This document is Section 01 45 05 CONTRACTOR PERSONNEL REQUIREMENTS (NAU) from the specifications for the SHAPE International School construction project in Belgium. It outlines the key personnel and qualifications required for the contractor to provide on this project, including the Superintendent, Construction Quality Control (CQC) System Manager, Site Safety and Health Officer (SSHO), and additional specialized QC personnel.

The document specifies the duties, minimum qualifications, and experience levels for each required position. It also addresses requirements for presence on site, allowance of concurrent duties, employment by the prime contractor versus subcontractors, and procedures for replacing approved personnel. Table 1 provides a detailed breakdown of the QC and safety personnel requirements by discipline, including civil, mechanical, electrical, structural, architectural, environmental, and others. The document is focused on ensuring the contractor has the right expertise and oversight to manage quality and safety on this construction project.

View the file

Other files

File Type Posted
B.08.03 Amendment 04.pdf PDF
AmmNo4_AE509 - Detailed Building Section H 3 and4.pdf PDF
AmmNo4_AE310 - Building Section H.pdf PDF
AmmNo4_AE207 - Exterior Building Elevation North.pdf PDF
AmmNo4_AE206 - Exterior Building Elevation South.pdf PDF
RFIs and Responses.pdf PDF
AmmNo4_AE510 - Detailed Building Section K 1 and 2.pdf PDF
AmmNo4_ASTI_technical_specifications_26APR2024.pdf PDF
AmmNo4_AE312 - Building Section K.pdf PDF
AmmNo4_Specifications_Index_26APR2024.pdf PDF
AmmNo4_AE311 - Building Section J.pdf PDF
AmmNo3_328030A-AE205-BE.pdf PDF
AmmNo3_328030A-AE206-BE.pdf PDF
AmmNo3_328030A-AF102-BE.pdf PDF
AmmNo3_328030A-AE410-BE.pdf PDF
AmmNo3_328030A_GI102_Color shedule.pdf PDF
AmmNo3_indexs of comments_specifications.pdf PDF
AmmNo3_328030A-AE201-BE.pdf PDF
AmmNo3_328030A-AE207-BE.pdf PDF
B.08.03 Amendment 03 W912GB24R0015-A0003.pdf PDF
AmmNo3_328030A-AE202-BE.pdf PDF
B.08.03 Amendment 02 W912GB24R0015-A00002.pdf PDF
Amd 2 Soil Contamination Survey_FR.pdf PDF
I.01.11 Site Visit Sign In.pdf PDF
B.08.03 Amendment 01 W912GB24R0015-0001.pdf PDF
PreProposal Slides.pptx PPTX presentation
B.08.02 Solicitation Attachment A Offeror Experience Form.docx DOCX document
General.pdf PDF
Electrical.pdf PDF
Plumbing.pdf PDF
B.08.02 Solicitation Attachment B Past Performance Questionnaire.docx DOCX document
Add6_Table of external influences.pdf PDF
Add5_Acoustical study_BEL.pdf PDF
Add3_Table manholes_BEL.pdf PDF
Add1_Soil Investigation Report.pdf PDF
Vol 2 - Health and Safety Plan.pdf PDF
SF 550 Fillable SHAPE access blank Site Visit.pdf PDF
B.02.14 W912GB24R0015.pdf PDF
Mechanical.pdf PDF
Architecture.pdf PDF
Civil.pdf PDF
Soil Contamination Survey_EN.pdf PDF
Add4_Siphonic roof drainage system.pdf PDF
Fire protection.pdf PDF
Structural.pdf PDF
140229-SPM-RMS SUBMITTAL.xlsx XLSX spreadsheet
231114_Permis Unique.pdf PDF
ADDENDUM2_convector_fan_coil_list.pdf PDF
technical_specifications.pdf PDF
Division 00 - 01.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAHPE International Belgium School BLDC240070

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 45 05

CONTRACTOR PERSONNEL REQUIREMENTS (NAU)

01/23

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 SUPERVISION

1.3.1 Duties

1.3.2 Superintendent Qualification

1.3.3 Host Nation Requirements

1.4 QUALITY CONTROL PERSONNEL

1.4.1 Construction Quality Control (CQC) System Manager (SM)

1.4.2 Specialized Personnel

1.4.3 Additional CQC Personnel

1.4.4 Training

1.5 SAFETY PERSONNEL

1.5.1 Site Safety and Health Officer (SSHO)

1.5.2 Members of QC Organization

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 SUBMITTAL REQUIREMENTS

3.1.1 Separate Items for Personnel

3.1.2 Qualifications of Personnel

3.1.3 Appointment Letter

3.2 PRESENCE ON SITE

3.2.1 Non-Site Personnel

3.2.2 Site Personnel

3.2.3 Additional CQC Personnel

3.3 CONCURRENT DUTIES ON THE SAME PROJECT

3.4 EMPLOYMENT BY PRIME CONTRACTOR

3.5 EMPLOYMENT BY OTHER THAN PRIME CONTRACTOR

3.6 PERSONNEL IDENTIFIED IN PROPOSAL OR OFFER

3.7 REPLACEMENT OF PERSONNEL

3.8 TABLE 1 - PERSONNEL REQUIREMENTS

-- End of Section Table of Contents --

SECTION 01 45 05 Page 1

SECTION 01 45 05

CONTRACTOR PERSONNEL REQUIREMENTS (NAU)

01/23

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Superintendent and Alternate Superintendent; G CQC and Alternate CQC SM; G SSHO and Alternate SSHO; G, DO Additional CQC Personnel; G

1.3 SUPERVISION

Submit for approval the name of a Superintendent and Alternate Superintendent meeting the requirements identified below.

1.3.1 Duties

Designate a qualified superintendent to:

a. Provide adequate supervision of all workers.

b. Ensure complete and satisfactory performance of all work required in accordance with the terms of the contract.

c. Receive instructions from the Contracting Officer.

d. Manage and coordinate day-to-day production and schedule adherence.

e. Attend partnering and quality control meetings.

In this context the highest level manager responsible for the overall construction activities at the site, including quality and production is the superintendent. Identify an alternate to serve in the event of the Superintendents absence.

SECTION 01 45 05 Page 2

1.3.2 Superintendent Qualification

The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.

1.3.3 Host Nation Requirements

The contractors superintendent must meet all training, education, and any other requirements established by the Host Nation authorities where work is performed. These requirements are in addition to, and do not relieve the contractor from any other requirement established by this contract.

1.4 QUALITY CONTROL PERSONNEL

Submit for approval the name of a CQC and Alternate CQC SM meeting the requirements identified below. Do not submit these names as part of the QC Plan, but as a separate submittal.

1.4.1 Construction Quality Control (CQC) System Manager (SM)

Identify as CQC SM an individual that is responsible for overall management of construction quality control and has the authority to act in all CQC matters for the Contractor. The CQC SM reports to the Superintendent. Identify an alternate to serve in the event of the CQC SM's absence. The requirements for the alternate are the same as the CQC

SM.

The CQC SM is required to be a graduate engineer, graduate architect, or a graduate of construction management. Any additional specialized experience requirements are identified in Table 1.

1.4.2 Specialized Personnel

Personnel identified in the technical provisions as requiring specialized skills to assure the required work is being performed properly will also be included as part of the CQC organization.

1.4.3 Additional CQC Personnel

In addition to CQC personnel specified elsewhere in the contract, submit for approval the names and qualifications of the Additional CQC Personnel identified in Table 1. These individuals must report to the CQC SM and have the necessary education and/or experience.

1.4.4 Training

All Quality Control Personnel identified in this section, , including all alternates, are required to have completed the Construction Quality Management (CQM) for Contractors course. This course is periodically offered by the Army Corps of Engineers. Contact the Contracting Officer for information on the next scheduled class.

The CQM Training certificate expires after 5 years. No one may be appointed or continue to serve in a position requiring this training if their certificate has expired. Retaking the course is required to obtain a new certificate.

SECTION 01 45 05 Page 3

1.5 SAFETY PERSONNEL

Submit for approval the name of a SSHO and Alternate SSHO meeting the requirements identified below. Do not submit these names as part of the APP or QC Plans, but as a separate submittal.

1.5.1 Site Safety and Health Officer (SSHO)

Provide a SSHO meeting the requirements of Section 01 35 26 SAFETY

REQUIREMENTS (NAU).

When the SSHO is on leave or is otherwise not available while construction work is ongoing, an equally-qualified Alternate SSHO must be provided and must fulfill the same roles and responsibilities as the primary SSHO.

1.5.2 Members of QC Organization

Contractor Safety Personnel must be members of the QC Organization. This does not change the requirement that they report directly to a senior project (or corporate) official.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.1 SUBMITTAL REQUIREMENTS

3.1.1 Separate Items for Personnel

Each person must be submitted on a unique item number for this section.

For example, the Superintentent and Assistant superintendant must be identified on separate items, however the submittal may include multiple items. This will ensure that approval or non-approval is linked to a specific individual.

3.1.2 Qualifications of Personnel

All persons proposed to be assigned a role on this project in accordance with this section, must be approved for that role prior to their assumption of duties on this project.

The contractor must submit adequate inforamtion to show the personnel proposed are qualified for the proposed position. Qualifications must include education, training, experience, and relevant certifications.

3.1.3 Appointment Letter

Include with the submittal identifying the site personnel a letter signed by a corporate official of the prime contractor with authority to execute the appointment.

This letter must identifiy the individual by name and clearly idnetify their role and responsbilities on the contract, which must be consistent with the requirements of the contract and their delegated position. Any limitations or restrictions on their authority must be identified.

The delegation letter must specifically prohibit the individual from redelegating any of their authorities, duties, or responsibilities.

SECTION 01 45 05 Page 4

3.2 PRESENCE ON SITE

3.2.1 Non-Site Personnel

Personnel identified in Table 1 as "Non-Site Personnel" are not required to be physically present on site when work is being performed.

3.2.2 Site Personnel

The contractors Site Superintendent, CQC SM, and SSHO, or their approved alternates must be physically present at the project site at all times work is being performed.

3.2.3 Additional CQC Personnel

Additional CQC Personnel identified in Table 1 must be physically present at the construction site when work is being performed on their areas of responsibility.

3.3 CONCURRENT DUTIES ON THE SAME PROJECT

The contractors site personnel may have concurrent duties on a single project only when column e. is marked in Table 1 .

Concurrent duties indicated apply to both primary and alternate personnel: when an alternate assumes the duties of the primary, they may not have concurrent duties unless Table 1 indicates the primary may have concurrent duties.

Any person proposed to perform concurrent duties must meet all qualifications, including education, training, and experience for all positions to which they are proposed to be assigned.

3.4 EMPLOYMENT BY PRIME CONTRACTOR

All personnel identified in this Specification Section must be directly employed by the prime contractor and have no affiliation with any subcontractor or supplier on this contract except as noted in paragraph

EMPLOYMENT BY OTHER THAN PRIME CONTRACTOR.

To be considered a prime contractor employee, an individual must be: (1) employed by the prime contractor, (2) directly paid by the prime contractor, and (3) be completely independent of and free from conflicts of interest with subcontractors the prime intends to use on the project.

Subsidiaries or related business units which are not wholly owned by the prime contractor are considered a subcontractor for the purposes of this section. However, if the prime contractor is a Joint Venture, employees of the Joint Venture members are considered to be prime contractor employees in this regard.

Personnel may not "seconded" from another firm, regardless of their relationship to the prime contractor. Personnel who have previously been employees of subsidiaries or related business units, or from firms to be employed as subcontractors on this project will not be considered to be sufficiently independent unless there has been a break of at least 12 months between their employment with these firms and this project.

Obtain written approval from the Contracting Officer if proposing to use personnel employed by a parent company or wholly owned subsidiary of the prime contractor.

3.5 EMPLOYMENT BY OTHER THAN PRIME CONTRACTOR

Where indicated in Table 1 in the Appendix to this section, required

SECTION 01 45 05 Page 5 personnel may be employed by a first-tier subcontractor.

Under no circumstances may one first-tier subcontractor be responsible for any quality control, safety, or supervision of another first-tier subcontractor without written approval of the Contracting Officer.

Designate, in writing, the specific authorities of a subcontractor responsible for supervision, quality control, and safety of any other subcontractor where no direct contractual relationship exists. This designation must be signed by authorized representatives of all companies involved.

3.6 PERSONNEL IDENTIFIED IN PROPOSAL OR OFFER

If the contractor was required to identify in their proposal or offer any personnel required by this specification by name, or the contractor identified any person by name in their proposal or offer, the contractor may not change these personnel or assign them other duties or responsibilities without the express written approval of the Contracting Officer. "Contracting Officer" in this specific context does not include an Administrative Contracting Officer.

Award of any resulting contract does not constitute approval of the person(s) for the role(s) identified in the proposal. Any personnel so identified must be submitted for approval in accordance with this section and be shown to meet the requirements of this contract.

3.7 REPLACEMENT OF PERSONNEL

Except when directed to remove or replace personnel by the Contracting Officer, the contractor may not replace personnel identified in their proposal or offer, nor any personnel approved in accordance with this section, without the approval of the Contracting Officer.

Submit any proposed changes as described elsewhere in this section.

Include an explanation of the reasoning for the request. The proposed personnel must be equivalent in experience and qualifications to the originally identified person(s).

The Contracting Officer has the sole right to determine whether the qualifications and experience are equivalent. The contractor may not appeal a rejection of a proposed substitute.

3.8 TABLE 1 - PERSONNEL REQUIREMENTS

Table 1 on the following pages identifies the MINIMUM quality control, safety, and inspection personnel required to be provided by the contractor for this project:

1. A check in column a. indicates the position is required for this project. Refer to paragraph 3.1 PRESENCE ON SITE for requirements regarding their on-site presence.

2. Column b. identifies the applicable work areas

3. Column c. identifies the minimum qualifications/training. The term "graduate" refers to an individual with a minimum of a Bachelors degree.

4. Column d. indicates the required minimum number of years experience in the indicated area. Experience must have been on projects similar in size, scope, and complexity to the current project, and have been obtained while serving in the same or a substantially similar role. If no value is indicated, at least

SECTION 01 45 05 Page 6 three (3) years experience is required.

5. Column e. indicates whether the person may be allowed other duties. If allowed other duties by column e., a single person can cover more than one area provided the person is qualified to perform quality control activities in each designated area. If not checked, the person may not be assigned any other duties concurrently on this project. See also "Restrictions or Limitations when allowed other duties" at the end of the table.

6. Column f. indicates whether the person may be employed by a subcontractor performing the applicable work. If not marked, the individual must be directly employed by the prime contractor.

SECTION 01 45 05 Page 7

Table 1: Required Contractor Personnel and Requirements

a. b. c. d. e. f.

Req'd Area / Discipline

Duties and Qualification Min Years Exp

Allowed Other

Duties

Employed by Sub

Non-Site Personnel

X Project Manager 7

Site Personnel

X Superintendent See paragraph 1.3 8 (3 as

SSI)

X CQC SM See paragraph 1.4.1 5

X SSHO See paragraph 1.5

X

Civil

Graduate Civil Engineer 3 X

Civil technician or Construction Manager

Specialized experience with concrete pavements

Specialized experience with Soils (may be Civil or Geotechnical Engineer)

Mechanical

Graduate Mechanical Engineer

X Experience supervising mechanical features of work in the field with a construction company

3 X

Experienced technician employed by a Testing, Adjusting & Balancing (TAB) agency that has a current certification from AABC, NEBB or TABB

SECTION 01 45 05 Page 8

Table 1 (Continued): Additional QC Personnel and Requirements

a. b. c. d. e. f.

Req'd Area / Discipline

Duties and Qualifications Min Years

Exp

Allowed Other

Duties

Employed by Sub

Electrical

Graduate Electrical Engineer

X Experience supervising electrical features of work in the field with a construction company

3 X* X

X

Structural

Graduate Civil Engineer (with Structural Track or Focus)

3 X

Experience supervising structural features of work in the field with a construction company

Architectural Graduate Architect

Environmental Graduate Environmental Engineer

X CADD Operator or Draftman

Three (3) years experience in the CADD language to be used for the production of the shop drawings and as-built drawings

3 X**

X Electrical - Comm/IT

Graduate Electrical Engineer or equivalent with 3 yrs specialized experience in Information and Communication system construction and installations

3 X* X

X Submittal Control Officer

Submittal clerk with experience 1

X Testing Adjusting and Balancing (TAB)

Specialist must be a memeber of AABC or an experienced tehcnician of the firm certified by NEBB***

3 3rd Party

Restrictions or Limitations if allowed other duties:

SECTION 01 45 05 Page 9

* "Electrical" QC may also serve as the "Electrical - Comm/IT" QC if sufficiently qualified for both roles.

**CADD Operator is not required to be on-site full-time, but must be physically present on site for all red zone meetings, monthly redline updates and as necessary to ensure the integrity of the as-built documentation.

***TAB Specialist may be certified by an European Equivalent to NEBB, and shall be employed by a third party.

-- End of Section --