20R3009vol1_AMD5.pdf
PDF 10 MB Posted
- Solicitation number
- W912HN20R3009
About this file
This document provides details for a federal contract solicitation to construct an aircraft maintenance hangar at Hunter Army Airfield in Savannah, Georgia. The solicitation was posted on October 29, 2020 under number W912HN20R3009 by the Department of the Army Corps of Engineers Engineering District Savannah. Proposals are due by December 15, 2020 at 1:00pm Eastern Time. The solicitation package includes three drawings files and five specifications files. Updated files will replace prior versions with the same file name. All currently available files constitute the full solicitation as amended. The opportunity is for the construction of an aircraft maintenance hangar at the specified military base, with responses due on the date provided.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hunter AAF, Georgia
Solicitation Number
W912HN20R3009
Aircraft Maintenance Hanger Volume 1 of 5: Procurement and Contracting Requirements and Specification Division 01
PN 88410
October 2020
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
CORPS OF ENGINEERS
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3640
US Army Corps of Engineers Savannah District
Construct Aircraft Maintenance Hangar 20R3009 Hunter AAF, GA
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL
01 45 00.15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
02 82 00 ASBESTOS REMEDIATION
DI VI SI ON 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 42 13 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
DI VI SI ON 04 - MASONRY
04 20 00 UNIT MASONRY
DI VI SI ON 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 14 00 FLUID-APPLIED WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
PROJECT TABLE OF CONTENTS Page 1
07 27 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 42 13 METAL WALL PANELS
07 60 00 FLASHING AND SHEET METAL
07 61 14 STEEL STANDING SEAM ROOFING
07 81 00 * 2 DELETEDSPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 13 COILING COUNTER DOORS
08 33 23 OVERHEAD COILING DOORS
08 34 16.10 STEEL SLIDING HANGAR DOORS
08 34 59 VAULT DOORS AND DAY GATES
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 67 23.13 STANDARD RESINOUS FLOORING
09 67 23.15 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM
09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES
DI VI SI ON 10 - SPECI ALTI ES
10 11 00 *4 VISUAL DISPLAY UNITS
10 14 00.20 INTERIOR SIGNAGE
10 14 53 TRAFFIC SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 13 WIRE MESH PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 43 FIRE EXTINGUISHER ACCESSORIES
10 51 13 METAL LOCKERS
DI VI SI ON 11 - EQUI PMENT
11 11 33.51 AIRCRAFT WASH RACK
DI VI SI ON 12 - FURNI SHI NGS
PROJECT TABLE OF CONTENTS Page 2
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 93 00 SITE FURNISHINGS
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 12 80 RELOCATABLE HAZARDOUS MATERIAL AND HAZARDOUS WASTE
STORAGE BUILDINGS
13 34 19 METAL BUILDING SYSTEMS
13 48 00 SEISMIC BRACING FOR MISCELLANEOUS EQUIPMENT
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 25 HIGH-EXPANSION FOAM SYSTEM, FIRE PROTECTION
21 30 05.16 FIRE PUMPS AND ENCLOSURES
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 15 COMMON PIPING FOR HVAC
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 82 00 TERMINAL HEATING UNITS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11.21 CYBERSECURITY FOR FOAM APPLICATION SYSTEMS
25 05 11.23 CYBERSECURITY FOR HVAC SYSTEMS
25 05 11.26 CYBERSECURITY FOR LIGHTING SYSTEMS
25 05 11.28 CYBERSECURITY FOR FIRE ALARM/MASS NOTIFICATION SYSTEMS
25 05 11.30 CYBERSECURITY FOR ELEVATOR CONTROL SYSTEM
DI VI SI ON 26 - ELECTRI CAL
26 05 48 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
PROJECT TABLE OF CONTENTS Page 3
26 28 01 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER
26 36 01 NON-AUTOMATIC TRANSFER SWITCH (NATS)
26 37 00 SANITARY SEWER PUMP STATION EMERGENCY STAND-BY POWER
SYSTEM
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 42 15 CATHODIC PROTECTION SYSTEM (STEEL WATER TANKS)
