B.08 - W912HN20R3009 - AMD0006 CC.pdf

PDF 1 MB Posted

Attached to
PN 88410 Construct Aircraft Maintenance Hangar, Hunter Army Airfield, Savannah, GA
Solicitation number
W912HN20R3009
Issued by

About this file

This solicitation requests proposals for the construction of an aircraft maintenance hangar at Hunter Army Airfield in Savannah, Georgia. Key details include a request for proposals due by January 12, 2021 at 1:00pm EST, with award being made to the lowest priced technically acceptable offer. The scope of work includes construction of the maintenance hangar, POL storage building, hazardous waste storage building, GSE shed, and mobile shop covered storage area. Ancillary items consist of concrete pavement, a water storage tank, site work, and demolition. Two optional items are additional site work and replacement of the water tank with a tower. The solicitation incorporates standard clauses for representations and certifications, evaluation factors of corporate experience and past performance, and a price schedule for fixed-price line items. Submissions must include standard forms, financial information, and past performance questionnaires.

View the file

Other files

File Type Posted
B.08 - W912HN20R3009 - AMD-0008.pdf PDF
B.08 - W912HN20R3009 - AMD0008CC.pdf PDF
B.08 - W912HN20R3009 - AMD0007.pdf PDF
B.08 - W912HN20R3009 - AMD0007CC.pdf PDF
20R3009vol1amd06.pdf PDF
B.08 - W912HN20R3009 - AMD0006.pdf PDF
W912HN-20-R-3009_VOL3_AMD6.pdf PDF
20R3009vol1_AMD5.pdf PDF
20R3009vol3_AMD5.pdf PDF
B.08. W912HN20R30090005.pdf PDF
W912HN-20-R-3009_VOL2_AMD5.pdf PDF
20R3009vol2_AMD5.pdf PDF
W912HN-20-R-3009_VOL3_AMD5.pdf PDF
W912HN-20-R-3009_VOL1_AMD4.pdf PDF
W912HN-20-R-3009_VOL3_AMD4.pdf PDF
W912HN-20-R-3009_VOL2_AMD4.pdf PDF
20R3009vol3 .pdf PDF
20R3009vol5 .pdf PDF
20R3009vol1 .pdf PDF
20R3009vol4 .pdf PDF
B.08 - W912HN20R3009 - AMD0004 Conform Copy.pdf PDF
B.08 - W912HN20R3009 - AMD0004.pdf PDF
20R3009vol2 .pdf PDF
W912HN-20-R-3009_VOL1 Revision 1.pdf PDF
20R3009vol5 Revision 1.pdf PDF
B.08 - W912HN20R3009 - AMD0003.pdf PDF
W912HN-20-R-3009_VOL2 Revision 1.pdf PDF
20R3009vol3 Revision 1.pdf PDF
20R3009vol1 Revision 3.pdf PDF
20R3009vol1 ver 2.pdf PDF
B.08. W912HN20R30090002.pdf PDF
20R3009vol2 ver 2.pdf PDF
20R3009vol1.pdf PDF
B.08 W912HN20R30090001.pdf PDF
20R3009vol4.pdf PDF
20R3009vol2.pdf PDF
W912HN-20-R-3009_VOL2.pdf PDF
W912HN-20-R-3009_VOL1.pdf PDF
W912HN-20-R-3009_VOL3.pdf PDF
20R3009vol3.pdf PDF
20R3009vol1.pdf PDF
20R3009vol4.pdf PDF
20R3009vol5.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PN 88410 Construct Aircraft Maintenance Hangar, Hunter Army Airf ield, Savannah, GA

A. This acquisition w ill be aw arded utilizing a Low est Priced Technically Acceptable (LPTA) Source Selection Process in accordance w ith

FAR 15.101-2.

B. This solicitation is being solicited on an unrestricted basis as full and open competition, but contains a HUBZone Price Evaluation Preference.

C. The North American Industry Classif ication System (NAICS) code is 236220.

D. Per DFARS 236.204 Disclosure of Magnitude: the Magnitude of this project is betw een $25,000,000 and $100,000,000.

E. The proposal of the successful offeror shall be incorporated by reference into the aw arded contract.

***Offerors should include the offeror's cage code in block 14 of the 1442 of the proposal submission.*** An amendment may be issued to revise the Erosion Control Draw ings if required upon approval and receipt of the Land Disturbance Permit.

HECTOR L SIERRA-ALMEDINA 912-652-5105

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

29-Oct-2020

(RFP)

(IFB)

X

CALL:

Hunter Army Aircraft Maintenance Hangar

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________720 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________12 Jan 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USACE - SAVANNAH DISTRICT

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

W912HN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

88410

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912HN20R3009 80

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

11/20/2020

W912HN20R3009

Section SF 30 - Block 14 Continuation Page (SF 30)

AMENDMENT 0001

A. CONTRACT CHANGES: FAR Clause 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995) has been clarified.

B. TECHNICAL SPECIFICATION CHANGES: The revised Section listed below (revised by Amendment No.

0001) is hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be found in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).

Revised Section 26 35 43

C. CONTRACT DRAWINGS – File No. 211-10-02: There are no drawing changes with this amendment.

AMENDMENT 0002

A. CONTRACT CHANGES: Updated Wage Determination, updated bid schedule, add site visit roster and include interim bidder inquiry report.

B. TECHNICAL SPECIFICATION CHANGES: Specification Section 07 81 00 has been deleted from this solicitation by Amendment 0002.

C. CONTRACT DRAWINGS: There are no drawing changes with this amendment.

AMENDMENT 0003

A. CONTRACT CHANGES: Wage Determination GA20200117 dated November 20, 2020.

remains in effect and Wage Determination GA20200077 dated Nov 20, 2020 has been added to the solicitation.

B. TECHNICAL SPECIFICATION CHANGES: The revised Sections listed below (revised by Amendment No. 0003) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1). The replaced Section listed below (replaced by Amendment No. 0003) is hereby added to and made a part of the solicitation; such Sections are replaced in their entirety and changes are neither underlined nor struck out.

Revised Sections Replaced Sections 10 51 13 08 71 00 Attachment A 13 12 80 22 00 00 41 22 13.13

C. CONTRACT DRAWINGS – File No. 211-10-02:

Volume 1:

All drawings have been replaced in their entirety.

Volume 2:

Sheets S-001, S-002, SB107, SB109, SB110, SB111, SB112, SB113, SB114, SB511, SB512, A- 415, A-416, A-612, I-503, and I-603 with Revision 1 dated 02 Dec 2020 are hereby added to and made a part of the Contract Drawings.

Volume 3:

There are no drawing changes in this volume with this amendment.

WAGE DETERMINATION

"General Decision Number: GA20200077 11/20/2020

Superseded General Decision Number: GA20190077

State: Georgia

Construction Type: Heavy Heavy Construction, Includes Water and Sewer Lines, and Heavy Construction on Treatment Plant Sites and Industrial Sites (Refineries, Power Plants, Chemical and Manufacturing Plants, Paper Mills, Etc.)

Counties: Bryan, Chatham and Effingham Counties in Georgia.

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 11/20/2020

ELEC0508-002 09/01/2019

Rates Fringes

ELECTRICIAN......................$ 26.55 4.8%+10.38

* ENGI0474-025 07/01/2020

Rates Fringes

POWER EQUIPMENT OPERATOR:

Mechanic....................$ 29.00 15.65

PLUM0188-006 08/01/2018

Rates Fringes

PIPEFITTER.......................$ 27.75 12.95

SUGA2012-107 08/11/2012

Rates Fringes

CARPENTER (Form Work Only).......$ 15.44 0.00

CARPENTER, Excludes Form Work....$ 14.76 0.00

CEMENT MASON/CONCRETE FINISHER...$ 16.96 0.00

IRONWORKER, REINFORCING..........$ 13.30 1.66

LABORER: Common or General......$ 11.96 1.16

LABORER: Pipelayer..............$ 15.50 0.00

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 16.88 1.30

OPERATOR: Bulldozer.............$ 18.36 4.57

OPERATOR: Crane.................$ 20.29 1.60

OPERATOR: Grader/Blade..........$ 20.24 0.00

OPERATOR: Loader................$ 13.21 0.00

OPERATOR: Piledriver............$ 18.72 2.06

OPERATOR: Roller................$ 12.04 0.69

PILEDRIVERMAN....................$ 18.50 0.78

TRUCK DRIVER: Dump Truck........$ 12.79 0.00

TRUCK DRIVER: Lowboy Truck......$ 17.28 1.84

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

AMENDMENT 0004

A. CONTRACT CHANGES: Proposal due date has been changed from 15 December 2020 at 1:00 PM (ET) to 8 January 2021 at 1:00 PM (ET)

Amendment No. 0004) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be found in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1). The added Section listed below (added by Amendment No. 0004) is hereby added to and made a part of the solicitation; such Sections are replaced in their entirety and changes are neither underlined nor struck out.

Revised Sections Added Section 01 35 26 10 11 00 01 45 00 05 12 00 05 21 00 07 42 00 07 92 00 08 33 13 08 33 23 08 34 16.10 09 90 00 10 11 00 10 22 13 10 51 13 11 11 33.51 13 12 80 22 00 00 23 09 13 23 52 00 26 24 13 33 16 15 33 16 23 41 22 13.13

Sheets GC103, CD107, CS503, CG102, CU107, CU507, and ES101, with Revision 1 dated 11 December 2020 are hereby added to and made a part of the Contract Drawings.

Volume 2:

Sheets SB102, SB106, SF201, SF202, SF203, SF204, SF205, and SF311, with Revision 1 dated 11 December 2020 are hereby added to and made a part of the Contract Drawings. Sheet SB51 with Revision 2 dated 11 December 2020 is hereby added to and made a part of the Contract Drawings.

Volume 3:

Sheets PL105, PL106, PL111, PL112, PL113, PL119, PL123, PL124, PL303, PL401, PL404, PL405, MH505, MH510, MH601, MH602, MH603, MH604, MH605, MI816, and MI819, with Revision 1 dated 11 December 2020 are hereby added to and made a part of the Contract Drawings.

AMENDMENT 0006

A. CONTRACT CHANGES: Proposal due date has been changed from 8 January 2021 at 1:00 PM (ET) to 12 January 2021 at 1:00 PM

B. TECHNICAL SPECIFICATION CHANGES: There are no technical specification changes with this amendment.

C. CONTRACT DRAWINGS – File No. 211-10-02:

Volume 3:

Sheet PL601 with Revision 1 dated 06 January 2021 is hereby added to and made a part of the Contract Drawings.

WAGE DETERMINATION

General Decision Number: GA20200117 11/20/2020 Superseded General Decision Number: GA20190117 State: Georgia Construction Type: Building County: Chatham County in Georgia.

** Wage determinations are available from https://beta.sam.gov . Contractors should regularly check and utilize the most current wage determination for this project.

INTERIM BID INQUIRY REPORT

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Technical Evaluators Report Closed Inquiries

Project: Hunter Aircraft Maintenace Hangar Review: 20R3009 HAAF Aircraft Hangar HAAF (00001) (sorted by CommentID ) Displaying 20 inquiries.

Id Discipline Sheet Detail Spec 8893708 Electrical EP502 UFGS 26 35 43

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

UFGS 26 35 43 states the frequency converter is rated 45 kva while Sheet EP502 states it is 90 kva. Which is correct?

On: Oct 30 2020. Forward request by email.

1-0 Evaluation Concurred. The correct size is 90 kVA. UFGS 26 35 43 will be revised in an upcoming amendment. By: Renard Davis; CESAS-EN Engineering Division; (912-652-5601) On: Nov 02 2020 1-1 Government Response. The correct size is 90 kVA. UFGS 26 35 43 will be revised in an forthcoming amendment. On: Nov 02 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8893716 Electrical EP502 UFGS 26 35 43

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Is the frequency converter intended to provide simultaneous operation of the 400 hertz ac and 28 volt dc outputs.

On: Oct 30 2020. Forward request by email.

1-0 Evaluation For Information Only. Yes. Per UFGS 26 35 43, paragraph 2.1.1.6, "400Hz and 28VDC voltages shall be deliverable simultaneously from converter on individual outputs". By: Renard Davis; CESAS-EN Engineering Division; (912-652-5601) On: Nov 02 2020

1-1 Government Response. Per UFGS 26 35 43, paragraph 2.1.1.6, "400Hz and 28VDC voltages shall be deliverable simultaneously from converter on individual outputs". On: Nov 02 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8898121 Other Spec Spec Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In regards to past project references would it be acceptable for the references to include private work that was not on a federal base as well as references on a Federal Base by contract value?

On: Nov 03 2020. Forward request by email.

1-0 Evaluation For Information Only. Per specifications 4.2.1 The Offeror's submission will be evaluated to determine whether the Offeror has experience performing recent, relevant projects. A minimum of three (3) projects must be submitted. Each project must meet the requirements of paragraph 4.1.3. At least one project must contain work described in paragraph 4.1.3.4 and at least one project must contain work described in paragraph 4.1.3.5. Please assure that you carefully read all of the information in specification section 4.1 Submission Requirements. By: Helane Church; CESAS-CD-BR Ft. Bragg Area Office; (910- 396-4870) On: Nov 03 2020

1-1 Government Response. Per specifications 4.2.1 The Offeror's submission will be evaluated to determine whether the Offeror has experience performing recent, relevant projects. A minimum of three (3) projects must be submitted. Each project must meet the requirements of paragraph 4.1.3. At least one project must contain work described in paragraph 4.1.3.4 and at least one project must contain work described in paragraph 4.1.3.5. Please assure that you carefully review all of the information in Specification Section 4.1 Submission Requirements. On: Nov 03 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8901640 Contracting na na RFP relevant experience requirements

Can a maintenance facility on military base with clear spans equivalent to that of a aircraft maintenance hangar be used in lieu of an actual aircraft maintenance hangar.

On: Nov 05 2020. Forward request by email.

1-0 Evaluation For Information Only. 4.1.3.3 To be considered relevant to the work in this solicitation, projects must consist of vertical construction projects similar to the following: Construction of new vertical facilities similar to an aircraft maintenance hangar, maintenance/operational facilities, administrative/office buildings, parts and tools storage, company operations facilities, Petroleum, Oil Lubricant (POL) storage, enclosed storage building, hangar apron, aircraft washing apron, water supply building, cybersecurity and fire protection systems. This specification exert references a maintenance/operational facilities are considered relevant.

By: Helane Church; CESAS-CD-BR Ft. Bragg Area Office; (910-396-4870) On: Nov 06 2020

1-1 Government Response. 4.1.3.3 To be considered relevant to the work in this solicitation, projects must consist of vertical construction projects similar to the following: Construction of new vertical facilities similar to an aircraft maintenance hangar, maintenance/operational facilities, administrative/office buildings, parts and tools storage, company operations facilities, Petroleum, Oil Lubricant (POL) storage, enclosed storage building, hangar apron, aircraft washing apron, water supply building, cybersecurity and fire protection systems. This specification exert references states that maintenance/operational facilities are considered relevant. Please note the requirement of 4.1.3.4 and 4.1.3.5. On: Nov 06 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8902222 Fire Protection/Life Safety A001-A002 07 81 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Sheets A001 and A002 state the Fire Resistive rating requirements are based upon construction Type IIB which does not typically require fireproofing. Please confirm spec 07 81 00 Spray Applied Fireproofing can be deleted.

On: Nov 05 2020. Forward request by email.

1-0 Evaluation Concurred. Building construction is Type IIB. Spray Applied Fireproofing to structural members is not included in the project. By: Matthew Deacon; CESAS-EN Engineering Division; (912-652- 5239) On: Nov 06 2020

1-1 Government Response. The building construction is Type IIB. Spray Applied Fireproofing to structural members is not included in the project. On: Nov 06 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8902550 Architectural 09 67 23.16 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specification 09 67 23.16 Fuel resistive Resinous Flooring, 5 Coat system is listed in the specifications, however we do not find any locations for this on room finish schedule. Advise if this specification is not applicable.

On: Nov 05 2020. Forward request by email.

1-0 Evaluation Concurred. Drawings A-610 and I-601 call for Maintenance Bay 152 to receive "Epoxy" flooring, further identified in notes and legends as 5 coat fuel resistant coating. By: Matthew Deacon; CESAS-EN Engineering Division; (912-652-5239) On: Nov 06 2020

1-1 Government Response. Specification 09 67 23.16 Fuel resistive Resinous Flooring, 5 Coat system are referenced in Drawings A-610 and I-601, which call for the Maintenance Bay 152 to receive "Epoxy" flooring, further identified in notes and legends as 5 coat fuel resistant coating. On: Nov 06 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8902555 Architectural Volume 2 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Regarding the continuous bid netting shown on plans, can either a specification or Basis of Design be provided for this product?

1-0 Evaluation Concurred. See sheet A-429 for bird netting salient features, equipment and details By:

Matthew Deacon; CESAS-EN Engineering Division; (912-652-5239) On: Nov 06 2020

1-1 Government Response. Reference sheet A-429 for bird netting salient features, equipment and details.

On: Nov 06 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8902558 Architectural 11 11 35.51 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Spec. 11 11 35.51 Aircraft Wash Rack, can a basis of design manufacturer and model be provided?

On: Nov 05 2020. Forward request by email.

1-0 Evaluation For Information Only. Please provide a wash rack that meets the salient features as required by specification 11 11 35.51. Any manufacturer and model that meets the salient features in the specification is acceptable. By: Ian Wright; CESAS-EN Engineering Division; (912-652-5538) On: Nov 06

1-1 Government Response. Please provide a wash rack that meets the salient features as required by specification 11 11 35.51. Any manufacturer and model that meets the salient features in the specification is acceptable. On: Nov 06 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8902560 Architectural All All

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Structural and Architectural details appear to be missing for the Fire Pump house building. It is shown on civil and Fire drawings but no other details found to construct enclosure.

1-0 Evaluation Concurred. Please see 21 30 05.16 "Fire Pumps and Enclosures" for Fire Pump Enclosure specifications. By: Matthew Deacon; CESAS-EN Engineering Division; (912-652-5239) On: Nov 06 2020 1-1 Government Response. Please reference 21 30 05.16 "Fire Pumps and Enclosures" for Fire Pump

Enclosure specifications. On: Nov 06 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8902562 General RFP Pricing schedule Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Should the cost for the Fire Pump House be included in CLIN item 0007 water tank or included with CLIN 0001.

On: Nov 05 2020. Forward request by email.

1-0 Evaluation For Information Only. The cost for the fire pump house should be included with CLIN 0001.

By: John Wallace; CESAS-EN Engineering Division; (912-652-5132) On: Nov 12 2020

1-1 Government Response. The cost for the fire pump house should be included with CLIN 0001. On: Nov 16 2020

1-2 Government Response. This new text supercedes ALL previous replies.

This will be addressed in a forthcoming Amendment. On: Nov 20 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8902563 General RFP Pricing schedule Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

For CLIN 0010, Option 2 Water Tower and associated water lines, confirm that the Base bid ground level steel water tank will be eliminated in this option.

On: Nov 05 2020. Forward request by email.

1-0 Evaluation Concurred. That is correct. It is shown and labeled on CU107A. By: richard hallman; CESAS-EN Engineering Division; (912-652-5677) On: Nov 10 2020 1-1 Government Response. Per Plate CU107A, the Base Bid ground level steel water tank will be eliminated in CLIN 0010, Option 2 Water Tower and associated water lines. On: Nov 10 2020

1-2 Government Response. This new text supercedes ALL previous replies.

This will be addressed in a forthcoming Amendment. On: Nov 20 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8907110 General 00 70 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Specification Section 00 70 00 Wage Determination lists the General Decision GA20200117 with a revision date of 01/03/2020. Beta.sam.gov shows that General Decision GA20200117 had a recent revision dated 10/30/2020. Please confirm that the decision dated 10/30/2020 should be used.

On: Nov 09 2020. Forward request by email.

1-0 Evaluation Concurred. The most current Wage Determination should be used. By: Tonja

Dreke; CECT-SAS Contracting Division; (912-652-6071) On: Nov 10 2020 1-1 Government Response. The most current Wage Determination should be used. On: Nov 10 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8910808 Contracting 4.1.3.1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In regards to past project references section 4.1.3.1, would it be acceptable to extend recent, relevant projects from six years to 10 years?

On: Nov 10 2020. Forward request by email.

1-0 Evaluation For Information Only. The contract requirements per specification section 4.1.3.1 for recent, relevant projects is the requirement for this solicitation. By: Helane Church; CESAS-CD-BR Ft. Bragg Area Office; (910-396-4870) On: Nov 12 2020

1-1 Government Response. Per section 4.1.3.1 which states, "To be considered recent, projects must have been successfully completed, or fully designed and at least 50% construction progress completed within six

(6) years preceding the date the solicitation is issued" is the requirement for this solicitation. On: Nov 12

Current Request Status: Request Closed Information for this report is procurement sensitive.

8911823 Contracting 4.1.3.4 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Can a maintenance facility on military base with clear spans equivalent to that of a aircraft maintenance hangar be used in lieu of an actual aircraft maintenance hangar, fulfilling the requirement stated in 4.1.3.4?

On: Nov 11 2020. Forward request by email.

1-0 Evaluation For Information Only. Per section 4.1.3.3 which states, "To be considered relevant to the work in this solicitation, projects must consist of vertical construction projects similar to the following: Construction of new vertical facilities similar to an aircraft maintenance hangar,maintenance/operational facilities, administrative/office buildings, parts and tools storage,company operations facilities, Petroleum, Oil Lubricant (POL) storage, enclosed storage building, hangar apron, aircraft washing apron, water supply building, cybersecurity and fire protection systems". This section allows a relevant project to be a maintenance/operational facility. By:

Helane Church; CESAS-CD-BR Ft. Bragg Area Office; (910-396-4870) On: Nov 12 2020

1-1 Government Response. Per section 4.1.3.3 which states, "To be considered relevant to the work in this solicitation, projects must consist of vertical construction projects similar to the following: Construction of new vertical facilities similar to an aircraft maintenance hangar,maintenance/operational facilities, administrative/office buildings, parts and tools storage,company operations facilities, Petroleum, Oil Lubricant (POL) storage, enclosed storage building, hangar apron, aircraft washing apron, water supply building, cybersecurity and fire protection systems". This section allows a relevant project to be a maintenance/operational facility. On: Nov 12 2020

Current Request Status: Request Closed

8924614 Structural SB107

Please confirm the continuous footing on column line 35 between Q and T. This continuous footing is labeled as a WF4.0 but scales closer to a WF5.0

On: Nov 18 2020. Forward request by email.

1-0 Evaluation Concurred. Use a WF5.0 between Column lines Q and T along 35. By: michael zaitz; CESAS-EN Engineering Division; (912-652-5386) On: Nov 19 2020 1-1 Government Response. The continuous footing should use a WF5.0 between Column lines Q and T along 35. On: Nov 20 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8924618 Structural SB107

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm the continuous footing on column line 35 between L and Q. This continuous footing is labeled as a WF4.0 but scales closer to a WF3.5

On: Nov 18 2020. Forward request by email.

1-0 Evaluation Concurred. Footing between column lines L and Q along 35 is a WF4.0. By: michael zaitz; CESAS-EN Engineering Division; (912-652-5386) On: Nov 19 2020 1-1 Government Response. The continuous footing between column lines L and Q along 35 is a WF4.0. On:

Nov 20 2020 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8926860 Commissioning 01 33 29 - Sustainability Reporting Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Please confirm per Section 01 33 29 - HPSB whole Building Commissioning is required.

On: Nov 19 2020. Forward request by email.

1-0 Evaluation Concurred. Whole Building Commissioning is required by the 1391. By: Myron Powell; CESAS-EN Engineering Division; (9126525394) On: Nov 20 2020

1-1 Government Response. Whole Building Commissioning is required per the contract requirements. On: Nov 20 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8926865 General Division 01 - General Requirements Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm the Government will make all reasonably required utilities, electricity and potable water available from existing outlets and supplies without consumption charges to Contractor.

On: Nov 19 2020. Forward request by email.

1-0 Evaluation For Information Only. The awarded contractor will be responsible to pay for all utility costs that occur from consumption during construction. By: Helane Church; CESAS-CD-BR Ft. Bragg Area Office; (910-396-4870) On: Nov 20 2020

1-1 Government Response. The awarded contractor will be responsible to pay for all utility costs that occur from consumption during construction. On: Nov 20 2020

Current Request Status: Request Closed Information for this report is procurement sensitive.

8926931 Architectural A-320X & SB501X

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Reference sheets A320X and SB501X. Bollard foundation for PEMBs on Sheet A-320X shows baseplate and SB501X shows foundations. Please clarify applicable detail.

On: Nov 19 2020. Forward request by email.

Source Selection Information – See FAR 2.101 and 3.104

1-0 Evaluation Concurred. Use foundation shown on SB501X for bollards for this building. By: michael zaitz; CESAS-EN Engineering Division; (912-652-5386) On: Nov 19 2020

1-1 Government Response. Use the foundation shown on SB501X for bollards for this building. On: Nov 20

Current Request Status: Request Closed Information for this report is procurement sensitive.

8926997 Equipment 41 22 13.13 - Bridge Cranes Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Is the crane runway to be designed as moment resistant? Drawing shows no tiebacks and next to a concrete wall.

On: Nov 19 2020. Forward request by email.

1-0 Evaluation Concurred. 2 ton crane is braced laterally by the CMU wall per 1/SF302 By: michael zaitz; CESAS-EN Engineering Division; (912-652-5386) On: Nov 19 2020

1-1 Government Response. The 2 ton crane is braced laterally by the CMU wall per 1/SF302. On: Nov 20

Current Request Status: Request Closed

Report Complete

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Patent 11/892,984 ProjNet property of ERDC since 2004.

SITE VISIT ROSTER

AMENDMENT 0005

A. CONTRACT CHANGES: None.

Amendment No. 0005) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1). The replaced Section listed below (replaced by Amendment No. 0005) is hereby added to and made a part of the solicitation; such Sections are replaced in their entirety and changes are neither underlined nor struck out.

Revised Sections Replaced Sections 01 78 23 01 91 00.15 - Attachment A 01 91 00.15 03 30 00 07 41 13 09 97 13.27 22 00 00

No changes.

Volume 2:

Sheets SF301, A-132, A-201, A-202, A-313, A-417, A-512, A-610, A-611, A-612, and A-613, with Revision 1 dated 18 December 2020 are hereby added to and made a part of the Contract Drawings.

Volume 3:

Sheets A-101X, A-102X, A-301X, A-310X, A-320X, A-101Y, A-102Y, A-301Y, A-310Y, A- 320Y, A-101Z, A-104Z, A-202Z, and A-301Z, with Revision 1 dated 18 December 2020 are hereby added to and made a part of the Contract Drawings.

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Base:FFP

Construct Maintenance Hangar, Complete FOB: Destination

NET AMT

0002 1 Job

Construct POL Storage Building, Complete

0003 1 Job

Construct Hazardous Waste Storage Building

0004 1 Job

Construct GSE Shed, Complete

0005 1 Job

Construct Mobile Shop Covered Storage Area

0006 1 Job Base:FFP

Construct 8" and 13" Thick Concrete Pavement Sections (Aprons, waskrack, storage yards)

0007 1 Job

Construct Water Storage Tank, Complete

0008 1 Job

Demolition, Site Preparation and Development Work Beyond the 5-foot Line, Complete

0009 1 Job Option 1FFP

All work East of S. Lightning Road (Landside Parking/Road), Complete

0010 1 Job Option 2-Water TowerFFP

Water Tower and 12” Waterline and Associated (The main line is a 16" line, but there are also smaller 12" and 6" lines) waterlines, Complete. The pricing for this CLIN (0010) is the additional cost to go from CLIN 0007-Water Tank to the Water Tower and associated work shown on Civil Series drawing sheets.

*** Do NOT include pricing that is already included at CLIN 0007 on this CLIN.

If this CLIN is exercised, there will be no water tank. It will be a water tower only.

This CLIN is for upgrade cost for the water tower only. (CLIN 0007 and 0010=Water Tower Total Cost if exercised)

CLIN TOTALS

TOTAL BASE PROPOSAL

(CLINS 0001-0008)

TOTAL OPTIONS 1 & 2 PROPOSAL

(CLINS 0009-0010)

TOTAL BASE PLUS OPTIONS 1 & 2 PROPOSAL

(CLINS 0001-0010)

Section 00 21 00 - Instructions

NOTICE TO PROPOSERS PART 2

PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

1. OVERVIEW.

1.1 This Request for Proposal (RFP) solicits for the Aircraft Maintenance Hangar at Hunter Army Airfield, GA. This will be a Firm-Fixed Price (FFP) contract.

2. GENERAL INSTRUCTIONS

2.1 Who May Submit a Proposal. The requirement will be advertised under full and open competition; any legally organized firm with an active registration in www.sam.gov may submit a proposal. Offerors submitting as a joint venture must provide the agreement forming the joint venture.

2.2 Information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors WILL NOT be evaluated for any factor. Information about firms that are part of a joint venture will be considered when the joint venture is the Offeror.

2.3 Offerors shall submit their proposal to the address shown under Proposal and Bid Bond Submission Instructions in Section 00 21 00.

3. GENERAL PROPOSAL FORMAT:

3.1 Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.

3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents.

Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.

3.3 Electronic Submissions.

3.3.1 Electronic material shall be on 8 ½ x 11 inch paper size, using no smaller than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum.

Pages in excess of any specified limitation shall not be evaluated.

3.3.2 Offerors SHALL submit an electronic version (PDF Format) of the original Volume I and Volume II. Offerors SHALL submit only two files in PDF format (i.e. Volume I and Volume II). These two files should be named in a specific format: Solicitation Number, Offeror’s Company name and the volume (i.e. W912HN19R3009_USACE_Volume_I.pdf). Given the limited time and resources of the evaluation board, failure to provide proposal in the correct format may hinder the board's ability to evaluate the Offeror's proposal.

3.4 Tabs. Proposal shall be organized and tabbed as follows:

VOLUME I Price/Representations/Certifications

TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror.

Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.

TAB B – Section 00 10 00 – Solicitation, Contract Line Item Number (CLIN) Schedule

TAB C - Section 00 45 00– Representations and Certifications – Offerors will provide a full copy of their electronic Representations and Certifications completed electronically via the System for Award Management (SAM) from their active SAM registration in lieu of the Section 00 45 00 Representations and Certifications that are included in the RFP. Offerors are to also submit a statement certifying that their Representations and Certifications are compliant with FAR 52.204-7, 52.204-8 and DFARS 252.204-7007 ALT A. Offeror’s Representation and Certifications are incorporated by reference into the proposal per FAR 52.204-19. In addition, if an offeror’s Representation and Certifications are amended from the electronic record at https://www.sam.gov, the offeror must submit a completed DFAR 252.204-7007 ALT A in full text identifying the changes to the electronic Representations and Certifications that are applicable to this solicitation only within Tab C.

TAB D – Proposal Data Sheet – See Attachment 1 provided at the end of this section.

Offerors should ensure telephone number; fax number, e-mail address and DUNS number are all included. The DUNS number provided will be used to access Past Performance Information Retrieval System (PPIRS) data. Offerors should also provide any other assigned number that identifies them in the PPIRS database. If a separate DUNS has been created for a joint venture, it must be submitted. The Offeror should also submit its Tax ID number on the proposal data sheet.

TAB E – Bid Bond – See Clause 52.228-1 and any other notes for required bond information.

The Offeror is required to submit a bid bond. Photocopied or electronically scanned bid bonds are not acceptable and may lead to the rejection of the proposal as non-responsive. Offerors shall use the most recent form SF24 (https://www.gsa.gov/forms-library/bid-bond).

TAB F – Financial Information –Provide either the last three years financial statements, Annual Reports, o r Dun and Bradstreet ratings. Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount. The Offeror shall also provide a Subcontracting Plan in accordance with FAR Clause 52.219-9 (Basic Clause as indicated in the RFP), Small Business Subcontracting Plan.

TAB G – Joint Venture Agreement, if applicable. See paragraph 2.1

VOLUME II Technical Submittal

TAB H – Past Performance Questionnaires/CPARS Summary Sheet (Attachment 2) and Past Performance Questionnaires (PPQ) (Attachment 3) or Contractor Performance Assessment Rating System (CPARS) evaluations.

4. FACTOR 1 – CORPORATE RELEVANT SPECIALIZED EXPERIENCE

4.1 SUBMISSION REQUIREMENTS:

4.1.1 Submit the Past Performance Questionnaire/CPARS Summary Sheet (Attachment 2), and the Past Performance Questionnaires (PPQ) (Attachment 3) or CPARS evaluations to demonstrate experience in performing projects meeting the requirements described in paragraph

4.1.3. If the Offeror is a joint venture, the projects did not have to have been performed by the joint venture submitting the offer. These projects could have been performed by either company in the joint venture. Offerors are required to submit projects wherein the Offeror, or proposed joint venture or joint venture member, was the prime contractor and played a significant role and to clearly define those roles. If any Offeror has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer. Ensure that the PPQs/CPARS and continuation sheet, if used, submitted for this Factor clearly describe the relevant characteristics of the project.

Offerors may submit PPQs or CPARS evaluations submitted on other procurements provided they are on the NAVFAC/USACE Past Performance Questionnaire Form. Offerors shall not merely incorporate by reference PPQs previously submitted for other procurements. Offerors may attach one additional single-sided page per PPQ or CPARS to further describe how the project meets the RFP requirements.

4.1.2 Offerors shall submit a minimum of three (3) and a maximum of five (5) projects using a PPQ or a CPARS evaluation. If an Offeror submits more than five (5) total project examples, only the first five (5) will be evaluated.

4.1.3 Recent, relevant projects.

4.1.3.1 To be considered recent, projects must have been successfully completed, or fully designed and at least 50% construction progress completed within six (6) years preceding the date the solicitation is issued.

4.1.3.2 Projects must be a minimum contract value of $20 million. The Government will not consider multiple projects such as individual task order, combined to meet the minimum contract value.

4.1.3.3 To be considered relevant to the work in this solicitation, projects must consist of vertical construction projects similar to the following:

Construction of new vertical facilities similar to an aircraft maintenance hangar, maintenance/operational facilities, administrative/office buildings, parts and tools storage, company operations facilities, Petroleum, Oil Lubricant (POL) storage, enclosed storage building, hangar apron, aircraft washing apron, water supply building, cybersecurity and fire protection systems.

4.1.3.4. Of the recent and relevant projects submitted, at least one (1) project shall be an aircraft maintenance hangar.

4.1.3.5. Of the recent and relevant projects submitted, at least one (1) project that was built on a Department of Defense property/installation or other Federal Government location that required all of the following: controlled access to the property or the installation; background checks or clearances by the Government of the contractor and subcontractor personnel; and controlled access to a secured construction site.

4.1.4 The project description on the PPQ or CPARS evaluation shall clearly describe the projects. The Government will not assume any project characteristics that are not specifically identified and described. The Offeror may attach a continuation sheet to the PPQ/CPAR if needed consisting of one (1) page to describe how the project contained the elements described above and meets the requirements of this factor. The submission must contain sufficient information for the government to determine whether the project meets the requirements of

4.1.3 and its subparagraphs.

4.1.5 The…