W912HN-20-R-3009_VOL3_AMD6.pdf

PDF 81 KB Posted

Attached to
PN 88410 Construct Aircraft Maintenance Hangar, Hunter Army Airfield, Savannah, GA
Solicitation number
W912HN20R3009
Issued by

About this file

This document contains plumbing schedules and specifications for the construction of an aircraft maintenance hangar at Hunter Army Airfield in Savannah, Georgia. The schedules include details for plumbing fixtures, pumps, domestic hot water heaters, air compressors, and thermostatic mixing valves. Proposals for the project are due by December 15, 2020. The solicitation was posted on October 29, 2020 by the Department of the Army Corps of Engineers Engineering District Savannah under solicitation number W912HN20R3009. The project involves the construction of a new aircraft maintenance hangar and annex buildings.

View the file

Other files

File Type Posted
B.08 - W912HN20R3009 - AMD-0008.pdf PDF
B.08 - W912HN20R3009 - AMD0008CC.pdf PDF
B.08 - W912HN20R3009 - AMD0007.pdf PDF
B.08 - W912HN20R3009 - AMD0007CC.pdf PDF
20R3009vol1amd06.pdf PDF
B.08 - W912HN20R3009 - AMD0006.pdf PDF
B.08 - W912HN20R3009 - AMD0006 CC.pdf PDF
20R3009vol1_AMD5.pdf PDF
20R3009vol3_AMD5.pdf PDF
B.08. W912HN20R30090005.pdf PDF
W912HN-20-R-3009_VOL2_AMD5.pdf PDF
20R3009vol2_AMD5.pdf PDF
W912HN-20-R-3009_VOL3_AMD5.pdf PDF
W912HN-20-R-3009_VOL1_AMD4.pdf PDF
W912HN-20-R-3009_VOL3_AMD4.pdf PDF
W912HN-20-R-3009_VOL2_AMD4.pdf PDF
20R3009vol3 .pdf PDF
20R3009vol5 .pdf PDF
20R3009vol1 .pdf PDF
20R3009vol4 .pdf PDF
B.08 - W912HN20R3009 - AMD0004 Conform Copy.pdf PDF
B.08 - W912HN20R3009 - AMD0004.pdf PDF
20R3009vol2 .pdf PDF
W912HN-20-R-3009_VOL1 Revision 1.pdf PDF
20R3009vol5 Revision 1.pdf PDF
B.08 - W912HN20R3009 - AMD0003.pdf PDF
W912HN-20-R-3009_VOL2 Revision 1.pdf PDF
20R3009vol3 Revision 1.pdf PDF
20R3009vol1 Revision 3.pdf PDF
20R3009vol1 ver 2.pdf PDF
B.08. W912HN20R30090002.pdf PDF
20R3009vol2 ver 2.pdf PDF
20R3009vol1.pdf PDF
B.08 W912HN20R30090001.pdf PDF
20R3009vol4.pdf PDF
20R3009vol2.pdf PDF
W912HN-20-R-3009_VOL2.pdf PDF
W912HN-20-R-3009_VOL1.pdf PDF
W912HN-20-R-3009_VOL3.pdf PDF
20R3009vol3.pdf PDF
20R3009vol1.pdf PDF
20R3009vol4.pdf PDF
20R3009vol5.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET ID

D R

AW

N

B Y:

D

ES

IG

N

B Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

C H

EC

KE

D B

Y:

US Army Corps of Engineers ®

D

C

B

A

C

AT

EG

O

R Y

C O

D E:

AN

SI

D

E

F

G

2 3 4 5 6 7 8 9 10

C:\Users\k6enximw\Desktop\Tele-Work Revit Projects\Hun400 (PN88410)\FY20PN88410_PLUMB_R18_TW Current.rvt1/5/2021 3:23:20 PM

JU

LY

W

2H N

-2 0-

R -3

I.

W

R

IG

H T

I.

W

R

IG

H T

R . H

AL

LM

AN

1-

-0

PL601

PL

U

M

BI

N G

S C

H

ED

U

LE

S

SA

VA

N N

AH

D

IS

TR

IC

T

W . O

G

LE

TH

O

R

PE

A

VE

SA

VA

N

N

AH

, G A

H U

N

TE

R A

R M

Y

AI

R

FI

EL

D

, G

EO

R G

IA

AA

B

AI

R C

R

AF

T M

AI

N

TE

N

AN

C

E H

AN

G

ER

FY

0, P N

VO

LU

M

E

-B U

IL

D

IN

G

(M

EP

A N

D A

N N

EX

B

U

IL

D

IN

G S)

K.

D

IX

O

N

READY TO ADVERTISE (RTA)

PLUMBING PUMP SCHEDULE

Mark CAPACITY (GPM)

HEAD

(ft) HP (MAX) V/HZ/PH COMMENTS

CP-1 1.4 25 1/8 SEE ELECTRICAL IN-LINE BRONZE

CP-2 1/8 SEE ELECTRICAL IN-LINE BRONZE, SHALL BE SIZED AND PROVIDED BY THE WATER HEATER HEATER MANUFACTURER

DWBP-1 176 34.65 3 SEE ELECTRICAL PACKAGED IN-LINE, DUPLEX PUMP WITH ONE BACKUP. PROVIDE WITH VFD, PROVIDE

MANUFACTURER STANDARD CONTROLS TO MAINTAIN 55 PSI SYSTEM PRESSURE

SP-1 50 25 1 SEE ELECTRICAL OIL DETECTOR, HI/LOW LEVEL CONTROL, AUDIBLE AND VISUAL ALARM CONTROLS, DUPLEX PUMP SP-2 50 15 0.5 SEE ELECTRICAL OIL DETECTOR, HI/LOW LEVEL CONTROL, AUDIBLE AND VISUAL ALARM CONTROLS, DUPLEX PUMP

DOMESTIC HOT WATER HEATER SCHEDULE

MARK LOCATION

STORAGE TANK

CAPACITY (MINIMUM)

RECOVERY

RATE (GPH)

FUEL SOURCE INLET WATER

TEMP (°F)

OUTLET WATER

TEMP (°F)

NET OUTPUT

(MBTUH)

MINIMUM

EFFICIENCY

DIRECT VENT (IN) V/HZ/PH NOTESTYPE FLUE OUTDOOR AIR

DHWH-1 MECHANICAL 112 800 350 NATURAL GAS 55 140 300 95 4 4 SEE ELECTRICAL 1,2

PLUMBING FIXTURE SCHEDULE

MARK DESCRIPTION MOUNTING C.W. (IN) H.W. (IN) WASTE (IN) VENT (IN) NOTES

FD-2 LINEAR FLOOR DRAIN FLOOR 2" 2"

FD-3 FLOOR DRAIN FLOOR 3" 2" PROVIDE TRAP PRIMERS WHERE INDICATED ON DRAWINGS

HB HOSE BIBB WALL 3/4" PROVIDE WITH VACUUM BREAKER

P-2 WATER CLOSET FLOOR 1" 4" 2" PROVIDE WITH BATTERY POWERED SENSOR DUAL FLUSH VALVE

P-2A WATER CLOSET (ADA) FLOOR 1" 4" 2" PROVIDE WITH BATTERY POWERED SENSOR DUAL FLUSH VALVE

P-3 URINAL WALL 3/4" 2" 1 1/2" PROVIDE WITH BATTERY POWERED SENSOR

P-3A URINAL (ADA) WALL 3/4" 2" 1 1/2" PROVIDE WITH BATTERY POWERED SENSOR

P-4 LAVATORY WALL 1/2" 1/2" 1 1/4" 1 1/4" PROVIDE WITH BATTERY POWERED SENSOR

P-4A LAVATORY (ADA) WALL 1/2" 1/2" 1 1/4" 1 1/4" PROVIDE WITH BATTERY POWERED SENSOR P-5 LAVATORY COUNTERTOP 1/2" 1/2" 1 1/4" 1 1/4" PROVIDE WITH BATTERY POWERED SENSOR

P-5A LAVATORY (ADA) COUNTERTOP 1/2" 1/2" 1 1/4" 1 1/4" PROVIDE WITH BATTERY POWERED SENSOR

P-6 SINGLE COMPARTMENT SINK WALL 1/2" 1/2" 2" 2" PROVIDE MANUAL GOOSENECK FAUCET WITH FAUCET MOUNTED EYEWASH. PROVIDE

HOT WATER LINE WITH THERMOSTATIC MIXING VALVE SET AT 100 DEG F

P-7 DOUBLE COMPARTMENT SINK WALL 1/2" 1/2" 1 1/4" 1 1/4" MANUAL GOOSENECK FAUCET

P-10 SHOWER WALL 1/2" 1/2" 2"

P-10A SHOWER (ADA) WALL 1/2" 1/2" 2"

P-11 WATER COOLER WALL 1/2" 1 1/2" 1 1/2" PROVIDE WITH INTEGRAL BOTTLE FILLER

P-11A WATER COOLER (ADA) WALL 1/2" 1 1/2" 1 1/2"

P-12 JANITOR'S SINK WALL 1/2" 1/2" 1 1/4" 1 1/4"

P-13 EMERGENCY

EYEWASH/SHOWER FLOOR 1" 1" 4" 2" PROVIDE WITH THERMOSTATIC MIXING VALVE SET AT 85 DEG F

P-14 EMERGENCY EYEWASH FLOOR 1/2" 1/2" PROVIDE WITH THERMOSTATIC MIXING VALVE SET AT 85 DEG F

P-15 WASH SINK FLOOR 1/2" 1/2" 1 1/4" 1 1/4" PROVIDE WITH FOOT PEDAL OPERATION

WH WALL HYDRANT WALL 3/4" FREEZEPROOF

AIR COMPRESSOR SCHEDULE

MARK LOCATION CAPACITY (SCFM) POWER (HP)

CUT IN PRESSURE

(PSI)

CUT OUT PRESSURE

(PSI) V/HZ/PH NOTES

AC-1 COMPRESSOR

ROOM 119

220 50 90 125 SEE ELECTRICAL 1

NOTES:

1. PROVIDE PACKAGED UNIT WITH BUILT-IN RECEIVER TANK, FILTERS, AIR DRYER, AND AFTERCOOLER. IT IS ACCEPTABLE TO PROVIDE SEPARATE EQUIPMENT IF CONTRACTOR ENSURES THAT THE EQUIPMENT CAN FIT IN THE SPACE WITH MANUFACTURER RECOMMENDED CLEARANCES.

DOMESTIC WATER EXPANSION TANK SCHEDULE

MARK LOCATION MINIMUM ACCEPTANCE

VOLUME (GAL)

PRECHARGE

PRESSURE (PSIG)

OPERATING

PRESSURE (PSIG) COMMENTS

DET-1 MECHANICAL ROOM 125 25 60

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

R ev is ed in

A cc or da n c e w ith

A m en dm en t 0

JA

N

COMPRESSED AIR TERMINALS

MARK MOUNTING TYPE C.A. (IN) NOTES

CAT-1 WALL 3/4" MOUNT AT 5' AFF TO SERVE WORKBENCHES

CAT-2 PEDESTAL 1" HOSE REEL ATTACHMENT

CAT-3 WALL 1" LOW PRESSURE HIGH VOLUME DROP

COMPRESSED AIR RECEIVER TANK

MARK LOCATION

VOLUME

(GAL) NOTES

RT-1 COMPRESSOR

ROOM 119

220 DRY RECEIVER TANK FOR AIR COMPRESSOR SYSTEM.

NOTES:

1. STORAGE TANK CAPACITY IS THE MINIMUM TOTAL CAPACITY OF ANY INTERGRAL WATER HEATER STORAGE AND THE CAPACITY OF THE DOMESTIC HOT WATER STORAGE TANK, DHWS-1.

PROVIDE COMBINATION OF INTERNAL STORAGE IN THE WATER HEATER AND EXTERNAL STORAGE IN THE TANK TO MEET MINIMUM CAPACITY.

2 MAXIMUM SIZE FOR DHWH-1 AND DHWS-1 SHALL BE A 66" DIAMETER AND 12' TALL.

THERMOSTATIC MIXING VALVE SCHEDULE

MARK LOCATION MIN CAPACITY

(GPM)

COLD E.W.T.

(F)

HOT E.W.T.

(F)

RECIRCULATION

E.W.T. (F)

MIXED L.W.T.

(F)

MAX. PRESSURE

DROP NOTES

TMV MECH ROOM

121 62 GPM 55 °F 140 °F 120 °F 120 °F 5.00 psi

Sheets
PL601 - PLUMBING SCHEDULES

File details come from the government source that posted it. Updated .