This solicitation package for a federal contract opportunity includes specifications, drawings, and amendments for the construction of an aircraft maintenance hangar at Hunter Army Airfield in Savannah, Georgia. Key details include the solicitation number W912HN20R3009 with a proposal due date of December 15, 2020 at 1:00pm ET. The scope of work involves vertical construction of a new aircraft maintenance hangar and associated facilities, including 8-inch and 13-inch thick concrete pavement sections, a water tank or optional water tower, and site utilities. Subsequent amendments provide updates to specifications, drawings, contract line items, and the wage determination. The contracting agency is the Department of the Army Corps of Engineers Engineering District Savannah.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
88410
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Hunter Aicraft Maintenance Hangar, HAAF, GA. The purpose of this amendment is to revise the solicitation as outlined below .
A. Post Site Visit Roster added to the solicitation.
B. Update to most recent Wage Determination GA20200117 dated November 20, 2020.
C. Updated Interim bidder inquiry ProjNet Report to date.
D. Updated Spec section 07 81 00.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Nov-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HN20R3009
X 9B. DATED (SEE ITEM 11)
29-Oct-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Nov-2020
CODE
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
11/20/2020
W912HN20R3009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
A. CONTRACT CHANGES: Updated Wage Determination, updated bid schedule, add site visit roster and include interim bidder inquiry report.
B. TECHNICAL SPECIFICATION CHANGES: Specification Section 07 81 00 has been deleted from this solicitation by Amendment 0002.
C. CONTRACT DRAWINGS: There are no drawing changes with this amendment.
INTERIM BID INQUIRY REPORT
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Technical Evaluators Report Closed Inquiries
Project: Hunter Aircraft Maintenace Hangar Review: 20R3009 HAAF Aircraft Hangar HAAF (00001) (sorted by CommentID ) Displaying 20 inquiries.
Id Discipline Sheet Detail Spec 8893708 Electrical EP502 UFGS 26 35 43
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
UFGS 26 35 43 states the frequency converter is rated 45 kva while Sheet EP502 states it is 90 kva. Which is correct?
On: Oct 30 2020. Forward request by email.
1-0 Evaluation Concurred. The correct size is 90 kVA. UFGS 26 35 43 will be revised in an upcoming amendment. By: Renard Davis; CESAS-EN Engineering Division; (912-652-5601) On: Nov 02 2020 1-1 Government Response. The correct size is 90 kVA. UFGS 26 35 43 will be revised in an forthcoming amendment. On: Nov 02 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8893716 Electrical EP502 UFGS 26 35 43
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Is the frequency converter intended to provide simultaneous operation of the 400 hertz ac and 28 volt dc outputs.
On: Oct 30 2020. Forward request by email.
1-0 Evaluation For Information Only. Yes. Per UFGS 26 35 43, paragraph 2.1.1.6, "400Hz and 28VDC voltages shall be deliverable simultaneously from converter on individual outputs". By: Renard Davis; CESAS-EN Engineering Division; (912-652-5601) On: Nov 02 2020
1-1 Government Response. Per UFGS 26 35 43, paragraph 2.1.1.6, "400Hz and 28VDC voltages shall be deliverable simultaneously from converter on individual outputs". On: Nov 02 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8898121 Other Spec Spec Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In regards to past project references would it be acceptable for the references to include private work that was not on a federal base as well as references on a Federal Base by contract value?
On: Nov 03 2020. Forward request by email.
1-0 Evaluation For Information Only. Per specifications 4.2.1 The Offeror's submission will be evaluated to determine whether the Offeror has experience performing recent, relevant projects. A minimum of three (3) projects must be submitted. Each project must meet the requirements of paragraph 4.1.3. At least one project must contain work described in paragraph 4.1.3.4 and at least one project must contain work described in paragraph 4.1.3.5. Please assure that you carefully read all of the information in specification section 4.1 Submission Requirements. By: Helane Church; CESAS-CD-BR Ft. Bragg Area Office; (910- 396-4870) On: Nov 03 2020
1-1 Government Response. Per specifications 4.2.1 The Offeror's submission will be evaluated to determine whether the Offeror has experience performing recent, relevant projects. A minimum of three (3) projects must be submitted. Each project must meet the requirements of paragraph 4.1.3. At least one project must contain work described in paragraph 4.1.3.4 and at least one project must contain work described in paragraph 4.1.3.5. Please assure that you carefully review all of the information in Specification Section 4.1 Submission Requirements. On: Nov 03 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8901640 Contracting na na RFP relevant experience requirements Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Can a maintenance facility on military base with clear spans equivalent to that of a aircraft maintenance hangar be used in lieu of an actual aircraft maintenance hangar.
On: Nov 05 2020. Forward request by email.
1-0 Evaluation For Information Only. 4.1.3.3 To be considered relevant to the work in this solicitation, projects must consist of vertical construction projects similar to the following: Construction of new vertical facilities similar to an aircraft maintenance hangar, maintenance/operational facilities, administrative/office buildings, parts and tools storage, company operations facilities, Petroleum, Oil Lubricant (POL) storage, enclosed storage building, hangar apron, aircraft washing apron, water supply building, cybersecurity and fire protection systems. This specification exert references a maintenance/operational facilities are considered relevant.
By: Helane Church; CESAS-CD-BR Ft. Bragg Area Office; (910-396-4870) On: Nov 06 2020
1-1 Government Response. 4.1.3.3 To be considered relevant to the work in this solicitation, projects must consist of vertical construction projects similar to the following: Construction of new vertical facilities similar to an aircraft maintenance hangar, maintenance/operational facilities, administrative/office buildings, parts and tools storage, company operations facilities, Petroleum, Oil Lubricant (POL) storage, enclosed storage building, hangar apron, aircraft washing apron, water supply building, cybersecurity and fire protection systems. This specification exert references states that maintenance/operational facilities are considered relevant. Please note the requirement of 4.1.3.4 and 4.1.3.5. On: Nov 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8902222 Fire Protection/Life Safety A001-A002 07 81 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Sheets A001 and A002 state the Fire Resistive rating requirements are based upon construction Type IIB which does not typically require fireproofing. Please confirm spec 07 81 00 Spray Applied Fireproofing can be deleted.
On: Nov 05 2020. Forward request by email.
1-0 Evaluation Concurred. Building construction is Type IIB. Spray Applied Fireproofing to structural members is not included in the project. By: Matthew Deacon; CESAS-EN Engineering Division; (912-652- 5239) On: Nov 06 2020
1-1 Government Response. The building construction is Type IIB. Spray Applied Fireproofing to structural members is not included in the project. On: Nov 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8902550 Architectural 09 67 23.16 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Specification 09 67 23.16 Fuel resistive Resinous Flooring, 5 Coat system is listed in the specifications, however we do not find any locations for this on room finish schedule. Advise if this specification is not applicable.
On: Nov 05 2020. Forward request by email.
1-0 Evaluation Concurred. Drawings A-610 and I-601 call for Maintenance Bay 152 to receive "Epoxy" flooring, further identified in notes and legends as 5 coat fuel resistant coating. By: Matthew Deacon; CESAS-EN Engineering Division; (912-652-5239) On: Nov 06 2020
1-1 Government Response. Specification 09 67 23.16 Fuel resistive Resinous Flooring, 5 Coat system are referenced in Drawings A-610 and I-601, which call for the Maintenance Bay 152 to receive "Epoxy" flooring, further identified in notes and legends as 5 coat fuel resistant coating. On: Nov 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8902555 Architectural Volume 2 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Regarding the continuous bid netting shown on plans, can either a specification or Basis of Design be provided for this product?
1-0 Evaluation Concurred. See sheet A-429 for bird netting salient features, equipment and details By:
Matthew Deacon; CESAS-EN Engineering Division; (912-652-5239) On: Nov 06 2020
1-1 Government Response. Reference sheet A-429 for bird netting salient features, equipment and details.
On: Nov 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8902558 Architectural 11 11 35.51 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Spec. 11 11 35.51 Aircraft Wash Rack, can a basis of design manufacturer and model be provided?
On: Nov 05 2020. Forward request by email.
1-0 Evaluation For Information Only. Please provide a wash rack that meets the salient features as required by specification 11 11 35.51. Any manufacturer and model that meets the salient features in the specification is acceptable. By: Ian Wright; CESAS-EN Engineering Division; (912-652-5538) On: Nov 06
1-1 Government Response. Please provide a wash rack that meets the salient features as required by specification 11 11 35.51. Any manufacturer and model that meets the salient features in the specification is acceptable. On: Nov 06 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8902560 Architectural All All
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Structural and Architectural details appear to be missing for the Fire Pump house building. It is shown on civil and Fire drawings but no other details found to construct enclosure.
1-0 Evaluation Concurred. Please see 21 30 05.16 "Fire Pumps and Enclosures" for Fire Pump Enclosure specifications. By: Matthew Deacon; CESAS-EN Engineering Division; (912-652-5239) On: Nov 06 2020 1-1 Government Response. Please reference 21 30 05.16 "Fire Pumps and Enclosures" for Fire Pump
Enclosure specifications. On: Nov 06 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8902562 General RFP Pricing schedule Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Should the cost for the Fire Pump House be included in CLIN item 0007 water tank or included with CLIN 0001.
On: Nov 05 2020. Forward request by email.
1-0 Evaluation For Information Only. The cost for the fire pump house should be included with CLIN 0001.
By: John Wallace; CESAS-EN Engineering Division; (912-652-5132) On: Nov 12 2020
1-1 Government Response. The cost for the fire pump house should be included with CLIN 0001. On: Nov 16 2020
1-2 Government Response. This new text supercedes ALL previous replies.
This will be addressed in a forthcoming Amendment. On: Nov 20 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8902563 General RFP Pricing schedule Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
For CLIN 0010, Option 2 Water Tower and associated water lines, confirm that the Base bid ground level steel water tank will be eliminated in this option.
On: Nov 05 2020. Forward request by email.
1-0 Evaluation Concurred. That is correct. It is shown and labeled on CU107A. By: richard hallman; CESAS-EN Engineering Division; (912-652-5677) On: Nov 10 2020 1-1 Government Response. Per Plate CU107A, the Base Bid ground level steel water tank will be eliminated in CLIN 0010, Option 2 Water Tower and associated water lines. On: Nov 10 2020
1-2 Government Response. This new text supercedes ALL previous replies.
This will be addressed in a forthcoming Amendment. On: Nov 20 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8907110 General 00 70 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Specification Section 00 70 00 Wage Determination lists the General Decision GA20200117 with a revision date of 01/03/2020. Beta.sam.gov shows that General Decision GA20200117 had a recent revision dated 10/30/2020. Please confirm that the decision dated 10/30/2020 should be used.
On: Nov 09 2020. Forward request by email.
1-0 Evaluation Concurred. The most current Wage Determination should be used. By: Tonja
Dreke; CECT-SAS Contracting Division; (912-652-6071) On: Nov 10 2020 1-1 Government Response. The most current Wage Determination should be used. On: Nov 10 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8910808 Contracting 4.1.3.1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In regards to past project references section 4.1.3.1, would it be acceptable to extend recent, relevant projects from six years to 10 years?
On: Nov 10 2020. Forward request by email.
1-0 Evaluation For Information Only. The contract requirements per specification section 4.1.3.1 for recent, relevant projects is the requirement for this solicitation. By: Helane Church; CESAS-CD-BR Ft. Bragg Area Office; (910-396-4870) On: Nov 12 2020
1-1 Government Response. Per section 4.1.3.1 which states, "To be considered recent, projects must have been successfully completed, or fully designed and at least 50% construction progress completed within six
(6) years preceding the date the solicitation is issued" is the requirement for this solicitation. On: Nov 12
Current Request Status: Request Closed Information for this report is procurement sensitive.
8911823 Contracting 4.1.3.4 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Can a maintenance facility on military base with clear spans equivalent to that of a aircraft maintenance hangar be used in lieu of an actual aircraft maintenance hangar, fulfilling the requirement stated in 4.1.3.4?
On: Nov 11 2020. Forward request by email.
1-0 Evaluation For Information Only. Per section 4.1.3.3 which states, "To be considered relevant to the work in this solicitation, projects must consist of vertical construction projects similar to the following: Construction of new vertical facilities similar to an aircraft maintenance hangar,maintenance/operational facilities, administrative/office buildings, parts and tools storage,company operations facilities, Petroleum, Oil Lubricant (POL) storage, enclosed storage building, hangar apron, aircraft washing apron, water supply building, cybersecurity and fire protection systems". This section allows a relevant project to be a maintenance/operational facility. By:
Helane Church; CESAS-CD-BR Ft. Bragg Area Office; (910-396-4870) On: Nov 12 2020
1-1 Government Response. Per section 4.1.3.3 which states, "To be considered relevant to the work in this solicitation, projects must consist of vertical construction projects similar to the following: Construction of new vertical facilities similar to an aircraft maintenance hangar,maintenance/operational facilities, administrative/office buildings, parts and tools storage,company operations facilities, Petroleum, Oil Lubricant (POL) storage, enclosed storage building, hangar apron, aircraft washing apron, water supply building, cybersecurity and fire protection systems". This section allows a relevant project to be a maintenance/operational facility. On: Nov 12 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8924614 Structural SB107
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm the continuous footing on column line 35 between Q and T. This continuous footing is labeled as a WF4.0 but scales closer to a WF5.0
On: Nov 18 2020. Forward request by email.
1-0 Evaluation Concurred. Use a WF5.0 between Column lines Q and T along 35. By: michael zaitz; CESAS-EN Engineering Division; (912-652-5386) On: Nov 19 2020 1-1 Government Response. The continuous footing should use a WF5.0 between Column lines Q and T along 35. On: Nov 20 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8924618 Structural SB107
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm the continuous footing on column line 35 between L and Q. This continuous footing is labeled as a WF4.0 but scales closer to a WF3.5
On: Nov 18 2020. Forward request by email.
1-0 Evaluation Concurred. Footing between column lines L and Q along 35 is a WF4.0. By: michael zaitz; CESAS-EN Engineering Division; (912-652-5386) On: Nov 19 2020 1-1 Government Response. The continuous footing between column lines L and Q along 35 is a WF4.0. On:
Nov 20 2020 Current Request Status: Request Closed
Information for this report is procurement sensitive.
8926860 Commissioning 01 33 29 - Sustainability Reporting Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Please confirm per Section 01 33 29 - HPSB whole Building Commissioning is required.
On: Nov 19 2020. Forward request by email.
1-0 Evaluation Concurred. Whole Building Commissioning is required by the 1391. By: Myron Powell; CESAS-EN Engineering Division; (9126525394) On: Nov 20 2020
1-1 Government Response. Whole Building Commissioning is required per the contract requirements. On: Nov 20 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8926865 General Division 01 - General Requirements Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm the Government will make all reasonably required utilities, electricity and potable water available from existing outlets and supplies without consumption charges to Contractor.
On: Nov 19 2020. Forward request by email.
1-0 Evaluation For Information Only. The awarded contractor will be responsible to pay for all utility costs that occur from consumption during construction. By: Helane Church; CESAS-CD-BR Ft. Bragg Area Office; (910-396-4870) On: Nov 20 2020
1-1 Government Response. The awarded contractor will be responsible to pay for all utility costs that occur from consumption during construction. On: Nov 20 2020
Current Request Status: Request Closed Information for this report is procurement sensitive.
8926931 Architectural A-320X & SB501X
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference sheets A320X and SB501X. Bollard foundation for PEMBs on Sheet A-320X shows baseplate and SB501X shows foundations. Please clarify applicable detail.
On: Nov 19 2020. Forward request by email.
1-0 Evaluation Concurred. Use foundation shown on SB501X for bollards for this building. By: michael zaitz; CESAS-EN Engineering Division; (912-652-5386) On: Nov 19 2020
1-1 Government Response. Use the foundation shown on SB501X for bollards for this building. On: Nov 20
Current Request Status: Request Closed Information for this report is procurement sensitive.
8926997 Equipment 41 22 13.13 - Bridge Cranes Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) Is the crane runway to be designed as moment resistant? Drawing shows no tiebacks and next to a concrete wall.
On: Nov 19 2020. Forward request by email.
1-0 Evaluation Concurred. 2 ton crane is braced laterally by the CMU wall per 1/SF302 By: michael zaitz; CESAS-EN Engineering Division; (912-652-5386) On: Nov 19 2020
1-1 Government Response. The 2 ton crane is braced laterally by the CMU wall per 1/SF302. On: Nov 20
Current Request Status: Request Closed Information for this report is procurement sensitive.
Report Complete
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Patent 11/892,984 ProjNet property of ERDC since 2004.
SITE VISIT ROSTER
WAGE DETERMINATION
General Decision Number: GA20200117 11/20/2020 Superseded General Decision Number: GA20190117 State: Georgia Construction Type: Building County: Chatham County in Georgia.
** Wage determinations are available from https://beta.sam.gov . Contractors should regularly check and utilize the most current wage determination for this project.
The following have been modified:
AMENDMENT 0001
A. CONTRACT CHANGES: FAR Clause 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995) has been clarified.
B. TECHNICAL SPECIFICATION CHANGES: The revised Section listed below (revised by Amendment No.
0001) is hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be found in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).
Revised Section 26 35 43
C. CONTRACT DRAWINGS – File No. 211-10-02: There are no drawing changes with this amendment.
SECTION 00 10 00 - SOLICITATION
CLIN 0006
The CLIN extended description has changed from:
Construct Pavements (Aprons, waskrack, storage yards, vehicle parking, walks, Drives, etc)
To:
Construct 8" and 13" Thick Concrete Pavement Sections (Aprons, waskrack, storage yards)
CLIN 0010
The CLIN description has changed from Option 2 to Option 2-Water Tower.
The CLIN extended description has changed from:
Water Tower and 12” Waterline and Associated (The main line is a 16" line, but there are also smaller 12" and 6" lines) waterlines, Complete
To:
Water Tower and 12” Waterline and Associated (The main line is a 16" line, but there are also smaller 12" and 6" lines) waterlines, Complete. The pricing for this CLIN (0010) is the additional cost to go from CLIN 0007-Water Tank to the Water Tower and associated work shown on Civil Series drawing sheets.
*** Do NOT include pricing that is already included at CLIN 0007 on this CLIN. If this CLIN is exercised, there will be no water tank. It will be a water tower only. This CLIN is for upgrade cost for the water tower only. (CLIN 0007 and 0010=Water Tower Total Cost if exercised)
(End of Summary of Changes)