B.08. W912HN21B3002 Site Visit Notes.pdf

PDF 121 KB Posted

Attached to
PN88725 MCA2 University Registrar, Force Modernization & Proponency Facility
Solicitation number
W912HN21B3002
Issued by

About this file

This document provides site visit notes and details for a federal construction contract opportunity. The U.S. Army Corps of Engineers is seeking a fixed firm price contract to construct a four story, 235,367 gross square foot Cyber Center of Excellence Headquarters and Professional Military Education facility at Fort Gordon, Georgia over a performance period of 1,080 calendar days. The solicitation was posted on December 2, 2020 and bids are due by January 12, 2021. The base bid includes six contract line items for construction work and privatized utility coordination, while nine optional line items are also specified. Questions from site visit attendees must be submitted by January 9th and an amendment extending the bid due date is expected.

View the file

Other files

File Type Posted
C.04. W912HN21B3002 MCA2 Abstract-s.pdf PDF
W912HN21B3002 Bid Opening Sign In Roster.pdf PDF
W912HN21B30020007 Conformed Copy.pdf PDF
W912HN21B30020007 Amendment.pdf PDF
B.08. W912HN21B3002 0006 Conformed Copy.pdf PDF
B.08. W912HN21B3002 0006 AMD.pdf PDF
B.08. W912HN21B3002 0005 Conformed Copy.pdf PDF
B.08. W912HN21B3002 0005 AMD.pdf PDF
B.08. W912HN21B3002 0005 ProjNet Report.pdf PDF
W912HN-21-B-3002_VOL1B_AMD4_Rev 2.pdf PDF
W912HN-21-B-3002_VOL1F_AMD4 Rev 1.pdf PDF
21B3002vol2 Rev 2.PDF PDF
W912HN-21-B-3002_VOL1C_AMD4 Rev 2.pdf PDF
B.08. W912HN21B3002 0004 AMD.pdf PDF
W912HN-21-B-3002_VOL1L_AMD4 Rev 1.pdf PDF
21B3002vol3 Rev 1.PDF PDF
W912HN-21-B-3002_VOL1K_AMD4 Rev 1.pdf PDF
W912HN-21-B-3002_VOL1E_AMD4 Rev 1.pdf PDF
W912HN-21-B-3002_VOL1D_AMD4 Rev 2.pdf PDF
21B3002vol1 Rev 3.PDF PDF
W912HN-21-B-3002_VOL1H_AMD4 Rev 1.pdf PDF
W912HN-21-B-3002_VOL1J_AMD4 Rev 1.pdf PDF
W912HN-21-B-3002_VOL1D_AMD3_Rev1.pdf PDF
W912HN-21-B-3002_VOL1A_AMD3_Rev 1.pdf PDF
W912HN-21-B-3002_VOL1B_AMD3_Rev 1.pdf PDF
21B3002vol2_Rev 1.PDF PDF
21B3002vol1_Rev 2.PDF PDF
W912HN-21-B-3002_VOL1C_AMD3_Rev 1.pdf PDF
B.08. W912HN21B3002 0003 Amd.pdf PDF
B.08. W912HN21B3002 Site Visit pic 10 P4278456.JPG JPG image
B.08. W912HN21B3002 Site Visit pic 2 IMG_0614.jpg JPG image
B.08. W912HN21B3002 0002 Amendment.pdf PDF
B.08. W912HN21B3002 Site Visit pic 8 P4278411.JPG JPG image
B.08. W912HN21B3002 Site Visit pic 9 P4278455.JPG JPG image
B.08. W912HN21B3002 Site Visit pic 7 P4278410.JPG JPG image
B.08. W912HN21B3002 Site Visit pic 1 IMG_0613.jpg JPG image
B.08. W912HN21B3002 Site Visit pic 5 P4278408.JPG JPG image
B.08. W912HN21B3002 Site Visit pic 6 P4278409.JPG JPG image
B.08. W912HN21B3002 MCA Projects_Google Earth.pdf PDF
B.08. W912HN21B3002 Site Visit pic 4 P4278407.JPG JPG image
B.08. W912HN21B3002 Site Visit pic 3 IMG_0616.jpg JPG image
B.08. W912HN21B3002 0002 Conformed solicitation.pdf PDF
B.08. W912HN21B3002 Site Visit Attendee List.pdf PDF
B.08. W912HN21B3002 Site Visit pic 11 P4278457.JPG JPG image
21B3002vol1 rev 1.PDF PDF
B.08. W912HN21B3002 Amd 0001.pdf PDF
21B3002vol4 rev 1.PDF PDF
W912HN-21-B-3002_VOL1G.pdf PDF
W912HN-21-B-3002_VOL1C.pdf PDF
21B3002vol1.PDF PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MCA2 CCOE HQ and PME Facility, W912HN21B3002

Fort Gordon, GA

Site Visit Notes

Attendees gathered at the project site on 5 January 2021 at 1030 a.m.

Mr. Jose Diaz, USACE Project Manager welcomed all and thanked everyone for attending.

Mr. Diaz asked all the sign the attendee list and presented all attendees with a Google Maps aerial view of the project site, Mr. Diaz gave an overview of the project as described below.

Project Synopsis

• The Cyber Center of Excellence Headquarters and Professional Military Education facility is a four (4) story, 235,367 GSF structure. It is an open secret, automation-aided, instructional facility that is comprised of classrooms, instructional labs, instructor workspace, conference rooms, student and staff break areas, and student records storage. The focus is to train and educate students in signal and cyberspace operations, and electronic warfare. The building also includes administrative spaces, which consists of workstations, private offices, shared use spaces, and a command suite, all in support of the Cyber Center of Excellence (CCoE) mission. Unique program components include a resource center and Top Secret/Sensitive Compartmented Information (TS/SCI) space on the fourth floor. Supporting facilities include site development, utilities and connections lighting, storm drainage and landscaping.

• This is an Invitation for Bid. Full and Open competition.

• Fixed Firm Price contract. The project will be incrementally funded over 2 fiscal years.

• The period of performance is 1,080 calendar days after NTP.

• Bid Schedule includes 15 contract line items.

• Base Bid: Includes CLINs 0001-0006 which include four pre-priced CLINs for privatized utility work. Contractors are advised that they are responsible to subcontract with privatized utility companies and coordinate all work.

• Option: There are nine bid options. CLINs 0007-0015. These are defined in Section 01 03 00.

Per FAR Clause 52.217-7 of the base contract, for Option CLINs 0007 through 0015, the Contracting Officer may exercise at any time between award date and 120 calendar days from the Issuance of Notice to Proceed. If any option is exercised, the contract period of performance is not impacted, the work will be performed concurrently with the base work for a total contract period of performance not to exceed 1080 calendar days.

• Proposals are due 12 January at 1 PM.

• Bid acceptance period is 120 calendar days.

• Major issues discussed were as follows:

o Coordination with the on-going MCA1 construction project adjacent to the MCA2 project site.

o Closure of Chamberlain Avenue.

o On-going relocation by the NEC of the existing telecommunications duct bank. This will reroute the existing duct bank outside of the building’s footprint.

• Mr. Diaz stated that any questions resulting from the site visit must be sent via ProjNet as a bidder inquiry and that the bidder inquiry will be re-opened from Wednesday, January 6th through close of business Friday, January 9th.

• Mr. Diaz stated that their will be an amendment issued sometime next week and that most likely the bid due date will be extended. The actual date will be formalized in an amendment.

• Mr. Diaz closed the site visit and allowed the visiting contractors to take photos of the site.

File details come from the government source that posted it. Updated .