21B3003_Specs_Vol3_BCOF Rev1.PDF
PDF 2 MB Posted
- Solicitation number
- W912HN21B3003
About this file
This is a solicitation for a construction project. The U.S. Army Corps of Engineers is seeking to construct an Advanced Individual Training complex at Fort Gordon, including a battalion headquarters, barracks for 600 soldiers, running track, physical training facilities, building information systems, fire protection and alarm systems, video surveillance, intrusion detection, and energy monitoring connection. Supporting facilities include site development, utilities, lighting, parking, walks, and landscaping. The project is valued between $25-100 million and will have a period of performance of 720 calendar days. The solicitation will use sealed bid procedures and provide a Hubzone price evaluation preference in accordance with FAR 52.219-4.
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Gordon, Georgia
Solicitation Number
W912HN-21-B-3003
AIT Barracks Complex, Phase 3 Volume 3 of 7: Barracks/COF Specification Divisions 21 - 25
PN 55516
February 2021
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
CORPS OF ENGINEERS
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3640
US Army Corps of Engineers Savannah District
AIT BARRACKS/COF 21B3003
Ft. Gordon, GA Brks/COF
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL
01 45 00.15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.37 INDOOR AIR QUALITY (IAQ) MANAGEMENT
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
DI VI SI ON 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 UNIT MASONRY
DI VI SI ON 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 12 00 BUILT-UP BITUMINOUS WATERPROOFING
07 14 00 FLUID-APPLIED WATERPROOFING
07 19 00 WATER REPELLENTS
PROJECT TABLE OF CONTENTS Page 1
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 27 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE MOISTURE BARRIER
07 41 13 METAL ROOF PANELS
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 54 19 POLYVINYL-CHLORIDE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 13 COILING COUNTER DOORS
08 33 23 OVERHEAD COILING DOORS
08 34 59 VAULT DOORS AND DAY GATES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 44 00 *1 CURTAIN WALL AND GLAZED ASSEMBLIES
08 51 13 ALUMINUM WINDOWS
08 60 45 SKYLIGHTS AND TRANSLUCENT PANELS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DI VI SI ON 09 - FI NI SHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
09 96 00 HIGH-PERFORMANCE COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 14 53 TRAFFIC SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 13 WIRE MESH PARTITIONS
10 22 39 FOLDING PANEL PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 73 00 COVERED TRAINING SHELTER
DI VI SI ON 11 - EQUI PMENT
PROJECT TABLE OF CONTENTS Page 2
11 47 00 *2 ICE MACHINES
DI VI SI ON 12 - FURNI SHI NGS
12 24 13 ROLLER WINDOW SHADES
12 32 00 MANUFACTURED WOOD CASEWORK
12 36 00 COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 93 00 SITE FURNISHINGS
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 21 13 ELECTRIC TRACTION FREIGHT ELEVATORS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 12 00 STANDPIPE SYSTEMS
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
21 30 00 FIRE PUMPS
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 15 COMMON PIPING FOR HVAC
23 05 48.19 BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 52 00 HEATING BOILERS
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 81 47 WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS
23 82 00 TERMINAL HEATING UNITS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
25 05 11.21 CYBERSECURITY FOR FIRE SUPPRESSION CONTROL SYSTEMS
25 05 11.23 CYBERSECURITY FOR HVAC CONTROL SYSTEMS
25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING
25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END
AND INTEGRATION
DI VI SI ON 26 - ELECTRI CAL
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 28 01 COORDINATED POWER SYSTEM PROTECTION
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
PROJECT TABLE OF CONTENTS Page 3
26 51 00 LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 13.43 TELEVISION DISTRIBUTION SYSTEM
27 05 28.36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 22 GEOTEXTILES USED AS FILTERS
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
31 31 16.19 TERMITE CONTROL BARRIERS
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 13.62 ASPHALT SURFACE TREATMENT
32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 12 36.13 ASPHALTIC SEAL COATS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 84 23 UNDERGROUND SPRINKLER SYSTEMS
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 40 00 STORM DRAINAGE UTILITIES
33 46 16 SUBDRAINAGE PIPING
33 48 00 BIORETENTION AREAS
33 51 15 NATURAL-GAS / LIQUEFIED PETROLEUM GAS DISTRIBUTION
PIPELINES
33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
APPENDICES
Appendix A STANDARD FORMS Appendix B GEOTECHNICAL REPORT
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SECTION 21 12 00
STANDPIPE SYSTEMS
05/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
FM GLOBAL (FM)
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 13 (2019; ERTA 1 2018; TIA 18-1; TIA 18-2; ;
ERTA 2-3 2019; TIA 19-3; TIA 19-4; TIA
19-5; TIA 19-6; ERTA 4 2019; ERTA 5 2020)
Standard for the Installation of Sprinkler Systems
NFPA 14 (2019; TIA 19-1) Standard for the Installation of Standpipes and Hose Systems
NFPA 24 (2019; TIA 19-1) Standard for the Installation of Private Fire Service Mains and Their Appurtenances
NFPA 291 (2019) Recommended Practice for Fire Flow Testing and Marking of Hydrants
UNDERWRITERS LABORATORIES (UL)
UL Fire Prot Dir (2012) Fire Protection Equipment Directory
1.2 SYSTEM DESCRIPTION
Design and provide new combination automatic, wet Class I standpipe and fire sprinkler system as shown.
