AmmNo4_AE509 - Detailed Building Section H 3 and4.pdf
PDF 2 MB Posted
- Attached to
- SHAPE International School, Belgium
- Solicitation number
- W912GB24R0015
- Issued by
-
Department of the Army European Command
About this file
This document appears to be a detailed building section drawing for a federal contract opportunity to construct a new Belgian School of the Shape International Schools (SIS) facility. The project involves constructing a three-story academic classroom building with approximately 5,500 square meters of total gross enclosed area. The facility will include administrative offices, multi-purpose classrooms, an information center, mechanical rooms, restrooms, and other required spaces for a functional school. Site improvements such as playgrounds, exterior lighting, recreation areas, signage, fencing, paving, and landscaping are also included. The design is compatible with the existing buildings on campus and uses a similar architectural vocabulary. The academic building has a cast-in-place concrete structure with exterior concrete walls as backup for brick wall systems and plaster-finished concrete block interior walls. The roof is flat with both a green roof system and photovoltaics. The project has an estimated construction value between $10,000,000 and $25,000,000 and is being procured by the Department of the Army European Command. A site visit is scheduled for March 20, 2024, and interested vendors must submit the attached SF 550 no later than March 8, 2024, to attend.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KEY PLAN
BELGIAN SCHOOL
THE CONTRACTOR IS RESPONSIBLE FOR CHECK OF ALL MEASUREMENTS. IN CASE OF
DISCREPANCY THE USACE COR OF ENGINEERS MUST BE INFORMED. CHANGES ARE ONLY
ALLOWED WITH WRITTEN PERMISSION OF THE USACE COR OF ENGINEERS.
L'ENTREPRENEUR EST RESPONSABLE DE LA VERIFICATION DE TOUTES LES MESURES. EN CAS
DE DIVERGENCE USACE COR DOIT ÊTRE INFORMÉ. CHANGEMENTS NE SONT AUTORISÉS AVEC
L'AUTORISATION ÉCRITE DE USACE COR.
10 First Floor 102500
20 Second Floor 106500
B
+102.08
+102.50
+103.40 +103.45
+104.80
+105.50
+106.08
+106.50
+107.40
+104.88
+101.50
+101.70
2.
.5 suspended ceiling panels concrete lightweight floor slab screed corkment underlay + floorfinish type linoleum suspended ceiling panels plasterboard ceiling plasterboard ceiling concrete lightweight floor slab sloped screed 2% min thickness 5cm reinforced bitumen vapor barrier with glass fiber mesh mineral wool insulation 2x 10cm high polymer elastic waterproof coating concrete lightweight floor slab screed corkment underlay + floorfinish type linoleum facing with extruded bricks in mix of light colors: peach, orange, red ..
288x88x48mm mineral wool boards Plaster coat clear glazing thermally broken coated aluminum joinery fritted glazing facing with extruded bricks in mix of light colors: peach, orange, red ..
288x88x48mm mineral wool boards
&aluminum treshold RAL9010 matt aluminum sunshading system RAL9010 matt aluminum coping RAL9010 matt waterproof cementation linoleum plinth welded corner
Plaster coat wooden tabletair tight fleece exterior coated aluminum window sill wooden tablet air tight fleece air tight fleece ventilated air space waterproof sheet supporting L-shaped steel profile Plaster coat ventilated air space waterproof cement base linoleum plinth welded joint
12 13 10 10
12 13 20
12 13 10 10
12 13 20
.7 gravel geotextile
AE509 AE514
00 Groundfloor 98500
10 First Floor 102500
-01 Terrain 98000
A
-11 96370 clear glazing thermally broken coated aluminum joinery clear glazing grey glass RAL7000 'squirrel' thermally broken coated aluminum joinery cellular blocks masonry
Plywood board aluminum coping RAL9010 matt plasterboard ceiling concrete lightweight floor slab sloped screed 2% min thickness 5cm reinforced bitumen vapor barrier with glass fiber mesh mineral wool insulation 2x 10cm high polymer elastic waterproof coating gravel mineral fibre insulation board - rockfeu hollow core concrete floor concrete floor slab extruded polystyrene insulation screed entrance mat masonry with concrete blocks insulation with cellular glass and bituminous coating lean concrete
+96.44
+98.13
+101.70
+102.08
+102.42
+103.30
+102.09
+101.81
+101.64
+100.95
+98.13
+98.00
+97.00
.5
16.45 1.33 40
100.3
41.15
9 2 15
176.5 110 2.5 11 5
300 5 30
112.5 16 30
2.
8.22 16.45 21.33
3.
95 7.5
37.14
24.57
11.76 138.74 138.74 118.92 20.48 49.95
452.77
5.
1.
3.
0.
8.
41.82 410.95
25.13
21.98 21.05 21.03 21.03 21.03 21.03 ø 8 ø 8 ø 8 ø 8 ø 8 ø 8 belgian blue stone treshold roofedge in plied aluminum sheets mineral wool insulation 11cm circular opening in steel plate ouverture circulaire en tôle d'acier steel girder HEA140 (painted) RAL9006 poutre en acier HEA140 (peint) RAL9006 steel profiles CHS 139,7x12,5 L=100mm (between stl. angle) ptd.
profiles en acier CHS 139,7x12,5 L=100mm (entre cornière en acier) peint steel profiles CHS 101,6x10 L=100mm (between stl. angle) ptd.
profiles en acier CHS 101,6x10 L=100mm (entre cornière en acier) peint zinc gutter gouttière en zinc rain water drain pipe zinc Ø80mm tuyau d'évacuation des eaux pluviales en zinc Ø80mm electrical conduite (steel) conduite électrique (acier) double steel angle (plate 20mm) painted RAL9010 cornière en acier double (plaque 20mm) peint RAL9010 steel base 950x440x25mm plaque de base en acier 950x440x25mm grouting 30mm jointoiement 30mm steel plate between L-profiles sloping towards ground level plaque en acier entre profiles (L) en pente vers niveau du sol
2x3 threaded rods M30(8.8) L=850mm 2x3 tiges filetées M30(8.8) L=850mm 110
3.
1.
2.
.2
0.
transparent roof dekking vapor barrier dimple membrane moisture barrier waterproofing membrane armed concrete floorplate
0.
404.7 maximum difference 20mm
A
B
C
D
2 3 4
US Army Corps of Engineers District or Division
Sheet reference number:
D es cr ip tio n
D at e D es cr ip tio n D at e
Ap pr
Ap pr
M ar k M ar k
/0
1/
M
G A/
AB
ET
EC
n v
0%
F O
R C
O N
ST
R
U C
TI
O
N
BE
LG
IA
N S
C H
O O
L S.
H .A
.P .E
IN
TE
R
N
AT
IO
N
AL
S
C H
O O
L
U
.S . A
R M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S E
U R
O
PE
D
IS
TR
IC
T W
IE
SB
AD
EN
, G
ER
M
AN
Y A
PO
, A
E
AB
ET
EC
A
R C
H
IT
EC
TS
E
N G
IN
EE
R S
N V
M
IT
C
H
EL
L/ G
IU
R
G O
LA
A
R C
H
IT
EC
TS
, L
LP
D w n by
D es ig ne d by
R ev ie w ed b y:
D at e:
R ev
C kd b y:
Su bm itt ed b y:
Fi le n am e:
Pl ot d at e:
Pl ot s ca le
C hi ef , A rc h.
B ra nc h
D es ig n fil e no
D ra w in g co de
BEL
D et ai le d Bu ild in g Se ct io n H
_3 +4
AE509SCALE 1 : 10AE509AE310
Section H - Callout 31
SCALE 1 : 10AE509AE310
Section H - Callout 42
VISUAL SCALE 1:10 @ A0
1m0.2m 0.8m0.6m0.4m0m
A a dd en da
: M od ifi ed a lu m in iu m p ro fil es
(v er tic al a nd h or iz on ta l)
/0 4/
File details come from the government source that posted it. Updated .