 2' ABOVE CEILING. FOR WSHP's LOCATED ABOVE 12' AFF, ENSURE THAT WSHP's ARE

LOCATED ABOVE CLEARABLE AREAS IN ROOM BELOW (NO PERMANENT BLOCKAGES)

FOR LADDER, SCAFFOLDING, ET. AL., TO BE USABLE FOR ACCESS TO WSHP.

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

C:\Users\K6ENXSWW\Desktop\Tele-Work Revit Projects\Gor0402 (PN55516) BKS\FY20PN55516_BKS_HVAC_R18_TW Current.rvt3/30/2021 1:53:12 PM

D

EC

EM

BE

R

W

2H N

-2 1-

B-

S.

W

YL

LI

E

S.

W

YL

LI

E

S.

B

AR

BI

N A

1-

-0

MH102

H

VA

C F

IR

ST

F

LO

O R

D U

C

TW

O R

K

PL

AN

A

R

EA

B

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

FO

R

T G

O R

D O

N , G

EO

R

G

IA

AI

T

BA

R

R

AC

KS

C

O M

PL

EX

, P H

FY

, P

N

VO

LU

M E

-B

AR

R

AC

KS

(P

LU

M

BI

N G

, M

EC

H

AN

IC

AL

EL

EC

TR

IC

AL

A N

D T

EL

EC

O M

M U

N

IC

AT

IO

N

K.

D

IX

O

N

READY TO ADVERTISE (RTA)

HVAC FIRST FLOOR DUCTWORK PLAN AREA B1

164 8268

SCALE: 1/8"=1'-0"

PLAN NORTHTRUE NORTH

KEY PLAN - NORTH ARROWS & DRAWING SCALE

SHEET NOTES, GENERAL:

KEY PLAN

AREA CAREA BAREA A

AREA D

SHEET KEY NOTES: #

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

M

AR

3PN

3PN

1025 3PN

3PN

2PN

2PN

2PN

2PN

DAYRM GAMES

DAY RM MEDIA

CUST

LAUNDRY

DRYER CLO

1035A

LAUNDRY

CORRIDOR

LEARNING LAB

JAN

1112A

2PN

CORRIDOR

2PN

2PN

3PN

3PN

3PN

3PN

3PN

3PN

3PN

2PN

3PN

2PN

2PN

STAIR 1

MH401

6ø OA

8ø OA

10/1012/10 OA

12/12 OA

16/10 EA 14/10 EA 12/10 EA 10/10 EA

10/8 EA

8ø EA 6ø EA 4ø EA

6ø OA

8ø OA10/8 OA10/10 OA12/12 OA

WSHP-1112

WSHP-1034

20/15 RA

14/14 SA

L 760

Y 115 V 760

F 115

10/10 OA

6ø OAF 115

Y 110

6ø OA

12/10 SA

6ø EA 6ø EA

F 95

W40

6ø OA

4ø EA

W30

Y 60

W30

Y 60

T 475 K 475

12/12 12/12

F 60 F 60

K 47512/12 12/12

T 475

6ø OA 6ø

CUH-1

MECH

1112K

ELEC CLO

1036B

2PN

12/12 RA

I 250 T 475

4ø EA

18/10 EA

12/12 OA

B 35

C215

N215

W25 W25 N215

C215

B 35

N215 W25

B 35 B 35

N215

12/12 OA

C215 C215

B 30 B 30

C215 C215

N215 N215 W25 W25 W25

N215 N215

C215 C215

B 30 B 306ø OA 6ø OA

6ø OA 6ø OA

10/8 10/810/8 10/8

4ø EA 4ø EA 4ø EA 4ø EA

W25 W25

10/8 SA 10/8 SA

6ø OA 6ø OA

6ø OA 6ø OA

10/8 SA 10/8 SA

N570

6ø EA

4ø EA

B 30 B 30

B 35 B 35 B 35 B 35

B 30 B 30

C215 C215 C215 C215 C215

C215 C215

C215

W25 W25

W25 W25

W25 W25

W25 W25

W25 W25

W25 W25 W25

W25 W25

C215 C215 C215 C215 C215 C215

C215

N215 N215 N215 N215 N215 N215 N215

N215

N215 N215 N215 N215 N215 N215 N215

B 30 B 30

B 35 B 35 B 35 B 35

B 306ø OA 6ø OA 6ø OA 6ø OA

6ø OA6ø OA 6ø OA

6ø OA 6ø OA 6ø OA 6ø OA

6ø OA 6ø OA

10/8 SA 10/8

10/8 SA 10/8 SA 10/8 SA 10/8 SA

10/8 SA

10/8 SA

10/8

10/8 SA

10/8 10/8

10/8 SA 10/8 SA

10/8 SA

4ø EA 4ø EA 4ø EA 4ø EA

4ø EA 4ø EA

10/8 OA

4ø 4ø

WSHP-1024

WSHP-1025

WSHP-1051

WSHP-1050WSHP-1048WSHP-1046

WSHP-1044WSHP-1042

WSHP-1040

WSHP-1049

WSHP-1047WSHP-1045WSHP-1043WSHP-1041WSHP-1039

WSHP-1037

WSHP-1038

T 380

WSHP-1036K 380

10/10 SA

12/10 RA

WSHP-1030 WSHP-1032

WSHP-1026

WSHP-1028

WSHP-1031

WSHP-1027 WSHP-1029

CORRIDOR

4ø EA

4ø 4ø 4ø EA 4ø EA

4ø EA

6ø EA

4ø EA

I 225

4ø EA 4ø EA4ø 4ø

4ø EA 4ø EA

L4C 1600 L4D 1600

WSHP-1035A

6ø OA 6ø OA

WSHP-1033 WSHP-1035

K 285

K 285

10/8 SA

Y 50

8/8 SA

20/10 EA

W30 4ø EA

8/8 SA

8/8 SA

12/8 SA

1. 4" DIA. DRYER EXHAUST, TYP. 16. SEE DETAIL 5/MH501.

SEE ARCHITECTURAL PLANS FOR EXACT LOCATIONS

AND TERMINATION CAP REQUIREMENTS.

2. EQUIPMENT CLEARANCE (TYP.)

3. LOUVER WITH MOTORIZED DAMPER. DAMPER(S) ARE

FULL OPEN WHEN A MINIMUM OF ONE DRYER IS

ACTIVATED, FULL CLOSED WHEN ALL DRYERS ARE

FULLY DE-ACTIVATED (TYP. OF 2.)

4. 2' x 2' CEILING ACCESS PANEL (TYP.)

1. SEE LEGEND AND GENERAL NOTES ON M-001.

2. SEE MH401 FOR DUCT AND DIFFUSER SIZING FOR TYPICAL 2-PERSON AND

3-PERSON MODULES.

3. PROVIDE BALANCING DAMPERS FOR ALL SUPPLY, RETURN AND EXHAUST DIFFUSERS,

REGISTERS AND GRILLES. SEE DETAIL 7, SHEET M-501 AND DETAIL 8, SHEET M-501.

4. PROVIDE ACCESS PANEL WITH LOCKING DOORS FOR ALL DAMPERS AND VALVES

LOCATED ABOVE HARD CEILINGS.

5. INSTALLATION OF HORIZONTAL WSHP's ABOVE CEILING TO BE NO MORE THAN 2' ABOVE CEILING. FOR WSHP's LOCATED ABOVE 12' AFF, ENSURE THAT WSHP's ARE

LOCATED ABOVE CLEARABLE AREAS IN ROOM BELOW (NO PERMANENT BLOCKAGES)

FOR LADDER, SCAFFOLDING, ET. AL., TO BE USABLE FOR ACCESS TO WSHP.

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

C:\Users\K6ENXSWW\Desktop\Tele-Work Revit Projects\Gor0402 (PN55516) BKS\FY20PN55516_BKS_HVAC_R18_TW Current.rvt3/30/2021 1:53:20 PM

D

EC

EM

BE

R

W

2H N

-2 1-

B-

S.

W

YL

LI

E

S.

W

YL

LI

E

S.

B

AR

BI

N A

1-

-0

MH103

H

VA

C F

IR

ST

F

LO

O R

D U

C

TW

O R

K

PL

AN

A

R

EA

C

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

FO

R

T G

O R

D O

N , G

EO

R

G

IA

AI

T

BA

R

R

AC

KS

C

O M

PL

EX

, P H

FY

, P

N

VO

LU

M E

-B

AR

R

AC

KS

(P

LU

M

BI

N G

, M

EC

H

AN

IC

AL

EL

EC

TR

IC

AL

A N

D T

EL

EC

O M

M U

N

IC

AT

IO

N

K.

D

IX

O

N

READY TO ADVERTISE (RTA)

164 8268

SCALE: 1/8"=1'-0"

PLAN NORTHTRUE NORTH

HVAC FIRST FLOOR DUCTWORK PLAN AREA C1

KEY PLAN

AREA CAREA BAREA A

AREA D

KEY PLAN - NORTH ARROWS & DRAWING SCALE

SHEET NOTES, GENERAL:SHEET KEY NOTES: #

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

M

AR

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

M

AR

MH401

MECHANICAL

MULTI-PURPOSE

ESS

1108A

ARMS VAULT

FIRE PUMP

1091STO.

1109F

SCRUB ROOM

STO.

1109C

STO.

1109E

STO.

1109D

ARMS VAULT

COMPANY STO.

WOMENS

MENS

AV

1109G

AV

1109H

JANITOR

AV

1109A

AV

1109B

COMPANY STO.

ELECTRICAL

WOMENS

VESTIBULE

WSHP-1109C

WSHP-1109B

WSHP-1109A

WSHP-1109D

WSHP-1109E

WSHP-1109F

L1D 330

EF-3EF-4

/1

O

A

18/16 EA

EUH-5 EUH-4

CUH-5

B 50

6ø OA

12/12 EA

G50G50

12/12 EA

B 50

16/14 EA

8/8 EA

8/8 OA

12/12

12/12

12/12 EA

12/12

/1

6ø EA

6ø OA

8/8 OA

8/8 OA

6/6 EA

8/8 OA

T 475 K 475

D260

N235

D260

N235

8/8 EA

12/12 RA

12/12 RA

8/8 OA

8/8 EA

6ø EA

12/12 EA

6/6 EA

8/8 OA

6ø EA

K 475T 475

K 475

D260

8/8 OA

14/10 OA

D260

N235

D260

N235

D260

12/10 OA

T 350

T 350

U350

U350

Z 350

Z 350

K 200

B 30

W30

W50

B 50

K 200

8/8 OA

6ø OA B 30

W30

K 200

U350

T 350

Z 350

Z 350 U350

T 350

W50

B 50

I 200 X30

X40

6ø EASTO RM

EUH-3

L1C 330 L1B 330

L1A 330

CUH-6

VESTIBULE

1097SCRUB ROOM

EUH-6

EF-1

L2A 2015

EF-2

L2B 1755

MENS

K 475T 475

K 475 T 475 T 475

T 570 T 570 K 570 K 570

12/12 SA

14/14 SA

20/15 RA

12/12 RA

12/12 SA12/12 RA

12/12 SA

14/14 SA

20/15 RA

12/12 RA

T 475 K 475

K 570 K 570 T 570 T 570

12/12 SA

14/14 SA 20/16 RA

12/12 RA

12/12 RA

20/15 RA

14/14

12/12

12/12 SA

14/14 SA

20/15 RA

12/12 RA

18/12 RA 14/14 SA

18/14 EA

/1

EA

24/18 EA

12/10 OA

/8

O A

14/14 OA

/1

O

A

20/16 OA

30/26

30/26 OA

DSD

D

SD

DSD

L3A 4140

L3B 4140

L9 8280

6ø OA

L8 2015

L11 1755

12/12 EA

12/12 EA

N235 N235

K 475 K 475 T 475 T 475

16/14 EA

18/16 EA

8/8 OA

8/8 EA

6ø OA

6ø OA

8/8 EA

WSHP-1105

I 170

R170

I 170

R170

8/6 SA 8/8 RA

6ø OA

8/6 SA

6ø OA

8/8 RA

WSHP-1092

C170 M170

C170 M170

8/8 RA

6ø OA8/6 SA

WSHP-1095

WSHP-1102

8/6 SA

8/8 RA

WSHP-1108C

WSHP-1108B

30/26 EA

6/6 SA

8/8 SA

6/6 SA

H115

H115

R455

22/18 OA

H115

H115

6/6 SA

H95

6/6 SA 8/8 SA

6/6 SA

R380

H95

H95

8/8 OA

8/8 EA

10/10 SA

10/10 RA

6/6 SA

I 200

10/8 OA

8ø OA

16/12 OA

I 200

16/14 OA20/14 OA

8ø OA

14/10 OA

10/8 EA

16/12 EA

18/14 EA

8/8 EA

10/8 EA

10/10 RA

1. BLANK OFF ANY UNUSED PORTION OF

THE LOUVER.

2. PROVIDE FULL SIZE PLENUM BOX OFF

THE LOUVER. PROVIDE A 12x12 DUCT

AND CONTROL DAMPER OFF OF THE

PLENUM BOX.

3. 42x36 OUTSIDE AIR DUCT DOWN FROM

DOAS-1. SEE MH114 FOR CONT.

4. 42x36 OUTSIDE AIR DUCT DOWN FROM DOAS-2, TRANSITION TO 32x30 DUCT.

SEE MH114 FOR CONTINUATION.

5. 30x26 EXHAUST AIR DUCT UP TO

DOAS-1. SEE MH114 FOR CONT.

6. 30x26 EXHAUST AIR DUCT UP TO

DOAS-2. SEE MH114 FOR CONT.

7. 28x24 OUTSIDE AIR DUCT DOWN

FROM DOAS-3. SEE MH114 FOR CONT.

8. 28x18 EXHAUST AIR DUCT UP TO DOAS-3.

SEE MH114 FOR CONTINUATION.

9. AIR FLOW MEASURING STATION FOR

DOAS-2 EXHAUST AIR. UNOBSTRUCTED

STRAIGHT DUCT RUN UPSTREAM AND

DOWNSTREAM OF AFMS SHALL BE

PROVIDED PER MANUFACTURER'S

RECOMMENDATIONS.

10. AIR FLOW MEASURING STATION FOR

DOAS-1 EXHAUST AIR. UNOBSTRUCTED

STRAIGHT DUCT RUN UPSTREAM AND

DOWNSTREAM OF AFMS SHALL BE

PROVIDED PER MANUFACTURER'S

RECOMMENDATIONS.

11. AIR FLOW MEASURING STATION FOR

DOAS-3 EXHAUST AIR. UNOBSTRUCTED

STRAIGHT DUCT RUN UPSTREAM AND

DOWNSTREAM OF AFMS SHALL BE

PROVIDED PER MANUFACTURER'S

RECOMMENDATIONS.

12. AIR FLOW MEASURING STATION FOR

DOAS-3 OUTSIDE AIR. UNOBSTRUCTED

STRAIGHT DUCT RUN UPSTREAM AND

DOWNSTREAM OF AFMS SHALL BE

PROVIDED PER MANUFACTURER'S

RECOMMENDATIONS.

13. EQUIPMENT CLEARANCE (TYP.)

14. CONTROL DAMPER.

15. AIR FLOW MEASURING STATION FOR

DOAS-1 OUTSIDE AIR. UNOBSTRUCTED

STRAIGHT DUCT RUN UPSTREAM AND

DOWNSTREAM OF AFMS SHALL BE

PROVIDED PER MANUFACTURER'S

RECOMMENDATIONS.

16. 2' x 2' CEILING ACCESS PANEL (TYP.)

17. AIR FLOW MEASURING STATION FOR DOAS-2 OUTSIDE AIR.

UNOBSTRUCTED STRAIGHT DUCT RUN UPSTREAM AND

DOWNSTREAM OF AFMS SHALL BE PROVIDED PER

MANUFACTURER'S RECOMMENDATIONS.

1. SEE LEGEND AND GENERAL NOTES ON M-001.

2. PROVIDE BALANCING DAMPERS FOR ALL SUPPLY, RETURN AND EXHAUST DIFFUSERS,

REGISTERS AND GRILLES. SEE DETAIL 7, SHEET M-501 AND DETAIL 8, SHEET M-501.

3. PROVIDE ACCESS PANEL WITH LOCKING DOORS FOR ALL DAMPERS AND VALVES

LOCATED ABOVE HARD CEILINGS.

4. INSTALLATION OF HORIZONTAL WSHP's ABOVE CEILING TO BE NO MORE THAN 2' ABOVE CEILING. FOR WSHP's LOCATED ABOVE 12' AFF, ENSURE THAT WSHP's ARE

LOCATED ABOVE CLEARABLE AREAS IN ROOM BELOW (NO PERMANENT BLOCKAGES)

FOR LADDER, SCAFFOLDING, ET. AL., TO BE USABLE FOR ACCESS TO WSHP.

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

C:\Users\K6ENXSWW\Desktop\Tele-Work Revit Projects\Gor0402 (PN55516) BKS\FY20PN55516_BKS_HVAC_R18_TW Current.rvt3/30/2021 1:53:28 PM

D

EC

EM

BE

R

W

2H N

-2 1-

B-

S.

W

YL

LI

E

S.

W

YL

LI

E

S.

B

AR

BI

N A

1-

-0

MH104

H

VA

C F

IR

ST

F

LO

O R

D U

C

TW

O R

K

PL

AN

A

R

EA

D

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

FO

R

T G

O R

D O

N , G

EO

R

G

IA

AI

T

BA

R

R

AC

KS

C

O M

PL

EX

, P H

FY

, P

N

VO

LU

M E

-B

AR

R

AC

KS

(P

LU

M

BI

N G

, M

EC

H

AN

IC

AL

EL

EC

TR

IC

AL

A N

D T

EL

EC

O M

M U

N

IC

AT

IO

N

K.

D

IX

O

N

READY TO ADVERTISE (RTA)

164 8268

SCALE: 1/8"=1'-0"

TRUE NORTH PLAN NORTH

KEY PLAN - NORTH ARROWS & DRAWING SCALESHEET NOTES, GENERAL:

KEY PLAN

AREA CAREA BAREA A

AREA D

HVAC FIRST FLOOR DUCTWORK PLAN AREA D1

SHEET KEY NOTES: #

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

M

AR

R

EV

IS

ED

IN

A C

C O

R D

AN

C

E W

IT

H

A M

EN

D

M

EN

T

M

AR

2 22 2

2 2 2

6ø OA

8ø OA

4ø EA

WSHP-2082

DAY ROOM MEDIA

2060 DAY ROOM GAMES

LEARNING LAB

LAUNDRY

LAUNDRY

2PN

2PN

3PN

DRYER CL

2059A

WSHP-2060

2PN

2PN

3PN

3PN

3PN

3PN

2PN

2PN

2PN

3PN

3PN

3PN

3PN

2PN

2PN

CORRIDOR

CORRIDOR

W30 6ø EA

Y 60

T 475 K 475

12/12 SA

12/12 RA

F 60

W30Y 60

T 475

K 475

12/12 SA

12/12 RA

W30

F 115 F 115

L 760

Y 110V 760

F 95

W40 Y 110

6ø OA 6ø OA 6ø OA

14/14 SA

20/15 RA 12/10 SA

6ø EA 6ø EA

4ø EA

6ø EA 4ø EA

10/10 OA

12/10 EA 14/10 EA10/10 EA 16/10 EA

20/10 EA

10/8 EA8ø EA6ø EA

12/12 RA

T 475

I 250

4ø EA

6ø OA 8ø OA 10/10 OA

10/8 OA 10/10 OA 12/12 OA

12/10 OA 12/12 OA

12/12 OA

12/12 OA

3PN

3PN

3PN

2PN

2PN

STAIRS

MECH

2082K

CORRIDOR

WSHP-2058

C215

B 30 B 30

C215

B 35 B 35 B 35 B 35

C215 C215 C215 C215

N215 N215 N215 N215 N215 N215 N215

C215

B 30

W25 W25 W25 W25 W25 W25 W25 W25

W25 W25 W25 W25 W25 W25 W25

N215 N215 N215 N215 N215 N215

C215 C215 C215 C215 C215 C215 C215

B 30B 30

B 35B 35B 35B 35

B 30

10/8 SA

10/8 SA

6ø OA 6ø OA 6ø OA

10/8 SA 10/8 SA 10/8 SA

4ø EA

4ø EA 4ø EA

6ø OA 6ø OA 6ø OA

10/8 SA

6ø OA

10/8 SA

10/8 SA

4ø EA 4ø EA

6ø OA

10/8 SA

10/8 SA 10/8 SA

B 30

C215

N215

N215

4ø EA 4ø EA

4ø EA 4ø EA

B 30 B 30

B 35 B 35

C215 C215 C215 C215

N215 N215 N215 N215 W25 W25

W25W25 W25 W25

W25 W25

6ø OA 6ø OA

10/8 SA

10/8 SA

4ø EA 4ø EA

4ø EA4ø EA

N570

N215 N215 N215

B 30 B 30

C215 C215 C215

10/8 SA 10/8 SA

4ø EA 4ø EA

6ø OA 6ø OA

10/8 SA 10/8 SA

C215

B 35B 35

N215

6ø OA

6ø OA

6ø OA 6ø OA 6ø OA 6ø OA 6ø OA6ø OA

WSHP-2062

WSHP-2076

WSHP-2075

WSHP-2074 WSHP-2072 WSHP-2070 WSHP-2068 WSHP-2066 WSHP-2064

WSHP-2073 WSHP-2071

10/8 SA

10/8 SA 10/8 SA

WSHP-2069 WSHP-2067

10/8 SA

WSHP-2065 WSHP-2063

WSHP-2061

WSHP-2056

WSHP-2055

WSHP-2054

WSHP-2052

10/8 SA 10/8 SA

WSHP-2053

WSHP-2051

WSHP-2049

WSHP-2050

4ø EAI 2254ø EA 4ø EA

L4E 1600 L4F 1600

MH302

K 380

T 380

A 60

WSHP-2059A

6ø OA

6ø OA 6ø OA

6ø OA 6ø OA

WSHP-2059

K 285

K 285

10/8 SA

Y 50

6ø EA

8/8 SA

10/10 RA

4ø EA

8/8 SA

10/10 SA

18/10 EA

4ø EA 4ø EA

4ø EA8/8 SA4ø EA 4ø EA4ø EA 4ø EA

12/8 SA

1. SEE LEGEND AND GENERAL NOTES ON M-001.

2. SEE MH401 FOR DUCT AND DIFFUSER SIZING FOR TYPICAL 2-PERSON AND

3-PERSON MODULES.

3. PROVIDE BALANCING DAMPERS FOR ALL SUPPLY, RETURN AND EXHAUST DIFFUSERS,

REGISTERS AND GRILLES. SEE DETAIL 7, SHEET M-501 AND DETAIL 8, SHEET M-501.

4. PROVIDE ACCESS PANEL WITH LOCKING DOORS FOR ALL DAMPERS AND VALVES

LOCATED ABOVE HARD CEILINGS.

5. INSTALLATION OF…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .