This document summarizes a federal solicitation for construction services. The U.S. Army Corps of Engineers, Savannah District is seeking to construct a battalion sized Advanced Individual Training complex at Fort Gordon, Georgia. The project scope includes barracks, headquarters, support facilities, utilities, site development, running track, physical training areas, building information systems, security systems, and energy monitoring systems. Sustainability and accessibility requirements are also specified. The acquisition will be conducted through full and open competition with preference given to HUBZone small businesses. The period of performance is 720 calendar days. Evaluation will be based on sealed bid procedures in accordance with the Federal Acquisition Regulation Part 14. The magnitude of construction is estimated between $25 million to $100 million.
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
D A
T E
C O
N T
R A
C T
N
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
C A
T E
G O
R Y
D
E
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
A N
S I
D
-W H
N B
D E
C E
M B
E
S A
V A
N N
A H
G
A
W
O
G L E
T H
O R
P
A
V E
N U
E
S A
V A
N N
H
D
I S
T R
I C
T
V O
L U
M
S
I T
E
F Y
P
N
A
B
R
R A
C K
S
C
O M
P L E
X
P
H
F O
G
R
D O
N
G
E O
R G
I A
READY TO ADVERTISE (RTA)
S
B
A R
B I N
A
K6ENDTBM 3/3/2021 3:24:38 PM P:\CIVIL3D PROJECTS\GOR0409\CIVIL\DRAWINGS\PLAN SHEETS\PN55516_C-CS.DWG
CS503
S I T
E
D
E T
A I L
M
A R
T I N
T
M
A R
T I N
M
K
O L A
S I N
S K
4"
4"
4"
NOTES:
1. INSTALL RUBBER MULCH AND RUBBER CURB AND GUTTER PER MANUFACTURER'S SPECIFICATIONS.
MULCH SHALL COMPLY WITH ASTM F 1292-04 AND BE OBTAINED BY A CERTIFIED SUPPLIER.
2. COMPACT SUBGRADE TO 90% PER SPECIFICATION 31 00 00 EARTHWORK.
3. 4" PERFORATED PVC UNDERDRAINS TO DRAIN TO 6" PVC CONNECTING PIPES AND ULTIMATELY TO
THE STORM MANHOLES SHOWN ON THE GRADING PLANS.
PHYSICAL TRAINING PIT
N.T.S.
150'
PULL-UP BARS
10'
10'
20'
10'
4" PERFORATED PVC PIPE,
0.5% MIN. SLOPE, TYP.
CAP END, TYP.
TIE INTO 6" PVC WITH ELBOW
CLEANOUT, TYP.
6" PVC PIPE
0.5% MIN. SLOPE, TYP.
6" X 8" PVC
ADAPTOR TEE,
TYP.
4" PERFORATED PVC PIPE,
0.5% MIN. SLOPE, TYP.
TIE INTO 6" PVC WITH ELBOW
CLEANOUT, TYP.
4" RUBBER HEADER CURB
SEE GRADING & DRAINAGE PLANS FOR
CONTINUATION OF STORM PIPES. CONNECT 8" PVC
PIPE INTO STMH WITH WATER TIGHT SEAL
I.E.: 467.08'
PLAN
SECTION
4" PERFORATED PVC PIPE
WRAP UNDERDRAIN AND
STONE IN GEOTEXTILE
POROUS GRAVEL AROUND
UNDERDRAIN
GEOTEXTILE SEPARATION
6" SAND BASE
8" COMPACTED
SUBGRADE
GEOTEXTILE SEPARATION
4" RUBBER MULCH
4" X 8" RUBBER
HEADER CURB
CURB 1" ABOVE MULCH
8" PVC PIPE
0.5% MIN. SLOPE, TYP.
ENSURE PVC PIPE DOES NOT
INTERFERE WITH PULL-UP
BAR CONCRETE FOOTINGS
62"
12'
NOTES:
1. THE POSTS ARE 6"X6"X12' AND SUNK 3.5' BELOW THE RUBBER MULCH SURFACE AND ANCHORED WITH
CONCRETE. THE CONCRETE ANCHORS WILL START 4" BELOW THE SAND BASE.
2. THE BARS ARE THREADED WATER PIPE, 1.0" INSIDE DIAMETER, 12' LONG WITH 1" END CAPS
3. THE BARS ARE THROUGH THE 6X6's AT 8.0' AND 7.5' ABOVE THE GROUND
4. THE DISTANCE FROM THE INSIDE POST EDGE IS APPROXIMATELY 62".
5. THE STEP-UPS (16" LONG) ARE CUT FROM 4"X4"X8' POSTS AND SECURED TO THE 6X6's WITH 3" SCREWS
THAT ARE COUNTER SUNK.
6. THE STEP-UP ON THE OUTSIDE 6X6's ARE 18" FROM THE GROUND, THE STEP-UPS ON THE INSIDE POSTS
ARE 24" ABOVE THE GROUND
7. MATCH COLOR AND MATERIAL OF CLIMBING BARS INSTALLED AT AIT BARRACKS COMPLEX, PHASES 1 & 2.
STEP-UPS
STEP-UPS
PULL-UP BARS
N.T.S.
ELEVATION
PLAN VIEW
RUBBER MULCH SURFACE
CONCRETE, TYP.
BAR
WOOD 6X6, TYP.
12"
3" MIN.
12'
12" SQUARE
V A
R I E
S
B
Y
M A
N U
F A
C T
U R
E R
NOTES:
1. BIKE RACK SHALL ACCOMODATE 20 BICYCLES.
2. RACK SHALL BE COATED AFTER COMPLETE FABRICATION WITH A COLORED POLYESTER COATING
APPLIED TO A THICKNESS OF 4-5 MILS. COLOR SHALL BE BLACK AS PER FORT GORDON DESIGN GUIDE.
3. INSTALL RACK PER MANUFACTURERS INSTRUCTIONS.
24'
6', TYP
FOUR, 11-SPACE
RIBBON-STYLE
BICYCLE RACKS, TYP.
PLAN
ASTM SCHEDULE 40, TP304
STEEL PIPE, 2.5" O.D.
PIPE EMBEDDED A MIN. OF
8" INTO CONCRETE
4" CONCRETE SLAB
MATCHING BASE COVER
CONCRETE FOOTING
BICYCLE RACK AND PAD
N.T.S.
SECTION
EXTERIOR
TRACK
SHOULDER
15'
2% MIN. SLOPE
5'5'
0.5" MIN. SYNTHETIC TRACK SURFACE
1.5" BITUMINOUS LEVELING COURSE
1.5" INTERMEDIATE COURSE
6" AGGREGATE BASE COURSE
PRIME COAT
8" COMPACTED SUBGRADE, 98% MOD. PROCTOR
2% M
IN
. S
LO
PE
11'
1% MIN. S
LOPE
COMPACTED SUBGRADE PER SPECIFICATION 31 00 00 EARTHWORK
EXISTING TRACK
RUNNING TRACK SECTION
N.T.S.
TACK COAT
INTERIOR
TRACK
SHOULDER
NOTES:
1. MATCH CROSS-SLOPE OF NEW TRACK SURFACE TO THAT OF THE EXISTING TRACK.
2. THICKNESS OF THE SYNTHETIC TRACK SURFACE WILL BE EQUAL TO THAT OF THE EXISTING TRACK BUT NOT LESS THAN 0.5 INCHES.
3. THE PROPOSED SECTION OF SYNTHETIC TRACK SURFACE SHALL MATCH AS CLOSELY AS POSSIBLE TO THE EXISTING TRACK SURFACE.
IT WILL BE AN IMPERMEABLE, POLYURETHANE-BASED SURFACE SUITABLE FOR FOR ALL-WEATHER PERFORMANCE WITH SIMILAR
CONSTRUCTION AND CUSHIONING.
4. THE SYNTHETIC TRACK SURFACE WILL BE A RED COLOR MATCHING THE EXISTING TRACK.
5. THE SYNTHETIC TRACK SURACE WILL BE INSTALLED PER AN APPROVED SYNTHETIC TRACK SURFACE MANUFACTURER'S
SPECIFICATIONS. CONTRACTOR MUST SUBMIT MANUFACTURER'S SPECIFICATIONS AND INSTALLATION PROCEDURES FOR APPROVAL.
R E
V I S
D
C
O R
D A
N C
E
W
I T
H
A
M E
N D
M E
M
A R
CS503 SITE DETAILS 3
File details come from the government source that posted it. Updated .