1.3 SYSTEM DESCRIPTION
System design and manufacturer's products shall be in accordance with the required and advisory provisions of NFPA 14 except as modified herein.
Standpipe system shall be designed by hydraulic calculations. Provide sprinkler portion of system under Section 21 13 13 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION. Each system shall include materials, accessories, and equipment inside and outside the building necessary to provide each system complete and ready for use. Devices and equipment shall be UL Fire Prot Dir listed or FM APP GUIDE approved for fire protection service. In the publications referred to herein, the advisory provisions shall be considered to be mandatory, as though the word "shall" had been substituted for "should" wherever it appears; reference to the
SECTION 21 12 00 Page 1
"authority having jurisdiction" shall be interpreted to mean HQ
USACE/CECW-CE.
1.3.1 Residual Pressure
The minimum residual pressure at the outlet of the most remote 64 mm hose connection shall be 100 psig while the system is discharging at the required design flow rates.
1.3.2 Friction Losses
Calculate losses in piping in accordance with the Hazen-Williams formula with 'C' value of 120 for steel piping, 150 for copper tubing, and 140 for cement-lined ductile-iron piping.
1.3.3 Water Supply
A waterflow test was performed by Augusta Utilities Department on 7 May 2020 along West Hospiptal Road that resulted in a static pressure of 67 psi with a residual pressure of 64 psi while flowing 1,130 gpm. This flow test data is provided for information only.
The Contractor's QFPE must perform/witness a fire hydrant flow test -which must be conducted in accordance with NFPA 291 - prior to development and submittal of calculations and shop drawings. Results must include hydrant elevations relative to the building and hydrant number/identifiers for the tested hydrants, including which were flowed, which had a gauge.
This information must be presented in a tabular form if multiple hydrants were flowed. The results must be included with the hydraulic calculations. Hydraulic calculations must be based on the Contractor's flow test noted in this paragraph. Hydraulic calculations must be based upon the Hazen-Williams formula with a "C" value noted in NFPA 13 for piping, and 100 for existing underground piping. Hydraulic calculations must be based on operation of the fire pump(s) provided in Section 21 30 00 FIRE PUMPS. The minimum residual pressure in a service lateral (lead-in) at the design flow rate must be 20 psi at the suction side of the fire pump.
1.3.4 Standpipe System Drawings
Prepare in accordance with the requirements for "Plans and Specifications" as specified in NFPA 14 . Each drawing shall be 34 by 22 inches . Plans shall be drawn to a scale not less than 1/8 inch scale Do not commence work until the design of each system and the various components have been approved. Show data essential for proper installation of each system.
Show details, plan view, elevations, and sections of the systems supply and piping. Show piping schematic of systems supply, devices, valves, pipe, and fittings. Submit drawings signed by a registered fire protection engineer. Show:
a. Room, space or area layout and include pipe supports and hangers.
b. Field wiring diagrams showing locations of devices and points of connection and terminals used for all electrical field connections in the system, with wiring color code scheme.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
SECTION 21 12 00 Page 2 submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
The designated fire protection engineer for the USACE Savannah District Office will review the submittals in this Section requiring District Office (DO) approval.
SD-02 Shop Drawings
Standpipe system ; G, DO
SD-03 Product Data
Aboveground Pipe and fittings ; G, DO
Mechanical couplings ; G, DO
Pipe hangers and supports ; G, DO
Valves , including gate, check, and hose; G, DO
Waterflow detector ; G, DO
Valve tamper switch ; G, DO
Data which describes more than one type of item shall be clearly marked to indicate which type the Contractor intends to provide.
Submit one original for each item and clear, legible, first-generation photocopies for the remainder of the specified copies. Incomplete or illegible photocopies will not be accepted. Partial submittals will not be accepted.
SD-06 Test Reports
Preliminary tests ; G, PO
Acceptance tests ; G, PO
SD-07 Certificates
Qualifications of installer ; G, DO
SD-11 Closeout Submittals
System as-built drawings ; G, DO
1.5 QUALITY ASSURANCE
1.5.1 Qualifications of Installer
Prior to commencing work, submit data showing that the Contractor has successfully installed fire extinguishing standpipe systems of the same type and design as specified herein, or that he has a firm contractual agreement with a subcontractor having the required experience. Include the names and locations of at least two installations where the Contractor, or the subcontractor referred to above, has installed such systems. Indicate the type and design of each system, and certify that
SECTION 21 12 00 Page 3 the system has performed satisfactorily for a period of at least 18 months.
Qualifications of System Technician: Installation drawings, shop drawing and as-built drawings shall be prepared, by or under the supervision of, an individual who is experienced with the types of works specified herein, and is currently certified by the National Institute for Certification in Engineering Technologies (NICET) as an engineering technician with minimum Level-III certification in Automatic Sprinkler System program. Contractor shall submit data for approval showing the name and certification of all involved individuals with such qualifications at or prior to submittal of drawings.
1.5.2 System As-Built Drawings
Upon completion, and before final acceptance of the work, submit a complete set of as-built drawings of each system. Submit 34 by 22 inch reproducible as-built drawings on mylar film with title block similar to full size contract drawings. Furnish as-built(record) working drawings in addition to the as-built drawings required by Division 1, "General Requirements."