26 51 00 LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 14 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 05 28.36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 05 29 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET
COMMUNICATION SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 16 PUBLIC ADDRESS SYSTEM
27 51 23.10 INTERCOMMUNICATION SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEMS
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 05 22 GEOTEXTILES USED AS FILTERS
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 11.51 PAINT REMOVAL FROM AIRFIELD PAVEMENTS
32 01 16.71 COLD MILLING ASPHALT PAVING
32 01 19.61 RESEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSES
32 11 23.23 BASE COURSE DRAINAGE LAYERS
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY
PAVEMENTS
32 13 73 COMPRESSION JOINT SEALS FOR CONCRETE PAVEMENTS
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
PROJECT TABLE OF CONTENTS Page 4
33 16 15 WATER STORAGE STEEL TANKS
33 16 23 GROUND-LEVEL STEEL WATER STORAGE TANKS
33 30 00 SANITARY SEWERAGE
33 31 23 SANITARY SEWER FORCE MAIN PIPING
33 32 13.13 PACKAGED SEWAGE LIFT STATIONS, WET WELL TYPE
33 40 00 STORM DRAINAGE UTILITIES
33 46 16 SUBDRAINAGE PIPING
33 51 15 NATURAL-GAS DISTRIBUTION PIPELINES
33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DI VI SI ON 41 - MATERI AL PROCESSI NG AND HANDLI NG EQUI PMENT
41 22 13.13 BRIDGE CRANES
DI VI SI ON 46 - WATER AND WASTEWATER EQUI PMENT
46 25 14 OIL-WATER SEPARATORS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
PN 88410 Construct Aircraft Maintenance Hangar, Hunter Army Airf ield, Savannah, GA
A. This acquisition w ill be aw arded utilizing a Low est Priced Technically Acceptable (LPTA) Source Selection Process in accordance w ith
FAR 15.101-2.
B. This solicitation is being solicited on an unrestricted basis as full and open competition, but contains a HUBZone Price Evaluation Preference.
C. The North American Industry Classif ication System (NAICS) code is 236220.
D. Per DFARS 236.204 Disclosure of Magnitude: the Magnitude of this project is betw een $25,000,000 and $100,000,000.
E. The proposal of the successful offeror shall be incorporated by reference into the aw arded contract.
***Offerors should include the offeror's cage code in block 14 of the 1442 of the proposal submission.*** An amendment may be issued to revise the Erosion Control Draw ings if required upon approval and receipt of the Land Disturbance Permit.
TONJA J DREKE 912-652-6071
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
29-Oct-2020
(RFP)
(IFB)
X
CALL:
Hunter Army Aircraft Maintenance Hangar
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________720 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________08 Jan 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
W912HN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
88410
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912HN20R3009 84
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
11/20/2020
Section SF 30 - Block 14 Continuation Page (SF 30)
AMENDMENT 0001
A. CONTRACT CHANGES: FAR Clause 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995) has been clarified.
B. TECHNICAL SPECIFICATION CHANGES: The revised Section listed below (revised by Amendment No.
0001) is hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be found in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).
Revised Section 26 35 43
C. CONTRACT DRAWINGS – File No. 211-10-02: There are no drawing changes with this amendment.
AMENDMENT 0002
A. CONTRACT CHANGES: Updated Wage Determination, updated bid schedule, add site visit roster and include interim bidder inquiry report.
B. TECHNICAL SPECIFICATION CHANGES: Specification Section 07 81 00 has been deleted from this solicitation by Amendment 0002.
C. CONTRACT DRAWINGS: There are no drawing changes with this amendment.
AMENDMENT 0003
A. CONTRACT CHANGES: Wage Determination GA20200117 dated November 20, 2020.
remains in effect and Wage Determination GA20200077 dated Nov 20, 2020 has been added to the solicitation.
B. TECHNICAL SPECIFICATION CHANGES: The revised Sections listed below (revised by Amendment No. 0003) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1). The replaced Section listed below (replaced by Amendment No. 0003) is hereby added to and made a part of the solicitation; such Sections are replaced in their entirety and changes are neither underlined nor struck out.
Revised Sections Replaced Sections 10 51 13 08 71 00 Attachment A 13 12 80 22 00 00 41 22 13.13
C. CONTRACT DRAWINGS – File No. 211-10-02:
Volume 1:
All drawings have been replaced in their entirety.
Volume 2:
Sheets S-001, S-002, SB107, SB109, SB110, SB111, SB112, SB113, SB114, SB511, SB512, A- 415, A-416, A-612, I-503, and I-603 with Revision 1 dated 02 Dec 2020 are hereby added to and made a part of the Contract Drawings.
Volume 3:
There are no drawing changes in this volume with this amendment.
WAGE DETERMINATION
"General Decision Number: GA20200077 11/20/2020
Superseded General Decision Number: GA20190077
State: Georgia
Construction Type: Heavy Heavy Construction, Includes Water and Sewer Lines, and Heavy Construction on Treatment Plant Sites and Industrial Sites (Refineries, Power Plants, Chemical and Manufacturing Plants, Paper Mills, Etc.)
Counties: Bryan, Chatham and Effingham Counties in Georgia.
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 11/20/2020
ELEC0508-002 09/01/2019
Rates Fringes
ELECTRICIAN......................$ 26.55 4.8%+10.38
* ENGI0474-025 07/01/2020
Rates Fringes
POWER EQUIPMENT OPERATOR:
Mechanic....................$ 29.00 15.65
PLUM0188-006 08/01/2018
Rates Fringes
PIPEFITTER.......................$ 27.75 12.95
SUGA2012-107 08/11/2012
Rates Fringes
CARPENTER (Form Work Only).......$ 15.44 0.00
CARPENTER, Excludes Form Work....$ 14.76 0.00
CEMENT MASON/CONCRETE FINISHER...$ 16.96 0.00
IRONWORKER, REINFORCING..........$ 13.30 1.66
LABORER: Common or General......$ 11.96 1.16
LABORER: Pipelayer..............$ 15.50 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 16.88 1.30
OPERATOR: Bulldozer.............$ 18.36 4.57
OPERATOR: Crane.................$ 20.29 1.60
OPERATOR: Grader/Blade..........$ 20.24 0.00
OPERATOR: Loader................$ 13.21 0.00
OPERATOR: Piledriver............$ 18.72 2.06
OPERATOR: Roller................$ 12.04 0.69
PILEDRIVERMAN....................$ 18.50 0.78
TRUCK DRIVER: Dump Truck........$ 12.79 0.00
TRUCK DRIVER: Lowboy Truck......$ 17.28 1.84
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
AMENDMENT 0004
A. CONTRACT CHANGES: Proposal due date has been changed from 15 December 2020 at 1:00 PM (ET) to 8 January 2021 at 1:00 PM (ET)
Amendment No. 0004) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be found in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1). The added Section listed below (added by Amendment No. 0004) is hereby added to and made a part of the solicitation; such Sections are replaced in their entirety and changes are neither underlined nor struck out.
Revised Sections Added Section 01 35 26 10 11 00 01 45 00 05 12 00 05 21 00 07 42 00 07 92 00 08 33 13 08 33 23 08 34 16.10 09 90 00 10 11 00 10 22 13 10 51 13 11 11 33.51 13 12 80 22 00 00 23 09 13 23 52 00 26 24 13 33 16 15 33 16 23 41 22 13.13
Sheets GC103, CD107, CS503, CG102, CU107, CU507, and ES101, with Revision 1 dated 11 December 2020 are hereby added to and made a part of the Contract Drawings.
Volume 2:
Sheets SB102, SB106, SF201, SF202, SF203, SF204, SF205, and SF311, with Revision 1 dated 11 December 2020 are hereby added to and made a part of the Contract Drawings. Sheet SB51 with Revision 2 dated 11 December 2020 is hereby added to and made a part of the Contract Drawings.
Volume 3:
Sheets PL105, PL106, PL111, PL112, PL113, PL119, PL123, PL124, PL303, PL401, PL404, PL405, MH505, MH510, MH601, MH602, MH603, MH604, MH605, MI816, and MI819, with Revision 1 dated 11 December 2020 are hereby added to and made a part of the Contract Drawings.
AMENDMENT 0005
A. CONTRACT CHANGES: None.
Amendment No. 0005) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1). The replaced Section listed below (replaced by Amendment No. 0005) is hereby added to and made a part of the solicitation; such Sections are replaced in their entirety and changes are neither underlined nor struck out.
Revised Sections Replaced Sections 01 78 23 01 91 00.15 - Attachment A 01 91 00.15 03 30 00 07 41 13 09 97 13.27 22 00 00
No changes.
Volume 2:
Sheets SF301, A-132, A-201, A-202, A-313, A-417, A-512, A-610, A-611, A-612, and A-613, with Revision 1 dated 18 December 2020 are hereby added to and made a part of the Contract Drawings.
Volume 3:
Sheets A-101X, A-102X, A-301X, A-310X, A-320X, A-101Y, A-102Y, A-301Y, A-310Y, A- 320Y, A-101Z, A-104Z, A-202Z, and A-301Z, with Revision 1 dated 18 December 2020 are hereby added to and made a part of the Contract Drawings.
WAGE DETERMINATION
General Decision Number: GA20200117 11/20/2020 Superseded General Decision Number: GA20190117 State: Georgia Construction Type: Building County: Chatham County in Georgia.
** Wage determinations are available from https://beta.sam.gov . Contractors should regularly check and utilize the most current wage determination for this project.
INTERIM BID INQUIRY REPORT
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Technical Evaluators Report Closed Inquiries
Project: Hunter Aircraft Maintenace Hangar Review: 20R3009 HAAF Aircraft Hangar HAAF (00001) (sorted by CommentID ) Displaying 20 inquiries.
Id Discipline Sheet Detail Spec 8893708 Electrical EP502 UFGS 26 35 43
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
UFGS 26 35 43 states the frequency converter is rated 45 kva while Sheet EP502 states it is 90 kva. Which is correct?
On: Oct 30 2020. Forward request by email.
1-0 Evaluation Concurred. The correct size is 90 kVA. UFGS 26 35 43 will be revised in an upcoming amendment. By: Renard Davis; CESAS-EN Engineering Division; (912-652-5601) On: Nov 02 2020 1-1 Government Response. The correct size is 90 kVA. UFGS 26 35 43 will be revised in an forthcoming amendment. On: Nov 02 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8893716 Electrical EP502 UFGS 26 35 43
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Is the frequency converter intended to provide simultaneous operation of the 400 hertz ac and 28 volt dc outputs.
On: Oct 30 2020. Forward request by email.
1-0 Evaluation For Information Only. Yes. Per UFGS 26 35 43, paragraph 2.1.1.6, "400Hz and 28VDC voltages shall be deliverable simultaneously from converter on individual outputs". By: Renard Davis; CESAS-EN Engineering Division; (912-652-5601) On: Nov 02 2020
1-1 Government Response. Per UFGS 26 35 43, paragraph 2.1.1.6, "400Hz and 28VDC voltages shall be deliverable simultaneously from converter on individual outputs". On: Nov 02 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8898121 Other Spec Spec Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In regards to past project references would it be acceptable for the references to include private work that was not on a federal base as well as references on a Federal Base by contract value?
On: Nov 03 2020. Forward request by email.
1-0 Evaluation For Information Only. Per specifications 4.2.1 The Offeror's submission will be evaluated to determine whether the Offeror has experience performing recent, relevant projects. A minimum of three (3) projects must be submitted. Each project must meet the requirements of paragraph 4.1.3. At least one project must contain work described in paragraph 4.1.3.4 and at least one project must contain work described in paragraph 4.1.3.5. Please assure that you carefully read all of the information in specification section 4.1 Submission Requirements. By: Helane Church; CESAS-CD-BR Ft. Bragg Area Office; (910- 396-4870) On: Nov 03 2020
1-1 Government Response. Per specifications 4.2.1 The Offeror's submission will be evaluated to determine whether the Offeror has experience performing recent, relevant projects. A minimum of three (3) projects must be submitted. Each project must meet the requirements of paragraph 4.1.3. At least one project must contain work described in paragraph 4.1.3.4 and at least one project must contain work described in paragraph 4.1.3.5. Please assure that you carefully review all of the information in Specification Section 4.1 Submission Requirements. On: Nov 03 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8901640 Contracting na na RFP relevant experience requirements
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Can a maintenance facility on military base with clear spans equivalent to that of a aircraft maintenance hangar be used in lieu of an actual aircraft maintenance hangar.
On: Nov 05 2020. Forward request by email.
1-0 Evaluation For Information Only. 4.1.3.3 To be considered relevant to the work in this solicitation, projects must consist of vertical construction projects similar to the following: Construction of new vertical facilities similar to an aircraft maintenance hangar, maintenance/operational facilities, administrative/office buildings, parts and tools storage, company operations facilities, Petroleum, Oil Lubricant (POL) storage, enclosed storage building, hangar apron, aircraft washing apron, water supply building, cybersecurity and fire protection systems. This specification exert references a maintenance/operational facilities are considered relevant.
By: Helane Church; CESAS-CD-BR Ft. Bragg Area Office; (910-396-4870) On: Nov 06 2020
1-1 Government Response. 4.1.3.3 To be considered relevant to the work in this solicitation, projects must consist of vertical construction projects similar to the following: Construction of new vertical facilities similar to an aircraft maintenance hangar, maintenance/operational facilities, administrative/office buildings, parts and tools storage, company operations facilities, Petroleum, Oil Lubricant (POL) storage, enclosed storage building, hangar apron, aircraft washing apron, water supply building, cybersecurity and fire protection systems. This specification exert references states that maintenance/operational facilities are considered relevant. Please note the requirement of 4.1.3.4 and 4.1.3.5. On: Nov 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8902222 Fire Protection/Life Safety A001-A002 07 81 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Sheets A001 and A002 state the Fire Resistive rating requirements are based upon construction Type IIB which does not typically require fireproofing. Please confirm spec 07 81 00 Spray Applied Fireproofing can be deleted.
On: Nov 05 2020. Forward request by email.
1-0 Evaluation Concurred. Building construction is Type IIB. Spray Applied Fireproofing to structural members is not included in the project. By: Matthew Deacon; CESAS-EN Engineering Division; (912-652- 5239) On: Nov 06 2020
1-1 Government Response. The building construction is Type IIB. Spray Applied Fireproofing to structural members is not included in the project. On: Nov 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8902550 Architectural 09 67 23.16 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Specification 09 67 23.16 Fuel resistive Resinous Flooring, 5 Coat system is listed in the specifications, however we do not find any locations for this on room finish schedule. Advise if this specification is not applicable.
On: Nov 05 2020. Forward request by email.
1-0 Evaluation Concurred. Drawings A-610 and I-601 call for Maintenance Bay 152 to receive "Epoxy" flooring, further identified in notes and legends as 5 coat fuel resistant coating. By: Matthew Deacon; CESAS-EN Engineering Division; (912-652-5239) On: Nov 06 2020
1-1 Government Response. Specification 09 67 23.16 Fuel resistive Resinous Flooring, 5 Coat system are referenced in Drawings A-610 and I-601, which call for the Maintenance Bay 152 to receive "Epoxy" flooring, further identified in notes and legends as 5 coat fuel resistant coating. On: Nov 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8902555 Architectural Volume 2 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Regarding the continuous bid netting shown on plans, can either a specification or Basis of Design be provided for this product?
1-0 Evaluation Concurred. See sheet A-429 for bird netting salient features, equipment and details By:
Matthew Deacon; CESAS-EN Engineering Division; (912-652-5239) On: Nov 06 2020
1-1 Government Response. Reference sheet A-429 for bird netting salient features, equipment and details.
On: Nov 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8902558 Architectural 11 11 35.51 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Spec. 11 11 35.51 Aircraft Wash Rack, can a basis of design manufacturer and model be provided?
On: Nov 05 2020. Forward request by email.
1-0 Evaluation For Information Only. Please provide a wash rack that meets the salient features as required by specification 11 11 35.51. Any manufacturer and model that meets the salient features in the specification is acceptable. By: Ian Wright; CESAS-EN Engineering Division; (912-652-5538) On: Nov 06
1-1 Government Response. Please provide a wash rack that meets the salient features as required by specification 11 11 35.51. Any manufacturer and model that meets the salient features in the specification is acceptable. On: Nov 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8902560 Architectural All All
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Structural and Architectural details appear to be missing for the Fire Pump house building. It is shown on civil and Fire drawings but no other details found to construct enclosure.
1-0 Evaluation Concurred. Please see 21 30 05.16 "Fire Pumps and Enclosures" for Fire Pump Enclosure specifications. By: Matthew Deacon; CESAS-EN Engineering Division; (912-652-5239) On: Nov 06 2020 1-1 Government Response. Please reference 21 30 05.16 "Fire Pumps and Enclosures" for Fire Pump
Enclosure specifications. On: Nov 06 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8902562 General RFP Pricing schedule Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Should the cost for the Fire Pump House be included in CLIN item 0007 water tank or included with CLIN 0001.
On: Nov 05 2020. Forward request by email.
1-0 Evaluation For Information Only. The cost for the fire pump house should be included with CLIN 0001.
By: John Wallace; CESAS-EN Engineering Division; (912-652-5132) On: Nov 12 2020
1-1 Government Response. The cost for the fire pump house should be included with CLIN 0001. On: Nov 16 2020
1-2 Government Response. This new text supercedes ALL previous replies.
This will be addressed in a forthcoming Amendment. On: Nov 20 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8902563 General RFP Pricing schedule Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
For CLIN 0010, Option 2 Water Tower and associated water lines, confirm that the Base bid ground level steel water tank will be eliminated in this option.
On: Nov 05 2020. Forward request by email.
1-0 Evaluation Concurred. That is correct. It is shown and labeled on CU107A. By: richard hallman; CESAS-EN Engineering Division; (912-652-5677) On: Nov 10 2020 1-1 Government Response. Per Plate CU107A, the Base Bid ground level steel water tank will be eliminated in CLIN 0010, Option 2 Water Tower and associated water lines. On: Nov 10 2020
1-2 Government Response. This new text supercedes ALL previous replies.
This will be addressed in a forthcoming Amendment. On: Nov 20 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8907110 General 00 70 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Specification Section 00 70 00 Wage Determination lists the General Decision GA20200117 with a revision date of 01/03/2020. Beta.sam.gov shows that General Decision GA20200117 had a recent revision dated 10/30/2020. Please confirm that the decision dated 10/30/2020 should be used.
On: Nov 09 2020. Forward request by email.
1-0 Evaluation Concurred. The most current Wage Determination should be used. By: Tonja
Dreke; CECT-SAS Contracting Division; (912-652-6071) On: Nov 10 2020 1-1 Government Response. The most current Wage Determination should be used. On: Nov 10 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8910808 Contracting 4.1.3.1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In regards to past project references section 4.1.3.1, would it be acceptable to extend recent, relevant projects from six years to 10 years?
On: Nov 10 2020. Forward request by email.
1-0 Evaluation For Information Only. The contract requirements per specification section 4.1.3.1 for recent, relevant projects is the requirement for this solicitation. By: Helane Church; CESAS-CD-BR Ft. Bragg Area Office; (910-396-4870) On: Nov 12 2020
1-1 Government Response. Per section 4.1.3.1 which states, "To be considered recent, projects must have been successfully completed, or fully designed and at least 50% construction progress completed within six
(6) years preceding the date the solicitation is issued" is the requirement for this solicitation. On: Nov 12
Current Request Status: Request Closed Information for this report is procurement sensitive.
8911823 Contracting 4.1.3.4 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Can a maintenance facility on military base with clear spans equivalent to that of a aircraft maintenance hangar be used in lieu of an actual aircraft maintenance hangar, fulfilling the requirement stated in 4.1.3.4?
On: Nov 11 2020. Forward request by email.
1-0 Evaluation For Information Only. Per section 4.1.3.3 which states, "To be considered relevant to the work in this solicitation, projects must consist of vertical construction projects similar to the following: Construction of new vertical facilities similar to an aircraft maintenance hangar,maintenance/operational facilities, administrative/office buildings, parts and tools storage,company operations facilities, Petroleum, Oil Lubricant (POL) storage, enclosed storage building, hangar apron, aircraft washing apron, water supply building, cybersecurity and fire protection systems". This section allows a relevant project to be a maintenance/operational facility. By:
Helane Church; CESAS-CD-BR Ft. Bragg Area Office; (910-396-4870) On: Nov 12 2020
1-1 Government Response. Per section 4.1.3.3 which states, "To be considered relevant to the work in this solicitation, projects must consist of vertical construction projects similar to the following: Construction of new vertical facilities similar to an aircraft maintenance hangar,maintenance/operational facilities, administrative/office buildings, parts and tools storage,company operations facilities, Petroleum, Oil Lubricant (POL) storage, enclosed storage building, hangar apron, aircraft washing apron, water supply building, cybersecurity and fire protection systems". This section allows a relevant project to be a maintenance/operational facility. On: Nov 12 2020
Current Request Status: Request Closed
8924614 Structural SB107
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm the continuous footing on column line 35 between Q and T. This continuous footing is labeled as a WF4.0 but scales closer to a WF5.0
On: Nov 18 2020. Forward request by email.
1-0 Evaluation Concurred. Use a WF5.0 between Column lines Q and T along 35. By: michael zaitz; CESAS-EN Engineering Division; (912-652-5386) On: Nov 19 2020 1-1 Government Response. The continuous footing should use a WF5.0 between Column lines Q and T along 35. On: Nov 20 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8924618 Structural SB107
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm the continuous footing on column line 35 between L and Q. This continuous footing is labeled as a WF4.0 but scales closer to a WF3.5
On: Nov 18 2020. Forward request by email.
1-0 Evaluation Concurred. Footing between column lines L and Q along 35 is a WF4.0. By: michael zaitz; CESAS-EN Engineering Division; (912-652-5386) On: Nov 19 2020 1-1 Government Response. The continuous footing between column lines L and Q along 35 is a WF4.0. On:
Nov 20 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8926860 Commissioning 01 33 29 - Sustainability Reporting Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Please confirm per Section 01 33 29 - HPSB whole Building Commissioning is required.
On: Nov 19 2020. Forward request by email.
1-0 Evaluation Concurred. Whole Building Commissioning is required by the 1391. By: Myron Powell; CESAS-EN Engineering Division; (9126525394) On: Nov 20 2020
1-1 Government Response. Whole Building Commissioning is required per the contract requirements. On: Nov 20 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8926865 General Division 01 - General Requirements Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm the Government will make all reasonably required utilities, electricity and potable water available from existing outlets and supplies without consumption charges to Contractor.
On: Nov 19 2020. Forward request by email.
1-0 Evaluation For Information Only. The awarded contractor will be responsible to pay for all utility costs that occur from consumption during construction. By: Helane Church; CESAS-CD-BR Ft. Bragg Area Office; (910-396-4870) On: Nov 20 2020
1-1 Government Response. The awarded contractor will be responsible to pay for all utility costs that occur from consumption during construction. On: Nov 20 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8926931 Architectural A-320X & SB501X
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference sheets A320X and SB501X. Bollard foundation for PEMBs on Sheet A-320X shows baseplate and SB501X shows foundations. Please clarify applicable detail.
On: Nov 19 2020. Forward request by email.
Source Selection Information – See FAR 2.101 and 3.104
1-0 Evaluation Concurred. Use foundation shown on SB501X for bollards for this building. By: michael zaitz; CESAS-EN Engineering Division; (912-652-5386) On: Nov 19 2020
1-1 Government Response. Use the foundation shown on SB501X for bollards for this building. On: Nov 20
Current Request Status: Request Closed Information for this report is procurement sensitive.
8926997 Equipment 41 22 13.13 - Bridge Cranes Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Is the crane runway to be designed as moment resistant? Drawing shows no tiebacks and next to a concrete wall.
On: Nov 19 2020. Forward request by email.
1-0 Evaluation Concurred. 2 ton crane is braced laterally by the CMU wall per 1/SF302 By: michael zaitz; CESAS-EN Engineering Division; (912-652-5386) On: Nov 19 2020
1-1 Government Response. The 2 ton crane is braced laterally by the CMU wall per 1/SF302. On: Nov 20
Current Request Status: Request Closed
Report Complete
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Patent 11/892,984 ProjNet property of ERDC since 2004.
SITE VISIT ROSTER
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Base:FFP
Construct Maintenance Hangar, Complete FOB: Destination
NET AMT
0002 1 Job
Construct POL Storage Building, Complete
0003 1 Job
Construct Hazardous Waste Storage Building
0004 1 Job
Construct GSE Shed, Complete
0005 1 Job
Construct Mobile Shop Covered Storage Area
0006 1 Job Base:FFP
Construct 8" and 13" Thick Concrete Pavement Sections (Aprons, waskrack, storage yards)
0007 1 Job
Construct Water Storage Tank, Complete
0008 1 Job
Demolition, Site Preparation and Development Work Beyond the 5-foot Line, Complete
0009 1 Job Option 1FFP
All work East of S. Lightning Road (Landside Parking/Road), Complete
0010 1 Job Option 2-Water TowerFFP
Water Tower and 12” Waterline and Associated (The main line is a 16" line, but there are also smaller 12" and 6" lines) waterlines, Complete. The pricing for this CLIN (0010) is the additional cost to go from CLIN 0007-Water Tank to the Water Tower and associated work shown on Civil Series drawing sheets.
*** Do NOT include pricing that is already included at CLIN 0007 on this CLIN.
If this CLIN is exercised, there will be no water tank. It will be a water tower only.
This CLIN is for upgrade cost for the water tower only. (CLIN 0007 and 0010=Water Tower Total Cost if exercised)
CLIN TOTALS
TOTAL BASE PROPOSAL
(CLINS 0001-0008)
TOTAL OPTIONS 1 & 2 PROPOSAL
(CLINS 0009-0010)
TOTAL BASE PLUS OPTIONS 1 & 2 PROPOSAL
(CLINS 0001-0010)
Section 00 21 00 - Instructions
NOTICE TO PROPOSERS PART 2
PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
1. OVERVIEW.
1.1 This Request for Proposal (RFP) solicits for the Aircraft Maintenance Hangar at Hunter Army Airfield, GA. This will be a Firm-Fixed Price (FFP) contract.
2. GENERAL INSTRUCTIONS
2.1 Who May Submit a Proposal. The requirement will be advertised under full and open competition; any legally organized firm with an active registration in www.sam.gov may submit a proposal. Offerors submitting as a joint venture must provide the agreement forming the joint venture.
2.2 Information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors WILL NOT be evaluated for any factor. Information about firms that are part of a joint venture will be considered when the joint venture is the Offeror.
2.3 Offerors shall submit their proposal to the address shown under Proposal and Bid Bond Submission Instructions in Section 00 21 00.
3. GENERAL PROPOSAL FORMAT:
3.1 Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.
3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents.
An…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .