B.08. W912HN21B30030004 Amendment.pdf
PDF 365 KB Posted
- Solicitation number
- W912HN21B3003
About this file
This document summarizes an amendment to a federal solicitation for construction services. The amendment updates technical specifications and drawings for a project to construct an Advanced Individual Training Complex at Fort Gordon, including a battalion headquarters and barracks for 600 soldiers, as well as supporting facilities. Revisions include updated sections for barracks and company operations facilities, added sections, and replacement drawings. The related opportunity is a full and open competitive solicitation by the Army Corps of Engineers seeking a standard design for facilities with a 40-year minimum life. Services required include construction, building information and security systems, as well as interior design. Pricing will be evaluated for HUBZone small business preference. The period of performance is 720 calendar days for a project valued between $25-100 million.
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
55516
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
A) Update specif ications and draw ings.
B) See Amendment 0004 summary of changes.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Apr-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HN21B3003
X 9B. DATED (SEE ITEM 11)
12-Feb-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Apr-2021
CODE
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN21B3003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
A. CONTRACT CHANGES: None.
B. TECHNICAL SPECIFICATION CHANGES: The revised Sections listed below (revised by Amendment No. 0004) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be found in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1). The replaced and added Sections listed below (replaced and added by Amendment No.
0004) are hereby added to and made a part of the solicitation; such Sections are replaced and added in their entirety and changes are neither underlined nor struck out. Deleted Sections are also indicated below.
Barracks/COF:
Revised Sections Added Sections Deleted Sections 07 21 13 14 21 23 14 21 13 08 33 23 10 11 00 27 10 00 28 31 76 33 61 13.13
BN HQ:
Revised Sections Added Sections Deleted Sections 12 36 00 --- --- 33 61 13.13
C. CONTRACT DRAWINGS – File No. 721-21-04:
Volume 1:
No changes.
Volume 2:
Sheet A-106A, with Revision 1 dated 07 April 2021, is hereby added to and made a part of the Contract Drawings.
W912HN21B3003
Sheets A-106, A-110, A-113, A-116, A-408, and A-423, with Revision 2 dated 07 April 2021, are hereby added to and made a part of the Contract Drawings.
Sheets A-108, A-110A, A-113A, A-116A, A-119, and A-119A, I-619, and I-624 with Revision 3 dated 07 April 2021, are hereby added to and made a part of the Contract Drawings.
Sheet A-604, with Revision 4 dated 07 April 2021, is hereby added to and made a part of the Contract Drawings.
No changes were made to the following drawings except for the revision mark and are now included in this amendment:
A-002, A-101, A-103, A-104, A-121, A-145, A-152, A-200, A-202, A-205, A-301, A-302, A-312, A-313, A-314, A-315, A-316, A-403, A-404, A-407, A-409, A-411, A-426, A-503, A-505, A-521, A-605, A-608, A-629, A-630, A-703, A-801, A-802, A-803, A-804, A-805, and A-901.
Sheet A-401 was inadvertently added to Amendment 0003, however no revisions were made.
Volume 3:
No changes.
Volume 4:
No changes.
(End of Summary of Changes)