1.6 DELIVERY, STORAGE AND HANDLING
Protect stored equipment from weather, humidity and temperature variations, dirt, dust, and other contaminants.
PART 2 PRODUCTS
2.1 ABOVEGROUND PIPING SYSTEMS
Provide fittings for changes in direction of piping and for connections.
Make changes in piping sizes through tapered reducing pipe fittings;
bushings will not be permitted. Perform welding in the shop; field welding will not be permitted. Conceal piping in areas with suspended ceiling.
2.1.1 Pipe and Fittings
NFPA 14 , except as modified herein. Steel piping shall be Schedule 40 for sizes less than 8 inches , and Schedule 30 or 40 for sizes 8 inches and larger. Fittings shall be welded, threaded, or grooved-end type.
Plain-end fittings with mechanical couplings and fittings which use steel gripping devices to bite into the pipe when pressure is applied will not be permitted. Rubber gasketed grooved-end pipe and fittings with mechanical couplings shall be permitted in pipe sizes 1.5 inches and larger. Fittings shall be UL Fire Prot Dir listed or FM APP GUIDE approved for use in wet pipe sprinkler systems. Fittings, mechanical couplings, and rubber gaskets shall be supplied by the same manufacturer.
Steel piping with wall thickness less than Schedule 30 shall not be threaded. Side outlet tees using rubber gasketed fittings shall not be permitted. Pipe and fittings shall be metal.
2.1.2 Pipe Hangers and Supports
Provide in accordance with NFPA 14 .
2.1.3 Valves
NFPA 14 . Provide valves of types approved for fire service. Hose and
SECTION 21 12 00 Page 4 gate valves shall open by counterclockwise rotation. Provide isolation and check valves as required by NFPA 14 . Isolation valves shall be OS&Y type. Check valves shall be flanged clear opening swing-check type with flanged inspection and access cover plate for sizes 4 inches and larger.
2.1.3.1 Hose Valves
Provide bronze hose valve with 2 1/2 inch National Standard male hose threads, and 2 1/2 inch NH female by 1 1/2 inch IPT male reducer with cap and chain.
2.1.4 Identification Signs
NFPA 14 . Attach properly lettered and approved metal signs to each valve and alarm device.
2.1.5 Waterflow Test Connection
Provide test connections approximately 6 feet above the floor for each standpipe system or portion of each standpipe system equipped with an alarm device; locate downstream and adjacent to each alarm actuating device. Provide test connection piping to a location where the discharge will be readily visible and where water may be discharged without property damage. Discharge to janitor sinks or similar fixtures shall not be permitted. Provide discharge orifice equivalent to 1/2 inch sprinkler orifice. The penetration of the exterior wall shall be no greater than 2 feet above finished grade.
2.1.6 Main Drains
Provide separate drain piping to discharge at safe points outside each building or to sight cones attached to drains of adequate size to readily receive the full flow from each drain under maximum pressure. Provide auxiliary drains as required by NFPA 13 and NFPA 14 .
2.1.7 Pipe Sleeves
Provide where piping passes entirely through walls, floors, roofs and partitions. Secure sleeves in position and location during construction.
Provide sleeves of sufficient length to pass through entire thickness of walls, floors, roofs and partitions. Provide one inch minimum clearance between exterior of piping and interior of sleeve or core-drilled hole.
Firmly pack space with mineral wool insulation. Seal space at both ends of the sleeve or core-drilled hole with plastic waterproof cement which will dry to a firm but pliable mass, or provide a mechanically adjustable segmented elastomeric seal. In fire walls and fire floors, seal both ends of pipe sleeves or core-drilled holes with UL listed fill, void, or cavity material.
2.1.7.1 Sleeves in Masonry and Concrete Walls, Floors, and Roofs
Provide hot-dip galvanized steel, ductile-iron, or cast-iron sleeves.
Core drilling of masonry and concrete may be provided in lieu of pipe sleeves when cavities in the core-drilled hole are completely grouted smooth. Extend sleeves in floor slabs 3 inches above finished floors.
2.1.7.2 Sleeves in Partitions
Provide 26 gauge galvanized steel sheet.
SECTION 21 12 00 Page 5
2.1.8 Escutcheon Plates
Provide one piece or split hinge type metal plates for piping passing through walls, floors, and ceilings in both exposed and concealed spaces.
Provide polished stainless steel plates or chromium-plated finish on copper alloy plates in finished spaces. Provide paint finish on metal plates in unfinished spaces. Securely anchor plates in place.
2.1.9 Fire Department Connections
Fire department connection shall be a freestanding unit provided by Augusta Utilities Department (AUD), and shall be located adjacent to the backflow preventer.
2.1.10 Waterflow Detector
Provide vane-type waterflow detector with mechanical diaphragm controlled retard device adjustable from 10 to 60 seconds and shall instantly recycle. Connect into the building fire alarm system. Provide a detector at the base of each standpipe riser upstream of main check valve.
Connection of flow detector switches to the building FACP must be performed by the fire alarm system installer.
2.1.11 Valve Tamper Switch
Provide valve tamper switch(es) to monitor the open position of valve(s) controlling water supply to the standpipe system. Switch contacts shall transfer from the normal (valve open) position to the off-normal (valve closed) position during the first two revolutions of the hand wheel or when the stem of the valve has moved not more than one-fifth of the distance from its normal position. Switch shall be tamper resistant.
Removal of the cover shall cause switch to operate into the off-normal position.
2.1.12 Fire Pumps
Provide as specified in Section 21 30 00 FIRE PUMPS.
2.2 ELECTRICAL WORK
Provide electrical work associated with this section under Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM, except for fire alarm wiring. Provide fire alarm wiring and connection to fire alarm systems under Section 28 31 76
INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM.
PART 3 EXECUTION
3.1 EXCAVATION, BACKFILLING, AND COMPACTING
Provide under this section as specified in Section 31 00 00 EARTHWORK.
3.2 CONNECTIONS TO EXISTING WATER SUPPLY SYSTEMS
Piping more than 5 feet outside the building walls shall be installed by Augusta Utilities Department (AUD).
SECTION 21 12 00 Page 6
3.3 STANDPIPE SYSTEM INSTALLATION
Equipment, materials, installation, workmanship, fabrication, assembly, erection, examination, inspection, and testing shall be in accordance with the NFPA standards referenced herein. Install piping straight and true to bear evenly on hangers and supports. Conceal piping to the maximum extent possible. Piping shall be inspected, tested and approved before being concealed. Provide fittings for changes in direction of piping and for all connections Make changes in piping sizes through standard reducing pipe fittings; do not use bushings. Cut pipe accurately and work into place without springing or forcing. Ream pipe ends and free pipe and fittings from burrs. Clean with solvent to remove all varnish and cutting oil prior to assemble. Make screw joints with PTFE tape applied to male thread only.
3.4 FIELD PAINTING
Field painting of fire extinguishing standpipe system shall be specified in Section 09 90 00 PAINTS AND COATINGS. Field painting requirements for "Fire Extinguishing Sprinkler Systems" shall apply.
3.4.1 Piping Labels
Provide permanent labels in mechanical rooms, spaced at 20 foot maximum intervals along pipe, indicating "STANDPIPE."
3.5 ELECTRICAL WORK
Provide electrical work associated with this section under Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM, except for fire alarm wiring. Provide fire alarm wiring and connection to fire alarm systems under Section 28 31 76
INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM.
3.6 FLUSHING
Flush the piping system with potable water in accordance with NFPA 14 .
Continue flushing operation until water is clear, but for not less than 10 minutes.
3.7 FIELD QUALITY CONTROL
Prior to initial operation, inspect equipment and piping systems for compliance with drawings, specifications, and manufacturer's submittals.
Perform tests in the presence of the Contracting Officer to determine conformance with the specified requirements.
3.7.1 Preliminary Tests
Each piping system shall be hydrostatically tested at 200 psig in accordance with NFPA 14 and NFPA 24 and shall show no leakage or reduction in gauge pressure after 2 hours. The Contractor shall conduct complete preliminary tests, which shall encompass all aspects of system operation.
Individually test alarms, and all other components and accessories to demonstrate proper functioning. Test water flow alarms by flowing water.
When tests have been completed and all necessary corrections made, submit to the Contracting Officer a signed and dated certificate, similar to that specified in NFPA 13 , attesting to the satisfactory completion of all testing and stating that the system is in operating condition. Also include a written request for a formal inspection and test.
SECTION 21 12 00 Page 7
3.7.2 Formal Inspection and Tests ( Acceptance Tests )
The Contracting Officer's Designated Representative (COR), Fire Protection Engineer, will witness formal tests and approve all systems before they are accepted. The system shall be considered ready for such testing only after all necessary preliminary tests have been made and all deficiencies found have been corrected to the satisfaction of the Contracting Officer and written certification to this effect is received by the District Fire Protection Engineer. Submit the request for formal inspection and testing at least 21 calendar days prior to the date the inspection is to take place. Experienced technicians regularly employed by the Contractor in the installation of both the mechanical and electrical portions of such systems shall be present during the inspection and shall conduct the testing. All instruments, personnel, appliances and equipment for testing shall be furnished by the Contractor. All necessary tests encompassing all aspects of system operation shall be made including the following, and any deficiency found shall be corrected and the system retested at no cost to the Government.
3.7.2.1 Flow Test
Perform flow tests of each standpipe riser in accordance with NFPA 14.
Affix 0-200 psi pressure gauges to lowest hose valve and next-to-highest hose valve. Connect lined, 2 1/2 inch diameter fire hose with underwriter's playpipe to highest hose valve and flow at least 250 gpm for 5 minutes from standpipe to a safe location outside the building. Furnish hose, nozzles and fittings required for this test.
3.7.2.2 Alarm Testing
a. Each pressure switch, waterflow detector, and water flow alarm bell shall be activated by flow of water.
b. Each valve tamper switch shall be activated by partially closing the associated control valve.
c. Alarm annunciation at the fire alarm control panel shall be verified.
d. Circuit supervision shall be demonstrated.
3.7.3 Additional Tests
When deficiencies, defects or malfunctions develop during the tests required, all further testing of the system shall be suspended until proper adjustments, corrections or revisions have been made to assure proper performance of the system. If these revisions require more than a nominal delay, the Contracting Officer shall be notified when the additional work has been completed, to arrange a new inspection and test of the system. All tests required shall be repeated prior to final acceptance, unless directed otherwise.
-- End of Section --
SECTION 21 12 00 Page 8
SECTION 21 13 13
WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
08/20
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B16.1 (2015) Gray Iron Pipe Flanges and Flanged Fittings Classes 25, 125, and 250
ASME B16.3 (2016) Malleable Iron Threaded Fittings, Classes 150 and 300
ASME B16.4 (2016) Standard for Gray Iron Threaded Fittings; Classes 125 and 250
ASME B16.21 (2016) Nonmetallic Flat Gaskets for Pipe Flanges
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C104/A21.4 (2016) Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water
AWWA C110/A21.10 (2012) Ductile-Iron and Gray-Iron Fittings for Water
AWWA C111/A21.11 (2017) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings
AWWA C203 (2008) Coal-Tar Protective Coatings and Linings for Steel Water Pipelines - Enamel and Tape - Hot-Applied
ASTM INTERNATIONAL (ASTM)
ASTM A47/A47M (1999; R 2018; E 2018) Standard Specification for Ferritic Malleable Iron Castings
ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A135/A135M (2009; R2014) Standard Specification for Electric-Resistance-Welded Steel Pipe
ASTM A153/A153M (2016a) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
SECTION 21 13 13 Page 1
ASTM A183 (2014; R 2020) Standard Specification for Carbon Steel Track Bolts and Nuts
ASTM A536 (1984; R 2019; E 2019) Standard Specification for Ductile Iron Castings
FM GLOBAL (FM)
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
INTELLIGENCE COMMUNITY STANDARD (ICS)
ICS 705-1 (2010) Physical and Technical Security Standard for Sensitive Compartmented Information Facilities
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-71 (2018) Gray Iron Swing Check Valves, Flanged and Threaded Ends
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 13 (2019; ERTA 1 2018; TIA 18-1; TIA 18-2; ;
ERTA 2-3 2019; TIA 19-3; TIA 19-4; TIA
19-5; TIA 19-6; ERTA 4 2019; ERTA 5 2020)
Standard for the Installation of Sprinkler Systems
NFPA 13R (2013) Standard for the Installation of Sprinkler Systems in Residential Occupancies Up to and Including Four Stories in Height
NFPA 24 (2019; TIA 19-1) Standard for the Installation of Private Fire Service Mains and Their Appurtenances
NFPA 101 (2018; ERTA 18-1; ERTA 18-2; ERTA 18-3;
ERTA 18-4; TIA 18-1; TIA 18-2; TIA 18-3;
TIA 18-4) Life Safety Code
NFPA 291 (2019) Recommended Practice for Fire Flow Testing and Marking of Hydrants
NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES
(NICET)
NICET 1014-7 (2012) Program Detail Manual for Certification in the Field of Fire Protection Engineering Technology (Field Code 003) Subfield of Automatic Sprinkler System Layout
UNDERWRITERS LABORATORIES (UL)
UL 199 (2020) UL Standard for Safety Automatic
SECTION 21 13 13 Page 2
Sprinklers for Fire-Protection Service
UL 312 (2010; Reprint Mar 2018) UL Standard for Safety Check Valves for Fire-Protection Service
UL 668 (2004; Reprint Jul 2016) UL Standard for Safety Hose Valves for Fire-Protection Service
UL Fire Prot Dir (2012) Fire Protection Equipment Directory
1.2 SYSTEM DESCRIPTION
The AIT Barracks Building shall be protected by a combination standpipe/wet-pipe sprinkler system. Refer to Section 21 12 00 for standpipe system requirements. Provide wet pipe sprinkler system(s) in all areas of the building. Except as modified herein, the system must meet the requirements of NFPA 13 . Pipe sizes which are not indicated on the Contract drawings must be determined by hydraulic calculations.
1.2.1 Hydraulic Design
1.2.1.1 Basis for Calculations
A waterflow test was performed by Augusta Utilities Department on 7 May 2020 along West Hospiptal Road that resulted in a static pressure of 67 psi with a residual pressure of 64 psi while flowing 1,130 gpm. This flow test data is provided for information only.
The contractor's QFPE must perform/witness a fire hydrant flow test -which MUST be conducted in accordance with NFPA 291 - prior to development and submittal of calculations and Shop Drawings . Results must include hydrant elevations relative to the building and hydrant number/identifiers for the tested hydrants, including which were flowed, which had a gauge.
This information must be presented in a tabular form if multiple hydrants were flowed. The results must be included with the hydraulic calculations. Hydraulic calculations must be based on the Contractor's flow test noted in this paragraph. Hydraulic calculations must be based upon the Hazen-Williams formula with a "C" value noted in NFPA 13 for piping, and 100 for existing underground piping. Hydraulic calculations must be based on operation of the fire pump(s) provided in Section 21 30 00 FIRE PUMPS. The minimum residual pressure in a service lateral (lead-in) at the design flow rate must be 20 psi at the suction side of the fire pump.
1.2.1.2 Hydraulic Calculations
a. Water supply curves and system requirements must be plotted on semi-logarithmic graph (N^1.85) paper so as to present a summary of the complete hydraulic calculation.
b. Provide a summary sheet listing sprinklers in the design area and their respective hydraulic reference points, elevations, minimum discharge pressures and minimum flows. Elevations of hydraulic reference points (nodes) must be indicated.
c. Documentation must identify each pipe individually and the nodes connected thereto. Indicate the diameter, length, flow, velocity, SECTION 21 13 13 Page 3 friction loss, number and type fittings, total friction loss in the pipe, equivalent pipe length and Hazen-Williams coefficient for each pipe.
d. Where the sprinkler system is supplied by interconnected risers, the sprinkler system must be hydraulically calculated using the hydraulically most demanding single riser. The calculations must not assume the simultaneous use of more than one riser.
e. All calculations must include the backflow preventer manufacturer's stated friction loss at the design flow or 12 psi for reduced pressure backflow preventer, whichever is greater.
f. All calculations must be performed back to the actual location of the flow test, taking into account the direction of flow in the service main at the test location.
g. For gridded systems, calculations must show peaking of demand area friction loss to verify that the hydraulically most demanding area is being used. A flow diagram indicating the quantity and direction of flows must be included.
1.2.1.3 Design Criteria
Hydraulically design the sprinkler system to discharge a minimum density of 0.20 gpm/square foot over the hydraulically most demanding 2,500 square feet of floor area. Hydraulic calculations must be in accordance with the Area/Density Method of NFPA 13. Add an allowance for exterior hose streams of 250 gpm to the sprinkler system demand at the fire hydrant shown on the drawings closest to the point where the water service enters the building.
1.2.2 Sprinkler Coverage
Sprinklers must be uniformly spaced on branch lines. Provide coverage throughout 100 percent of the building. This includes, but is not limited to, telephone rooms, electrical equipment rooms (regardless of the fire resistance rating of the enclosure), boiler rooms, switchgear rooms, transformer rooms, attached electrical vaults and other electrical and mechanical spaces. Coverage per sprinkler must be in accordance with NFPA 13 . Provide sprinklers below all obstructions in accordance with NFPA 13 . Exceptions are as follows:
a. Sprinklers may be omitted from small rooms which are exempted for specific occupancies in accordance with NFPA 101 .
b. Facilities that are designed in accordance with NFPA 13R.
1.2.3 Qualified Fire Protection Engineer (QFPE)
An individual who is a licensed professional engineer (P.E.) who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveying (NCEES) and has relevant fire protection engineering experience. Services of the QFPE must include:
a. Reviewing SD-02, SD-03, and SD-05 submittal packages for completeness and compliance with the provisions of this specification. Working (shop) drawings and calculations must be prepared by, or prepared
SECTION 21 13 13 Page 4 under the immediate supervision of, the QFPE. The QFPE must affix their professional engineering stamp with signature to the shop drawings, calculations, and material data sheets, indicating approval prior to submitting the shop drawings to the DFPE.
b. Provide a letter documenting that the SD-02, SD-03, and SD-05 submittal package has been reviewed and noting all outstanding comments.
c. Performing in-progress construction surveillance prior to installation of ceilings (rough-in inspection).
d. Witnessing pre-Government functional performance testing and performing a final installation review.
e. Signing applicable certificates under SD-07.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government (DO = Savannah District Office DFPE, PO = Fort Gordon Project Office). Partial submittals and submittals not fully complying with NFPA 13 and this specification section must be returned Disapproved Without Review. SD-02, SD-03 and SD-05 must be submitted simultaneously.
Shop drawings (SD-02), product data (SD-03) and calculations (SD-05) must be prepared by the designer and combined and submitted as one complete package. The QFPE must review the SD-02/SD-03/SD-05 submittal package for completeness and compliance with the Contract provisions prior to submission to the Government. The QFPE must provide a Letter of Confirmation that they have reviewed the submittal package for compliance with the contract provisions. This letter must include their professional engineer stamp and signature. Partial submittals and submittals not reviewed by the QFPE must be returned Disapproved Without Review.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Qualified Fire Protection Engineer (QFPE) ; G, DO
Sprinkler System Designer ; G, DO
Sprinkler System Installer ; G, DO
SD-02 Shop Drawings
Shop Drawings ; G, DO
SD-03 Product Data
Pipe ; G, DO
Fittings ; G, DO
SECTION 21 13 13 Page 5
Valves , including gate, check, butterfly, and globe; G, DO
Relief Valves ; G, DO
Sprinklers ; G, DO
Pipe Hangers and Supports ; G, DO
Sprinkler Alarm Switch ; G, DO
Valve Supervisory (Tamper) Switch ; G, DO
Air Vent ; G, DO
Hose Valve ; G, DO
Nameplates ; G, DO
Data which describes more than one type of item shall be clearly marked to indicate which type the Contractor intends to provide.
Submit one original for each item and clear, legible, first-generation photocopies for the remainder of the specified copies. Incomplete or illegible photocopies will not be accepted. Partial submittals will not be accepted.
SD-05 Design Data
Hydraulic Calculations ; G, DO
SD-06 Test Reports
Test Procedures ; G, DO
SD-07 Certificates
Verification of Compliant Installation ; G, PO
Request for Government Final Test ; G, PO
SD-10 Operation and Maintenance Data
Operating and Maintenance (O&M) Instructions ; G, PO
Spare Parts Data; G, PO
SD-11 Closeout Submittals
As-built drawings
1.4 QUALITY ASSURANCE
1.4.1 Preconstruction Submittals
Within 36 days of contract award but no less than 14 days prior to commencing work on site, the prime Contractor must submit the following for review and approval. SD-02, SD-03, and SD-05 submittals received prior to the review and approval of the qualifications submittals listed under SD-01 will be returned Disapproved Without Review.
SECTION 21 13 13 Page 6
1.4.1.1 Shop Drawings
Three copies of the shop drawings, no later than 28 days prior to the start of system installation. Working drawings conforming to the requirements prescribed in NFPA 13 and must be no smaller than ANSI D.
Each set of drawings must include the following:
1. A descriptive index with drawings listed in sequence by number. A legend sheet identifying device symbols, nomenclature, and conventions used in the package.
2. Floor plans drawn to a scale not less than 1/8-inch equals 1-foot clearly showing locations of devices, equipment, risers, and other details required to clearly describe the proposed arrangement.
3. Actual center-to-center dimensions between sprinklers on branch lines and between branch lines; from end sprinklers to adjacent walls; from walls to branch lines; from sprinkler feed mains, cross mains and branch lines to finished floor and roof or ceiling. A detail must show the dimension from the sprinkler and sprinkler deflector to the ceiling in finished areas.
4. Longitudinal and transverse building sections showing typical branch line and cross main pipe routing, elevation of each typical sprinkler above finished floor and elevation of "cloud" or false ceilings in relation to the building ceilings.
5. Plan and elevation views which establish that the equipment will fit the allotted spaces with clearance for installation and maintenance.
6. Riser layout drawings drawn to a scale of not less than 1/2-inch equals 1 foot to show details of each system component, clearances between each other and from other equipment and construction in the room.
7. Details of each type of riser assembly, pipe hanger, and restraint of underground water main at point-of-entry into the building, and electrical devices and interconnecting wiring. The dimension from the edge of vertical piping to the nearest adjacent wall(s) must be indicated on the drawings when vertical piping is located in stairs or other portions of the means of egress.
8. Details of each type of pipe hanger and related components.
9. Include fire pump curve with shop drawings and hydraulic calculations.
1.4.1.2 Product Data
Submit three copies of annotated catalog data to show the specific model, type, and size of each item. Catalog cuts must also indicate the NRTL listing. The data must be highlighted to show model, size, options, and other pertinent information, that are intended for consideration. Data must be adequate to demonstrate compliance with all contract requirements. Product data for all equipment must be combined into a single submittal.
1.4.1.3 Hydraulic Calculations
Calculations must be as outlined in NFPA 13 except that calculations must be performed by computer using software intended specifically for fire
SECTION 21 13 13 Page 7 protection system design using the design data shown on the drawings.
Calculations must include isometric diagram indicating hydraulic nodes and pipe segments. Include fire pump curve with submittal.
The backflow preventer assembly shall be a double-check detector type unit, per the requierments of Augusta Utilities Department. Hydraulic calculations must include a minimum of 8 PSI pressure loss across the backflow preventer or the actual pressure loss, whichever is greater.
1.4.1.4 Operating and Maintenance (O&M) Instructions
Submit in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA as supplemented and modified by this specification section.
Provide three manuals and one PDF version on electronic media. The manuals must include the manufacturer's name, model number, parts list, list of parts and tools that should be kept in stock by the owner for routine maintenance, troubleshooting guide, and recommended service organization (including address and telephone number) for each item of equipment. Each service organization submitted must be capable of providing 4-hour on-site response to a service call on an emergency basis.
Submit spare parts data for each different item of material and equipment specified. The data must include a complete list of parts and supplies, and a list of parts recommended by the manufacturer to be replaced after 1 year and 3 years of service. Include a list of special tools and test equipment required for maintenance and testing of the products supplied.
1.4.2 Qualifications
1.4.2.1 Sprinkler System Designer
The sprinkler system designer must be certified as a Level III Technician by National Institute for Certification in Engineering Technologies (NICET) in the Water-Based Systems Layout subfield of Fire Protection Engineering Technology in accordance with NICET 1014-7 .
1.4.2.2 Sprinkler System Installer
The sprinkler system installer must be regularly engaged in the installation of the type and complexity of system specified in the contract documents, and must have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.
1.4.3 Regulatory Requirements
Equipment and material must be listed or approved. Listed or approved, as used in this Section, means listed, labeled or approved by a Nationally Recognized Testing Laboratory (NRTL) such as UL Fire Prot Dir or FM APP GUIDE. The omission of these terms under the description of an item or equipment described must not be construed as waiving this requirement. All listings or approvals by testing laboratories must be from an existing ANSI or UL published standard. The recommended practices stated in the manufacturer's literature or documentation are mandatory requirements.
SECTION 21 13 13 Page 8
1.5 DELIVERY, STORAGE, AND HANDLING
Protect all equipment delivered and placed in storage from the weather, excessive humidity and temperature variations, dirt and dust, or other contaminants. All pipes must be either capped or plugged until installed.
1.6 EXTRA MATERIALS
Spare sprinklers and wrench(es) must be provided as spare parts in accordance with NFPA 13 .
PART 2 PRODUCTS
2.1 MATERIALS AND EQUIPMENT
2.1.1 Standard Products
Provide materials, equipment, and devices listed for fire protection service when so required by NFPA 13 or this specification. For each classification of material, select materials from one manufacturer where possible, and not a combination of manufacturers. Material and equipment must be standard products of a manufacturer regularly engaged in the manufacture of the products for at least 2 years prior to bid.
2.1.2 Nameplates
Major components of equipment must have the manufacturer's name, address, type or style, model or serial number, catalog number, date of installation, installing Contractor's name and address, and the contract number provided on a new name plate permanently affixed to the item or equipment. Nameplates must be etched metal or plastic, permanently attached by screws to control units, panels or adjacent walls.
2.1.3 Identification and Marking
Pipe and fitting markings must include name or identifying symbol of manufacturer and nominal size. Pipe must be marked with ASTM designation. Valves and equipment markings must have name or identifying symbol of manufacturer, specific model number, nominal size, name of device, arrow indicating direction of flow, and position of installation (horizontal or vertical), except if valve can be installed in either position. Markings must be included on the body casting or on an etched or stamped metal nameplate permanently on the valve or cover plate.
2.1.4 Pressure Ratings
Valves, fittings, couplings, alarm switches, and similar devices must be rated for the maximum working pressures that can be experienced in the system, but in no case less than 175 psi .
2.2 UNDERGROUND PIPING COMPONENTS
2.2.1 Pipe
Pipe must comply with NFPA 24 . Minimum pipe size is 6 inches . Piping more than 5 feet outside the building walls will be designed and installed by Augusta Utilities Department. A continuous section of welded stainless steel fire water service piping from a point outside the building perimeter to a flanged fitting at least one foot above the finished floor
SECTION 21 13 13 Page 9 within the building is acceptable.
2.2.2 Fittings and Gaskets
Fittings must be ductile-iron conforming to AWWA C110/A21.10 with cement mortar lining conforming to AWWA C104/A21.4 . Gaskets must be suitable in design and size for the pipe with which such gaskets are to be used.
Gaskets for ductile-iron pipe joints must conform to AWWA C111/A21.11 .
2.2.3 Buried Utility Warning and Identification Tape
Provide detectable aluminum foil plastic backed tape or detectable magnetic plastic tape manufactured specifically for warning and identification of buried piping. Tape must be detectable by an electronic detection instrument. Provide tape, 3 inches minimum width, color coded for the utility involved with warning and identification imprinted in bold block letters continuously and repeatedly over the entire tape length.
Warning and identification must read "CAUTION BURIED WATER PIPING BELOW" or similar wording. Use permanent code and letter coloring unaffected by moisture and other substances contained in trench backfill material.
2.3 ABOVEGROUND PIPING COMPONENTS
2.3.1 Steel Piping Components
2.3.1.1 Steel Pipe
Except as modified herein, steel pipe must be black as permitted by NFPA 13 and conform to the applicable provisions of ASTM A53/A53M, ASTM A135/A135M or ASTM A153/A153M .
Steel pipe must be minimum Schedule 40 for sizes 2 inches and less; and minimum Schedule 10 for sizes larger than 2 inches . Steel piping with wall thickness less than Schedule 40 must not be threaded.
2.3.1.2 Fittings
Fittings must be welded, threaded, or grooved-end type. Threaded fittings must be cast-iron conforming to ASME B16.4 , malleable-iron conforming to ASME B16.3 or ductile-iron conforming to ASTM A536. Plain-end fittings with mechanical couplings, fittings that use steel gripping devices to bite into the pipe, steel press fittings and field welded fittings are not permitted. Fittings, mechanical couplings, and rubber gaskets must be supplied by the same manufacturer. Threaded fittings must use Teflon tape or manufacturer's approved joint compound. Saddle tees using rubber gasketed fittings are not permitted on this project. Reducing couplings are not permitted except as allowed by NFPA 13 .
2.3.1.3 Grooved Mechanical Joints and Fittings
Joints and fittings must be designed for not less than 175 psi service and the product of the same manufacturer. Field welded fittings must not be used. Fitting and coupling housing must be malleable-iron conforming to ASTM A47/A47M, Grade 32510; ductile-iron conforming to ASTM A536, Grade 65-45-12. Rubber gasketed grooved-end pipe and fittings with mechanical couplings are permitted in pipe sizes 2 inches and larger. Gasket must be the flush type that fills the entire cavity between the fitting and the pipe. Nuts and bolts must be heat-treated steel conforming to ASTM A183 and must be cadmium-plated or zinc-electroplated.
SECTION 21 13 13 Page 10
2.3.1.4 Flanges
Flanges must conform to NFPA 13 and ASME B16.1 . Gaskets must be non-asbestos compressed material in accordance with ASME B16.21 , 1/16-inch thick, and full face or self-centering flat ring type.
2.3.2 Flexible Sprinkler Hose
The use of flexible hose is not permitted.
2.3.3 Pipe Hangers and Supports
Provide galvanized pipe hangersand supports in accordance with NFPA 13 .
2.3.4 Valves
Provide valves of types approved for fire service. Valves must open by counterclockwise rotation.
2.3.4.1 Control Valve
Manually operated sprinkler control/gate valve must be outside stem and yoke (OS&Y) type, butterfly type, or as indicated on the drawings, and must be listed/approved for use in fire sprinkler systems.
2.3.4.2 Check Valves
Check valves must comply with UL 312 . Check valves 4 inches and larger must be of the swing type, have a clear waterway and meet the requirements of MSS SP-71 , for Type 3 or 4. Inspection plate must be provided on valves larger than 6 inches .
2.3.4.3 Hose Valve
Valve must comply with UL 668 .
2.3.5 Riser Check Valves
Provide riser check valve, pressure…