W912HN-21-B-3002_VOL1B.pdf
PDF 10 MB Posted
- Solicitation number
- W912HN21B3002
About this file
This federal contract opportunity solicitation seeks bids for the PN88725 MCA2 University Registrar, Force Modernization & Proponency Facility project. The Army Corps of Engineers Engineering District Savannah posted the solicitation on December 2, 2020, with bids due by January 12, 2021 at 1:00 PM ET. The bid opening will take place on January 12, 2021 at 2:00 PM ET. The solicitation includes four specification files and nine drawing files with information on the required products and services. Bidders should consult the solicitation for details on submitting bids via WebEx.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AS
A
D
VE
R
TI
SE
D
D
VE
R
TI
D
VE
R
TI
D
VE
R
TI
D
VE
R
TI
D
VE
R
TI
D
VE
R
TI
D
VE
R
TI
APPLICABLE CODES AND STANDARDS
1. UNIFIED FACILITIES CRITERIA, INCLUDING
A. UFC 1-200-01 DOD BUILDING CODE, 20 JUNE 2016
(CHANGE 2, 1 NOVEMBER 2018)
B. UFC 3-301-01 STRUCTURAL ENGINEERING, 1 JUNE 2013
(CHANGE 4, 1 NOVEMBER 2018)
C. UFC 3-310-04 SEISMIC DESIGN OF BUILDINGS, 1 JUNE 2013
(CHANGE 1, 20 JUNE 2016)
D. UFC 4-010-01
DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, 12 DECEMBER 2018
E. UFC 4-023-03 DESIGN OF BUILDINGS TO RESIST PROGRESSIVE COLLAPSE,
14 JULY 2009 (CHANGE 3, 1 NOVEMBER 2016)
2. INTERNATIONAL BUILDING CODE, 2015 EDITION
3. AMERICAN CONCRETE INSTITUTE, BUILDING CODE REQUIREMENTS FOR
REINFORCED CONCRETE (ACI 318-14).
4. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC):
SPECIFICATION FOR STRUCTURAL STEEL BUIDLINGS (AISC 360-10) AND
STEEL CONSTRUCTION MANUAL, 14TH EDITION.
5. AMERICAN WELDING SOCIETY (AWS) D1.1, D1.3, D1.4, D1.8.
6. MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES (ASCE 7-10).
7. STEEL DECK INSTITUTE SPECIFICATIONS AND LOAD TABLES.
8. ASTM MATERIAL STANDARDS AS NOTED.
9. AISI SPECIFICATIONS FOR DESIGN OF COLD FORMED STEEL STRUCTURAL MEMBERS
(AISI S100).
10. BUILDING CODE REQUIREMENTS AND SPECIFICATIONS FOR MASONRY STRUCTURES
(ACI 530-13 AND ACI 530.1-13).
11. SEISMIC EVALUATION AND RETROFIT OF EXISTING BUILDINGS (ASCE 41-13)
12. US ARMY CORPS OF ENGINEERS SAVANNAH DISTRICT DESIGN MANUAL FOR MILITARY
CONSTRUCTION, VOLUME I (JUNE 2016) AND VOLUME II (OCTOBER 2015)
13. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC):
SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS (AISC 341-10) AND
SEISMIC DESIGN MANUAL, 2ND EDITION.
DESIGN LOADS
1. DEAD LOAD
ACTUAL WEIGHT OF MATERIALS USED AND THE FOLLOWING ALLOWANCES:
MEP ALLOWANCE 10 PSF
FLOOR FINISHES 10 PSF
RAISED ACCESS FLOOR 15 PSF
BUILT UP FLOOR 60 PSF
ROOFING 15 PSF
EXTERIOR WALL 25 PSF
ROOF PAD & CURB ALLOWANCE 50 PSF
2. LIVE LOAD
CLASS ROOMS & OFFICES 65 PSF (INCLUDES PARTITION ALLOWANCE)
LOBBIES/CONFERENCE ROOMS 100 PSF
CORRIDORS – FIRST FLOOR 100 PSF
CORRIDORS – ABOVE FIRST FLOOR 80 PSF
MECHANICAL EQUIPMENT ROOMS 150 PSF
STORAGE (LIGHT) 125 PSF
ELECTRICAL AND SERVER ROOMS 150 PSF
ROOFS (NON-MECH) 20 PSF
ROOFS (MECH) 100 PSF
STAIRS AND EXITS 100 PSF
SEE S-101 TO S-105 FOR LOADING PLANS
4. SNOW LOAD
GROUND SNOW LOAD, Pg = 10 PSF FLAT ROOF SNOW LOAD, Pf = 7.7 PSF MINIMUM SNOW LOAD, Pm = 11 PSF
SNOW EXPOSURE FACTOR, Ce = 1.0
SNOW LOAD IMPORTANCE FACTOR, I = 1.1
THERMAL FACTOR, Ct = 1.0
ADDITIONAL SNOW DRIFTS PER BUILDING CODE
5. WIND LOAD
RISK CATEGORY = III
ULTIMATE DESIGN WIND SPEED, Vult = 120 MPH NOMINAL DESIGN WIND SPEED, Vasd = 93 MPH
WIND EXPOSURE = C
INTERNAL PRESSURE COEFFICIENT = = +/- 0.18
DESIGN WIND PRESSURES FOR COMPONENTS AND CLADDING (ULTIMATE)
TRIBUTARY AREA
ZONE 10SF 50SF 100SF
ROOF ZONE 1 (NEG) -42.5 PSF -40.0 PSF -39.0 PSF
ROOF ZONE 2, 3 (NEG) -71.3 PSF -53.7 PSF -46.1 PSF
ROOF ZONE 1 (POS) 17.4 PSF 16.0 PSF 16.0 PSF
ROOF ZONE 2, 3 (POS) 39.0 PSF 34.9 PSF 33.2 PSF
OVERHANG ZONE 2 -61.2 PSF -58.7 PSF -57.6 PSF
OVERHANG ZONE 3 -100.8 PSF -50.8 PSF -29.0 PSF
WALL ZONE 4 (NEG) -42.2 PSF -38.2 PSF -36.4 PSF
WALL ZONE 5 (NEG) -51.9 PSF -43.9 PSF -40.4 PSF
WALL ZONES 4,5 (POS) 39.0 PSF 34.9 PSF 33.2 PSF
PARAPETS (POS/NEG) 110.3 PSF 88.6 PSF 79.3 PSF
LOCATIONS OF ZONES 1 THROUGH 5 ARE DEFINED PER ASCE 7-10.
WIDTH OF ZONES 2, 3 AND 5 MEASURED FROM BUILDING’S EDGE a = 26.4 FT.
SEE S-005 AND S-006 FOR COMPONENTS AND CLADDING PRESSURE MAP
NORTH BAR N-S DIRECTION
WIND DESIGN BASE SHEAR V = 590 KIPS
NORTH BAR E-W DIRECTION
WIND DESIGN BASE SHEAR V = 315 KIPS
CONNECTOR N-S DIRECTION
WIND DESIGN BASE SHEAR V = 340 KIPS
CONNECTOR E-W DIRECTION
WIND DESIGN BASE SHEAR V = 1150 KIPS
SOUTH BAR N-S DIRECTION
WIND DESIGN BASE SHEAR V = 610 KIPS
SOUTH BAR E-W DIRECTION
WIND DESIGN BASE SHEAR V = 360 KIPS
6. SEISMIC LOAD
RISK CATEGORY = III
SEISMIC IMPORTANCE FACTOR, Ie = 1.25 MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETERS: Ss = 0.274, S1 = 0.108 DESIGN SPECTRAL RESPONSE ACCELERATION PARAMETERS: Sds = 0.219, Sd1 = 0.122
SITE CLASS: C
SEISMIC DESIGN CATEGORY: B
ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE PROCEDURE
NORTH BAR N-S DIRECTION
BASIC SEISMIC FORCE-RESISTING SYSTEM:
STEEL BRACED FRAMES NOT DETAILED FOR SEISMIC RESISTANCE
RESPONSE MODIFICATION COEFFICIENT R = 3
SYSTEM OVERSTRENGTH FACTOR ΩO = 3
DEFLECTION AMPLIFICATION FACTOR Cd = 3 SEISMIC RESPONSE COEFFICIENT Cs = 0.0656
DESIGN BASE SHEAR V = 470 KIPS
NORTH BAR E-W DIRECTION
BASIC SEISMIC FORCE-RESISTING SYSTEM:
STEEL MOMENT FRAMES NOT DETAILED FOR SEISMIC RESISTANCE
RESPONSE MODIFICATION COEFFICIENT R = 3
SYSTEM OVERSTRENGTH FACTOR ΩO = 3
DEFLECTION AMPLIFICATION FACTOR Cd = 3 SEISMIC RESPONSE COEFFICIENT Cs = 0.038
DESIGN BASE SHEAR V = 275 KIPS
CONNECTOR N-S DIRECTION
BASIC SEISMIC FORCE-RESISTING SYSTEM:
STEEL MOMENT FRAMES NOT DETAILED FOR SEISMIC RESISTANCE
RESPONSE MODIFICATION COEFFICIENT R = 3
SYSTEM OVERSTRENGTH FACTOR ΩO = 3
DEFLECTION AMPLIFICATION FACTOR Cd = 3 SEISMIC RESPONSE COEFFICIENT Cs = 0.038
DESIGN BASE SHEAR V = 430 KIPS
CONNECTOR E-W DIRECTION
BASIC SEISMIC FORCE-RESISTING SYSTEM:
STEEL BRACED FRAMES NOT DETAILED FOR SEISMIC RESISTANCE
RESPONSE MODIFICATION COEFFICIENT R = 3
SYSTEM OVERSTRENGTH FACTOR ΩO = 3
DEFLECTION AMPLIFICATION FACTOR Cd = 3 SEISMIC RESPONSE COEFFICIENT Cs = 0.0758
DESIGN BASE SHEAR V = 850 KIPS
SOUTH BAR N-S DIRECTION
BASIC SEISMIC FORCE-RESISTING SYSTEM:
STEEL BRACED FRAMES NOT DETAILED FOR SEISMIC RESISTANCE
RESPONSE MODIFICATION COEFFICIENT R = 3
SYSTEM OVERSTRENGTH FACTOR ΩO = 3
DEFLECTION AMPLIFICATION FACTOR Cd = 3 SEISMIC RESPONSE COEFFICIENT Cs = 0.0913
DESIGN BASE SHEAR V = 650 KIPS
SOUTH BAR E-W DIRECTION
BASIC SEISMIC FORCE-RESISTING SYSTEM:
STEEL MOMENT FRAMES NOT DETAILED FOR SEISMIC RESISTANCE
RESPONSE MODIFICATION COEFFICIENT R = 3
SYSTEM OVERSTRENGTH FACTOR ΩO = 3
DEFLECTION AMPLIFICATION FACTOR Cd = 3 SEISMIC RESPONSE COEFFICIENT Cs = 0.038
DESIGN BASE SHEAR V = 290 KIPS
ANTI-TERRORISM/FORCE PROTECTION CRITERIA
NEW BUILDING LOCATION NEW CONSTRUCTION WITHIN
A CONTROLLED PERIMETER
BUILDING CATEGORY PRIMARY GATHERING BUILDING
DESIGN LEVEL OF PROTECTION (LOP) MINIMUM
CONVENTIONAL CONSTR STANDOFF DISTANCE N/A (CONTROLLED PERIMETER > 200 FEET)
APPLICABLE EXPLOSIVE WEIGHT CLASS N/A (CONTROLLED PERIMETER > 200 FEET)
PROGRESSIVE COLLAPSE CRITERIA APPLIES ALTERNATE PATH AND ENHANCED LOCAL
RESISTANCE (OCCUPANCY III)
PROGRESSIVE COLLAPSE DESIGN DATA
THE DESIGN OF THE BUILDING IS IN ACCORDANCE WITH UFC 4-023-03, 14
JULY 2009 (CHANGE 3, 1 NOVEMBER 2016). FUTURE ADDITIONS AND
ALTERATIONS TO THIS STRUCTURE SHALL NOT JEOPARDIZE THE REQUIREMENTS
FOR PROGRESSIVE COLLAPSE RESISTANCE.
1. RISK CATEGORY III
2. PROGRESSIVE COLLAPSE RESISTANCE DESIGN
A. ALTERNATE PATH METHOD
B. ENHANCED LOCAL RESISTANCE
FOUNDATION DESIGN
1. THE FOUNDATION DESIGN IS BASED UPON THE GEOTECHNICAL REPORT
PREPARED BY:
Soils Section, Geotechnical & HTRW Branch, U.S. Army Engineer District, Savannah
REPORT NAME: SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING REPORT, CYBER
CENTER OF EXCELLENCE, SCI MISSION COMMAOND, UNIVERSITY REGISTRAR,
FORCE MODERNIZATION AND PROPONENCY FACILITY (MCA-2)
FY 20, PN 88725, FORT GORDON, GEORGIA
DATED: JULY 2019
2. COLUMN FOOTINGS AND WALL FOOTINGS SHALL BE SUPPORTED BY SOILS WITH MINIMUM
BEARING CAPACITY OF 5,000 PSF. DENSIFY AND STRENGTHEN SOILS, AS REQUIRED, BY USE OF
AGGREGATE PIERS (AP) AS INDICATED IN THE GEOTECHNICAL REPORT AND SPECIFICATION
DIVISION 31. SOIL IMPROVEMENT CALCULATIONS SHALL BE SEALED BY A PROFESIONAL
ENGINEER LICENSED IN GEORGIA. INSTALLATION SHALL BE BY A QUALIFIED
PROFESSIONAL ENGINEER LICENSED IN GEORGIA EXPERIENCED IN THE CHOSEN METHOD.
3. SUITABLE BACKFILL SOILS SHALL BE PLACED TO RAISE EXISTING GRADE LEVEL TO THE
FINAL GRADE LEVEL AS SHOWN ON CIVIL AND STRUCTURAL DRAWINGS.
4. FROST DEPTH = 0 inches
5. ENGINEERING PROPERTIES OF SOIL:
AT-REST EARTH PRESSURE COEFFICIENT Ko = 0.50 ACTIVE EARTH PRESSURE COEFFICIENT Ka = 0.33 PASSIVE EARTH PRESSURE COEFFICIENT Kp = 3.00
SOIL - CONCRETE FRICTION COEFFICIENT = 0.35
SOIL BACKFILL INTERNAL FRICTION ANGLE = 30 DEGREES
MOIST UNIT WEIGHT 120 PCF
SATURATED UNIT WEIGHT 125 PCF
6. SLABS-ON-GRADE SHALL BE UNDERLAIN BY A VAPOR RETARDER OVER A MINIMUM 4 INCH
CAPILLARY BARRIER COMPOSED OF NO. 57, 67, 78, OR 89 STONE. VERTICAL
MODULUS OF SUBGRADE REACTION = 150 PCI
7. SUITABLE BACKFILL SOILS SHALL BE PLACED IN ACCORDANCE WITH THE RECOMMENDATIONS
PRESENTED IN THE GEOTECHNICAL REPORT. BACKFILL SOILS SHOULD BE PLACED IN LIFTS
NO MORE THAN 8 INCHES LOOSE THICKNESS. STRUCTURAL FILL AND SUBGRADES TO BE
COMPACTED TO AT LEAST 92% MAXIMUM DRY DENSITY. THE TOP TWO FEET OF ALL AREAS
TO RECEIVE PAVEMENT OR STRUCTURE SHALL BE COMPACTED TO AT LEAST 95% MAXIMUM DRY
DENSITY. BASE COURSE BENEATH PAVED AREAS TO BE COMPACTED TO 100% MAXIMUM DRY
DENSITY.
MATERIALS OF CONSTRUCTION
1. NORMAL WEIGHT CONCRETE 28 DAY COMPRESSIVE STRENGTH
GENERAL STRUCTURAL CONCRETE f’c = 4,000 PSI
2. LIGHTWEIGHT CONCRETE: 115 PCF
PLUS OR MINUS 3 PCF
CONCRETE FILL ON METAL DECK f’c = 3,000 PSI
3. REINFORCING STEEL – ASTM A615 GRADE 60 Fy = 60 KSI REINFORCING STEEL TO BE WELDED – ASTM A706 Fy = 60 KSI
4. WELDED WIRE REINFORCEMENT – ASTM A1064 Fy = 70 KSI
5. DEFORMED BAR ANCHORS – ASTM A496 Fy = 70 KSI
6. STRUCTURAL STEEL
WIDE FLANGE AND TEE SHAPES - ASTM A992 Fy = 50 KSI ANGLES, CHANNELS AND PLATES - ASTM A36 Fy = 36 KSI PLATES – ASTM A572 Fy = 50 KSI HSS RECTANGULAR AND SQUARE - ASTM A500 GRADE C Fy = 50 KSI HSS ROUND - ASTM A500 GRADE C Fy = 46 KSI
COMMON GRADE BOLTS – A307
HIGH STRENGTH BOLTS - ASTM F1852 Fu = 120 KSI HIGH STRENGTH BOLTS – ASTM F2280 Fu = 150 KSI
SHEAR STUD CONNECTORS – ASTM A108
ANCHOR RODS - ASTM F1554 GRADE 55 w/S1 SUPPLEMENT Fy = 55 KSI
NUTS – ASTM A563 GRADE D HEAVY HEX
WELDING ELECTRODES - E70XX
METAL ROOF DECKING (GALVANIZED)
ASTM A653 G90 (Z275) ZINC COATING Fy = 33 KSI
STRUCTURAL QUALITY
COMPOSITE METAL FORM DECK (GALVANIZED)
ASTM A653 G60 (Z180) ZINC COATING Fy = 50 KSI
STRUCTURAL QUALITY
7. MASONRY
CONCRETE MASONRY ASSEMBLY f'm = 2000 PSI CONCRETE MASONRY UNITS: ASTM C-90 f’c = 2000 PSI (NET AREA) MIN.
GROUT: ASTM C476, f’g = 2000 PSI MIN.
MORTAR: ASTM C270, TYPE S,
JOINT REINFORCEMENT: ASTM A951 LADDER TYPE Fy = 70 KSI
8. NON-SHRINK GROUT AND NON-METALLIC GROUT f'c = 4000 PSI AT 7 DAYS AT BASE PLATES AND BEARING PLATES f'c = 8000 PSI AT 28 DAYS
CONSTRUCTION NOTES
A. GENERAL CONSTRUCTION NOTES
1. STRUCTURAL DRAWINGS SHOULD NOT BE SCALED. PRINTED DIMENSIONS HAVE
PRECEDENCE OVER SCALED DRAWINGS AND LARGE SCALE OVER SMALL.
2. ALL DRAWINGS AND SPECIFICATIONS ARE CONSIDERED TO BE A PART OF THE CONTRACT
DOCUMENTS. STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH THE CIVIL,
ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR LOCATION AND
SIZE OF OPENINGS, BLOCKOUTS, FLOOR DEPRESSIONS, CURBS, DIMENSIONS, ETC. NOT
INDICATED ON THE STRUCTURAL DRAWINGS. THE LOCATION AND SIZE OF MECHANICAL
AND ELECTRICAL OPENINGS IN SLABS, WALLS AND DECKS SHALL BE COORDINATED BY
THE CONTRACTOR. PROVIDE ALL ADDITIONAL FRAMING OR REINFORCING TO ACCOMMODATE
OPENINGS AS REQUIRED BY THE APPLICABLE STANDARD DETAILS SHOWN ON THE STRUCTURAL
DRAWINGS. NO HOLES, NOTCHES, BLOCKOUTS, ETC. ARE ALLOWED IN STRUCTURAL MEMBERS
UNLESS DETAILED ON THE STRUCTURAL DRAWINGS OR APPROVED BY THE STRUCTURAL ENGINEER.
3. WHERE DIMENSIONS ARE PROVIDED FOR OPENINGS, BLOCKOUTS, FLOOR DEPRESSIONS,
CURBS, ETC., BUT MAY BE AFFECTED BY THE EQUIPMENT PURCHASED, THE
CONTRACTOR SHALL VERIFY THE INFORMATION PROVIDED PRIOR TO CONSTRUCTION.
4. PROVIDE CONCRETE EQUIPMENT PADS AND INERTIAL BASES FOR MECHANICAL AND
ELECTRICAL INSTALLATIONS. CONSTRUCT PADS AND BASES IN ACCORDANCE WITH THE
TYPICAL DETAILS. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR LIMITS AND
LOCATIONS.
5. THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH EXISTING
CONDITIONS, CHECK AND VERIFY EXISTING DIMENSIONS AND TAKE ADDITIONAL
MEASUREMENTS AS NEEDED. NOTIFY ARCHITECT OF ANY DISCREPANCY BETWEEN ACTUAL
CONDITIONS AND INDICATED CONDITIONS. MODIFICATION OF DETAILS OF CONSTRUCTION
SHALL NOT BE MADE WITHOUT WRITTEN APPROVAL OF THE ARCHITECT OR STRUCTURAL
ENGINEER.
6. CONTRACTOR SHALL PROVIDE AND BE RESPONSIBLE FOR THE PROTECTION AND REPAIR
OF ADJACENT EXISTING SURFACES AND AREAS WHICH MAY BE DAMAGED BY NEW WORK.
7. ALL COLUMNS AND FOUNDATIONS, UNLESS NOTED OTHERWISE, SHALL BE CENTERED ON
GRIDLINES IN EACH DIRECTION. BEAMS SHALL BE EQUALLY SPACED BETWEEN COLUMN
CENTERLINES UNLESS NOTED OTHERWISE.
8. TYPICAL DETAILS SHALL APPLY IN GENERAL CONSTRUCTION UNLESS SPECIFICALLY
DETAILED. WHERE NO DETAILS ARE GIVEN, CONSTRUCTION SHALL BE AS SHOWN FOR
SIMILAR WORK.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATE DESIGN AND CONSTRUCTION
OF ALL FORMS, SHORING AND TEMPORARY BRACING. THE CONTRACTOR SHALL PROVIDE
ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE AND SAFETY OF WORKMEN
DURING CONSTRUCTION.
A. DO NOT PLACE CONSTRUCTION MATERIALS OR OTHER CONSTRUCTION LOADS ON THE
STRUCTURE SUCH THAT THE LOADS PLACED EXCEED THE CAPACITY OF THE STRUCTURE.
B. TAKE INTO CONSIDERATION THAT FULL STRUCTURAL CAPACITY OF MANY STRUCTURAL
MEMBERS IS NOT REALIZED UNTIL STRUCTURAL ASSEMBLY IS COMPLETE; THAT IS,
UNTIL SLABS, DECKS, DIAGONAL BRACING AND SHEAR WALLS ARE INSTALLED.
C. PROVIDE TEMPORARY BRACING AND GUYING TO PROVIDE STABILITY AND RESIST
ALL LOADS TO WHICH THE PARTIALLY COMPLETED STRUCTURE MAY BE
SUBJECTED INCLUDING ERECTION EQUIPMENT AND ITS OPERATION. ADEQUACY
OF TEMPORARY BRACING AND GUYING FOR THIS PURPOSE IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR.
B. EARTHWORK AND FOUNDATIONS
1. ALL EARTHWORK, SOIL MODIFICATION, DEWATERING, AND SITE PREPARATION SHALL BE
PERFORMED IN STRICT ACCORDANCE WITH THE SPECIFICATIONS AND THE GEOTECHNICAL
REPORT. EXISTING SOILS SHALL BE MODIFIED AS INDICATED IN THE FOUNDATION
DESIGN GENERAL NOTES. ALL FOUNDATION EXCAVATIONS SHALL BE OBSERVED AND APPROVED
BY THE GEOTECHNICAL ENGINEER. SUITABLE BACKFILL SOILS SHALL BE PLACED TO RAISE
EXISTING GRADE LEVEL TO THE FINAL GRADE LEVEL AS SHOWN ON CIVIL AND STRUCTURAL
DRAWINGS.
2. ANY EXISTING FILLS OR UNSUITABLE SOILS AS DETERMINED BY THE GEOTECHNICAL ENGINEER
SHALL BE EXCAVATED AND REPLACED WITH PROPERLY COMPACTED FILL.
3. EXTREME CARE SHALL BE EXERCISED WHEN EXCAVATING OR GRADING ADJACENT TO
EXISTING STRUCTURES OR IMPROVEMENTS SO AS NOT TO DAMAGE OR UNDERMINE
FOUNDATIONS, WALLS, SLABS, UTILITIES, ETC.
4. DO NOT EXCAVATE BELOW THE BEARING ELEVATION OF ANY COMPLETED FOOTING NOR
ANY CLOSER TO THE FOOTING THAN A SLOPE OF TWO HORIZONTAL (MEASURED FROM
EDGE OF FOOTING TO NEAREST POINT IN EXCAVATION) TO ONE VERTICAL.
5. HORIZONTAL CONSTRUCTION JOINTS IN COLUMN FOOTINGS, SLABS ON GRADE
AND MAT FOUNDATIONS ARE NOT PERMITTED.
6. PROVIDE DOWELS FOR ALL WALLS EMBEDDED INTO COLUMN FOOTINGS, MAT FOUNDATIONS
AND GRADE BEAMS. DOWELS SHALL BE THE SAME SIZE AND SPACING AS VERTICAL WALL
REINFORCEMENT UNO.
7. BOTTOM OF ALL FOOTINGS SHALL BE PLACED AT LEAST 24 INCHES BENEATH THE
FINISHED FLOOR OR FINISHED GRADE LEVEL, WHICHEVER IS LOWER. BOTTOM OF
NON LOAD-BEARING FOOTINGS MAY BE PLACED AT LEAST 18 INCHES BENEATH FINISHED
FLOOR OR FINISHED GRADE LEVEL, WHICHEVER IS LOWER.
C. CONCRETE AND REINFORCING
1. LOCATION OF CONSTRUCTION JOINTS OR POUR JOINTS SHALL BE AS INDICATED ON
APPROVED SHOP DRAWINGS.
2. ALL CONCRETE SHALL BE VIBRATED DURING PLACEMENT.
3. PROVIDE 3/4" CHAMFER ON ALL EXPOSED CONCRETE CORNERS.
4. NO STAKES, STEEL OR WOOD, SHALL BE PERMITTED IN ANY CONCRETE POUR. SUSPEND
FORMS FROM ABOVE GRADE.
5. ANCHOR RODS, DOWELS, REINFORCING STEEL, INSERTS, ETC., SHALL BE SECURELY TIED
IN PLACE PRIOR TO POURING CONCRETE. CONCRETE BLOCKS ONLY SHALL BE USED TO
SUPPORT REINFORCING OFF GRADE.
6. ALL REINFORCEMENT SHALL BE DETAILED, FABRICATED AND PLACED IN ACCORDANCE
WITH ACI 315.
7. PROVIDE MINIMUM CONCRETE COVERING FOR REINFORCEMENT AS FOLLOWS:
CONDITION CLEAR COVER
SLABS-ON-GRADE 2 IN.
CONCRETE DEPOSITED AGAINST EARTH: 3 IN.
FORMED SURFACES EXPOSED TO
WEATHER OR IN CONTACT WITH EARTH: 3 IN.
BUILDING INTERIOR SURFACES:
BEAMS, GIRDERS, AND COLUMNS 2 IN.
SLABS AND WALLS 1 IN.
8. PROVIDE DOWELS OF SAME SIZE AND NUMBER FROM ADJACENT POUR, BOTH VERTICALLY
AND HORIZONTALLY, TO MATCH TYPICAL REINFORCING SHOWN. LAPS TO BE IN
ACCORDANCE WITH THE DEVELOPMENT LENGTH AND LAP SPLICE SCHEDULE. DOWELS
SHALL BE CLEANED AFTER POUR.
9. FIELD WELDING OR BENDING OF REINFORCING IS NOT PERMITTED EXCEPT AS INDICATED
ON THE DRAWINGS OR AS APPROVED BY THE STRUCTURAL ENGINEER. USE LOW HYDROGEN
ELECTRODES E70 OR E90 AS REQUIRED.
10. CONDUITS CAST WITHIN STRUCTURAL CONCRETE ARE NOT PERMITTED, UNO.
11. CONTINUOUS REINFORCEMENT IN WALLS AND FOOTINGS MAY BE SPLICED AS REQUIRED,
PROVIDED THAT BARS ARE OF THE LONGEST PRACTICAL LENGTH AND ALL SPLICES ARE
SHOWN ON THE REINFORCING BAR SHOP DRAWINGS. SPLICES ARE TO BE STAGGERED
WHEN POSSIBLE. PROVIDE LAP SPLICES AND DEVELOPMENT LENGTHS IN ACCORDANCE
WITH THE DEVELOPMENT LENGTH AND LAP SPLICE SCHEDULE. USE CLASS B LAP
SPLICES UNLESS NOTED OTHERWISE.
12. CORING OF SLABS, BEAMS, COLUMNS, OR WALLS IS NOT PERMITTED. PROVIDE SLEEVES
FOR ALL PENETRATIONS PRIOR TO PLACING CONCRETE.
D. COMPOSITE SLABS & DECKS
1. CONCRETE WITH CALCIUM CHLORIDE OR ANY ADMIXTURE CONTAINING CHLORIDES SHALL
NOT BE USED WITH COMPOSITE STEEL DECK.
2. COMPOSITE BEAMS ARE DESIGNED FOR UNSHORED CONSTRUCTION. BEAMS SHALL BE
FABRICATED WITH THE CAMBER INDICATED ON THE PLANS. BEAMS WITHOUT SPECIFIED
CAMBER SHALL BE ERECTED WITH THE STANDARD MILL TOLERANCE CAMBER UP.
3. PROVIDE COMPOSITE DECK LAYOUT THAT IS CONTINUOUS OVER TWO OR MORE
SUPPORTS. COMPLY WITH DECK MANUFACTURER SHORING REQUIREMENTS FOR OTHER
DECK LAYOUTS.
4. TO COMPENSATE FOR DEFLECTION OF THE STRUCTURE UNDER THE LOAD OF FRESHLY
PLACED CONCRETE, THE SLAB THICKNESS SHALL BE INCREASED ACCORDINGLY TO
PROVIDE A LEVEL SURFACE WITHIN TOLERANCE. ADDITIONAL CONCRETE SHALL BE PLACED
AT NO ADDITIONAL COST TO THE OWNER. ADDITIONAL CONCRETE THICKNESS SHALL NOT
TO EXCEED 3/4 INCH.
5. CORE DRILLED OR CUT OPENINGS IN COMPOSITE SLABS SHALL NOT EXCEED 10" IN ANY
DIMENSION. LARGER OPENINGS, WHEN REQUIRED SHALL BE BOXED OUT AND REINFORCED
PER TYPICAL UNFRAMED OPENING DETAIL.
6. CORE DRILLED OR CUT OPENINGS SHALL NOT BE PLACED CLOSER THAN 1 OPENING
DIAMETER OR WIDTH TO ANY BEAM NOR SPACED CLOSER THAN 2 OPENING DIAMETERS
OR WIDTHS. WHEN TWO ADJACENT OPENINGS ARE OF A DIFFERENT SIZE, SPACING SHALL
BE BASED UPON THE LARGER SIZE.
7. WHEN TOTAL WIDTH OF ADJACENT OPENINGS REQUIRED IS LARGER THAN 30" OR WHEN
REQUIRED SPACING OF OPENINGS CANNOT BE MET, CORED OR CUT OPENINGS SHALL BE
SUPPORTED ALONG ALL EDGES. PROVIDE W10X12 SUPPORT BEAMS AT THESE LOCATIONS.
LOCATE BEAMS 6" CLEAR OF OPENING EDGES.
8. ELECTRICAL CONDUIT IN SLABS ON METAL DECK SHALL NOT BE PERMITTED.
AS
A
D
VE
R
TI
E. MECHANICAL ANCHORS
1. MECHANICAL ANCHORS SHALL MEET THE REQUIREMENTS OUTLINED IN THE CONTRACT
DOCUMENTS.
2. ANCHORS SHALL BE ZINC PLATED UNLESS SPECIFICALLY NOTED AS STAINLESS STEEL
ON THE PLAN DETAILS.
3. WHEN DETAILS OF SECTIONS INDICATE MECHANICAL ANCHORS BUT NO SIZE, PROVIDE
ANCHORS WITH 3/4" DIAMETER.
4. INSTALL ANCHORS IN ACCORDANCE WITH THE EVALUATION REPORT AND MANUFACTURER'S
PRINTED INSTALLATION INSTRUCTIONS. PROVIDE THE MINIMUM EMBEDMENT DEPTHS,
SPACING, AND EDGE DISTANCES PER MANUFACTURER LITERATURE.
5. WHEN INSTALLING DRILLED-IN-ANCHORS, USE CARE AND CAUTION TO AVOID CUTTING
OR DAMAGING THE EXISTING REINFORCING BARS.
6. TEST INSTALLED ANCHORS IN ACCORDANCE WITH THE ANCHOR SCHEDULE AND AS FOLLOWS:
A. EXPANSION ANCHORS SHALL BE TESTED WITH A CALIBRATED TORQUE WRENCH.
THE TORQUE LISTED BELOW SHALL BE OBTAINED WITHIN 1/2 TURN OF THE NUT.
B. TESTING SHALL BE DONE IN THE PRESENCE OF SPECIAL INSPECTOR. ANCHORS
TESTED SHALL BE SELECTED AT RANDOM BY THE SPECIAL INSPECTOR. THE TEST
FREQUENCY SHALL BE AS FOLLOWS:
100% OF ALL ANCHORS USED FOR STUCTURAL APPLICATIONS.
50% OF ANCHORS OR ALTERNATE BOLTS IN A GROUP USED FOR NON STRUCTURAL
APPLICATIONS SUCH AS EQUIPMENT ANCHORAGE. INCLUDE AT LEAST ONE HALF
THE ANCHORS IN EACH GROUP.
10% OF ANCHORS USED FOR SILL PLATE BOLTING.
10% OF ANCHORS WHERE THE FACTORED DESIGN TENSION LOAD IS LESS THAN
100 LBS AND IS CLEARLY IDENTIFIED ON THE PLANS OR DETAIL.
IF ANY ANCHOR FAILS, ALL OF THE SAME TYPE SHALL BE TESTED, WHICH ARE
INSTALLED BY THE SAME TRADE, NOT PREVIOUSLY TESTED UNTIL TWENTY
CONSECUTIVE ANCHORS PASS, THEN RESUME THE INITIAL TESTING FREQUENCY.
C. TEST EQUIPMENT SHALL BE CALIBRATED BY AN APPROVED TESTING LABORATORY
IN ACCORDANCE WITH STANDARD RECOGNIZED PROCEDURES.
7. MINIMUM ANCHOR EMBEDMENT DEPTHS SHALL BE PER INSTALLATION DATA PROVIDED BY
APPROVED ANCHOR MANUFACTURER.
F. ADHESIVE ANCHORS AND DOWELS
1. REINFORCING BAR DOWELS, THREADED RODS, BOLTS ETC. WHICH
ARE INDICATED AS ADHESIVE ANCHOR, ADHESIVE REINFORCEMENT, OR ADHESIVE DOWELS
SHALL MEET THE REQUIREMENTS OUTLINED IN THE CONTRACT DOCUMENTS.
2. DRILL, BRUSH, AND CLEAN ALL HOLES, AND INSTALL ALL ANCHORS IN COMPLETE
ACCORDANCE WITH MANUFACTURERS PUBLISHED INSTALLATION INSTRUCTIONS, AS WELL AS
ALL APPLICABLE BUILDING CODES OR ENGINEERING REPORTS.
3. ADHESIVE ANCHORS AND DOWELS SHALL ONLY BE INSTALLED BY ACI CERTIFIED INSTALLERS.
USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE EXISTING REINFORCING BARS.
4. ADHESIVE ANCHORS SHALL BE INSTALLED AND TESTED IN ACCORDANCE WITH THE ADHESIVE
ANCHOR TEST SCHEDULE AND AS FOLLOWS:
A. DOWNWARD INSTALLED ANCHORS: 25% OF THE FIRST 40 ANCHORS INSTALLED AND 10% OF
ALL ANCHORS INSTALLED THEREAFTER.
HORIZONTAL AND UPWARD INSTALLED ANCHORS: 100% OF ALL ANCHORS.
B. IF ANY FAILURES OCCUR, THE PREVIOUS 10 ANCHORS INSTALLED SHALL BE TESTED AS
WELL AS THE NEXT 5 ANCHORS INSTALLED.
C. ANCHORS SHALL BE ALLOWED TO CURE 48 HOURS PRIOR TO TESTING.
D. TENSION TEST SHALL BE IN ACCORDANCE WITH ASTM E-1512.
5. MINIMUM ANCHOR EMBEDMENT DEPTHS SHALL BE PER INSTALLATION DATA PROVIDED BY
APPROVED ANCHOR MANUFACTURER.
G. HEADED STUDS AND DEFORMED BAR ANCHORS
1. HEADED STUDS AND DEFORMED BAR ANCHORS SHALL BE ELECTRIC-ARC STUD WELDED
PER MANUFACTURERS RECOMMENDATIONS AND THE AWS CODE. FILLET WELDING SHALL
NOT BE ALLOWED WITHOUT APPROVAL OF THE STRUCTURAL ENGINEER. WELDMENT SHALL
BE IN SUCH A MANNER AS TO PROVIDE COMPLETE FUSION BETWEEN THE END OF THE
STUD AND THE PLATE. THERE SHOULD NO POROSITY OR EVIDENCE OF LACK OF FUSION
BETWEEN THE WELDED END OF THE STUD AND THE PLATE. THE STUD WILL DECREASE IN
LENGTH DURING WELDING APPROXIMATELY 1/8” FOR 5/8” DIAMETER STUDS AND SMALLER,
3/16” FOR LARGER THAN 5/8” DIAMETER.
2. HEADED STUDS SHALL BE TYPE B PER THE AWS CODE WITH A MINIMUM ULTIMATE STRENGTH
OF 65 KSI. STUDS SHALL BE MANUFACTURED OF COLD DRAWN BAR STOCK CONFORMING TO
ASTM A-108.
3. DEFORMED BAR ANCHORS SHALL COMPLY WITH ASTM A-496 WITH A MINIMUM YIELD
STRENGTH OF 70 KSI.
4. UNLESS NOTED OTHERWISE, DEFORMED BAR ANCHOR LENGTH SHALL BE AS FOLLOWS:
BAR DIAMETER EMBEDMENT LENGTH
3/8" 24" 1/2" 24" 5/8" 30"
H. STRUCTURAL STEEL
1. STEEL FRAMING DESIGNATIONS AND SYMBOLS ARE DEFINED IN THE STRUCTURAL STEEL
SYMBOL LEGEND SHOWN ON PLANS.
2. ALL FIELD BOLTED SHEAR CONNECTIONS SHALL BE MADE WITH F1852 BOLTS, UNLESS NOTED
OTHERWISE. ALL BOLTS SHALL BE FULLY PRETENSIONED AND INSPECTED USING TENSION
CONTROL TWIST-OFF STYLE BOLTS. UNLESS SPECIFICALLY INDICATED AS SLIP CRITICAL
OR PRETENSIONED, ALL JOINTS SHALL BE DESIGNATED AS SNUG TIGHT. ROUTINE
OBSERVATION TO VERIFY THE SPLINED ENDS ARE PROPERLY SEVERED DURING INSTALLATION
IS REQUIRED FOR ALL BOLTS.
3. CANTILEVER BEAM SIZE MATCHES MAIN SPAN BEAM SIZE UNLESS NOTED OTHERWISE.
4. PLACE NON-SHRINK GROUT UNDER ALL COLUMN BASE PLATES BEFORE PLACING ANY
ELEVATED SLABS.
5. WHERE THE WORK OF OTHER TRADES REQUIRES CUTS OR OPENINGS TO BE MADE IN
STRUCTURAL STEEL MEMBERS, APPROVAL SHALL BE OBTAINED FROM THE ENGINEER.
SUCH OPENINGS SHALL BE MADE IN THE SHOP AND CLEARLY INDICATED ON THE SHOP
DRAWING.
6. ALL WELDERS MUST BE QUALIFIED IN THE PROCESS USED AND AWS CERTIFIED.
7. WELD LENGTHS CALLED FOR ON THE PLANS ARE THE NET EFFECTIVE LENGTH REQUIRED.
WHERE FILLET WELD SYMBOL IS GIVEN WITHOUT INDICATION OF SIZE, USE MINIMUM SIZE
WELDS AS SPECIFIED BY AISC OR 3/16", WHICH EVER IS GREATER.
8. ALL GROOVE WELDS INDICATED ON PLANS AND SECTIONS SHALL BE COMPLETE JOINT
PENETRATION WELDS (CJP) UNLESS SPECIFICALLY INDICATED TO BE PARTIAL PENETRATION
WELDS.
9. ALL COMPLETE JOINT PENETRATION GROOVE WELDS AND FILLET WELDS AT BRACING
CONNECTIONS SHALL HAVE A FILLER METAL WITH A MINIMUM NOTCH TOUGHNESS OF 20
FOOT-POUNDS AT A TEMPERATURE OF 0 DEGREES FAHRENHEIT OR LOWER.
10. E70XX ELECTRODES SHALL BE USED FOR ALL WELDING. THE WELDING OF E7018 OVER
E70TG-K2 IS NOT ALLOWED. THE MIXING OF ANY OTHER PROCESSES AND WIRES MUST
BE SUBMITTED TO THE STRUCTURAL ENGINEER OF RECORD FOR APPROVAL. THE USE
OF E70-T4 IS NOT ALLOWED. IN GROOVE WELDS, FCAW FILLER METAL WIRE SHALL BE
LIMITED TO 5/64" DIAMETER. SMAW WELDING ELECTRODES SHALL BE LIMITED TO 5/32"
DIAMETER.
11. ALL SHOP AND FIELD WELDS SHALL BE PREQUALIFIED WELDS. ANY WELDS BEYOND THE
RANGE OR TOLERANCE OR REQUIREMENTS FOR PREQUALIFICATION SHALL BE QUALIFIED
BY TEST PER AWS D1.1 CLAUSE 4 PART B. WELDS AT BASE METALS OVER 2" IN
THICKNESS ARE NOT ALLOWED AS PREQUALIFIED WELD JOINTS WITHOUT TESTING.
12. A WELDING PROCEDURE SPECIFICATION (WPS) PER AWS D1.1 SHALL BE DEVELOPED
BY THE FABRICATOR/ERECTOR AND APPROVED BY THE STRUCTURAL ENGINEER OF
RECORD (SEOR) OR HIS DESIGNEE. THE WPS SHALL INCLUDE THE WELDING
PARAMETERS RECOMMENDED BY THE ELECTRODE MANUFACTURER. THE WPS MUST BE
SUBMITTED AND APPROVED BEFORE ANY WELDING MAY BEGIN. ALLOW A MINIMUM OF
FOUR WEEKS FOR THE REVIEW PROCESS.
13. A PRE-CONSTRUCTION MEETING BETWEEN THE SEOR, THE FABRICATOR, THE ERECTOR,
THE CONTRACTOR AND THE INSPECTORS SHALL TAKE PLACE TO DISCUSS THE WELDING
PROCEDURE SPECIFICATIONS (WPS) TO INSURE THE QUALITY OF WORK THAT THE
ENGINEER OF RECORD HAS SPECIFIED. THE WELDING ELECTRODE MANUFACTURER'S
SPECIFICATIONS SHOULD BE ATTACHED TO THE WPS ON ALL JOBS. ALL WELDERS AND
INSPECTORS SHALL BE INSTRUCTED IN THE PROPER USE OF THE WPS AND SHALL
ALSO BE INSTRUCTED TO RETAIN A COPY OF THE WPS
14. TO ASSURE THE PROPER AMPERAGE AND VOLTAGE OF THE WELDING PROCESS, THE USE
OF A HAND HELD CALIBRATED AMP AND VOLT METER SHALL BE USED. THIS EQUIPMENT
SHALL BE USED BY THE FABRICATOR, ERECTOR AND THE INSPECTORS. AMPERAGE AND
VOLTAGE SHALL BE MEASURED NEAR THE ARC. TRAVEL SPEED AND ELECTRODE STICK
OUT SHALL BE VERIFIED TO BE IN COMPLIANCE WITH THE APPROVED WPS
15. A WELDING SEQUENCE SHALL BE DEVELOPED BY THE FABRICATOR/ERECTOR AND
APPROVED BY THE ENGINEER OF RECORD OR HIS DESIGNEE FOR ALL WELDING TO BE
DONE FOR THE LATERAL FORCE RESISTING SYSTEM AND PROGRESSIVE COLLAPSE
RESISTING SYSTEM.
16. PROVIDE CONNECTIONS FOR REACTIONS SHOWN ON PLANS AND ELEVATIONS,
DETAILS AND SCHEDULES. REACTIONS SHOWN ON THESE DRAWINGS ARE FACTORED (LRFD).
A. ALL BOLTED CONNECTIONS SHALL HAVE A MINIMUM OF (2) HIGH STRENGTH
BOLTS WITH A MINIMUM DIAMETER OF 3/4". ALL WELDED CONNECTIONS SHALL
HAVE THE MINIMUM WELD SIZE AS SPECIFIED IN AISC OR 3/16", WHICHEVER
IS GREATER.
B. PENDING APPROVAL OF STRUCTURAL ENGINEER OF RECORD, ALTERNATIVE SHEAR
CONNECTIONS AS DETAILED IN ACCORDANCE WITH THE AISC STEEL CONSTRUCTION
MANUAL CONNECTION TABLES ARE PERMITTED.
C. CONNECTIONS NOT SHOWN IN THE AISC CONSTRUCTION MANUAL SHALL ONLY BE
PERMITTED WITH THE APPROVAL OF THE STRUCTURAL ENGINEER OF RECORD.
D. ALL CONNECTIONS SHALL BE DESIGNED AND SEALED BY A LICENSED PROFESSIONAL
ENGINEER IN THE STATE OF CONSTRUCTION. SUBMIT DESIGN CALCULATIONS
BEARING ENGINEER'S PROFESSIONAL SEAL AND SIGNATURE.
17. ALL HSS SECTIONS WITH OPEN ENDS SHALL BE CAPPED WITH A MINIMUM 3/8" THICK
CAP PLATE, SEAL WELDED AND GROUND SMOOTH UNO.
18. COMPONENTS AND SURFACES OF ALL ARCHITECTURALLY EXPOSED STRUCTURAL
STEEL (AESS) SHALL BE FABRICATED AND ERECTED WITH CARE AND TOLERANCES FOR
THE CATEGORY IT IS ASSIGNED. ALL AESS SHALL COMPLY WITH CHAPTER 10 OF THE
2016 ASIC 303, CODE OF STANDARD PRACTICE FOR STEEL BUILDILNGS AND BRIDGES,
AND AS MODIFIED BY THE CONTRACT DOCUMENTS.
I. STAIR DESIGN
1. CONTRACTOR SHALL PROVIDE COMPLETE DRAWINGS AND CALCULATIONS FOR ALL STAIRWAYS.
STAIRS, STAIR LANDINGS, STAIR MEMBERS, HANDRAILS, AND SUPPORTS NOT SHOWN SHALL
BE STRUCTURALLY DESIGNED, DETAILED AND SEALED BY A LICENSED PROFESSIONAL
ENGINEER REGISTERED IN THE STATE OF CONSTRUCTION.
2. ALL REQUIRED EMBEDDED ANGLES AND PLATES SHALL BE PART OF THE STAIR DESIGN
AND DETAILING.
3. STAIRWAYS SHALL BE DESIGNED FOR DEAD LOAD, LIVE LOAD OF 100 PSF AND
SEISMIC LOADS. STAIRWAYS EXPOSED TO THE ELEMENTS SHALL ALSO BE DESIGNED
TO SUPPORT SNOW AND WIND LOADS.
4. STAIRS AND RELATED ITEMS SHALL COMPLY WITH THE BUILDING CODE.
5. REFER TO THE ARCHITECTURAL DRAWINGS FOR STAIRWAY DIMENSIONS, DETAILS AND
OTHER REQUIREMENTS.
6. STAIRS MAY BE SUPPORTED BY THE PRIMARY STRUCTURE PROVIDED STAIR FRAMING DOES
NOT IMPOSE ECCENTRIC OR TORSIONAL LOADING UPON THE PRIMARY FRAMING.
J. STEEL STUD EXTERIOR WALL FRAMING
1. EXTERIOR METAL STUDS SHALL BE MEET OR EXCEED SSMA ICC ESR 3064P.
2. STUD FRAMING SHALL BE IN ACCORDANCE WITH AISI, “SPECIFICATION FOR DESIGN OF
COLD FORMED STEEL STRUCTURAL MEMBERS”.
3. CONTRACTOR SHALL PROVIDE COMPLETE DRAWINGS AND CALCULATIONS FOR ALL EXTERIOR
STEEL STUD WALL FRAMING. ALL FRAMING MEMBERS, SPACING AND CONNECTIONS SHALL
BE DESIGNED, DETAILED AND SEALED BY A LICENSED PROFESSIONAL ENGINEER REGISTERED
IN THE STATE OF CONSTRUCTION.
4. COMPLY WITH ALL LOADING REQUIREMENTS AS ESTABLISHED BY THE CONTRACT DOCUMENTS.
5. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONAL REQUIREMENTS, OPENING
LOCATIONS, ETC., AND TO SPECIFICATION FOR ADDITIONAL REQUIREMENT. STUDS SHALL
BE DETAILED TO ACCOMMODATE MOVEMENT OF THE STRUCTURE THROUGH THE USE OF
VERTICAL SLIDE CLIPS, SLIP CONNECTIONS, ETC.
K. METAL ROOF DECKING
1. PROVIDE STEEL DECKS THAT CONFORM TO THE REQUIREMENTS OF IBC CHAPTER 22,
SECTION 2210, COLD-FORMED STEEL AND THE STEEL DECK INSTITUTE, LATEST EDITION.
2. CUTTING AND FRAMING OF OPENINGS FOR OTHER TRADES SHALL BE THE RESPONSIBILITY
OF THE TRADES INVOLVED. HOLES THAT ARE LOCATED AND DIMENSIONS ON THE
DRAWINGS SHALL BE THE RESPONSIBILITY OF THE DECK ERECTOR.
3. ALL DECK SHALL HAVE THE TYPES AND GAUGES AS INDICATED ON THE DRAWINGS.
4. DECKS SHALL HAVE MINIMUM 2" BEARING AT SUPPORTS.
5. ROOF DECK WITH INSULATING CONCRETE SHALL BE VENTED.
6. SEE ARCHITECTURAL AND LIFE SAFETY DRAWINGS FOR THE EXTENT OF FIREPROOFING.
STEEL DECK TO BE SPRAY FIREPROOFED SHALL BE GALVANIZED,
CLEANED AND DEGREASED BEFORE SHIPPING.
L. POWDER ACTUATED FASTENERS
1. ALL POWDER ACTUATED FASTENERS SHALL BE APPROVED FOR TYPE, APPLICATION AND
INSTALLATION AND SHALL HAVE AN APPROVED ICC-ES RESEARCH REPORT NUMBER.
2. THE USE OF POWDER DRIVEN FASTENERS, IN TENSION, IS LIMITED TO SUPPORT OF MINOR
LOADS SUCH AS DRYWALL OR ACOUSTICAL CEILINGS, DUCTWORK, CONDUIT, ETC. IN
GENERAL, LOADS SHOULD BE LIMITED TO LESS THAN 100 LBS.
3. FASTENERS SHALL NOT BE INSTALLED UNTIL THE CONCRETE HAS REACHED ITS DESIGN
STRENGTH.
4. FASTENERS SHALL NOT BE INSTALLED IN CONCRETE WHERE THE THICKNESS IS LESS
THAN THREE TIMES THE PENETRATION REQUIRED, EXCEPT 1-1/8" PENETRATION IN 3-1/4"
THICK FLOOR SLAB IS ACCEPTABLE.
5. THE MINIMUM DISTANCE FROM THE EDGE OF CONCRETE TO CENTER OF ANCHOR IS 3 INCHES.
6. FASTENERS IN THE UNDERSIDE OF CONCRETE ON METAL DECKING SHALL BE PLACED IN
THE HIGH FLUTE PORTION OF THE SLAB.
7. WHEN INSTALLING POWDER DRIVEN PINS IN EXISTING NON-PRESTRESSSED REINFORCED
CONCRETE, USE CARE AND CAUTION TO AVOID CUTTING OR DAMAGING THE EXISTING
REINFORCING BARS.
M. MASONRY
1. ALL CONCRETE MASONRY UNITS SHALL BE MEDIUM WEIGHT HOLLOW BLOCK MADE WITH
NORMAL WEIGHT AGGREGATE IN ACCORDANCE WITH ASTM C33.
2. ALL MASONRY WALLS SHALL BE REINFORCED UNLESS NOTED OTHERWISE. THE FOLLOWING
SHALL CONSTITUTE MINIMUM REINFORCEMENT REQUIREMENTS FOR INTERIOR MASONRY WALLS
AND EXTERIOR MASONRY WALLS:
WALL SIZE VERTICAL REINFORCEMENT LADDER TYPE JOINT REINFORCEMENT
8" (INTERIOR) 1-#5 AT 48" CENTERED 2-W2.8 IN MORTAR BED AT 16"
8" (EXTERIOR) 1-#5 AT 24" CENTERED 2-W2.8 IN MORTAR BED AT 16"
6" (EXTERIOR) 1-#5 AT 24" CENTERED 2-W2.8 IN MORTAR BED AT 16"
3. PROVIDE VERTICAL REINFORCEMENT AS INDICATED. IN ADDITION, PROVIDE VERTICAL BARS
AROUND ALL OPENINGS, AT CORNERS, ANCHORED INTERSECTIONS AND AT END OF WALL
PANELS.
4. CONTINUOUS BOND BEAMS SHALL BE PLACED IN ONE OF THE TOP THREE COURSES OF
ALL WALLS. BOND BEAMS SHALL BE REINFORCED AS FOLLOWS:
WALL SIZE REINFORCEMENT
8" 2-#5 6" 2-#5
5. ALL REINFORCING SHALL HAVE A MINIMUM COVERAGE OF ONE BAR DIAMETER (1/2"MIN.)
OF GROUT. CENTERED BARS SHALL BE SECURELY PLACED IN THE CENTER OF A CELL.
EACH FACE BARS SHALL BE PLACED 1" CLEAR OF THE FACE SHELL. WHERE TWO
LAYERS ARE REQUIRED IN 8" OR SMALLER BLOCK, USE ONE BAR IN EACH OF TWO
ADJACENT CELLS.
6. CONTROL JOINTS: MAXIMUM SPACING OF CONTROL JOINTS SHALL BE AS FOLLOWS,
UNLESS NOTED OTHERWISE. (DO NOT PLACE CONTROL JOINTS IN SHEAR WALLS. SEE
ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION ON LOCATION OF CONTROL
JOINTS):
EXTERIOR WALLS INTERIOR WALLS
30 FT 40 FT
7. ALL MASONRY WALLS SHOWN ON STRUCTURAL DRAWINGS ARE WEIGHT BEARING OR EXTERIOR WALLS, UNLESS NOTED OTHERWISE. REFER TO ARCHITECTURAL DRAWINGS FOR ALL MASONRY WALLS.
8. REFER TO MECHANICAL, ELECTRICAL, PLUMBING AND ARCHITECTURAL DRAWINGS FOR
LOCATIONS OF CONDUIT, PIPING, DUCTWORK, AND OPENINGS IN MASONRY WALLS.
PROVIDE ADDITIONAL REINFORCEMENT AT OPENINGS OR SLEEVES AS INDICATED. DO NOT
CUT REINFORCEMENT. OPENINGS IN SHEAR WALLS LARGER THAN 18" ARE NOT PERMITTED
UNLESS SPECIFICALLY DETAILED.
9. CONTINUOUS REINFORCING IN WALLS MAY BE SPLICED AS REQUIRED, PROVIDED BARS
ARE OF THE LONGEST PRACTICAL LENGTH AND ALL SPLICES ARE SHOWN ON
REINFORCING SHOP DRAWINGS. WHEREVER POSSIBLE, SPLICES SHALL BE STAGGERED.
10. LAP ALL REINFORCING BARS IN MASONRY MIN 48 BAR DIAMETERS AT SPLICES, UNLESS
NOTED OTHERWISE IN DETAILS. HORIZONTAL MASONRY REINFORCING SHALL BE CONTINUOUS
AROUND ALL CORNERS AND INTERSECTIONS
11. ALL VERTICAL REINFORCING SHALL BE CONTINUOUS FOR FULL HEIGHT OF WALL AND
DOWELED INTO FOOTING OR SLAB ON GRADE BELOW AND EXTENDED INTO BOND BEAMS
ABOVE. CONTINUITY MAY BE ESTABLISHED WITH LAPPED SPLICES MEETING ALL INDICATED
REQUIREMENTS.
12. GROUT REINFORCED CELLS SOLID. REINFORCING SHALL BE SECURELY HELD IN PLACE.
GROUT IN 4'-0" MAXIMUM LIFTS.
13. NO PIPES OR DUCTS SHALL BE EMBEDDED IN MASONRY UNLESS NOTED OR DETAILED
SPECIFICALLY.
14. CELLS CONTAINING BOLTS SHALL BE GROUTED SOLID WITH AT LEAST 1/2" GROUT
COVERAGE BETWEEN THE BOLT AND THE MASONRY AT THE BLOCK FACE.
N. FUTURE
1. THIS STRUCTURE IS NOT DESIGNED FOR FUTURE VERTICAL EXPANSION.
X BY
WWR WELDED WIRE REINFORCEMENT
WT WEIGHT
KSF KIPS PER SQUARE FOOT WP WORK POINT
KPA KILOPASCAL WLD WELDED
KO KNOCK-OUT WL WIND LOAD
K KIPS WF WIND FRAME
W/O WITHOUT
JT JOINT W/ WITH
JST JOIST
JBE JOIST BEARING ELEVATION VIF VERIFY IN FIELD
VERT VERTICAL
INT INTERIOR
INFO INFORMATION UNO UNLESS NOTED OTHERWISE
IN4 INCHES TO THE FOURTH POWER
IN3 INCHES TO THE THIRD POWER TYP TYPICAL
IN INCH, INCHES TOW TOP OF WALL
IJ ISOLATION JOINT TOS TOP OF STEEL, TOP OF SLAB
IF INSIDE FACE TOP TOP OF PIER
ID INSIDE DIAMETER TOF TOP OF FOOTING
TOC TOP OF CONCRETE
HT HEIGHT THK THICK, THICKNESS
HS HIGH STRENGTH TEMP TEMPERATURE, TEMPORARY
HSB HIGH STRENGTH BOLT T & B TOP AND BOTTOM
HP HIGH POINT T TOP
HS HEADED STUD
HORIZ HORIZONTAL SYM SYMMETRICAL
HK HOOK STRUC STRUCTURAL
STIFF STIFFENER
GC GENERAL CONTRACTOR STD STANDARD
GALV GALVANIZED SSH SHORT SLOTTED HOLES
GA GAGE OR GAUGE SS STAINLESS STEEL
SQ SQUARE
FV FIELD VERIFY SPEC SPECIFICATION
FTG FOOTING SPA SPACING, SPACES
FT FEET SOMD SLAB ON METAL DECK
FS FAR SIDE, FOOTING STEP SOG SLAB ON GRADE
FP FULL PENETRATION SL SNOW LOAD
FL FLOOR SIM SIMILAR
FF FINISHED FLOOR SF SQUARE FEET
FDN FOUNDATION SEOR STRUCTURAL ENGINEER OF RECORD
FD FLOOR DRAIN SECT SECTION
F FOOTING MARK SCH SCHEDULE
SC SLIP CRITICAL
EXT EXTERIOR
EXP EXPANSION RTU ROOF TOP UNIT
EX EXIST EXISTING RO ROUGH OPENING
EW EACH WAY REV REVISION
ES EACH SIDE REQD REQUIRED
EQUIP EQUIPMENT REINF REINFORCE, REINFORCEMENT
EQ EQUAL REF REFER, REFERENCE
EOS EDGE OF SLAB RD ROOF DRAIN
EOD EDGE OF DECK R RADIUS
EMBED EMBEDMENT
ELEV ELEVATOR QTY QUANTITY
ELEC ELECTRICAL
EL ELEVATION PVMT PAVEMENT
EJ EXPANSION JOINT PT POST TENSION
EF EACH FACE PSI POUNDS PER SQUARE INCH
EE EACH END PSF POUNDS PER SQUARE FOOT
EA EACH PROJ PROJECTION
PREFAB PREFABRICATED
DWG DRAWING PLF POUNDS PER LINEAR FOOT
DN DOWN PLBG PLUMBING
DL DEAD LOAD PL PLATE
DIM DIMENSION PJP PARTIAL JOINT PENETRATION
DIAG DIAGONAL PDF POWER DRIVEN FASTENER
DIA DIAMETER PAF POWER ACTUATED FASTENER
DET DETAIL PC PRECAST CONCRETE
DBL DOUBLE PA PASCAL
DBA DEFORMED BAR ANCHOR P PIER MARK
COORD COORDINATE OPP OPPOSITE
CONT CONTINUOUS OPNG OPENING
CONST CONSTRUCTION OF OUTSIDE FACE
CONN CONNECTION OD OUTSIDE DIAMETER
CONC CONCRETE OC ON CENTER
COL COLUMN
CMU CONCRETE MASONRY UNIT NWT NORMAL WEIGHT
CLR CLEARANCE OR CLEAR NTS NOT TO SCALE
CL CENTERLINE NS NEAR SIDE
CJP COMPLETE JOINT PENETRATION NOM NOMINAL
CJ CONSTRUCTION JOINT NO NUMBER
CIP CAST IN PLACE NIC NOT IN CONTRACT
CANT CANTILEVER
C COLUMN MARK MO MASONRY OPENING
MISC MISCELLANEOUS
BTWN BETWEEN MIN MINIMUM
BSMT BASEMENT MFR MANUFACTURER
BRG BEARING MEP MECHANICAL, ELECTRICAL, PLUMBING
BP BASE PLATE MECH MECHANICAL
BOT BOTTOM MAX MAXIMUM
BOF BOTTOM OF FOOTING MATL MATERIAL
BLKG BLOCKING
BLDG BUILDING LWT LIGHTWEIGHT
B BEAM MARK, BOTTOM LP LOW POINT
LONG LONGITUDINAL
ARCH ARCHITECTURAL LLV LONG LEG VERTICAL
APPROX APPROXIMATE (LY) LLH LONG LEG HORIZONTAL
ALT ALTERNATE LL LIVE LOAD
AFF ABOVE FINISHED FLOOR LF LINEAR FEET
ADJ ADJACENT LE LEFT END
ADDL ADDITIONAL LBS POUNDS
AB ANCHOR BOLTS L LENGTH
INDICATES SLAB STEP SYMBOL
AS
A
D
VE
R
TI
INSPECT ALL WELDS, INCLUDING FLOOR AND ROOF
DECK WELDING ● SEC 05 12 00
AWS D1.1
UFC 4-023-03
Appendix H 1711.2
SINGLE PASS FILLET WELDS NOT EXCEEDING
5/16" IN SIZE ARE EXEMPTED
CONDUCT PERIODIC VISUAL OBSERVATIONS OF THE
STRUCTURAL SYSTEMS FOR GENERAL
CONFORMANCE TO THE CONSTRUCTION
DOCUMENTS AND PREPARE PERIODIC REPORTS OF
OBSERVATIONS DESCRIBING WORK PROGRESS AND
NON-CONFORMING ITEMS
● UFC 4-023-03
Appendix H 1710.2
PROGRESSIVE COLLAPSE RESISTING SYSTEMS
PERFORM ADDITIONAL INSPECTIONS AS
DETERMINED BY THE GEOTECHNICAL ENGINEER FOR
SPECIALTY ELEMENTS
IBC 1705.7
INSPECT VAPOR RETARDER FOR CONFORMANCE
WITH MANUFACTURES WRITTEN INSTALLATION
INSTRUCTIONS ● SEC 03 30 00
TESTING AND EVALUATION OF IN-PLACE DENSITY OF
COMPACTED FILL AS WORK PROGRESSES ● IBC 1705.6 ONE DENSITY TEST FOR EACH LIFT, DAYS
OPERATION, OR 5000 SQ. FT. OF FILL AREA
VERIFY USE OF PROPER MATERIALS, AND LIFT
THICKNESSES DURING PLACEMENT AND
COMPACTION OF COMPACTED FILL ● IBC 1705.6 ONE DENSITY TEST FOR EACH LIFT, DAYS
OPERATION, OR 5000 SQ. FT. OF FILL AREA
PERFORM CLASSIFICATION AND TESTING OF
CONTROLLED FILL MATERIAL ● IBC 1705.6 TEST EACH SOURCE
INSPECT AND OBSERVE PROOF ROLLING OF
SUBGRADE PRIOR TO FILL PLACEMENT ● SEC 31 23 00 IBC 1705.6
VERIFY EXCAVATIONS ARE EXTENDED TO PROPER
DEPTH AND HAVE REACHED PROPER MATERIAL ● SEC 31 23 00 IBC 1705.6
ALL FOOTING AND PILE CAP EXCAVATIONS
SHALL BE OBSERVED AND APPROVED PRIOR
TO CONCRETE PLACEMENT
VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS
ARE ADEQUATE TO ACHIEVE THE DESIGN BEARING
CAPACITY ● IBC 1705.6
ALL FOOTING AND PILE CAP EXCAVATIONS
SHALL BE OBSERVED AND APPROVED PRIOR
TO CONCRETE PLACEMENT
EART OR S ALLO O N ATIONS AN SOIL
CONDUCT WEEKLY VISUAL OBSERVATIONS OF THE
STRUCTURAL SYSTEMS FOR GENERAL
CONFORMANCE TO THE CONSTRUCTION
DOCUMENTS AND PREPARE WEEKLY REPORTS OF
OBSERVATIONS DESCRIBING WORK PROGRESS AND
NON-CONFORMING ITEMS
● IBC 1704.6
GENERAL
CONTIN O S PERIO IC SECTION RE ERENCE
INSPECTION ITEM RE IRE RE ENCY SPECI ICATION CO E REMAR S
SC E LE O SPECIAL INSPECTION SERVICES
MEASURE FLOOR FLATNESS AND LEVELNESS AS
DIRECTED ● SEC 03 30 00 INCLUDE UNIT PRICE IN BID PROPOSAL FORM
VERIFY THAT THE NECESSARY DESIGN STRENGTH
HAS BEEN REACHED PRIOR TO REMOVAL OF FORMS ● SEC 03 30 00 ACI 318 Ch 26.11
IBC 1705.3
OBSERVE PROPER CURING TEMPERATURE AND
TECHNIQUES ● SEC 03 30 00
ACI 318 Ch 26.5.3, 26.5.4, 26.5.5
IBC 1705.3
OBSERVE CONCRETE PLACEMENT ● ACI 318 Ch 26.5.2
IBC 1705.3
MAINTAIN A SPREADSHEET SHOWING DATE,
SEQUENTIAL ORDER OF STRENGTH TEST RESULTS,
AND INDICATE RUNNING AVERAGE ● ACI 318 Ch
26.11.2(d), 26.11.2(e)
PERFORM CONCRETE STRENGTH TESTING ● SEC 03 30 00
ASTM C172
ASTM C31
ACI 318 Ch 26.4, 26.5.3, 26.12
IBC 1705.3
SAMPLE CONCRETE SPECIMENS PRIOR TO
PLACEMENT FOR STRENGTH TESTS TO BE
PERFORMED IN LAB. A MINIMUM OF NINE (9)
CYLINDERS SHALL BE MADE. TEST THREE AT 7 DAYS
AND THREE AT 28 DAYS. THREE CYLINDERS SHALL
BE HELD IN RESERVE.
● SEC 03 30 00
ASTM C172
ASTM C31
ACI 318 Ch 26.4, 26.5.3, 26.12
IBC 1705.3
ADDITIONAL CYLINDERS SHALL BE MADE AS
NEEDED FOR EARLY FORM REMOVAL, TWO
6X12 OR THREE 4X8 CYLINDERS ARE
REQUIRED FOR AN ACCEPTABLE TEST.
SINGLE CYLINDER TEST IS INADEQUATE FOR
STRENGTH EVALUATION PURPOSES
SAMPLE FRESH CONCRETE PRIOR TO PLACEMENT.
MEASURE SLUMP, AIR CONTENT, AND TEMPERATURE
DURING CONCRETE DELIVERY. ● SEC 03 30 00
ASTM C172
ASTM C31
ACI 318 Ch 26.4, 26.5.3, 26.12
IBC 1705.3
ADDITIONAL CYLINDERS SHALL BE MADE AS
NEEDED FOR EARLY FORM REMOVAL, TWO
6X12 OR THREE 4X8 CYLINDERS ARE
REQUIRED FOR AN ACCEPTABLE TEST.
SINGLE CYLINDER TEST IS INADEQUATE FOR
STRENGTH EVALUATION PURPOSES
VERIFY USE OF CORRECT CONCRETE MIX DESIGN
AND REVIEW DELIVERY TICKETS ● SEC 03 30 00 ACI 318 Ch 26.4
INSPECT POST-INSTALLED ANCHORS INSTALLED
DOWNWARD. VERIFY PLACEMENT LOCATION AND
INSTALLATION PROCEDURES. ● ACI 318 Ch 17.8.2, 26.7.1, 26.7.2
IBC 1705.3
INSPECT POST-INSTALLED ANCHORS INSTALLED
HORIZONTALLY OR UPWARD. VERIFY PLACEMENT
LOCATION AND INSTALLATION PROCEDURES. ●
ACI 318
Ch 17.8.2, 26.7.1, 26.7.2
IBC 1705.3
OBSERVE AND VERIFY PLACEMENT OF OTHER
EMBEDMENTS CAST IN CONCRETE PRIOR TO
CONCRETE PLACEMENT ● ACI 318 Ch 26.8 VISUAL INSPECTION OF ALL EMBEDMENTS
OBSERVE AND VERIFY PLACEMENT OF ANCHORS,
BOLTS, AND RODS CAST IN CONCRETE PRIOR TO
CONCRETE PLACEMENT ● ACI 318
Ch 17.8.2, 26.7.1
IBC 1705.3
VISUAL INSPECTION OF ALL BOLTS
VERIFY CORRECT MATERIAL USED, INCLUDING THE
USE OF A706 IN WELDED SPLICES, IF ANY ● AWS D1.4
ACI 318 Ch 26.6.4
IBC 1705.3
OBSERVE WELDING OF STEEL REINFORCEMENT ● AWS D1.4
ACI 318 Ch 26.6.4
IBC 1705.3
INSPECT REINFORCING STEEL PRIOR TO CLOSING OF
THE FORMS AND ARRIVAL OF CONCRETE TO THE
JOBSITE. VERIFY PLACEMENT. ● SEC 03 30 00
ACI 318
Ch 20, 25.2, 25.3, 26.6.1, 26.6.2, 26.6.3
IBC 1705.3
INSPECT CONCRETE FORMWORK FOR SHAPE,
LOCATION, AND DIMENSIONS OF THE CONCRETE
MEMBER BEING FORMED ● ACI 318 Ch 26.11
IBC 1705.3
CONCRETE AN REIN ORCING STEEL
CONTIN O S PERIO IC SECTION RE ERENCE
INSPECTION ITEM RE IRE RE ENCY SPECI ICATION CO E REMAR S
SC E LE O SPECIAL INSPECTION SERVICES
OBSERVE AND VERIFY USE OF CORRECT MEMBER
SIZES, MATERIAL THICKNESS, FASTENERS, AND
WELDING ●
COL ORME STEEL RAMING
OBSERVE PREPARATION, SAMPLE AND TEST
CONCRETE MASONRY UNITS, MORTAR SPECIMENS,
GROUT SPECIMENS AND/OR PRISMS FOR
COMPRESSIVE STRENGTH f'm
ACI 530.1 Ch 1.4
ASTM C-1019, ASTM
C-140 or ASTM C-1314
RANDOMLY SAMPLE AND TEST PRIOR TO
CONSTRUCTION AND ONCE FOR EVERY 5000
SF OF MASONRY WALL CONSTRUCTED
VERIFY SLUMP FLOW AND VISUAL STABILITY INDEX
(VSI) AS DELIVERED TO THE PROJECT SITE FOR
SELF-CONSOLIDATING GROUT ● ACI 530.1 Ch 1.5
IBC 1705.4
ASTM C-1611
VERIFY SIZE AND LOCATION OF STRUCTURAL
ELEMENTS ● ACI 530.1 Ch 3.3
IBC 1705.4
VERIFY PROPER TYPE, SIZE, LOCATION AND GRADE
OF WELDED REINFORCEMENT. OBSERVE WELDING
OF STEEL REINFORCEMENT ●
ACI 530 Ch 8.1.6.7.2, 9.3.3.4(c)
AWS D1.4
IBC 1705.4
INSPECTION OF GROUT SPACE AND OBSERVATION
OF GROUT PLACEMENT. ● ACI 530.1 Ch 3.2, 3.4, 3.5
IBC 1705.4
VERIFY PROPER PROTECTION OF MASONRY DURING
COLD WEATHER (BELOW 40°F) OR HOT WEATHER
(ABOVE 90°F) ● ACI 530.1 Ch 1.8
IBC 1705.4
INSPECT PROPER TYPE, SIZE, AND LOCATION OF
EMBEDMENTS, ACCESSORIES AND ANCHORS,
INCLUDING ANCHORAGE OF MASONRY TO
STRUCTURAL STEEL MEMBERS, FRAMES OR OTHER
CONSTRUCTION.
ACI 530 Ch 1.2.1, 6.1.4.3, 6.2 ACI 530.1 Ch 1.5, 3.3(d), 3.4
IBC 1705.4
INSPECT PROPER SIZE, LOCATION AND GRADE OF
REINFORCEMENT AND CONNECTORS PRIOR TO
GROUTING ● ACI 530.1 Ch 1.5, 2.4, 2.7, 3.2, 3.4
IBC 1705.4
INSPECT PLACEMENT OF MASONRY UNITS AND
CONFIRM PROPER CONSTRUCTION OF MORTAR
JOINTS. ● ACI 530.1 Ch 3.3
IBC 1705.4
VERIFY CONSTRUCTED FOUNDATIONS ARE LEVEL
WITHIN TOLERANCE ● ACI 530.1 Ch 3.1
VERIFY MATERIALS CONFORM TO ASTM STANDARDS
SPECIFIED IN THE CONSTRUCTION DOCUMENTS ● SEC 05 12 00 IBC 1706.1
VERIFY APPROVED MORTAR AND GROUT
PROPORTIONS ARE USED ON SITE. ● SEC 04 20 00
ACI 530.1 Ch 1.5, 2.1, 2.2, 2.6
IBC 1705.4
CONCRETE MASONRY LEVEL
SPECIAL INSPECTION PROVISIONS FOR STRUCTURAL STEEL SHALL BE APPLICABLE TO THOSE COMPONENTS FABRICATED AND/OR ASSEMBLED IN THE FABRICATION SHOP. AISC CERTIFICATION IS CONSIDERED TO BE FABRICATOR APPROVAL PER CONTRACT SPECIFICATIONS UNLESS OTHERWISE DIRECTED BY THE OWNER. SUBMIT CERTIFICATION TO OWNER'S
CONSTRUCTION REPRESENTATIVE.
TESTING AND INSPECTION REPORTS SHALL BE PREPARED FOR EACH INSPECTION ITEM ON A DAILY BASIS WHENEVER WORK IS PERFORMED ON THAT ITEM. REPORTS SHALL BE DISTRIBUTED TO THE CONTRACTOR, OWNER'S CONSTRUCTION REPRESENTATIVE, BUILDING OFFICIAL (IF REQUESTED), AND ARCHITECT FOR THEIR REVIEW, COMMENT, AND ACTION, A...
THE FOLLOWING SCHEDULE CONTAINS A LIST OF SPECIAL INSPECTION ACTIVITIES RELATED TO THE QUALITY ASSURANCE PLAN REQUIRED BY THE CONTRACT SPECIFICATIONS (IBC CHAPTER 17) FOR THE FABRICATION, ERECTION AND CONSTRUCTION OF THE STRUCTURAL SYSTEMS AS GIVEN IN THE SPECIFICATIONS AND DRAWINGS OF THE PROJECT. ALL INSPECTORS SHALL BE QUALIFIED BY TRAINING AND EXPERIENCE FOR THE REQUIRED INSPECTIONS AND
TEST PROCEDURES. REFER TO CONTRACT SPECIFICATIONS FOR SPECIFIC TEST PROCEDURES.
QUALIFIED SPECIAL INSPECTORS SHALL BE EMPLOYED PER THE PROVISIONS OF THE CONSTRUCTION CONTRACT TO PERFORM INSPECTIONS IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS. INSPECTORS SHALL PERFORM ALL DUTIES AND RESPONSIBILITIES AS REQUIRED BY THE CONTRACT DOCUMENTS AND SPECIFICATIONS.
TESTING AN INSPECTION SERVICES
SIGNATURE
OWNER NAME
SIGNATURE
PREPARED BY NAME
A FINAL REPORT OF SPECIAL INSPECTIONS DOCUMENTING COMPLETION OF THE SPECIFIED SPECIAL INSPECTIONS AND CORRECTION OF ANY DISCREPANCIES, DEFICIENCIES, AND CODE VIOLATIONS SHALL BE SUBMITTED AND APPROVED BY THE OWNER'S CONSTRUCTION REPRESENTATIVE AND THE DESIGN PROFESSIONALS OF RECORD PRIOR TO FINAL...
DISCREPANCIES FROM THE APPROVED PLANS, SPECIFICATIONS, SHOP DRAWINGS, OR DESIGN DIRECTIVES AND CODE VIOLATIONS OBSERVED DURING THE CONDUCT OF SPECIAL INSPECTIONS SERVICES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION, TO THE ATTENTION OF THE OWNER'S CONSTRUCTION...
THE SPECIAL INSPECTORS SHALL KEEP RECORDS OF SPECIFIED SPECIAL INSPECTIONS AND TESTING AND SHALL FURNISH COPIES OF INSPECTION AND TESTING REPORTS TO THE OWNER'S CONSTRUCTION REPRESENTATIVE AND TO THE APPROPRIATE DESIGN PROFESSIONALS OF RECORD UPON REQUEST. DETAILED SUMMARIES OF ALL SPECIAL INSPECTION ACTIVITIES, FINDINGS, DEFICIENCIES, AND DISCREPANCIES SHALL BE FURNISHED TO THE OWNER'S CONSTRUCTION REPRESENTATIVE AND TO THE APPROPRIATE DESIGN PROFESSIONALS OF RECORD AT INTERVALS NOT
EXCEEDING 1 WEEK.
THIS STATEMENT OF SPECIAL INSPECTIONS IS PREPARED IN ACCORDANCE WITH SECTION 1704 OF THE 2015 INTERNATIONAL BUILDING CODE (IBC), UFC 4-023-03 AND UFC 3-301-01. IT INCLUDES A SCHEDULE OF SPECIAL
INSPECTIONS APPLICABLE TO THIS PROJECT.
REPRESENTATIVE NAME:
GENERAL CONTRACTOR NAME:
COMPANY USACE
GEOTECHNICAL ENGINEER OF RECORD (GEOR) NAME: LELAND H. SCHUMAN
COMPANY HDR
STRUCTURAL ENGINEER OF RECORD (SEOR) NAME: GONZALO KOOSAU
COMPANY
ARCHITECT OF RECORD (AOR) NAME:
BUILDING OWNER OF OWNERS AGENT
PROJECT LOCATION FORT GORDON, GA
MODERNIZATION AND PROPONENCY
STRUCTURE NAME SCI MISSION COMMAND, UNIVERSITY REGISTRAR, FORCE
PROJECT NAME CYBER CENTER OF EXCELLENCE
STATEMENT O SPECIAL INSPECTIONS
INSPECT FIRE RESISTANT JOINT SYSTEMS IN
ACCORDANCE WITH ASTM E-2393 ● IBC 1705.17.2
IBC 715
INSPECT PENETRATION FIRESTOP SYSTEMS IN
ACCORDANCE WITH ASTM E-2174 ● IBC 1705.17.1
IBC 714
IRE RESISTANT PENETRATIONS AN OINTS
PERFORM PRESSURE DIFFERENCE TESTING, FLOW
MEASUREMENTS AND DETECTION AND CONTROL
VERIFICATION ● IBC 1705.18 PERFORM PRIOR TO OCCUPANCY AND AFTER
SUFFICIENT COMPLETION
RECORD DEVICE LOCATION AND PERFORM LEAKAGE
TESTING ● IBC 1705.18 PERFORM DURING ERECTION OF DUCTWORK,
AND PRIOR TO CONCEALMENT
TESTING OR SMO E CONTROL
INSPECT SURFACE PREPARATION OF
MEMBERS,RECORD AMBIENT TEMPERATURES, AND
VENTILATION MEASURES. MEASURE APPLIED
THICKNESS AND VISUAL INSPECTION.
● IBC 1705.15
AWCI 12-B
VERIFY CONDITIONS ARE IN CONFORMNACE
WITH MANUFACTURERS WRITTEN
INSTRUCTIONS
MASTIC AN INT MESCENT IRE RESISTANT COATINGS
DOCUMENT ACCEPTANCE OR REJECTION OF
WELDS ●
VERIFY REPAIR ACTIVITIES ●
WELDS MEET VISUAL ACCEPTANCE CRITERIA ●
VERIFY SIZE AND LOCATION OF WELDS,
INCLUDING SUPPORT, SIDELAP, AND PERIMETER
WELDS ● SEC 05 30 00
SDI QA/QC
IBC 1705.2.2
AFTER WELDING
WPS FOLLOWED ●
ENVIRONMENTAL CONDITIONS (WIND SPEED,
MOISTURE, TEMPERATURE) ●
CONTROL AND HANDLING OF WELDING
CONSUMABLES ●
USE OF QUALIFIED WELDERS ● SEC 05 30 00
SDI QA/QC
IBC 1705.2.2
DURING WELDING
CHECK WELDING EQUIPMENT ●
MATERIAL IDENTIFICATION (TYPE/GRADE) ●
MANUFACTURER CERTIFICATIONS FOR
WELDING CONSUMABLES AVAILABLE ●
WELDING PROCEDURE SPECIFICATION (WPS)
AVAILABLE ● SEC 05 30 00
SDI QA/QC
IBC 1705.2.2
PRIOR TO WELDING
STEEL EC ING
CONTIN O S PERIO IC SECTION RE ERENCE
INSPECTION ITEM RE IRE RE ENCY SPECI ICATION CO E REMAR S
SC E LE O SPECIAL INSPECTION SERVICES
DOCUMENT ACCEPTANCE OR REJECTION OF
MECHANICAL FASTENERS ●
VERIFY REPAIR ACTIVITIES ●
CHECK SPACING, TYPE, AND INSTALLATION OF
SUPPORT FASTENERS ●
CHECK SPACING, TYPE, AND INSTALLATION OF
SUPPORT FASTENERS ●
CHECK SPACING, TYPE, AND INSTALLATION OF
SUPPORT FASTENERS ● SEC 05 30 00
SDI QA/QC
IBC 1705.2.2
AFTER MECHANICAL FASTENING
FASTENERS ARE INSTALLED IN ACCORDANCE
WITH MANUFACTURER'S INSTRUCTIONS ●
FASTENERS ARE POSITIONED AS REQUIRED ● SEC 05 30 00
SDI QA/QC
IBC 1705.2.2
DURING MECHANICAL FASTENING
PROPER STORAGE OF MECHANICAL
FASTENERS ●
PROPER TOOLS AVAILABLE FOR FASTENER
INSTALLATION ●
MANUFACTURER INSTALLATION INSTRUCTIONS
AVAILABLE FOR MECHANICAL FASTERNERS ● SEC 05 30 00
SDI QA/QC
IBC 1705.2.2
PRIOR TO MECHANICAL FASTENING
DOCUMENT ACCEPTANCE OR REJECTION OF
MATERIALS ●
VERIFY DECK MATERIALS ARE REPRESENTED
BY THE MILL CERTIFICATIONS THAT COMPLY WITH
THE CONSTRUCTION DOCUMENTS ●
VERIFY COMPLIANCE OF DECK AND ALL DECK
ACCESSORIES INSTALLATION WITH CONSTRUCTION
DOCUMENTS ● SEC 05 30 00
SDI QA/QC
IBC 1705.2.2
AFTER DECK PLACEMENT
DOCUMENT ACCEPTANCE OR REJECTION OF
MATERIALS ●
VERIFY COMPLIANCE OF MATERIALS (DECK
AND DECK ACCESSORIES) WITH CONSTRUCTION
DOCUMENTS, INCLUDING PROFILES, MATERIAL
PROPERTIES, AND BASE METAL THICKNESS
● SEC 05 30 00
SDI QA/QC
IBC 1705.2.2
PRIOR TO DECK PLACEMENT
STEEL EC ING
AS
A
D
VE
R
TI
EACH PASS MEETS QUALITY
REQUIREMENTS ●
EACH PASS WITHIN PROFILE
LIMITATIONS ●
INTERPASS AND FINAL CLEANING ●
WELDING TECHNIQUES
AISC 360 TABLE
N5.4-2
AWS D1.1
INTERMIX OF FILLER METALS AVOIDED
UNLESS APPROVED ● AISC 341
TABLE J6-2
PROPER POSITION (F, V, H, OH) ●
INTERPASS TEMPERATURE MAINTAINED ●
PREHEAT APPLIED ●
SHIELDING GAS TYPE/FLOW RATE ●
SELECTED WELDING MATERIALS ●
TRAVEL SPEED ●
SETTINGS ON WELDING EQUIPMENT ●
WPS FOLLOWED
ENVIRONMENTAL…