This document contains instructions for completing an Excel submittal register input template to feed data into construction project management systems, as well as details of a federal contract opportunity for construction of a new international school facility in Belgium.
The Excel template is to be used to input submittal data for a construction project, with details provided on copying the template file, entering required contract and project information, and formatting data within restricted columns. Instructions indicate saving the completed template as a CSV file for import.
The federal contract opportunity involves construction of a new three-story, 5,500 square meter academic building to replace existing facilities for the Belgian School of the Shape International Schools in Belgium. The project scope includes administrative offices, classrooms, support spaces, site improvements, and related infrastructure. Design is to be compatible with existing architecture using brick, metal panels and green roofs. The pre-bid site visit will take place on March 20, 2024 and bids are due by March 8, 2024. The estimated value is between $10-25 million. The work is to be performed for the Department of the Army European Command.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1- 799
RMS SUBMITTAL REGISTER INPUT FORM CONTRACT NUMBER DELIVERY ORDER
TITLE AND LOCATION
Button Administrator: Administrator:
Excel Submittal Register Input Template – Instructions By Alan Korslien /Doug Ramsey June 6, 2003 Revised: 2/1/2010 by Gerald McKoy @ RMS Center Version: 6.0
The Excel submittal register input template is used to create a batch input file to feed into RMS or QCS. The Excel format allows flexibility in getting submittal data into the RMS/QCS systems; both from a user familiarity standpoint (with Excel), and the editing capability available in Excel (cut & paste, insert rows, etc.) RMS Import/Export-Submittal screen has the option of selecting this template or the batch input file created within Specsintac. However, Contractors must enter the data in QCS either by hand or using this template. The contract will indicate who is to provide the submittal register.
There are a few restrictions in using the template:
1. Before starting your input, if you are starting out with the “blank” template file, make a copy of the file, specific to your project. i. e. Ph6A_MFH_submittal_register.xls.
2. Do not alter the shaded areas of the template. The worksheet is protected, the user cannot normally make structural changes to the template.
3. Input contract number, DO number and title and location. This data does not get imported into RMS/QCS, but will be shown as a pre-import "prompt" to remind you which project's submittal data you are importing.
4. Enter data starting in the first available data row (row 8) and continue without blank rows between data items. Blank rows at the end of the sheet are acceptable and will not affect the import operation.
5. There MUST be data in columns A, B, & C. Column D thru O must have one and only one "X" in a column. Column P thru U must have one and only one column with an "X". Columns V thru AA must have one and only one column with an "X".
6. When inputting the X’s in columns D through AA, use the tab key or cursor to navigate. Also, do not enter any blanks in these fields with the spacebar.
7. The worksheet is set up with 800 rows for data. If this needs to be increased, contact you Project Engineer or your RMS representative for instructions.
8. When you have completed your input and editing, save the “xls” file.
IF NOT IMPORTING DATA INTO THE RMS/QCS SYSTEM(S), DISREGARD BELOW INSTRUCTIONS
9. You must create a ".CSV” (comma delimited) formatted file from the "xls" file for importing into RMS as follows:
a. Save-as
b. Pick file type of: CSV (MS DOS) (*.csv)
c. Enter filename: (default will be the name of the .xls file) i.e. Ph6A_MFH_submittal_register_import.csv
d. Then click : “OK” and “Yes”
10. The “.csv” file formated file has been saved. Close out of ".cvs" file and Select “No” when asked to save changes to the “csv” file.
11. The “.csv” file is now ready for import into RMS/QCS.
<-----Right click for Instructions TYPE OF SUBMITTAL CLASSIFICATION REVIEWING OFFICE
| SECTION | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | 01-PRECON SUBMITTALS | 02-SHOP DRAWINGS | 03-PRODUCT DATA | 04-SAMPLES | 05-DESIGN DATA | 06-TEST REPORTS | 07-CERTIFICATES | 08-MFRS INSTRUCTIONS | 09-MFRS FIELD REPORT | 10-O&M DATA | 11-CLOSEOUT SUBMITTALS | 12-OTHER | FIO-FOR INFORMATION ONLY | GA -GOVERNMENT APPROVED | DA-DESIGNER OF RECORD APPROVED | CR-CONFORMANCE REVIEW | DA / CR | DA/GA | DO-DISTRICT OFFICE | AO-AREA OFFICE | RO-RESIDENT OFFICE | PO-PROJECT OFFICE | DR-DESIGNER OF RECORD | AE-ARCHITECT | |
| 00 74 01 | 3.5.2 | List of Required HN Permits | x | ||||||||||||||||||||||||
| 00 74 01 | 3.5.2 | Approved Permit | x | ||||||||||||||||||||||||
| 00 74 01 | 3.5.4 | HN Final Acceptance | x | ||||||||||||||||||||||||
| 00 74 11 | 3.5.2 | Electrical Service Installation | x | ||||||||||||||||||||||||
| 00 74 11 | 3.3.1 | Certification Of Clean Backfill | x | ||||||||||||||||||||||||
| 01 22 00 | 1.1.2 | Quantity Measurement Plan | x | x | |||||||||||||||||||||||
| 01 30 01 | 3.1.3 | Pre-Construction Documentation | x | ||||||||||||||||||||||||
| 01 30 01 | 3.2 | Mobilization Plan | x | x | |||||||||||||||||||||||
| 01 30 01 | 3.6.1 | Environmental Protection Plan | x | x | |||||||||||||||||||||||
| 01 30 01 | 3.4.2 | Traffic Control Plan | x | x | |||||||||||||||||||||||
| 01 30 01 | 3.5.2 | Construction Fence/Screening | x | x | |||||||||||||||||||||||
| 01 30 01 | 3.11.2 | Temporary Construction Plan | x | x | |||||||||||||||||||||||
| 01 30 01 | 3.7.1 | Hazardous Materials | x | x | |||||||||||||||||||||||
| 01 30 01 | 3.1.5 | Weekly Status | x | ||||||||||||||||||||||||
| 01 32 01 | 1.3 | Project Scheduler Qualifications | x | x | |||||||||||||||||||||||
| 01 32 01 | 3.3.1 | Preliminary Project Schedule | x | x | |||||||||||||||||||||||
| 01 32 01 | 3.3.2 | Initial Project Schedule | x | x | |||||||||||||||||||||||
| 01 32 01 | 3.3.3 | Schedule Update | x | x | |||||||||||||||||||||||
| 01 32 01 | 3.8.6 | Schedule Update | x | x | |||||||||||||||||||||||
| 01 32 01 | 3.3.4 | Revised Schedule | x | x | |||||||||||||||||||||||
| 01 33 00 | 1.7 | Submittal Register | x | x | |||||||||||||||||||||||
| 01 35 26 | 1.9 | Project Accident Prevention Plan | x | x | x | ||||||||||||||||||||||
| 01 35 26 | 1.8.1 | Host Nation Equivalent Training | x | x | x | ||||||||||||||||||||||
| 01 35 26 | 1.10 | Activity Hazard Analysis (AHA) | x | x | |||||||||||||||||||||||
| 01 35 26 | 1.13 | Notifications and Reports | x | ||||||||||||||||||||||||
| 01 35 26 | 1.13.2 | Accident Reports | x | x | x | ||||||||||||||||||||||
| 01 45 00 | 3.2.1 | Construction Quality Control | |||||||||||||||||||||||||
| (CQC) Plan | x | x | |||||||||||||||||||||||||
| 01 45 00 | 3.6.2 | Testing Laboratory Certification | x | ||||||||||||||||||||||||
| 01 45 05 | 1.3 | Superintendent and Alternate Superintendent | x | x | |||||||||||||||||||||||
| 01 45 05 | 1.4 | CQC and Alternate CQC SM | x | x | |||||||||||||||||||||||
| 01 45 05 | 1.5 | SSHO and Alternate SSHO | x | x | x | ||||||||||||||||||||||
| 01 45 05 | 1.4.3 | Additional CQC Personnel | x | x | |||||||||||||||||||||||
| 01 78 00 | 3.1.2 | Commissioning Plan | x | x | |||||||||||||||||||||||
| 01 78 00 | 3.2.3 | Working As-Built Markup Drawings | x | ||||||||||||||||||||||||
| 01 78 00 | 1.8.4 | Warranty Management Plan | x | ||||||||||||||||||||||||
| 01 78 00 | 1.8.7 | Warranty Tags | x | ||||||||||||||||||||||||
| 01 78 00 | 1.6 | Spare Parts Data | x | ||||||||||||||||||||||||
| 01 78 00 | 1.9 | Equipment Guarantees | x | ||||||||||||||||||||||||
| 01 78 00 | 1.8.4 | Posted Instructions | x | ||||||||||||||||||||||||
| 01 78 00 | 1.8.3 | Local Warranty Contractor | x | ||||||||||||||||||||||||
| 01 78 00 | 3.2 | As-Built Drawings | x | x | |||||||||||||||||||||||
| 01 78 00 | 3.3 | Record Drawings | x | x | |||||||||||||||||||||||
| 01 78 00 | 1.8.6 | Warranty Repair Report Construction Book | x | x | |||||||||||||||||||||||
| 01 78 23 | 3.1 | Operation and Maintenance Manual | x | ||||||||||||||||||||||||
| 01 78 23 | 1.7 | Data Package List | x | ||||||||||||||||||||||||
| 01 78 23 | 1.4 | O&M Database | x | ||||||||||||||||||||||||
| 01 78 23 | 3.2.1 | Training Plan | x | ||||||||||||||||||||||||
| 01 78 23 | 3.2.3 | Training Outline | x | ||||||||||||||||||||||||
| 01 78 23 | 3.2.2 | Training Content | x | ||||||||||||||||||||||||
| 01 78 23 | 3.2.4 | Training Video Recording | x | ||||||||||||||||||||||||
| 01 78 23 | 3.2.6 | Validation of Training Completion | x |
x x x x x x x x x x x x x
800- 1600
RMS SUBMITTAL REGISTER INPUT FORM CONTRACT NUMBER DELIVERY ORDER
TITLE AND LOCATION
Button Administrator: Administrator:
Excel Submittal Register Input Template – Instructions By Alan Korslien /Doug Ramsey June 6, 2003 Revised: 2/1/2010 by Gerald McKoy @ RMS Center Version: 6.0
The Excel submittal register input template is used to create a batch input file to feed into RMS or QCS. The Excel format allows flexibility in getting submittal data into the RMS/QCS systems; both from a user familiarity standpoint (with Excel), and the editing capability available in Excel (cut & paste, insert rows, etc.) RMS Import/Export-Submittal screen has the option of selecting this template or the batch input file created within Specsintac. However, Contractors must enter the data in QCS either by hand or using this template. The contract will indicate who is to provide the submittal register.
There are a few restrictions in using the template:
1. Before starting your input, if you are starting out with the “blank” template file, make a copy of the file, specific to your project. i. e. Ph6A_MFH_submittal_register.xls.
2. Do not alter the shaded areas of the template. The worksheet is protected, the user cannot normally make structural changes to the template.
3. Input contract number, DO number and title and location. This data does not get imported into RMS/QCS, but will be shown as a pre-import "prompt" to remind you which project's submittal data you are importing.
4. Enter data starting in the first available data row (row 8) and continue without blank rows between data items. Blank rows at the end of the sheet are acceptable and will not affect the import operation.
5. There MUST be data in columns A, B, & C. Column D thru O must have one and only one "X" in a column. Column P thru U must have one and only one column with an "X". Columns V thru AA must have one and only one column with an "X".
6. When inputting the X’s in columns D through AA, use the tab key or cursor to navigate. Also, do not enter any blanks in these fields with the spacebar.
7. The worksheet is set up with 800 rows for data. If this needs to be increased, contact you Project Engineer or your RMS representative for instructions.
8. When you have completed your input and editing, save the “xls” file.
IF NOT IMPORTING DATA INTO THE RMS/QCS SYSTEM(S), DISREGARD BELOW INSTRUCTIONS
9. You must create a ".CSV” (comma delimited) formatted file from the "xls" file for importing into RMS as follows:
a. Save-as
b. Pick file type of: CSV (MS DOS) (*.csv)
c. Enter filename: (default will be the name of the .xls file) i.e. Ph6A_MFH_submittal_register_import.csv
d. Then click : “OK” and “Yes”
10. The “.csv” file formated file has been saved. Close out of ".cvs" file and Select “No” when asked to save changes to the “csv” file.
11. The “.csv” file is now ready for import into RMS/QCS.
<-----Right click for Instructions TYPE OF SUBMITTAL CLASSIFICATION REVIEWING OFFICE
| SECTION | PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | 01-PRECON SUBMITTALS | 02-SHOP DRAWINGS | 03-PRODUCT DATA | 04-SAMPLES | 05-DESIGN DATA | 06-TEST REPORTS | 07-CERTIFICATES | 08-MFRS INSTRUCTIONS | 09-MFRS FIELD REPORT | 10-O&M DATA | 11-CLOSEOUT SUBMITTALS | 12-OTHER | FIO-FOR INFORMATION ONLY | GA -GOVERNMENT APPROVED | DA-DESIGNER OF RECORD APPROVED | CR-CONFORMANCE REVIEW | DA / CR | DA/GA | DO-DISTRICT OFFICE | AO-AREA OFFICE | RO-RESIDENT OFFICE | PO-PROJECT OFFICE | DR-DESIGNER OF RECORD | AE-ARCHITECT |
| 01.01 | 11 | Temporary mesh fencing | x | |||||||||||||||||||||||
| 01.01 | 22 | Covering of the temporary roadways for vehicles loaded with construction materials and equipment | x | |||||||||||||||||||||||
| 01.01 | 61-01 | Schedule for completion for sample classroom | x | |||||||||||||||||||||||
| 01.01 | 61-02 | Sample classroom | x | |||||||||||||||||||||||
| 01.01 | 61-03 | Sample classroom | x | |||||||||||||||||||||||
| 01.01 | 61-04 | Sample classroom | x | |||||||||||||||||||||||
| 01.01 | 61-05 | Sample classroom | x | |||||||||||||||||||||||
| 01.01 | 64 | Soil testing | x | |||||||||||||||||||||||
| 01.02 | 10 | Inventory of removing plants | x | |||||||||||||||||||||||
| 01.02 | 11 | Removing trees and bushes | x | |||||||||||||||||||||||
| 01.02 | 13 | Removing hedges | x | |||||||||||||||||||||||
| 01.02 | 31-01 | Dewatering plan | x | |||||||||||||||||||||||
| 01.02 | 31-02 | Explanatory report of dewatering | x | |||||||||||||||||||||||
| 01.02 | 31-03 | Monitoring of the dewatering | x | x | ||||||||||||||||||||||
| 02.02 | 12 | Excavations for basements, crawl spaces and foundations, etc. | x | |||||||||||||||||||||||
| 02.02 | 22 | Disposal of surplus or unusable soil out of the worksite | x | |||||||||||||||||||||||
| 02.03 | 13-01 | Sand for fill | x | |||||||||||||||||||||||
| 02.03 | 13-02 | Sand for fill (BENOR) | x | |||||||||||||||||||||||
| 02.03 | 13-03 | Plate tests on compacted sand | x | |||||||||||||||||||||||
| 02.07 | 11 | Grounding loop | x | |||||||||||||||||||||||
| 03.01 | 11-01 | Sub-base in lean concrete | x | |||||||||||||||||||||||
| 03.01 | 11-02 | Sub-base in lean concrete (BENOR) | x | |||||||||||||||||||||||
| 03.02 | 12-01 | Foundation masonry | x | |||||||||||||||||||||||
| 03.02 | 12-02 | Foundation masonry (BENOR&CE) | x | |||||||||||||||||||||||
| 03.02 | 12-03 | Foundation masonry - cement and coating | x | |||||||||||||||||||||||
| 03.03 | 10-01 | Ready-mixed concrete - testing procedure plan | x | |||||||||||||||||||||||
| 03.03 | 10-02 | Ready-mixed concrete - testing laboratories | x | |||||||||||||||||||||||
| 03.03 | 10-03 | Ready-mixed concrete - formwork and form release agent | x | |||||||||||||||||||||||
| 03.03 | 10-04 | Ready-mixed concrete - electrical boxes for embedding in concrete | x | |||||||||||||||||||||||
| 03.03 | 10-05 | Ready-mixed concrete - concrete pouring plan | x | |||||||||||||||||||||||
| 03.03 | 10-06 | Ready-mixed concrete - concrete repair product (if applicable) | x | |||||||||||||||||||||||
| 03.03 | 10-07 | Ready-mixed concrete - coating on underground concrete | x | |||||||||||||||||||||||
| 03.03 | 11-01 | Waterproof concrete (BENOR&CE) | x | |||||||||||||||||||||||
| 03.03 | 11-02 | Waterproof concrete - composition | x | |||||||||||||||||||||||
| 03.03 | 11-03 | Waterproof concrete - conformity of composition of waterproof concrete (grade/class) - every delivery | x | |||||||||||||||||||||||
| 03.03 | 11-04 | Waterproof concrete - admixtures for waterproof concrete | x | |||||||||||||||||||||||
| 03.03 | 11-05 | Waterproof concrete - construction joint drawing | x | |||||||||||||||||||||||
| 03.03 | 11-06 | Waterproof concrete - concrete testing reports | x | |||||||||||||||||||||||
| 03.03 | 11-07 | Waterproof concrete - waterstop in construction joints | x | |||||||||||||||||||||||
| 03.03 | 11-08 | Waterproof concrete - injection product and method (if applicable) | x | |||||||||||||||||||||||
| 03.03 | 11-09 | Waterproof concrete - injection product and method (if applicable) | x | |||||||||||||||||||||||
| 03.03 | 12-01 | Ordinary concrete (BENOR&CE) | x | |||||||||||||||||||||||
| 03.03 | 12-02 | Ordinary concrete - composition | x | |||||||||||||||||||||||
| 03.03 | 12-03 | Ordinary concrete - conformity of composition of ordinary concrete (grade/class) | x | |||||||||||||||||||||||
| 03.03 | 12-04 | Ordinary concrete - admixtures for ordinary concrete (if applicable) | x | |||||||||||||||||||||||
| 03.03 | 12-05 | Ordinary concrete - construction joint drawing | x | |||||||||||||||||||||||
| 03.03 | 12-06 | Ordinary concrete - concrete testing reports | x | |||||||||||||||||||||||
| 03.03 | 13-01 | Precast slabs for monolithic concrete floors | x | |||||||||||||||||||||||
| 03.03 | 13-02 | Precast slabs for monolithic concrete floors (BENOR&CE) | x | |||||||||||||||||||||||
| 03.03 | 13-03 | Monolitic precast slabs - calculation notes | x | |||||||||||||||||||||||
| 03.03 | 13-04 | Monolitic precast slabs - layout drawings and details | x | |||||||||||||||||||||||
| 03.03 | 13-05 | Precast slabs for lightweight concrete floors | x | |||||||||||||||||||||||
| 03.03 | 13-06 | Precast slabs for lightweight concrete floors (BENOR&CE) | x | |||||||||||||||||||||||
| 03.03 | 13-07 | Lightweight precast slabs - calculation notes | x | |||||||||||||||||||||||
| 03.03 | 13-08 | Lightweight precast slabs - layout drawings and details | x | |||||||||||||||||||||||
| 03.03 | 14-01 | Precast slabs for monolithic concrete floors | x | |||||||||||||||||||||||
| 03.03 | 14-02 | Precast slabs for monolithic concrete floors (BENOR&CE) | x | |||||||||||||||||||||||
| 03.03 | 14-03 | Monolitic precast slabs - calculation notes | x | |||||||||||||||||||||||
| 03.03 | 14-04 | Monolitic precast slabs - layout drawings and details | x | |||||||||||||||||||||||
| 03.03 | 14-05 | Precast slabs for lightweight concrete floors | x | |||||||||||||||||||||||
| 03.03 | 14-06 | Precast slabs for lightweight concrete floors (BENOR&CE) | x | |||||||||||||||||||||||
| 03.03 | 14-07 | Lightweight precast slabs - calculation notes | x | |||||||||||||||||||||||
| 03.03 | 14-08 | Lightweight precast slabs - layout drawings and details | x | |||||||||||||||||||||||
| 03.03 | 15-01 | Precast slabs for monolithic concrete floors | x | |||||||||||||||||||||||
| 03.03 | 15-02 | Precast slabs for monolithic concrete floors (BENOR&CE) | x | |||||||||||||||||||||||
| 03.03 | 15-03 | Monolitic precast slabs - calculation notes | x | |||||||||||||||||||||||
| 03.03 | 15-04 | Monolitic precast slabs - layout drawings and details | x | |||||||||||||||||||||||
| 03.03 | 15-05 | Precast slabs for lightweight concrete floors | x | |||||||||||||||||||||||
| 03.03 | 15-06 | Precast slabs for lightweight concrete floors (BENOR&CE) | x | |||||||||||||||||||||||
| 03.03 | 15-07 | Lightweight precast slabs - calculation notes | x | |||||||||||||||||||||||
| 03.03 | 15-08 | Lightweight precast slabs - layout drawings and details | x | |||||||||||||||||||||||
| 03.03 | 61-01 | Reinforcement for concrete | x | |||||||||||||||||||||||
| 03.03 | 61-02 | Reinforcement for concrete (BENOR&CE) | x | |||||||||||||||||||||||
| 03.03 | 62-01 | Prefabricated welded mesh | x | |||||||||||||||||||||||
| 03.03 | 62-02 | Prefabricated welded mesh (BENOR&CE) | x | |||||||||||||||||||||||
| 03.03 | 91-01 | Smooth formwork | x | |||||||||||||||||||||||
| 03.03 | 91-02 | Smooth formwork | x | |||||||||||||||||||||||
| 03.03 | 91-03 | Smooth formwork - repair mortar (if applicable) | x | |||||||||||||||||||||||
| 03.03 | 91-04 | Smooth formwork | x | |||||||||||||||||||||||
| 03.03 | 92-01 | Circular column formwork | x | |||||||||||||||||||||||
| 03.03 | 92-02 | Circular column formwork | x | |||||||||||||||||||||||
| 03.03 | 92-03 | Circular column formwork - repair mortar (if applicable) | x | |||||||||||||||||||||||
| 03.03 | 92-04 | Circular column formwork | x | |||||||||||||||||||||||
| 03.04 | 22-01 | Impermeable rubber construction joints | x | |||||||||||||||||||||||
| 03.04 | 22-02 | Impermeable rubber construction joints | x | |||||||||||||||||||||||
| 03.04 | 22-03 | Impermeable rubber construction joints | x | |||||||||||||||||||||||
| 03.04 | 22-04 | Impermeable rubber construction joints | x | |||||||||||||||||||||||
| 03.04 | 24-01 | EPDM strips for expansion joint sealing | x | |||||||||||||||||||||||
| 03.04 | 24-02 | EPDM strips for expansion joint sealing | x | |||||||||||||||||||||||
| 03.04 | 24-03 | EPDM strips for expansion joint sealing | x | |||||||||||||||||||||||
| 03.04 | 24-04 | EPDM strips for expansion joint sealing | x | |||||||||||||||||||||||
| 03.05 | 11-01 | Concrete components other than floorings | x | |||||||||||||||||||||||
| 03.05 | 11-02 | Concrete components other than floorings | x | |||||||||||||||||||||||
| 03.05 | 11-03 | Concrete components other than floorings | x | |||||||||||||||||||||||
| 03.05 | 11-04 | Concrete components other than floorings | x | |||||||||||||||||||||||
| 03.05 | 11-05 | Concrete components other than floorings (BENOR&CE) | x | |||||||||||||||||||||||
| 03.05 | 13-01 | Hollow core precast floor slabs | x | |||||||||||||||||||||||
| 03.05 | 13-02 | Hollow core precast floor slabs | x | |||||||||||||||||||||||
| 03.05 | 13-03 | Hollow core precast floor slabs | x | |||||||||||||||||||||||
| 03.05 | 13-04 | Hollow core precast floor slabs (BENOR&CE) | x | |||||||||||||||||||||||
| 03.06 | 11-01 | Rolled steel sections | x | |||||||||||||||||||||||
| 03.06 | 11-02 | Rolled steel sections | x | |||||||||||||||||||||||
| 03.06 | 11-03 | Rolled steel sections | x | |||||||||||||||||||||||
| 03.06 | 11-04 | Rolled steel sections - shrinkless mortar, fixations, etc. | x | |||||||||||||||||||||||
| 03.06 | 12-01 | Tubular steel sections | x | |||||||||||||||||||||||
| 03.06 | 12-02 | Tubular steel sections | x | |||||||||||||||||||||||
| 03.06 | 12-03 | Tubular steel sections | x | |||||||||||||||||||||||
| 03.06 | 12-04 | Tubular steel sections - shrinkless mortar, fixations, etc. | x | |||||||||||||||||||||||
| 03.06 | 31-01 | Anti-corrosive painting on untreated steel | x | |||||||||||||||||||||||
| 03.06 | 31-02 | Anti-corrosive painting on untreated steel | x | |||||||||||||||||||||||
| 03.06 | 31-03 | Anti-corrosive painting on untreated steel | x | |||||||||||||||||||||||
| 03.07 | 11-01 | Bluestone elements | x | |||||||||||||||||||||||
| 03.07 | 11-02 | Bluestone elements | x | |||||||||||||||||||||||
| 03.07 | 11-03 | Bluestone elements | x | |||||||||||||||||||||||
| 03.07 | 11-04 | Bluestone elements - elastic sealant | x | |||||||||||||||||||||||
| 03.07 | 11-05 | Bluestone elements - fixing mortar | x | |||||||||||||||||||||||
| 03.09 | 13-01 | Masonry with load-bearing hollow concrete blocks | x | |||||||||||||||||||||||
| 03.09 | 13-02 | Masonry with load-bearing hollow concrete blocks | x | |||||||||||||||||||||||
| 03.09 | 13-03 | Masonry with load-bearing hollow concrete blocks (BENOR&CE) | x | |||||||||||||||||||||||
| 03.09 | 13-04 | Masonry with load-bearing hollow concrete blocks - cement mortar | x | |||||||||||||||||||||||
| 03.09 | 13-05 | Masonry with load-bearing hollow concrete blocks - elastic joints | x | |||||||||||||||||||||||
| 03.09 | 13-06 | Masonry with load-bearing hollow concrete blocks - anchoring accessories | x | |||||||||||||||||||||||
| 03.09 | 13-07 | Masonry with load-bearing hollow concrete blocks - wall reinforcement | x | |||||||||||||||||||||||
| 03.09 | 23-01 | Raised, non load bearing masonry with hollow concrete blocks | x | |||||||||||||||||||||||
| 03.09 | 23-02 | Raised, non load bearing masonry with hollow concrete blocks | x | |||||||||||||||||||||||
| 03.09 | 23-03 | Masonry with load-bearing hollow concrete blocks (BENOR&CE) | x | |||||||||||||||||||||||
| 03.09 | 23-04 | Masonry with load-bearing hollow concrete blocks - cement mortar | x | |||||||||||||||||||||||
| 03.09 | 23-05 | Masonry with load-bearing hollow concrete blocks - elastic joints | x | |||||||||||||||||||||||
| 03.09 | 23-06 | Masonry with load-bearing hollow concrete blocks - anchoring accessories | x | |||||||||||||||||||||||
| 03.09 | 23-07 | Masonry with load-bearing hollow concrete blocks - wall reinforcement | x | |||||||||||||||||||||||
| 03.09 | 34-01 | Extruded brick facing | x | |||||||||||||||||||||||
| 03.09 | 34-02 | Extruded brick facing | x | |||||||||||||||||||||||
| 03.09 | 34-03 | Extruded brick facing (BENOR&CE) | x | |||||||||||||||||||||||
| 03.09 | 34-04 | Extruded brick facing - cement mortar | x | |||||||||||||||||||||||
| 03.09 | 34-05 | Extruded brick facing - elastic joints | x | |||||||||||||||||||||||
| 03.09 | 34-06 | Extruded brick facing - anchoring accessories | x | |||||||||||||||||||||||
| 03.09 | 39-01 | Non-decorative brick facing | x | |||||||||||||||||||||||
| 03.09 | 39-02 | Non-decorative brick facing | x | |||||||||||||||||||||||
| 03.09 | 39-03 | Non-decorative brick facing (BENOR&CE) | x | |||||||||||||||||||||||
| 03.09 | 39-04 | Non-decorative brick facing - cement mortar | x | |||||||||||||||||||||||
| 03.09 | 39-05 | Non-decorative brick facing - elastic joints | x | |||||||||||||||||||||||
| 03.09 | 39-06 | Non-decorative brick facing - anchoring accessories | x | |||||||||||||||||||||||
| 03.09 | 83-01 | Steel profiles for masonry work | x | |||||||||||||||||||||||
| 03.09 | 83-02 | Steel profiles for masonry work-calculations | x | |||||||||||||||||||||||
| 03.09 | 83-03 | Steel profiles for masonry work | x | |||||||||||||||||||||||
| 03.09 | 91-01 | Elastic joint sealant | x | |||||||||||||||||||||||
| 03.09 | 91-02 | Elastic joint sealant | x | |||||||||||||||||||||||
| 03.09 | 93-01 | Thermal interruption for masonry in cellular glass | x | |||||||||||||||||||||||
| 03.09 | 93-02 | Thermal interruption in cellular glass (CE) | x | |||||||||||||||||||||||
| 03.09 | 93-03 | Thermal interruption in cellular glass - calculation of compressive strength | x | |||||||||||||||||||||||
| 03.09 | 93-04 | Thermal interruption for masonry in cellular glass | x | |||||||||||||||||||||||
| 03.09 | 93-05 | Thermal interruption for masonry in cellular concrete | x | |||||||||||||||||||||||
| 03.09 | 93-06 | Thermal interruption in cellular concrete (BENOR&CE) | x | |||||||||||||||||||||||
| 03.09 | 93-07 | Thermal interruption for masonry in cellular concrete | x | |||||||||||||||||||||||
| 03.09 | 98-01 | Sound breakers in masonry | x | |||||||||||||||||||||||
| 03.09 | 98-02 | Sound breakers in masonry | x | |||||||||||||||||||||||
| 03.09 | 98-03 | Sound breakers in masonry | x | |||||||||||||||||||||||
| 03.10 | 21-01 | Grouting with traditional mortar | x | |||||||||||||||||||||||
| 03.10 | 21-02 | Grouting with traditional mortar (BENOR&CE) | x | |||||||||||||||||||||||
| 03.10 | 21-03 | Grouting with traditional mortar | x | |||||||||||||||||||||||
| 03.10 | 21-04 | Grouting with traditional mortar - test walls | x | |||||||||||||||||||||||
| 03.10 | 21-05 | Grouting with traditional mortar | x | |||||||||||||||||||||||
| 03.10 | 22-01 | Grouting with colored mortar | x | |||||||||||||||||||||||
| 03.10 | 22-02 | Grouting with colored mortar (BENOR&CE) | x | |||||||||||||||||||||||
| 03.10 | 22-03 | Grouting with colored mortar | x | |||||||||||||||||||||||
| 03.10 | 22-04 | Grouting with colored mortar - test walls | x | |||||||||||||||||||||||
| 03.10 | 22-05 | Grouting with colored mortar | x | |||||||||||||||||||||||
| 03.11 | 17-01 | Base wall PE-flashing against upward moisture | x | |||||||||||||||||||||||
| 03.11 | 17-02 | Base wall PE-flashing against upward moisture | x | |||||||||||||||||||||||
| 03.11 | 17-03 | Base wall PE-flashing against upward moisture | x | |||||||||||||||||||||||
| 03.11 | 26-01 | PE-wall flashing for cavity walls | x | |||||||||||||||||||||||
| 03.11 | 26-02 | PE-wall flashing for cavity walls | x | |||||||||||||||||||||||
| 03.11 | 26-03 | PE-wall flashing for cavity walls | x | |||||||||||||||||||||||
| 03.12 | 15-01 | Mineral wool insulation for cavity walls | x | |||||||||||||||||||||||
| 03.12 | 15-02 | Mineral wool insulation (ATG&CE) | x | |||||||||||||||||||||||
| 03.12 | 15-03 | Mineral wool insulation for cavity walls | x | |||||||||||||||||||||||
| 03.12 | 36 | Thermal insulation with mineral wool insulation boards | x | |||||||||||||||||||||||
| 03.12 | 44-01 | Underground cellular glass insulation | x | |||||||||||||||||||||||
| 03.12 | 44-02 | Underground cellular glass insulation | x | |||||||||||||||||||||||
| 03.12 | 44-03 | Waterproofing membrane on cellular glass panels | x | |||||||||||||||||||||||
| 03.12 | 44-04 | Waterproofing membrane on cellular glass (ATG&CE) | x | |||||||||||||||||||||||
| 03.12 | 44-05 | Waterproofing membrane on cellular glass - certificate of correct installation | x | |||||||||||||||||||||||
| 03.12 | 44-06 | Waterproofing membrane on cellular glass - Ten year guarantee | x | |||||||||||||||||||||||
| 03.12 | 44-07 | Underground cellular glass insulation | x | |||||||||||||||||||||||
| 03.15 | 37-01 | Brick tie channels | x | |||||||||||||||||||||||
| 03.15 | 37-02 | Brick tie channels | x | |||||||||||||||||||||||
| 03.15 | 37-03 | Brick tie channels | x | |||||||||||||||||||||||
| 03.15 | 41-01 | Brick vent | x | |||||||||||||||||||||||
| 03.15 | 41-02 | Brick vent | x | |||||||||||||||||||||||
| 03.15 | 52-01 | Watertight duction pipe system | x | |||||||||||||||||||||||
| 03.15 | 52-02 | Watertight duction pipe system | x | |||||||||||||||||||||||
| 03.15 | 53-01 | Multiple cable / pipe seal | x | |||||||||||||||||||||||
| 03.15 | 53-02 | Multiple cable / pipe seal | x | |||||||||||||||||||||||
| 05.01 | 12-01 | Sloping concrete | x | |||||||||||||||||||||||
| 05.01 | 12-02 | Sloping concrete (ATG&CE) | x | |||||||||||||||||||||||
| 05.01 | 12-03 | Sloping concrete | x | |||||||||||||||||||||||
| 05.01 | 34-01 | Vapor barrier & primer for EPDM roof | x | |||||||||||||||||||||||
| 05.01 | 34-02 | Vapor barrier & primer for EPDM roof | x | |||||||||||||||||||||||
| 05.01 | 34-03 | Vapor barrier & primer for EPDM roof (ATG&CE) | x | |||||||||||||||||||||||
| 05.01 | 34-04 | Vapor barrier & primer for EPDM roof | x | |||||||||||||||||||||||
| 05.01 | 34-05 | Vapor barrier & bonding layer for bituminous roof | x | |||||||||||||||||||||||
| 05.01 | 34-06 | Vapor barrier & bonding layer for bituminous roof | x | |||||||||||||||||||||||
| 05.01 | 34-07 | Vapor barrier & bonding layer for bituminous roof (ATG&CE) | x | |||||||||||||||||||||||
| 05.01 | 34-08 | Vapor barrier & bonding layer for bituminous roof | x | |||||||||||||||||||||||
| 05.01 | 36-01 | Self-adhesive vapor barrier | x | |||||||||||||||||||||||
| 05.01 | 36-02 | Self-adhesive vapor barrier | x | |||||||||||||||||||||||
| 05.01 | 36-03 | Self-adhesive vapor barrier (ATG & CE) | x | |||||||||||||||||||||||
| 05.01 | 36-04 | Self-adhesive vapor barrier | x | |||||||||||||||||||||||
| 05.01 | 41-01 | Mineral wool insulation boards for flat roofs | x | |||||||||||||||||||||||
| 05.01 | 41-02 | Mineral wool insulation boards for flat roofs | x | |||||||||||||||||||||||
| 05.01 | 41-03 | Mineral wool insulation boards for flat roofs | x | |||||||||||||||||||||||
| 05.01 | 61.13 | Steel deck for cold roof (Covered WW) - coating composition | x | |||||||||||||||||||||||
| 05.01 | 61-08 | Steel deck for cold roof (Covered WW) - layout drawing | x | |||||||||||||||||||||||
| 05.01 | 61-09 | Steel deck for cold roof (Covered WW) - details | x | |||||||||||||||||||||||
| 05.01 | 61-10 | Steel deck for cold roof (Covered WW) | x | |||||||||||||||||||||||
| 05.01 | 61-11 | Steel deck for cold roof (Covered WW) - calculation | x | |||||||||||||||||||||||
| 05.01 | 62.13 | Steel deck for cold roof (for covered playground structure) | x | |||||||||||||||||||||||
| 05.01 | 62.01 | Steel deck for cold roof - layout drawing | x | |||||||||||||||||||||||
| 05.01 | 62.02 | Steel deck for cold roof - details | x | |||||||||||||||||||||||
| 05.01 | 62.03 | Steel deck for cold roof with coatings | x | |||||||||||||||||||||||
| 05.01 | 62.04 | Acoustic infill strips | x | |||||||||||||||||||||||
| 05.01 | 62.05 | Steel deck for cold roof - calculation | x | |||||||||||||||||||||||
| 05.01 | 71-01 | Roofing underlay with plywood panels (Covered WW) - layout drawing | x | |||||||||||||||||||||||
| 05.01 | 71-02 | Roofing underlay with plywood panels (Covered WW) - details | x | |||||||||||||||||||||||
| 05.01 | 71-03 | Roofing underlay with plywood panels (Covered WW) | x | |||||||||||||||||||||||
| 05.01 | 71-04 | Roofing underlay with plywood panels (Covered WW) - CE | x | |||||||||||||||||||||||
| 05.01 | 71-05 | Roofing underlay with plywood panels (Covered WW) - FSC | x | |||||||||||||||||||||||
| 05.01 | 71-06 | Roofing underlay with plywood panels (Covered WW) - thickness calculation | x | |||||||||||||||||||||||
| 05.01 | 71-07 | Roofing underlay with plywood panels | x | |||||||||||||||||||||||
| 05.04 | 30 | Metal sheet roofing covers - detailed layout drawing with fixation indication | x | |||||||||||||||||||||||
| 05.04 | 31-01 | Zinc or zinc alloy roofing cover | x | |||||||||||||||||||||||
| 05.04 | 31-02 | Zinc or zinc alloy roofing cover - separation layer | x | |||||||||||||||||||||||
| 05.04 | 31-03 | Zinc or zinc alloy roofing cover- quality guarantee label | x | |||||||||||||||||||||||
| 05.04 | 31-04 | Zinc or zinc alloy roofing cover | x | |||||||||||||||||||||||
| 05.04 | 31-05 | Zinc or zinc alloy roofing cover - details | x | |||||||||||||||||||||||
| 05.05 | 32-01 | EPDM membrane (ATG and CE for all composants) | x | |||||||||||||||||||||||
| 05.05 | 32-02 | EPDM membrane (FLL test certificate) | x | |||||||||||||||||||||||
| 05.05 | 32-03 | EPDM membrane - for all composants | x | |||||||||||||||||||||||
| 05.05 | 32-04 | EPDM membrane | x | |||||||||||||||||||||||
| 05.05 | 32-05 | EPDM membrane - liquid test | x | |||||||||||||||||||||||
| 05.05 | 32-06 | EPDM membrane - certificate of correct installation | x | |||||||||||||||||||||||
| 05.05 | 32-07 | EPDM membrane - ten year guarantee | x | |||||||||||||||||||||||
| 05.05 | 61-01 | Stone ballast | x | |||||||||||||||||||||||
| 05.05 | 61-02 | Supplementary stone ballast in corners and edges - calculation of thickness | x | |||||||||||||||||||||||
| 05.06 | 15-01 | Almuminum wall cover section | x | |||||||||||||||||||||||
| 05.06 | 15-02 | Almuminum wall cover section | x | |||||||||||||||||||||||
| 05.06 | 81-01 | Concrete roof pavers | x | |||||||||||||||||||||||
| 05.06 | 81-02 | Concrete roof pavers | x | |||||||||||||||||||||||
| 05.06 | 81-03 | Concrete roof pavers (ATG/CE) | x | |||||||||||||||||||||||
| 05.06 | 81-04 | Concrete roof pavers | x | |||||||||||||||||||||||
| 05.07 | 11-01 | Wooden gutter framing | x | |||||||||||||||||||||||
| 05.07 | 11-02 | Wooden gutter framing (ATG&CE) | x | |||||||||||||||||||||||
| 05.07 | 11-03 | Wooden gutter framing - treatment against insects and mold | x | |||||||||||||||||||||||
| 05.07 | 11-04 | FSC-Wooden gutter framing "chain of custody" | x | |||||||||||||||||||||||
| 05.07 | 11-05 | Wooden gutter framing - wood species | x | |||||||||||||||||||||||
| 05.07 | 11-06 | Wooden gutter framing - strenght class | x | |||||||||||||||||||||||
| 05.07 | 11-07 | Wooden gutter framing - sort class | x | |||||||||||||||||||||||
| 05.07 | 11-08 | Wooden gutter framing | x | |||||||||||||||||||||||
| 05.07 | 21-01 | Zinc gutter cover - for all composants | x | |||||||||||||||||||||||
| 05.07 | 21-02 | Zinc gutter cover- quality guarantee label | x | |||||||||||||||||||||||
| 05.07 | 21-03 | Zinc gutter cover | x | |||||||||||||||||||||||
| 05.07 | 21-04 | Zinc gutter cover - details | x | |||||||||||||||||||||||
| 05.08 | 11-01 | Zinc prefabricated rainwater gutter and chutes | x | |||||||||||||||||||||||
| 05.08 | 11-02 | Zinc prefabricated rainwater gutter and chutes - quality guarantee label | x | |||||||||||||||||||||||
| 05.08 | 11-03 | Zinc prefabricated rainwater gutter and chutes | x | |||||||||||||||||||||||
| 05.08 | 15-01 | Siphonic rainwater system in PE - all composants | x | |||||||||||||||||||||||
| 05.08 | 15-02 | Siphonic rainwater system in PE | x | |||||||||||||||||||||||
| 05.08 | 15-03 | Siphonic rainwater system in PE - calculations | x | |||||||||||||||||||||||
| 05.08 | 15-04 | Siphonic rainwater system in PE (approval certificate) | x | |||||||||||||||||||||||
| 05.08 | 15-05 | Siphonic rainwater system in PE | x | |||||||||||||||||||||||
| 06.01 | 14-01 | Polyvinyl chloride pipes | x | |||||||||||||||||||||||
| 06.01 | 14-02 | Polyvinyl chloride pipes (BENOR) | x | |||||||||||||||||||||||
| 06.01 | 15-01 | Polyethylene pipes | ||||||||||||||||||||||||
| 06.01 | 15-02 | Polyethylene pipes (BENOR) | ||||||||||||||||||||||||
| 06.01 | 21-01 | Empty conduits in PVC | x | |||||||||||||||||||||||
| 06.01 | 21-02 | Empty conduits in PVC (BENOR) | x | |||||||||||||||||||||||
| 06.02 | 11-01 | Polyvinyl chloride drainage pipes | x | |||||||||||||||||||||||
| 06.02 | 11-02 | Polyvinyl chloride drainage pipes (BENOR) | x | |||||||||||||||||||||||
| 06.03 | 21-01 | Prefabricated concrete grease trap | x | |||||||||||||||||||||||
| 06.03 | 21-02 | Prefabricated concrete grease trap | x | |||||||||||||||||||||||
| 06.04 | 21-01 | Prefabricated concrete sewer drain | x | |||||||||||||||||||||||
| 06.04 | 21-02 | Prefabricated concrete sewer drain (BENOR) | x | |||||||||||||||||||||||
| 06.04 | 24-01 | Prefabricated polyvinyl chloride sewer drains | x | |||||||||||||||||||||||
| 06.04 | 24-02 | Prefabricated polyvinyl chloride sewer drains (BENOR) | x | |||||||||||||||||||||||
| 06.04 | 25-01 | Prefabricated polyethylene sewer drains | x | |||||||||||||||||||||||
| 06.04 | 25-02 | Prefabricated polyethylene sewer drains | x | |||||||||||||||||||||||
| 06.04 | 42-01 | Prefabricated trench out of polyester concrete with grating | x | |||||||||||||||||||||||
| 06.04 | 42-02 | Prefabricated trench out of polyester concrete with grating | x | |||||||||||||||||||||||
| 06.04 | 61-01 | Cast-iron storm drain | x | |||||||||||||||||||||||
| 06.04 | 61-02 | Cast-iron storm drain (BENOR) | x | |||||||||||||||||||||||
| 06.05 | 11-01 | Cast-iron manhole covers | x | |||||||||||||||||||||||
| 06.05 | 11-02 | Cast-iron manhole covers (BENOR) | x | |||||||||||||||||||||||
| 06.05 | 12-01 | Composite manhole covers | x | |||||||||||||||||||||||
| 06.05 | 12-02 | Composite manhole covers (classification) | x | |||||||||||||||||||||||
| 06.06 | 11-01 | Prefabricated concrete septic cisterns | x | |||||||||||||||||||||||
| 06.06 | 11-02 | Prefabricated concrete septic cisterns | x | |||||||||||||||||||||||
| 06.07 | 12-01 | Prefabricated concrete rainwater cistern units | x | |||||||||||||||||||||||
| 06.07 | 12-02 | Prefabricated concrete rainwater cistern units | x | |||||||||||||||||||||||
| 06.07 | 42-01 | Filter unit for harvesting rainwater | x | |||||||||||||||||||||||
| 06.07 | 42-02 | Filter unit for harvesting rainwater | x | |||||||||||||||||||||||
| 06.08 | 15-01 | Connection to the SHAPE utility network | x | |||||||||||||||||||||||
| 06.08 | 15-02 | Connection to the SHAPE utility network | x | |||||||||||||||||||||||
| 06.08 | 32-01 | Suction pipes made of plastic material | x | |||||||||||||||||||||||
| 06.08 | 32-02 | Suction pipes made of plastic material | x | |||||||||||||||||||||||
| 07.01 | 20 | Planning procedure for steel exterior joinery | x | |||||||||||||||||||||||
| 07.01 | 21-01 | Exterior steel joinery | x | |||||||||||||||||||||||
| 07.01 | 21-02 | Exterior steel joinery - all door fittings | x | |||||||||||||||||||||||
| 07.01 | 21-03 | Exterior steel joinery - PUR coating | x | |||||||||||||||||||||||
| 07.01 | 21-04 | Exterior steel joinery - levels of performance | x | |||||||||||||||||||||||
| 07.01 | 21-05 | Exterior steel joinery - execution details | x | |||||||||||||||||||||||
| 07.01 | 21-06 | Exterior steel joinery | x | |||||||||||||||||||||||
| 07.01 | 26-01 | Spider glass canopy with polycarbonate panels | x | |||||||||||||||||||||||
| 07.01 | 26-02 | Spider glass canopy with polycarbonate panels | x | |||||||||||||||||||||||
| 07.01 | 26-03 | Spider glass canopy with polycarbonate panels | x | |||||||||||||||||||||||
| 07.01 | 26-04 | Spider glass canopy with polycarbonate panels | x | |||||||||||||||||||||||
| 07.01 | 26-05 | Spider glass canopy with polycarbonate panels | x | |||||||||||||||||||||||
| 07.01 | 50 | Planning procedure for aluminum exterior joinery | x | |||||||||||||||||||||||
| 07.01 | 52-01 | Exterior aluminum joinery | x | |||||||||||||||||||||||
| 07.01 | 52-02 | Exterior aluminum joinery (ATG / CE) | x | |||||||||||||||||||||||
| 07.01 | 52-03 | Exterior aluminum joinery - table with Uw-values | x | |||||||||||||||||||||||
| 07.01 | 52-04 | Exterior aluminum joinery - aluminum coating | x | |||||||||||||||||||||||
| 07.01 | 52-05 | Exterior aluminum joinery - aluminum coating, Qualicoat label | x | |||||||||||||||||||||||
| 07.01 | 52-06 | Exterior aluminum joinery - levels of performance | x | |||||||||||||||||||||||
| 07.01 | 52-07 | Exterior aluminum joinery - fittings and accessories | x | |||||||||||||||||||||||
| 07.01 | 52-08 | Exterior aluminum joinery - fittings and accessories | x | |||||||||||||||||||||||
| 07.01 | 52-09 | Exterior aluminum joinery - motorized multi-point motor lock | x | |||||||||||||||||||||||
| 07.01 | 52-10 | Exterior aluminum joinery - self-locking mortise lock | x | |||||||||||||||||||||||
| 07.01 | 52-11 | Exterior aluminum joinery - euro profile cylinder | x | |||||||||||||||||||||||
| 07.01 | 52-12 | Exterior aluminum joinery - execution details | x | |||||||||||||||||||||||
| 07.01 | 52-13 | Exterior aluminum joinery - master key plan | x | |||||||||||||||||||||||
| 07.01 | 52-14 | Exterior aluminum joinery | x | |||||||||||||||||||||||
| 07.01 | 84-01 | Sandwich panel with outside enameled glass finishing | x | |||||||||||||||||||||||
| 07.01 | 84-02 | Sandwich panel with outside enameled glass finishing - thickness | x | |||||||||||||||||||||||
| 07.01 | 84-03 | Sandwich panel with outside enameled glass finishing - seals | x | |||||||||||||||||||||||
| 07.01 | 84-04 | Sandwich panel with outside enameled glass finishing - installation details | x | |||||||||||||||||||||||
| 07.02 | 42-01 | Exterior safety glazing | x | |||||||||||||||||||||||
| 07.02 | 42-02 | Exterior safety glazing (ATG/CE) | x | |||||||||||||||||||||||
| 07.02 | 42-03 | Exterior safety glazing - thickness calculation | x | |||||||||||||||||||||||
| 07.02 | 42-04 | Exterior safety glazing - 10 years guarantee | x | |||||||||||||||||||||||
| 07.02 | 42-05 | Exterior safety glazing | x | |||||||||||||||||||||||
| 07.02 | 42-06 | Exterior safety glazing - seals | x | |||||||||||||||||||||||
| 07.03 | 22-01 | Window sill in coated aluminum | x | |||||||||||||||||||||||
| 07.03 | 22-02 | Window sill in coated aluminum | x | |||||||||||||||||||||||
| 07.03 | 22-03 | Window sill in coated aluminum | x | |||||||||||||||||||||||
| 07.04 | 20 | Planning procedure for aluminum exterior curtain walls | x | |||||||||||||||||||||||
| 07.04 | 21-01 | Exterior aluminum curtain walls | x | |||||||||||||||||||||||
| 07.04 | 21-02 | Aluminum curtain walls (ATG / CE) | x | |||||||||||||||||||||||
| 07.04 | 21-03 | Exterior aluminum curtain walls - table with Uw-values | x | |||||||||||||||||||||||
| 07.04 | 21-04 | Exterior aluminum curtain walls - aluminum coating | x | |||||||||||||||||||||||
| 07.04 | 21-05 | Exterior aluminum curtain walls - aluminum coating, Qualicoat label | x | |||||||||||||||||||||||
| 07.04 | 21-06 | Exterior aluminum curtain walls - levels of performance | x | |||||||||||||||||||||||
| 07.04 | 21-07 | Exterior aluminum curtain walls - fittings and accessories | x | |||||||||||||||||||||||
| 07.04 | 21-08 | Exterior aluminum curtain walls - fittings and accessories | x | |||||||||||||||||||||||
| 07.04 | 21-09 | Exterior aluminum curtain walls - execution details | x | |||||||||||||||||||||||
| 07.04 | 21-10 | Exterior aluminum curtain walls | x | |||||||||||||||||||||||
| 07.04 | 31-01 | Steel trapezoidal cladding | x | |||||||||||||||||||||||
| 07.04 | 31-02 | Steel trapezoidal cladding - coating composition + guarantee | x | |||||||||||||||||||||||
| 07.04 | 31-03 | Steel trapezoidal cladding - calculations | x | |||||||||||||||||||||||
| 07.04 | 31-04 | Steel trapezoidal cladding - sheet sampels | x | |||||||||||||||||||||||
| 07.04 | 31-05 | Steel trapezoidal cladding - screws sampels | x | |||||||||||||||||||||||
| 07.04 | 31-06 | Steel trapezoidal cladding - mineral wool insulation | x | |||||||||||||||||||||||
| 07.04 | 31-07 | Steel trapezoidal cladding - layout drawing | x | |||||||||||||||||||||||
| 07.04 | 31-08 | Steel trapezoidal cladding - execution details | x | |||||||||||||||||||||||
| 07.04 | 31-09 | Steel trapezoidal cladding | x | |||||||||||||||||||||||
| 07.04 | 52-01 | Ceramic tiles for wall cladding | x | |||||||||||||||||||||||
| 07.04 | 52-02 | Ceramic tiles for wall cladding (CE) | x | |||||||||||||||||||||||
| 07.04 | 52-03 | Ceramic tiles for wall cladding - primer & adhesive | x | |||||||||||||||||||||||
| 07.04 | 52-04 | Ceramic tiles for wall cladding - jointing mortar | x | |||||||||||||||||||||||
| 07.04 | 52-05 | Ceramic tiles for wall cladding - adhesive and mortar (CE) | x | |||||||||||||||||||||||
| 07.04 | 52-06 | Ceramic tiles for wall cladding - steel edge&corner profiles | x | |||||||||||||||||||||||
| 07.04 | 52-07 | Ceramic tiles for wall cladding | x | |||||||||||||||||||||||
| 07.04 | 61-01 | Façade plastering with cement mortar | x | |||||||||||||||||||||||
| 07.04 | 61-02 | Façade plastering with cement mortar (CE) | x | |||||||||||||||||||||||
| 07.04 | 61-03 | Façade plastering with cement mortar | x | |||||||||||||||||||||||
| 07.04 | 61-04 | Façade plastering with cement mortar - testing of geometric characteristics | x | |||||||||||||||||||||||
| 07.04 | 82-01 | Aluminum continuous louvre wall (outdoor MEP) | x | |||||||||||||||||||||||
| 07.04 | 82-02 | Aluminum continuous louvre wall (outdoor MEP) | x | |||||||||||||||||||||||
| 07.04 | 82-03 | Aluminum continuous louvre wall (outdoor MEP) | x | |||||||||||||||||||||||
| 07.04 | 82-04 | Aluminum continuous louvre wall (outdoor MEP) | x | |||||||||||||||||||||||
| 07.07 | 21-01 | Exterior sunshading system in aluminum | x | |||||||||||||||||||||||
| 07.07 | 21-02 | Exterior sunshading system in aluminum - shop drawings of the assembling | x | |||||||||||||||||||||||
| 07.07 | 21-03 | Exterior sunshading system in aluminum - fixing detail (into the aluminum joinery) | x | |||||||||||||||||||||||
| 07.07 | 21-04 | Exterior sunshading system in aluminum - Qualicoat | x | |||||||||||||||||||||||
| 07.07 | 21-05 | Exterior sunshading system in aluminum | x | |||||||||||||||||||||||
| 07.07 | 21-06 | Exterior sunshading system in aluminum - calculations of wind action | x | |||||||||||||||||||||||
| 07.07 | 21-07 | Exterior sunshading system in aluminum | x | |||||||||||||||||||||||
| 07.09 | 14 | Stainless steel railings with horizontal bars | x | |||||||||||||||||||||||
| 07.09 | 14 | Stainless steel railings with horizontal bars | x | |||||||||||||||||||||||
| 07.09 | 14 | Stainless steel railings with horizontal bars | x | |||||||||||||||||||||||
| 07.10 | 11-01 | Fall protection equipment | x | |||||||||||||||||||||||
| 07.10 | 11-02 | Fall protection equipment - in accordance with NBN EN 795 | x | |||||||||||||||||||||||
| 07.10 | 11-03 | Fall protection equipment - calculations | x | |||||||||||||||||||||||
| 07.10 | 11-04 | Fall protection equipment | x | |||||||||||||||||||||||
| 07.10 | 11-05 | Fall protection equipment | x | |||||||||||||||||||||||
| 07.10 | 11-06 | Fall protection equipment | x | |||||||||||||||||||||||
| 07.10 | 11-07 | Fall protection equipment - inspection from external agency | x | |||||||||||||||||||||||
| 09.01 | 33-01 | Thermal floor insulation with extruded PS | x | |||||||||||||||||||||||
| 09.01 | 33-02 | Thermal floor insulation with extruded PS (ATG/CE) | x | |||||||||||||||||||||||
| 09.01 | 33-03 | Thermal floor insulation with extruded PS | x | |||||||||||||||||||||||
| 09.01 | 33-04 | Thermal floor insulation with extruded PS | x | |||||||||||||||||||||||
| 09.01 | 34-01 | Thermal floor insulation with polyisocyanurate foam | x | |||||||||||||||||||||||
| 09.01 | 34-02 | Thermal floor insulation with polyisocyanurate foam (ATG/CE) | x | |||||||||||||||||||||||
| 09.01 | 34-03 | Thermal floor insulation with polyisocyanurate foam | x | |||||||||||||||||||||||
| 09.01 | 34-04 | Thermal floor insulation with polyisocyanurate foam | x | |||||||||||||||||||||||
| 09.01 | 44-01 | Acoustic floor insulation with PE | x | |||||||||||||||||||||||
| 09.01 | 44-02 | Acoustic floor insulation with PE -sound test | x | |||||||||||||||||||||||
| 09.01 | 44-03 | Acoustic floor insulation with PE | x | |||||||||||||||||||||||
| 09.01 | 44-04 | Acoustic floor insulation with PE | x | |||||||||||||||||||||||
| 09.01 | 51-01 | Bituminous waterproof membrane for floors | x | |||||||||||||||||||||||
| 09.01 | 51-02 | Bituminous waterproof membrane for floors (ATG/CE) | x | |||||||||||||||||||||||
| 09.01 | 51-03 | Bituminous waterproof membrane for floors | x | |||||||||||||||||||||||
| 09.01 | 51-04 | Bituminous waterproof membrane for floors - certificate of correct installation | x | |||||||||||||||||||||||
| 09.02 | 14-01 | Floating screed with cement base layer | x | |||||||||||||||||||||||
| 09.02 | 14-02 | Floating screed with cement base layer - reinforcement mesh | x | |||||||||||||||||||||||
| 09.02 | 14-03 | Floating screed with cement base layer (CE) | x | |||||||||||||||||||||||
| 09.02 | 14-04 | Floating screed with cement base layer - certification of composition | x | |||||||||||||||||||||||
| 09.02 | 14-05 | Floating screed with cement base layer | x | |||||||||||||||||||||||
| 09.02 | 14-06 | Floating screed with cement base layer - in situ tests | x | |||||||||||||||||||||||
| 09.03 | 33-01 | Epoxy coating for technical floors | x | |||||||||||||||||||||||
| 09.03 | 33-02 | Epoxy coating for technical floors -quality controlled manufacturing | x | |||||||||||||||||||||||
| 09.03 | 33-03 | Epoxy coating for technical floors | x | |||||||||||||||||||||||
| 09.03 | 33-04 | Epoxy coating for technical floors - field quality monitoring on site | x | |||||||||||||||||||||||
| 09.03 | 33-05 | Epoxy coating for technical floors - 10 years full guarantee | x | |||||||||||||||||||||||
| 09.04 | 11-01 | Porcelain stoneware floor tiles - type 1a | x | |||||||||||||||||||||||
| 09.04 | 11-02 | Porcelain stoneware floor tiles - type 1a | x | |||||||||||||||||||||||
| 09.04 | 11-03 | Porcelain stoneware floor tiles - type 1a (CE) | x | |||||||||||||||||||||||
| 09.04 | 11-04 | Porcelain stoneware floor tiles - type 1b | x | |||||||||||||||||||||||
| 09.04 | 11-05 | Porcelain stoneware floor tiles - type 1b | x | |||||||||||||||||||||||
| 09.04 | 11-06 | Porcelain stoneware floor tiles - type 1b (CE) | x | |||||||||||||||||||||||
| 09.04 | 11-07 | Porcelain stoneware floor tiles - type 2a | x | |||||||||||||||||||||||
| 09.04 | 11-08 | Porcelain stoneware floor tiles - type 2a | x | |||||||||||||||||||||||
| 09.04 | 11-09 | Porcelain stoneware floor tiles - type 2a (CE) | x | |||||||||||||||||||||||
| 09.04 | 11-10 | Porcelain stoneware floor tiles - type 2b | x | |||||||||||||||||||||||
| 09.04 | 11-11 | Porcelain stoneware floor tiles - type 2b | x | |||||||||||||||||||||||
| 09.04 | 11-12 | Porcelain stoneware floor tiles - type 2b (CE) | x | |||||||||||||||||||||||
| 09.04 | 11-13 | Porcelain stoneware floor tiles - standard elastic mastic | x | |||||||||||||||||||||||
| 09.04 | 11-14 | Porcelain stoneware floor tiles - sanitary mastic | x | |||||||||||||||||||||||
| 09.04 | 11-15 | Porcelain stoneware floor tiles - cement adhesive & jointing mortar | x | |||||||||||||||||||||||
| 09.04 | 11-16 | Porcelain stoneware floor tiles - epoxy adhesive & jointing mortar | x | |||||||||||||||||||||||
| 09.04 | 11-17 | Porcelain stoneware floor tiles | x | |||||||||||||||||||||||
| 09.04 | 11-18 | Porcelain stoneware floor tiles - mastics, adhesives & mortars | x | |||||||||||||||||||||||
| 09.04 | 11-19 | Porcelain stoneware floor tiles - mastics, adhesives & mortars (CE) | x | |||||||||||||||||||||||
| 09.05 | 34-01 | Linoleum floor with corkment underlay | x | |||||||||||||||||||||||
| 09.05 | 34-02 | Linoleum floor with corkment underlay (CE) | x | |||||||||||||||||||||||
| 09.05 | 34-03 | Linoleum floor with corkment underlay - corkment underlay | x | |||||||||||||||||||||||
| 09.05 | 34-04 | Linoleum floor with corkment underlay - corkment underlay | x | |||||||||||||||||||||||
| 09.05 | 34-05 | Linoleum floor with corkment underlay - sound test | x | |||||||||||||||||||||||
| 09.05 | 34-06 | Linoleum floor with corkment underlay - leveling compound | x | |||||||||||||||||||||||
| 09.05 | 34-07 | Linoleum floor with corkment underlay - primer | x | |||||||||||||||||||||||
| 09.05 | 34-08 | Linoleum floor with corkment underlay - adhesive | x | |||||||||||||||||||||||
| 09.05 | 34-09 | Linoleum floor with corkment underlay - welding rods | x | |||||||||||||||||||||||
| 09.05 | 34-10 | Linoleum floor with corkment underlay - edging and cover strips | x | |||||||||||||||||||||||
| 09.05 | 34-11 | Linoleum floor with corkment underlay | x | |||||||||||||||||||||||
| 09.05 | 34-12 | Linoleum floor with corkment underlay | x | |||||||||||||||||||||||
| 09.05 | 41-01 | Loose lay acoustic vinyl tiles | x | |||||||||||||||||||||||
| 09.05 | 41-02 | Loose lay acoustic vinyl tiles (CE) | x | |||||||||||||||||||||||
| 09.05 | 41-03 | Loose lay acoustic vinyl tiles | x | |||||||||||||||||||||||
| 09.05 | 41-04 | Loose lay acoustic vinyl tiles - leveling compound | x | |||||||||||||||||||||||
| 09.05 | 41-05 | Loose lay acoustic vinyl tiles - adhesive | x | |||||||||||||||||||||||
| 09.05 | 41-06 | Loose lay acoustic vinyl tiles | x | |||||||||||||||||||||||
| 09.08 | 11-01 | Stoneware baseboards | x | |||||||||||||||||||||||
| 09.08 | 11-02 | Stoneware baseboards | x | |||||||||||||||||||||||
| 09.08 | 11-03 | Stoneware baseboards | x | |||||||||||||||||||||||
| 09.08 | 64 | Baseboard in MDF | ||||||||||||||||||||||||
| 09.08 | 72-01 | Linoleum baseboard with PVC strip | x | |||||||||||||||||||||||
| 09.08 | 72-02 | Linoleum baseboard with PVC strip | x | |||||||||||||||||||||||
| 09.08 | 72-03 | Linoleum baseboard with PVC strip | x | |||||||||||||||||||||||
| 09.08 | 72-04 | Linoleum baseboard - contact adhesive | x | |||||||||||||||||||||||
| 09.08 | 72-05 | Linoleum baseboard with PVC strip | x | |||||||||||||||||||||||
| 09.09 | 52-01 | Strips in stainless steel | x | |||||||||||||||||||||||
| 09.09 | 52-02 | Strips in stainless steel | x | |||||||||||||||||||||||
| 09.09 | 52-03 | Strips in stainless steel | x | |||||||||||||||||||||||
| 09.10 | 11-01 | Expansion joint profile for floors | x | |||||||||||||||||||||||
| 09.10 | 11-02 | Expansion joint profile for floors | x | |||||||||||||||||||||||
| 09.10 | 11-03 | Expansion joint profile for floors | x | |||||||||||||||||||||||
| 09.10 | 32-01 | Frame for entrance matting | x | |||||||||||||||||||||||
| 09.10 | 32-02 | Frame for entrance matting | x | |||||||||||||||||||||||
| 09.10 | 32-03 | Frame for entrance matting | x | |||||||||||||||||||||||
| 09.10 | 44-01 | Entrance matting | x | |||||||||||||||||||||||
| 09.10 | 44-02 | Entrance matting | x | |||||||||||||||||||||||
| 09.10 | 44-03 | Entrance matting - lay out sections | x | |||||||||||||||||||||||
| 09.12 | 13.01 | Stair covering in ceramic tile | x | |||||||||||||||||||||||
| 09.12 | 13.02 | Stair covering in ceramic tile | x | |||||||||||||||||||||||
| 09.12 | 13.03 | Stair covering in ceramic tile | x | |||||||||||||||||||||||
| 09.12 | 13.04 | Stair covering in ceramic tile | x | |||||||||||||||||||||||
| 09.14 | 10 | Balustrades, banisters and handrails - project references from the manufacturers company | x | |||||||||||||||||||||||
| 09.14 | 12-01 | Banister and balustrades in coated steel with stainless steel handrails | x | |||||||||||||||||||||||
| 09.14 | 12-02 | Banister and balustrades in coated steel with stainless steel handrails | x | |||||||||||||||||||||||
| 09.14 | 12-03 | Banister and balustrades in coated steel with stainless steel handrails | x | |||||||||||||||||||||||
| 09.14 | 12-04 | Banister and balustrades in coated steel with stainless steel handrails - calculations | x | |||||||||||||||||||||||
| 09.14 | 12-05 | Banister and balustrades in coated steel with stainless steel handrails | x | |||||||||||||||||||||||
| 09.14 | 14-01 | Handrail in stainless steel with wall brackets in coated steel | x | |||||||||||||||||||||||
| 09.14 | 14-02 | Handrail in stainless steel with wall brackets in coated steel | x | |||||||||||||||||||||||
| 09.14 | 14-03 | Handrail in stainless steel with wall brackets in coated steel | x | |||||||||||||||||||||||
| 09.14 | 14-04 | Handrail in stainless steel with wall brackets in coated steel | x | |||||||||||||||||||||||
| 09.14 | 14-05 | Handrail in stainless steel with wall brackets in coated steel | x | |||||||||||||||||||||||
| 10.01 | 31-01 | Rock wool barriers above suspended ceilings - acoustical | x | |||||||||||||||||||||||
| 10.01 | 31-02 | Rock wool barriers above suspended ceilings - acoustical | x | |||||||||||||||||||||||
| 10.01 | 31-03 | Rock wool barriers above suspended ceilings - acoustical | x | |||||||||||||||||||||||
| 10.01 | 31-04 | Rock wool barriers above suspended ceilings - smoke | x | |||||||||||||||||||||||
| 10.01 | 31-05 | Rock wool barriers above suspended ceilings - smoke | x | |||||||||||||||||||||||
| 10.01 | 31-06 | Rock wool barriers above suspended ceilings - smoke | x | |||||||||||||||||||||||
| 10.01 | 31-07 | Rock wool barriers above suspended ceilings | x | |||||||||||||||||||||||
| 10.01 | 41-01 | Cubicle system cells made of HPL panels | x | |||||||||||||||||||||||
| 10.01 | 41-02 | Cubicle system cells made of HPL panels | x | |||||||||||||||||||||||
| 10.01 | 41-03 | Cubicle system cells made of HPL panels - hardware | x |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .