About this file
Written by GovTribe AI
· Dec 28, 2023
This federal contract opportunity is for the construction of an Advanced Individual Training Complex at Fort Gordon. The scope of work includes building a battalion headquarters, barracks for 600 soldiers, supporting facilities such as utilities and site development, and connecting the buildings to the existing energy plant. Comprehensive interior design and building information system services are required. The facilities must be designed to a minimum 40-year life in accordance with DoD standards including energy efficiencies and integrated building systems. The magnitude of construction is between $25-100 million. The solicitation will use FAR Part 14 sealed bid procedures. The contracting agency is the US Army Corps of Engineers Savannah District.
Other files
File
Type
Posted
C.04. W912HN21B3003 AIT Abstract-s1_Page_2.jpg
JPG image
Apr 26, 2021
C.04. W912HN21B3003 AIT Abstract-s1_Page_1.jpg
JPG image
Apr 26, 2021
AIT Bid Opening Roster.jpg
JPG image
Apr 26, 2021
B.08. W912HN21B30030004 Amendment.pdf
PDF
Apr 9, 2021
B.08. 21B3003_Amd04_Specs_Vol5_BNHQ.PDF
PDF
Apr 9, 2021
B.08. 21B3003_Amd04_Specs_Vol4_BCOF.PDF
PDF
Apr 9, 2021
B.08. 21B3003_Amd04_Specs_Vol1_BCOF.PDF
PDF
Apr 9, 2021
B.08. W912HN-21-B-3003_DRAWINGS_VOL2_AMD4.pdf
PDF
Apr 9, 2021
B.08. 21B3003_Amd04_Specs_Vol2_BCOF.PDF
PDF
Apr 9, 2021
B.08. 21B3003-Amd04_Specs_Vol6_BNHQ.PDF
PDF
Apr 9, 2021
B.08. W912HN21B30030004 Conformed Copy.pdf
PDF
Apr 9, 2021
21B3003_Amd03_Specs_Vol5_BNHQ Rev3.PDF
PDF
Apr 2, 2021
21B3003_Amd03_Specs_Vol6_BNHQ Rev3.PDF
PDF
Apr 2, 2021
W912HN-21-B-3003_DRAWINGS_VOL2_AMD3.pdf
PDF
Apr 2, 2021
W912HN-21-B-3003_DRAWINGS_VOL3_AMD3.PDF
PDF
Apr 2, 2021
W912HN-21-B-3003_DRAWINGS_VOL4_AMD3.PDF
PDF
Apr 2, 2021
W912HN-21-B-3003_DRAWINGS_VOL1_AMD3.pdf
PDF
Apr 2, 2021
B.08. 21B3003_Amd03_Specs_Vol2_BCOF Rev3.PDF
PDF
Apr 2, 2021
B.08. 21B3003_Amd03_Specs_Vol3_BCOF Rev2.PDF
PDF
Apr 2, 2021
B.08. 21B3003_Amd03_Specs_Vol1_BCOF Rev3.PDF
PDF
Apr 2, 2021
B.08. W912HN21B3003 0003 Conformed Copy.pdf
PDF
Apr 2, 2021
B.08. 21B3003_Amd03_Specs_Vol4_BCOF Rev3.PDF
PDF
Apr 2, 2021
B.08. W912HN21B3003 0003 AMD.pdf
PDF
Apr 2, 2021
W912HN-21-B-3003_DRAWINGS_VOL4_AMD2.PDF
PDF
Mar 22, 2021
21B3003_Specs_Vol6_BNHQ Rev2.PDF
PDF
Mar 22, 2021
21B3003_Specs_Vol5_BNHQ Rev2.PDF
PDF
Mar 22, 2021
21B3003_Specs_Vol3_BCOF Rev1.PDF
PDF
Mar 22, 2021
W912HN-21-B-3003_DRAWINGS_VOL3_AMD2.PDF
PDF
Mar 22, 2021
W912HN21B3003 0002 Conformed copy.pdf
PDF
Mar 22, 2021
21B3003_Specs_Vol2_BCOF Rev2.PDF
PDF
Mar 22, 2021
W912HN-21-B-3003_DRAWINGS_VOL2_AMD2.pdf
PDF
Mar 22, 2021
21B3003_Specs_Vol4_BCOF Rev2.PDF
PDF
Mar 22, 2021
W912HN21B3003 0002 Amendment.pdf
PDF
Mar 22, 2021
21B3003_Specs_Vol1_BCOF Rev2.PDF
PDF
Mar 22, 2021
W912HN-21-B-3003_DRAWINGS_VOL3_AMD1.PDF
PDF
Mar 5, 2021
21B3003_Specs_Vol2_BCOF_Rev1.PDF
PDF
Mar 5, 2021
B.08. W912HN21B30030001 Site Visit IMG_0858.JPG
JPG image
Mar 5, 2021
W912HN21B30030001 Amendment.pdf
PDF
Mar 5, 2021
W912HN-21-B-3003_DRAWINGS_VOL1_AMD1.pdf
PDF
Mar 5, 2021
21B3003_Specs_Vol5_BNHQ_Rev1.PDF
PDF
Mar 5, 2021
W912HN21B3003 0001 Conformed Copy.pdf
PDF
Mar 5, 2021
21B3003_Specs_Vol6_BNHQ_Rev1.PDF
PDF
Mar 5, 2021
20B3003_Specs_Vol1_BCOF_Rev1.PDF
PDF
Mar 5, 2021
21B3003_Specs_Vol4_BCOF_Rev1.PDF
PDF
Mar 5, 2021
AIT Phase III Site Plans.pdf
PDF
Mar 5, 2021
W912HN-21-B-3003_DRAWINGS_VOL2_AMD1.pdf
PDF
Mar 5, 2021
20B3003_Specs_Vol1_BCOF.PDF
PDF
Feb 12, 2021
21B3003_Specs_Vol7_Apps.PDF
PDF
Feb 12, 2021
21B3003_Specs_Vol5_BNHQ.PDF
PDF
Feb 12, 2021
21B3003_Specs_Vol4_BCOF.PDF
PDF
Feb 12, 2021
On GovTribe
Work with this file
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated Mar 6, 2021 .