This document is an amendment to a solicitation for the construction of an aircraft maintenance hangar at Hunter Army Airfield in Savannah, Georgia. The amendment revises the proposal due date from December 15, 2020 to January 8, 2021 at 1:00 PM Eastern Time. It also provides revised technical specifications and contract drawings. The revised specifications and drawings replace earlier versions in their entirety. The solicitation package, as amended, includes three drawings files and five specifications files. The Department of the Army Corps of Engineers Engineering District Savannah issued the solicitation on October 29, 2020 for project number 88410.

View the file

Other files

File Type Posted
B.08 - W912HN20R3009 - AMD-0008.pdf PDF
B.08 - W912HN20R3009 - AMD0008CC.pdf PDF
B.08 - W912HN20R3009 - AMD0007.pdf PDF
B.08 - W912HN20R3009 - AMD0007CC.pdf PDF
20R3009vol1amd06.pdf PDF
B.08 - W912HN20R3009 - AMD0006.pdf PDF
B.08 - W912HN20R3009 - AMD0006 CC.pdf PDF
W912HN-20-R-3009_VOL3_AMD6.pdf PDF
20R3009vol1_AMD5.pdf PDF
20R3009vol3_AMD5.pdf PDF
B.08. W912HN20R30090005.pdf PDF
W912HN-20-R-3009_VOL2_AMD5.pdf PDF
20R3009vol2_AMD5.pdf PDF
W912HN-20-R-3009_VOL3_AMD5.pdf PDF
W912HN-20-R-3009_VOL1_AMD4.pdf PDF
W912HN-20-R-3009_VOL3_AMD4.pdf PDF
W912HN-20-R-3009_VOL2_AMD4.pdf PDF
20R3009vol3 .pdf PDF
20R3009vol5 .pdf PDF
20R3009vol1 .pdf PDF
20R3009vol4 .pdf PDF
B.08 - W912HN20R3009 - AMD0004 Conform Copy.pdf PDF
20R3009vol2 .pdf PDF
W912HN-20-R-3009_VOL1 Revision 1.pdf PDF
20R3009vol5 Revision 1.pdf PDF
B.08 - W912HN20R3009 - AMD0003.pdf PDF
W912HN-20-R-3009_VOL2 Revision 1.pdf PDF
20R3009vol3 Revision 1.pdf PDF
20R3009vol1 Revision 3.pdf PDF
20R3009vol1 ver 2.pdf PDF
B.08. W912HN20R30090002.pdf PDF
20R3009vol2 ver 2.pdf PDF
20R3009vol1.pdf PDF
B.08 W912HN20R30090001.pdf PDF
20R3009vol4.pdf PDF
20R3009vol2.pdf PDF
W912HN-20-R-3009_VOL2.pdf PDF
W912HN-20-R-3009_VOL1.pdf PDF
W912HN-20-R-3009_VOL3.pdf PDF
20R3009vol3.pdf PDF
20R3009vol1.pdf PDF
20R3009vol4.pdf PDF
20R3009vol5.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

88410

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Hunter Aicraft Maintenance Hangar, HAAF, GA. The purpose of this amendment is to revise the solicitation as outlined below .

A. CONTRACT CHANGES: Proposal due date has been changed from 15 December 2020 at 1:00pm (ET) to 8 January 2021 at 1:00pm (ET)

B. TECHNICAL SPECIFICATION CHANGES: SEE SUMMARY OF CHANGES BELOW

C. CONTRACT DRAWINGS – File No. 211-10-02: SEE SUMMARY OF CHANGES BELOW All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Dec-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HN20R3009

X 9B. DATED (SEE ITEM 11)

29-Oct-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Dec-2020

CODE

USACE - SAVANNAH DISTRICT

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN20R3009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0004

A. CONTRACT CHANGES: Proposal due date has been changed from 15 December 2020 at 1:00 PM (ET) to 8 January 2021 at 1:00 PM (ET)

B. TECHNICAL SPECIFICATION CHANGES: The revised Sections listed below (revised by Amendment No. 0004) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be found in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1). The added Section listed below (added by Amendment No. 0004) is hereby added to and made a part of the solicitation; such Sections are replaced in their entirety and changes are neither underlined nor struck out.

Revised Sections Added Section 01 35 26 10 11 00 01 45 00 05 12 00 05 21 00 07 42 00 07 92 00 08 33 13 08 33 23 08 34 16.10 09 90 00 10 11 00 10 22 13 10 51 13 11 11 33.51 13 12 80 22 00 00 23 09 13 23 52 00 26 24 13 33 16 15 33 16 23 41 22 13.13

W912HN20R3009

C. CONTRACT DRAWINGS – File No. 211-10-02:

Volume 1:

Sheets GC103, CD107, CS503, CG102, CU107, CU507, and ES101, with Revision 1 dated 11 December 2020 are hereby added to and made a part of the Contract Drawings.

Volume 2:

Sheets SB102, SB106, SF201, SF202, SF203, SF204, SF205, and SF311, with Revision 1 dated 11 December 2020 are hereby added to and made a part of the Contract Drawings. Sheet SB51 with Revision 2 dated 11 December 2020 is hereby added to and made a part of the Contract Drawings.

Volume 3:

Sheets PL105, PL106, PL111, PL112, PL113, PL119, PL123, PL124, PL303, PL401, PL404, PL405, MH505, MH510, MH601, MH602, MH603, MH604, MH605, MI816, and MI819, with Revision 1 dated 11 December 2020 are hereby added to and made a part of the Contract Drawings.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 15-Dec-2020 01:00 PM to 08-Jan-2021 01:00 PM.

The number of offeror copies required 1 has been added.

(End of Summary of Changes)