This document is a contract amendment for Solicitation W912GB24R0015 for the construction of a new three-story academic facility for the Shape International School in Belgium. The amendment updates FAR clause 52.211-10 regarding commencement and completion of work, provides new drawings, and incorporates questions and answers from previous requests for information. The project will construct a new 5,500 square meter school facility to replace the existing facilities at the SHAPE campus. Key details include a 900-calendar day period of performance, a magnitude of construction between $10-25 million, and a site visit scheduled for March 20, 2024. Interested vendors must submit an SF 550 by March 8, 2024 to attend the site visit. The contracting agency is the Department of the Army European Command.

View the file

Other files

File Type Posted
AmmNo4_AE509 - Detailed Building Section H 3 and4.pdf PDF
AmmNo4_AE310 - Building Section H.pdf PDF
AmmNo4_AE201 - Exterior Building Elevation East and West.pdf PDF
RFIs and Responses.pdf PDF
AmmNo4_AE510 - Detailed Building Section K 1 and 2.pdf PDF
AmmNo4_ASTI_technical_specifications_26APR2024.pdf PDF
AmmNo4_AE312 - Building Section K.pdf PDF
AmmNo4_Specifications_Index_26APR2024.pdf PDF
AmmNo4_AE311 - Building Section J.pdf PDF
AmmNo3_328030A-AE205-BE.pdf PDF
AmmNo3_328030A-AE206-BE.pdf PDF
AmmNo3_328030A-AF102-BE.pdf PDF
AmmNo3_328030A-AE410-BE.pdf PDF
AmmNo3_328030A_GI102_Color shedule.pdf PDF
AmmNo3_indexs of comments_specifications.pdf PDF
B.08.03 Amendment 03 W912GB24R0015-A0003.pdf PDF
AmmNo3_328030A-AE202-BE.pdf PDF
AmmNo3_328030A-AE204-BE.pdf PDF
AmmNo3_Technical Specifications.pdf PDF
AmmNo3_328030A-AE203-BE.pdf PDF
AmmNo3_328030E-E651-BE.pdf PDF
AmmNo3_328030C-CT101-BE.pdf PDF
AmmNo3_01 45 05.pdf PDF
AmmNo3_School Calendar 2024 2025.docx DOCX document
I.01.11 Site Visit Sign In.pdf PDF
PreProposal Slides.pptx PPTX presentation
B.08.02 Solicitation Attachment A Offeror Experience Form.docx DOCX document
Structural.pdf PDF
140229-SPM-RMS SUBMITTAL.xlsx XLSX spreadsheet
231114_Permis Unique.pdf PDF
ADDENDUM2_convector_fan_coil_list.pdf PDF
technical_specifications.pdf PDF
Division 00 - 01.pdf PDF
B.02.14 W912GB24R0015.pdf PDF
Mechanical.pdf PDF
Architecture.pdf PDF
Civil.pdf PDF
Soil Contamination Survey_EN.pdf PDF
Add4_Siphonic roof drainage system.pdf PDF
Fire protection.pdf PDF
General.pdf PDF
Electrical.pdf PDF
Plumbing.pdf PDF
B.08.02 Solicitation Attachment B Past Performance Questionnaire.docx DOCX document
Add6_Table of external influences.pdf PDF
Add5_Acoustical study_BEL.pdf PDF
Add3_Table manholes_BEL.pdf PDF
Add1_Soil Investigation Report.pdf PDF
Vol 2 - Health and Safety Plan.pdf PDF
SF 550 Fillable SHAPE access blank Site Visit.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

Update FAR 52.211-10;

Provide new draw ings;

Incorporate all RFIs and responses.

Point of contact for this amendment is: Kris Morrow (kristina.k.morrow @usace.army.mil)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-May-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912GB24R0015

X 9B. DATED (SEE ITEM 11)

22-Feb-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-May-2024

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

KONRAD ADENAUER RING 39

D-65187 WIESBADEN GERMANY

WIESBADEN 65187

W912GB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912GB24R0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 900 calendar days after notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)