- W912HN21B3002
About this file
This federal solicitation seeks bids for a construction project at Fort Gordon, Georgia. The solicitation was posted on December 2nd, 2020 for project PN88725 to build a Cyber Instructional Facility. Bids are due by January 12th, 2021 at 1:00 PM ET with the bid opening scheduled for 2:00 PM ET the same day. The solicitation includes specifications and drawings provided in four PDF volumes. The construction work includes building a new facility and related site work. The Army Corps of Engineers Engineering District Savannah is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contractor Report All Inquiries
Project: MCA2 SCI Mission Cmd, University Registrar, Force Mod, Propenentcy Facility Review: W912HN21B3002 Bidder Inquiry (00001) (sorted by CommentID ) Displaying 230 inquiries.
Id Discipline Sheet Detail Spec
8949255 Civil Geotech
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Can a geotechnical Soils report be provided for this project?
On: Dec 04 2020.
Government Response. . The geotechnical report is provided as part of the response to this comment for information only. See attached file. However; we will formally issue the geotechnical report as an amendment to the solicitation. On: Dec 07 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8949573 Civil C-502 C1
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Sheet C-502, Detail C1 states under the notes section that the pavement markings shall be Thermoplastic and High Build paint. The markings will have to be one or the other. Can you please clarify if High Build or Thermoplastic will acceptable or is this up to the contractor's choice between the two?
On: Dec 04 2020.
Government Response. . The note should state "and/or" for either Thermoplastic or High Build. This will be changed via amendment. On: Dec 11 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8949579 Civil CS101A;C502 E1
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Where are the HDCP parking signs to be located? On sheet CS101A, the location for the HDCP Parking Signs (numbers 6 and 6A in the Legend) are shown on the concrete curb/sidewalk area. However, on sheet C502 detail E1 the signs are shown to be installed behind the sidewalk in a grassed area. HDCP Parking signs are usually installed on the other side of the sidewalk. Any signs not installed in soil will have to be core-drilled and set with hydraulic concrete which will be more costly.
On: Dec 04 2020.
Government Response. . The HDCP parking signs shall be installed as noted and shown in Detail E1/C-502. They will not be installed in the sidewalk. On: Dec 11 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8949597 Civil CS101A-CS101C
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The sign legend shows the size for R1-1 Stop sign to be 24" or 36" within R/W. The smallest size a Stop sign can be is 30," per MUTCD standards. See Table 2B-1 on https://mutcd.fhwa.dot.gov/htm/2009r1r2/part2/part2b.htm#table2B01. 36" Stop signs are typically used on expressways or multi-lane highways.
On: Dec 04 2020.
Government Response. . 30" Stop Signs shall be used for this project. On: Dec 11 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
Page 1 of 51ProjNet: Logged In User
1/28/2021https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAl...
8949793 Civil 33 40 00 2.6 Resilient Connectors
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Specifications call for Resilient Connectors, flexible, watertight connectors used for connecting pipe to manholes and inlets.
This specification is not depicted in the details or typical for GDOT piping. Will these connectors be required for all manhole connections ?
On: Dec 04 2020.
Government Response. . The Resilient Connectors are noted in Details C1/C-503 and C3/C-503 and will be required for all manhole connections. On: Dec 11 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8949797 Civil 33 40 00 2.4.5.2 External
Sealing Bands
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Specifications call for External Sealing Bands, will this be required ? This is not typical for GDOT specified piping installation.
On: Dec 04 2020.
Government Response. . External Sealing Bands will be required as noted in the specifications. On: Dec 11 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8949803 Civil 33 40 00 3.2.1 Concrete
Pipe Requirements
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Specifications mention variable bedding depths for the piping. Will there be a uniform typical section provided for the pipe bedding based on sizes and locations? No details found for bedding, not typical for GDOT unless called for by typical section.
On: Dec 04 2020.
Government Response. . See Detail A1/C-503 "Typical Trench Section for Storm Sewer" for pipe bedding. On: Dec 11 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8949820 Civil 33 40 00 3.9.1.1 Leakage
Test
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Specifications call for leakage testing by low pressure air or water testing prior to completing backfill and goes further into detail. This type of testing is quite expensive for such a large quantity amount of piping. Would the government consider deleting this specification in lieu of other quality testing procedures?
On: Dec 04 2020.
Government Response. . Leakage testing will be required as noted in the specifications. On: Dec 11
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8949896 General 00 21 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will the government consider adjusting the site walk, bid date of the time allotted for questions so that we can ask questions after the site walk? Currently we can ask questions up to 10 days prior to the bid date and the site walk is 7 days prior to the bid date.
Page 2 of 51ProjNet: Logged In User
On: Dec 04 2020.
Government Response. . As the date approaches, the Government may entertain extending the question period, however; if done, will be accomplished via amendment to the solicitation. On: Dec 07 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8950135 Civil C-502 A1;A8
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The two sidewalk details on sheet C-502 calls for two different mix designs. Detail A1 calls for a 3,500psi mix in note #9. Detail A8 calls for a 3,000psi mix in note #8. Can you please clarify which mix design we are to utilize for concrete sidewalks.
On: Dec 04 2020.
Government Response. . All sidewalk concrete shall be 3,500 PSI. This will be corrected via amendment. On: Dec 11 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8957618 Landscape Architecture
L503
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On the fixed and removeable bollards, the ones on page L503. Are these crash rated or carry any type of crash specification? I didn't see anything in the specs on these as far as manufacturer or crash specifications in the specs on them.
On: Dec 08 2020.
Government Response. . There is no crash rated requirement for the site bollards. On: Dec 11 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8960469 Contracting Section 00 21 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The solicitation requires submittal of a Bid Bond "IN ORIGINAL FORM" and states that "PHOTOCOPIED OR ELECTRONICALLY SCANNED BID BONDS ARE NOT ACCEPTABLE." However, the Office of the Under Secretary of Defense issued Class Deviation 2020-O0016 on April 30, 2020 which provides flexibility with regard to original documents, manual signatures, seals and notarization. It clarifies that digital/electronic copies of certain documents (including bonds) are considered to be acceptable. It specifically states that "Electronic signatures and electronic, mechanically-applied, or printed dates may be used and shall be considered original signatures and dates, without regard to the order in which they are affixed for all of part 28, not just 28.101-3;" and "A corporate seal is not required on any form listed at FAR 28.106-1;" FAR 28-106-1 includes SF 24 Bid Bond on the list. Will the Government remove the requirement for a Bid Bond in original form and allow for submittal of bid bonds, without corporate seals, electronically?
On: Dec 09 2020.
Government Response. . The Government will not be removing the requirement for original bid bonds.
They are still required to be sent in original form to the Savannah District Office as per instructions. On:
Dec 10 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8960470 Contracting Section 00 73 00 –
Conditions of Contract
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The solicitation includes 52.222-34 Project Labor Agreement (MAY 2020), which requires offerors to enter into a project labor agreement prior to the award of this contract. FAR Part 22.503 states that an agency should consider requirement of a project labor agreement (PLA) when there is a shortage of skilled labor in the region in which the construction project will be sited. Has the Government determined that there is a shortage of skilled labor in the Fort Gordon, GA area?
Page 3 of 51ProjNet: Logged In User
On: Dec 09 2020.
Government Response. . A PLA will not be required. This clause will be removed with the next amendment. On: Dec 10 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8960471 Contracting Section 00 73 00 –
Conditions of Contract
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The solicitation includes 52.222-34 Project Labor Agreement (MAY 2020), which requires offerors to enter into a project labor agreement prior to the award of this contract. FAR Part 22.503 states that an agency should consider requirement of a project labor agreement (PLA) when project labor agreements have been used on comparable projects undertaken by in the geographic area of the project. Has the Government required the use of a PLA previously on Fort Gordon, GA projects?
On: Dec 09 2020.
Government Response. . A PLA is not required. This clause will be removed with next amendment. On:
Dec 10 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8960472 Contracting Section 00 73 00 –
Conditions of Contract
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The solicitation includes 52.222-34 Project Labor Agreement (MAY 2020), which requires offerors to enter into a project labor agreement prior to the award of this contract. Is there an existing PLA in place at Fort Gordon, GA?
On: Dec 09 2020.
Government Response. . A PLA is not required. This clause will be removed with next amendment. On:
Dec 10 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8967401 Landscape Architecture
L-601
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The legend on sheet L-601 calls for the Deciduous, and some Evergreen shrubs to be 5 Gal in size. These are not available in this size. Will the 3 Gal size be accepted?
On: Dec 14 2020.
Government Response. . 3 Gal will not be accepted. On: Dec 18 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8967508 Landscape Architecture
L-601, LP101A-LP101C
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The Sharps Improved Buffalo Sod is not available. Will another type of sod be accepted? If so, please specify which type.
On: Dec 14 2020.
Government Response. . Cynodon dactylon x C. transvaalensis 'TIFTUF' / Cynodon 'Tif Tuf' Certified Bermuda is acceptable in this area. On: Dec 18 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8967513 Landscape Architecture
L-601, LP101A-LP101C
Page 4 of 51ProjNet: Logged In User
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The legend on sheet L-601 shows the common periwinkle quantity to be 1,026. Sheets LP101A-LP101C show much larger quantities needed for 12" o.c. ground cover. This is a significant quantity difference. Will you please specify the correct quantity or square footage needed.
On: Dec 14 2020.
Government Response. . Correct count for VC (common periwinkle) = 21,414 On: Dec 18 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8967517 Civil 33 40 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Would the government consider utilizing HP plastic pipe in lieu of RCP for the storm pipe? Please reference the attached HP brochure for product information. HP pipe has an elongated bell and double gasketed watertight joint which is superior to RCP. With HP pipe, there would be no need for diaper bands or special gaskets required to make RCP watertight which would save time and money. Also HP pipe would be a less costly method for labor and material.
(Attachment: Brochure_HP_Storm_12in_to_60in_(11-16).pdf) On: Dec 14 2020.
Government Response. . No, all storm drainage pipe, outside of building roof drains, shall be RCP. On:
Dec 18 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8967710 General 21B3002 page 13 of 72
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
We request the RFI period be extended past the site visit date of 01/05/21.
On: Dec 14 2020.
Government Response. . At this time, no bid date extension will be added. Please follow the solicitation as issued. On: Dec 15 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8967711 General SF1442
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
We request IFB due date be extended two weeks to allow time for market to absorb RFIs generated by site visit on 01/05/21.
On: Dec 14 2020.
Government Response. . At this time, no bid date extension will be added. Please follow the solicitation as issued. On: Dec 15 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8967715 General n/a
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Due to recent rise in Covid infection rate please consider making site visit a virtual event.
On: Dec 14 2020.
Government Response. . Currently, we are looking into we can make the site visit a virtual event. If the decision is made to make the site visit a virtual event, all parties will be notified of the change via an amendment. On: Dec 15 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8967718 General Site Visit Questionnaire
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 5 of 51ProjNet: Logged In User
Per the site visit questionnaire please provide provide General Order No 1.
On: Dec 14 2020.
Government Response. . A copy of General Order No. 1 is provided for information only. See attached pdf file. On: Dec 15 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8967846 Landscape Architecture
L-503 4-6 Section 32 32 23 para
2.2.1.5
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The block size for the retaining walls is much larger than a typical block retaining wall. Several suppliers can not find this size. Is there a preferred supplier for this item?
On: Dec 14 2020.
Government Response. . The preferred unit is Proterra Block from Oaks Landscape Products On: Dec 18 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8967851 Landscape Architecture
L-502 3
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
All of the CIP concrete seat walls, planter walls, and gateway pillars call for a sandblast finish. Will there be an acceptable alternative?
On: Dec 14 2020.
Government Response. . "As an alternative to sand blasting, after form stripping and initial curing, contractor may propose the following method to achieve a consistent exposed aggregate aesthetic effect equal to sandblast:
Form-applied chemical retarder. Follow manufacturer's directions for form preparation, application, form removal and washing to expose aggregate.
Regardless of whether sandblasting or retarder is used, mockups shall be used to determine variations in approach, proper execution and desired finish. Allow for mock to show three variations for review by design team. " On: Dec 18 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8969061 Electronic Drawing TY001, Vol 1J Gen Notes 1 & 20
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing TY001 in Vol 1J, General Note 1 states that the security equipment will be procured under a separate contract. General Note 20 makes several statements about the responsibilities of the security contractor, including the installation of the equipment. In our eyes, these are conflicting directions.
Can you please provide some clarity on whether or not the security equipment & installation will be procured by this contract?
On: Dec 15 2020.
Government Response. . Security equipment and installation will be separately contracted, however the General Contractor is responsible for coordination with the security contractor, and final responsibility to ensure a completely operational system per specification 28 10 05, paragraph 1.2. On: Dec 18 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8969099 Site CD101A-C
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will the Utility companies such as Georgia Power, Augusta Utilities, etc. be responsible and carry the cost to demolish any of their utilities as labeled on the demolition plans?
Page 6 of 51ProjNet: Logged In User
On: Dec 15 2020.
Government Response. . Augusta Utilities (AUD) will be responsible for abandonment and/or demolition of utilites governed by them. All other private utilities will act as subs to the General Contractor, thus abandonment and/or demolition of utilities outside of AUD will be the responsibility of the General Contractor. On: Dec 18 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8969105 Site CD101A-C
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will any of the existing underground items to be demolished encased in a concrete duct bank?
On: Dec 15 2020.
Government Response. . It is likely that the existing communication and underground power (except lighting) lines within the project area will be encased in concrete. We recommend estimating removal of these utilities include removed of concrete encasement. On: Dec 18 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8970385 Architectural SF1442
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please specify the project title to be used for the project bid bond.
1.The cover page of the project specifications has the project title:
W912HN-21-B-3002
Cyber Instructional Facility (Admin/Command) MCA2
PN88725
2a. The SF1442 has the project title:
MCA2 Force Modernization & Proponency Center
And also:
2b. The SF1442 also has the project title:
PN 88725 Mission Comman, University Registrar, Modernization & Proponency Facility (MCA2)
3. The cover page of the drawings has the project title:
SCI Mission Command, University Registrar Force Modernization and Proponency
On: Dec 15 2020.
Government Response. . W912HN21B3002 PN88721 Mission Command, University Registrar, Modernization & Proponency Facility (MCA2) On: Dec 16 2020
Government Response. . The text below appends or clarifies ALL previous replies.
W912HN21B3002 PN88725 Mission Command, University Registrar, Modernization & Proponency Facility
(MCA2)
**correcting PN ** On: Dec 16 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8971077 Mechanical 25 05 11
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In Spec Section 25 05 11, paragraph 1.7.1.1, it appears that the Div 25 Integrated Automation Contractor is to be separate from the HVAC/Electrical controls contractors. Does Ft. Gordon have a preferred Div 25 Integrated Automation Contractor?
On: Dec 16 2020.
Government Response. . The Control System Cybersecurity Subject Matter Expert is a requirement of the contractor. This individual is to assist with the implementation and execution of all specification 25 05
Page 7 of 51ProjNet: Logged In User
11 requirements and submittals. This requirement is not exclusive to HVAC/Electrical controls. As stated in the specification, this person can serve across the contract. On: Dec 31 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8972903 Civil V-111
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Sheet V-111 shows temporary Line A, a "paved" 20' wide pedestrian route, and Line B, a "paved" 8' wide pedestrian route to be maintained throughout construction. There is not a typical section showing what is required for this "paved" pedestrian route. Will you please specify and or provide a typical section for this?
On: Dec 17 2020.
Government Response. . Temporary walkways can be 4" TH. concrete on compacted subgrade, ref to A1 / C-502 and spec section 32 16 13 for site concrete information On: Dec 31 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8973210 General 01 03 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Refer to Specification 01 03 00 OPTIONS Paragraph 3.1.2 CLIN 0008 Bid Alternate #2 Raise Building Finish Floor Elevation by 2'-0" This Paragraph references the Civil Drawings for this alternate, for example CD101A-A2, and Landscape Drawings for example L-601-A2, along with Site Mechanical Drawings for example SS101-A2.
These drawings are not in the Contract Drawings. Are the drawings going to be issued in a Amendment? Please advise.
Also, will Structural drawings be provided that show the structural changes involved with raising the FF 2 feet?
On: Dec 17 2020.
Government Response. . ll Drawings listed in Paragraph 3.1.2 CLIN 0008 Bid Alternate #2 Raise Building Finish Floor Elevation by 2'-0" can be found in Volume 1K of the Contract Documents. Additional Structural Drawings will not be issued with this alternate. Contractor should review Alt #2 drawings in Volume 1K for a complete understanding of the scope. On: Dec 18 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8973802 Architectural AC101
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference RCP drawings AC101 thru AC104F, drawings IN101 thru IN104F, drawing IN601 Finish Legend and Spec section 09 51 00 in reference to FCB, Felt Ceiling Baffles. The locations for these cannot be located on any of these drawings or in the specifications. Please clarify.
On: Dec 17 2020.
Government Response. . Felt Ceiling Baffles are located in reception, room 480. Felt ceiling baffles are annotated on drawings AC104A, AC104B, IN104A and IN104B. Will include felt ceiling baffles in specification 09 51 00 On: Dec 31 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8973803 Architectural 09 84 20
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference Spec section 09 84 20 in reference to acoustical wall panels. Para 2.3 System Description states that the panels should be "site fabricated" and that "Prefabricated panels do not satisfy intent of this specification", whereas Para 2.4 Fabric Covered Acoustical Wall Panels states that they are to be "prefinished, factory assembled, seamless fabric covered...". Please clarify which is correct.
On: Dec 17 2020.
Government Response. . Acoustic wall panels are to be site fabricated. Will delete the "prefinished, factory assembled, seamless fabric covered...". From para 2.4. On: Dec 31 2020
Page 8 of 51ProjNet: Logged In User
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8974486 Landscape Architecture
L-601
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Some of the items on the plant schedule are conflicting between the plant size and container size. Some of these plant sizes will come in different container sizes that have been specified for this project. In the cases where conflict arises, which size is more important the container size or the plant size?
5 Gallon containers are no longer available on the horticulture market.
On: Dec 18 2020.
Government Response. . Plant size should be prioritized. On: Dec 31 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8976676 Contracting See Question See Question See Question
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Due to various market factors (Holidays, Covid-19 case increases, other Federal Contracts due at the same time, site visit scheduled less than 10 days before the due date, etc.) will the Government consider extending the bid response date a minimum of two weeks?
On: Dec 21 2020.
Government Response. . After the pre-bid site visit, the Government will review and consider if an extension is required. If a extension is granted, it will be issued via amendment to the solicitation. On: Dec 21 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8978805 Fire Protection/Life
Safety AR101,AR102,AR103,AR104 N/A Div. 21
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify if fire protection will be required to be provided under the 12" and 24" raised access floors.
On: Dec 22 2020.
Government Response. . No, Fire Protection is not required below the RAF. On: Dec 31 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8979612 Architectural 08 81 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 08 81 00 Glazing, 2.5 lists Sound Rated Window Assemblies as Alternate 7, however, section 01 03 00 Alternates lists Alternate 7 as Terrazzo. Please confirm this spec should reference Bid Alternate #6.
On: Dec 22 2020.
Government Response. . Correct. Section 2.5 should read: "Sound Rated Window Assembly (Bid Alternate # 6)" A revised spec will be provided in future amendment. On: Dec 31 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8979617 Architectural A-632
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Sheet A-632-A6 shows bid alternate #6 windows to have STC rating of 45, however, Sheet A-631 shows base bid clerestory windows (not affected by alternate #6) as having no STC rating. Is the intent to have some interior windows with an STC rating and some with no STC rating? Please confirm the bidding requirement for these windows in the base bid and alternates.
Page 9 of 51ProjNet: Logged In User
On: Dec 22 2020.
Government Response. . Confirmed. Bid Alternate #6 contains STC Rated window assemblies while the Base Bid (not affected by alternate #6) contains non-STC rated window assemblies. On: Dec 31 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8980014 General RFP
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will attendees at the 1/5/21 site visit be allowed to take photos of the areas of construction? If not can photos of all areas be provided via amendment
On: Dec 23 2020.
Government Response. . Cameras are not allowed on Fort Gordon without special permission. The Corps will issue photographs of the site in a forth coming amendment. On: Jan 04 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8980017 Architectural 07 16 00.01
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Regarding specification 07 16 00.01, Vapor Emission Control for Concrete Floor Systems with Finish Flooring, will this be applicable to the recessed concrete floors under the raised access floor system?
On: Dec 23 2020.
Government Response. . No, this does not apply to concrete floors under the raised access floor system. On: Jan 06 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8980018 Civil 33 40 00 3.9.1.1 Leakage
Test
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The government has previously allowed video testing in lieu of low pressure air or water testing of the storm pipe and manholes due to the high cost associated with this type of testing. Will Video testing be an acceptable form of testing this system?
On: Dec 23 2020.
Government Response. . Leakage testing will be required as noted in the specifications. On: Jan 07
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8981643 Contracting See Question See Question See Question
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please provide details for site visit schedule on 1/5 at 1030 AM. Exact meeting location, what gate to use, location of visitor's center, etc.
On: Dec 28 2020.
Government Response. . The Visitor's Center is located at Bldg. 00076, positioned to the right of the McKenna Gate (Gate 1) Access Control Point, is located just off Gordon Highway (US-78) on the east side of post. On: Dec 31 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8981850 Contracting Section 00 70 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The solicitation includes FAR 52.219-9, Deviation Small Business Subcontracting Plan (Deviation 2018-O0018) (JUN 2020) by reference, however we are unable to find this Class Deviation. On the Defense Contracting and Pricing
Page 10 of 51ProjNet: Logged In User page - https://www.acq.osd.mil/dpap/dars/archive/2018/class_deviations.html, Class Deviation 2018-O0018 is titled "Micro-Purchase Threshold, Simplified Acquisition Threshold, and Special Emergency Procurement Authority (31 August 2018)" Will the Government please provide a copy of the Class Deviation referenced in the solicitation?
On: Dec 28 2020.
Government Response. . https://classdeviations.com/2018-O0018 exerpt for 52.219-9 Deviation
(d)The Offerer's subcontracting plan shall include the following:
(11)A description of the types of records that will be maintained concerning procedures that have been adopted to comply with the requirements and goals in the plan, including establishing source lists; and a description of the offerer's efforts to locate small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns and award subcontracts to them. The records shall include at least the following (on a plant-wide or company-wide basis, unless otherwise indicated):
(iii)Records on each subcontract solicitation resulting in an d of more than the simplified acquisition threshold, indicating- **** On: Dec 31 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8981852 Contracting Section 00 70 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The solicitation does NOT include FAR 52.246-12 Inspection of Construcion (AUG 1996). Will the Government revise the solicitation to include this clause?
On: Dec 28 2020.
Government Response. . It will be included at next Amendment. On: Dec 31 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8981853 Contracting Section 00 70 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The solicitation includes DFARS 252.225-7021 Trade Agreements - Basic (Deviation 2020-O0019), however DFARS
225.1101 Acquisition of Supplies, this clause is applicable to contracts for supplies, not construction services. Will the Government delete this clause?
On: Dec 28 2020.
Government Response. . Yes this will be removed in the forthcoming Amendment. On: Jan 06 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8981854 Contracting Section 00 70 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The solicitation includes DFARS 252.225-7045 Balance of Payments Program - Construction Material Under Trade Agreements - Basic (Deviation 2020-O0019) however DFARS 225.7503 requires this clause for solicitaions and contracts for construction to be performed outside the United States. Will the Government delete this clause?
On: Dec 28 2020.
Government Response. . Concur On: Dec 31 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8981855 Contracting Section 00 70 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 11 of 51ProjNet: Logged In User
The solicitation includes DFARS 252.232-7007 Limitation of Government's Obligation, however paragraph (j) has not been completed. Does the Government anticipate that this contract may be incrementally funded?
On: Dec 28 2020.
Government Response. . Paragraph J does not get completed until award. On: Dec 31 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8981856 Contracting Section 00 70 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The solicitation includes DFARS 252.232-7007 Limitation of Government's Obligation, however paragraph (j) has not been completed. If the Government anticipates that this contract may be incrementally funded, do they expect the incremental funding to be only for certain CLINs?
On: Dec 28 2020.
Government Response. . Paragraph J does not get completed until award. On: Dec 31 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8981857 Contracting Section 00 73 00 –
Conditions of Contract
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The soliciation includes DFARS 252.236-7001 Contract Drawings and Specifications and includes text which states that the plans and specifications attached to the solicitation, amended by the solicitation and amended by the ACO or COR after award but prior to the pre-construction meeting shall be the applicable plans and specifications. Upon award, will the ACO or COR have the contractual authority to amend the plans and specifications after award but prior to the pre-construction meeting.
On: Dec 28 2020.
Government Response. . The ACO is able to modify construction contracts within the scope of the contract under specific clauses following award with authority given by the PCO. Plans and specs do not get changed after award unless via a modification to the contract either by the ACO or PCO. On: Dec 31
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8981858 Contracting Section 00 73 00 –
Supplementary Conditions
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The soliciation includes DFARS 252.236-7001 Contract Drawings and Specifications and includes text which states that the plans and specifications attached to the solicitation, amended by the solicitation and amended by the ACO or COR after award but prior to the pre-construction meeting shall be the applicable plans and specifications. Upon award, will the ACO or COR have the contractual authority to amend the plans and specifications after award but prior to the pre-construction meeting without a revision to the contract price and schedule?
On: Dec 28 2020.
Government Response. . If after award a modification is required that could affect the price an RFP would be sent to the Contractor. It is unlikely for this to happen prior to the pre-construction meeting. On:
Dec 31 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8981859 Contracting Section 00 10 00 -
Solicitation
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
CLINS 0003 through 0006 are pre-priced options; how and when will these amounts be adjusted?
On: Dec 28 2020.
Page 12 of 51ProjNet: Logged In User
Government Response. . They are pre-priced CLIN's. Use pricing as stated in CLIN description On: Dec 31 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8981860 Contracting Section 00 10 00 -
Solicitation
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
CLINS 0003 through 0006 are pre-priced options; will the Government modify the solicitation to include contract language regarding how these amounts will be adjusted?
On: Dec 28 2020.
Government Response. . These are pre-priced CLIN's. Use pricing as stated within the CLIN description.
On: Dec 31 2020
Government Response. . The text below appends or clarifies ALL previous replies.
As with all Contracts, no matter pre-priced CLIN or not, once it is awarded the FAR Clause 52.243-4 Changes would be utilized in most cases. This clause does not require any other language to be added.
On: Jan 13 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8981861 Contracting Section 00 10 00 -
Solicitation
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
CLINS 0003 through 0006 are identified as "Pre-Priced amounts" to be included in the offeror's proposal. Is it the Government's intention for the contractor to solicit firm pricing from the utilities and upon receipt of firm bids from each utility, to provide to the Government these amounts plus G&A, profit, insurance and bond costs and to then adjust the CLIN allowance up or down by a contract modification to the final value? Will the Government please add that language to the contract clauses?
On: Dec 28 2020.
Government Response. . Contractors are to use the pre-priced values as listed in the CLIN description as instructed. On: Dec 31 2020
Government Response. . The text below appends or clarifies ALL previous replies.
No language required. Contractor is not to solicit further pricing as pricing is already provided as a pre-priced CLIN. On: Jan 13 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8982466 Architectural 08 71 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference the Door Hardware specification section 08 71 00 95% submission dated July 22, 2020, this specification included a door hardware schedule. However, the Door Hardware specification section 08 71 00, 100% submission released for bidding purposes, does not include a door hardware schedule. Please advise if a new door hardware schedule will be issued, or if we should utilize the hardware schedule included with the 95% submission specification for bidding purposes.
On: Dec 28 2020.
Government Response. . All previous submissions have included a Door Hardware Specification. Bidders should use the hardware schedule dated November 22, 2020 submitted with the RTA set. On: Jan 06 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8982468 Architectural A201
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The General Notes indicate to "provide roller shades at all exterior glazing, except at stairs and glazing between grids 6 and 7 on levels 1 and 2". However, will roller shades be required at the East and West Elevations shown on drawing A201 where the SX111 Curtainwall is required which also requires sunshades?
Page 13 of 51ProjNet: Logged In User
On: Dec 28 2020.
Government Response. . Roller shades will be required at exterior glazing along the east and west elevation that has SXIII curtain wall. On: Jan 06 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8982651 General 01 50 00
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Spec 01 50 00, 3.6.1, d lists the temporary field offices GC needs to provide for Owners use. Is the 3000 SF size listed correct? This will require at least 4 connected office trailers to accommodate the requirements and add significant cost to the project.
On: Dec 29 2020.
Government Response. . Yes, the size of the field office is correct On: Dec 31 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8982653 Civil CS101C A1
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
CS101C at North end (top of page) of site shows a dashed line identified as AT/FP. What does this signify? Is this part of work?
On: Dec 29 2020.
Government Response. . This dashed line is part of an unobstructed zone for the adjacent MCA-1 project currently under construction and is not part of work for MCA-2. On: Jan 06 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8982656 Civil V-111 1
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Are we required to provide temporary fence around the entire work limits? Or just around the staging area shown on V-111.
On: Dec 29 2020.
Government Response. . Temporary fencing is required around entire work limits. On: Jan 06 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8982657 General RFP
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is MCA1 phase of construction currently being done? Is there a completion date for that phase?
On: Dec 29 2020.
Government Response. . Yes, MCA1 is currently under construction. The contractual completion date is July 2022 On: Dec 31 2020
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8982659 Civil LS101A 1 107500
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Specification 10 75 00 Flagpoles, 2.1.1, b, 1 and 2 note 40' tall and 35' tall flagpoles. The location of these are not called out on drawing LS101A, please advise.
On: Dec 29 2020.
Government Response. . Refer to 4 / L-402 for location of 40' and 35' flag pole locations. On: Jan 06
Current Request Status: Request Closed
Page 14 of 51ProjNet: Logged In User
8982666 Structural SF102B A2
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
SF102B has the designation of "#" for column lines H and K. Regarding Intumescent Fireproofing that this symbol relates to, are there any steel members along these lines except those specifically noted to receive this? Please clarify this.
On: Dec 29 2020.
Government Response. . Neglect the "#" designation shown beside the column bubbles H and K. On:
Jan 06 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8983663 Architectural AC101A
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference drawings AC101A thru AC104F, General Note 13. This says refer to detail E7/AI521. There is no detail labeled E7/AI521. Please clarify.
On: Dec 30 2020.
Government Response. . General Note 13 should refer to detail E8/AI521. Will update Reflected Ceiling Plan General Note 13 accordingly for all AC Area sheet series. On: Jan 06 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8983664 Architectural IN601
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference drawing IN601, referencing ACT-1 through ACT-7. Notes reference trim 252427, which is an extruded aluminum trim similar to Axiom or Infinity. However, if you reference Detail A1 & E8 on drawing AI521, this trim appears to be a bent trim similar to Armstrong channel molding, additionally spec section 09 51 00 Para 2.5a seems to support this. Please clarify which trim this should be.
On: Dec 30 2020.
Government Response. . Trim is to be extruded aluminum and is not a channel molding. Infinity is used for the basis of design trim. Exposed Edge Trim is included in specification section 09 51 00 Para 2.4.1 and is included in the finish legend on sheet IN-601. On: Jan 06 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8983665 Architectural IN101A
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference Interior Design Finish Plan Drawings IN101A in regards to Room 199-Open Office. There are three types of ACT ceiling tiles listed as the finish, but the location/extents of each type is not clear on Reflected Ceiling Plan Drawing AC101A. Please clarify.
On: Dec 30 2020.
Government Response. . Where multiple ceiling types are colocated in the open office areas, will provide ceiling type tag and dimension ACT tile to clarify location and extent. Will include in next amendment. On: Jan 06 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8983666 Architectural IN102A
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference Interior Design Finish Plan Drawings IN102A in regards to Room 299-Open Office. There are three types of ACT ceiling tiles listed as the finish, but the location/extents of each type is not clear on Reflected Ceiling Plan Drawing AC102A. Please clarify.
On: Dec 30 2020.
Page 15 of 51ProjNet: Logged In User
Government Response. . Where multiple ceiling types are colocated in the open office areas, will provide ceiling type tag and dimension ACT tile to clarify location and extent. Will include in next amendment. On: Jan 06 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8983667 Architectural IN102B
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference Interior Design Finish Plan Drawings IN102B in regards to Room 279-Open Office, Room 271-Corridor and Room 275-Collab. There is more than one type of ACT ceiling tiles listed as the finish for these rooms, but the location/extents of each type is not clear on Reflected Ceiling Plan Drawing AC102B. Please clarify.
On: Dec 30 2020.
Government Response. . Where multiple ceiling types are colocated in the open office areas, will provide ceiling type tag and dimension ACT tile to clarify location and extent. Will include in next amendment. On: Jan 06 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8983671 Architectural IN103A
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference Interior Design Finish Plan Drawings IN103A in regards to Room 399-Open Office. There are three types of ACT ceiling tiles listed as the finish, but the location/extents of each type is not clear on Reflected Ceiling Plan Drawing AC103A. Please clarify.
On: Dec 30 2020.
Government Response. . Where multiple ceiling types are colocated in the open office areas, will provide ceiling type tag and dimension ACT tile to clarify location and extent. Will include in next amendment. On: Jan 06 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8983674 Architectural IN101B
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference Interior Design Finish Plan Drawings IN101B in regards to Room 271-Corridor. There is more than one type of ACT ceiling tiles listed as the finish for this room, but the location/extents of each type is not clear on Reflected Ceiling Plan Drawing AC101B. Please clarify.
On: Dec 30 2020.
Government Response. . Assumed in reference to 171-Where multiple ceiling types are colocated in the open office areas, will provide ceiling type tag and dimension ACT tile to clarify location and extent. Will include in next amendment. On: Jan 06 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8983676 Architectural IN101D
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference Interior Design Finish Plan Drawings IN101D in regards to Rooms 132, 133, 137 and 138-Labs. ACT ceiling tiles and painted Gyp Board are listed as the ceiling finishes for these rooms, but the location/extents of the Gyp Board ceilings are not shown on Reflected Ceiling Plan Drawing AC101D. Please clarify.
On: Dec 30 2020.
Government Response. . Gyp board ceiling in not included in these rooms. Tag will be updated accordingly. On: Jan 06 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8983677 Architectural IN103B
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 16 of 51ProjNet: Logged In User
Reference Interior Design Finish Plan Drawings IN103B in regards to Rooms 371-Corridor and Room 375-Collab.
There are two types of ACT ceiling tiles listed as the finish (along with painted gyp board), but the location/extents of each type ceiling tile is not clear on Reflected Ceiling Plan Drawing AC103B. Please clarify.
On: Dec 30 2020.
Government Response. . Where multiple ceiling types are co-located in the corridor and collab area, will provide ceiling type tag and dimension ACT tile to clarify location and extent. Will include in next amendment. On: Jan 06 2021
Current Request Status: Request Closed
Information for this report is procurement sensitive.
8983679 Architectural IN104B
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference Interior Design Finish Plan Drawings IN104B in regards to Room 404-Collab. There are two types of ACT ceiling tiles listed as the finish (along with painted gyp board), but the location/extents of each type ceiling tile is not clear on Reflected Ceiling Plan Drawing AC104B. Please clarify.
On: Dec 30 2020.
Government Response. . Where multiple ceiling types are colocated in the corridor and collab area, will provide ceiling type tag and dimension ACT tile to clarify location and extent. Will include in next amendment. On: Jan 06 2021
Current…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .