technical_specifications.pdf
PDF 6 MB Posted
- Attached to
- SHAPE International School, Belgium
- Solicitation number
- W912GB24R0015
- Issued by
-
Department of the Army European Command
About this file
This solicitation is for the construction of a new three-story academic classroom building for the Shape International Schools facility in Belgium. The 5,500 square meter building will replace existing facilities and include administrative offices, classrooms, an information center, mechanical and utility rooms, halls, computer network areas, storage rooms, and other required spaces for a fully functional school. Site improvements such as playgrounds, exterior lighting, recreation areas, signage, fencing, paving and landscaping are also included. Related infrastructure for water, gas, sewer, storm drainage and electrical service will be constructed. The design will be compatible with existing architecture using brick, metal panels and standing seam metal roofs. The structure will be cast-in-place concrete with concrete block interior walls and a flat green roof. Interested vendors must submit an SF 550 by 8 March 2024 in order to attend the scheduled site visit on 20 March 2024 at 1300 CET. The magnitude of construction is estimated between $10-25 million. The acceptance and turn-over must be integrated with the academic calendar of the Shape International Schools.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VOLUME 1 : TECHNICAL SPECIFICATIONS
100% For Construction New Belgian School
S.H.A.P.E., Belgium
January 26, 2024 ABETEC nv Architects & Engineers
100 % FOR CONSTRUCTION
S.H.A.P.E., New Belgian School, Belgium Table of Contents January 26, 2024
Table of Contents
PART 0
GENERAL
G00.02 Fire protection systems and life safety devices G00.10 Penetration firestopping G00.13 Color and Finishing Schedules G00.14 Construction Products Regulation (CPR)
PART 1
CIVIL AND ARCHITECTURE
CHAPTER 00 – GENERAL TECHNICAL CLAUSES AND BASIS OF DESIGN
00.01 STANDARDS, GUIDELINES AND CONSTRUCTION CRITERIA
00.01.02 Standards and norms
00.01.03 Energy Performance Regulation
CHAPTER 01 – PRELIMINARY WORKS AND DEMOLITION WORKS
01.01 MOBILIZATION
01.01.10 Temporary fencing
01.01.11 Temporary mesh fencing
01.01.20 Temporary access route
01.01.22 Covering of the temporary roadways for vehicles loaded with construction materials and equipment
01.01.60 Miscellaneous
01.01.61 Sample classroom
01.01.64 Soil testing
01.02 SITE PREPARATION
01.02.10 Removing plantings
01.02.11 Removing trees and bushes
01.02.30 Lowering of the water table
01.02.31 Construction site dewatering
CHAPTER 02 –EARTHWORKS AND FOUNDATIONS
02.02 EXCAVATIONS
02.02.10 Excavations
02.02.12 Excavations for basements, crawl spaces and foundations, etc
02.02.20 Disposal of surplus or unusable soil
02.02.22 Disposal of surplus or unusable soil out of the worksite
02.03 FILL
02.03.10 Fill
02.03.13 Fill with compacted sand
02.07 ACCESSORIES
02.07.10 Groundings
02.07.11 Grounding Loop
CHAPTER 03 – STRUCTURAL WORKS
03.01 NON-REINFORCED CONCRETE
03.01.10 Layers of blinding concrete
03.01.11 Sub-base in lean concrete
03.02 FOUNDATION MASONRY
03.02.10 Foundation masonry in contact with the ground
03.02.12 Foundation masonry of heavy concrete blocks in contact with the ground
03.03 REINFORCED READY-MIXED CONCRETE
03.03.10 Reinforced ready-mixed concrete
03.03.11 Concrete for liquid impermeable / waterproof reinforced concrete
03.03.12 Concrete for ordinary reinforced concrete
03.03.13 Precast slabs for monolithic and lightweight concrete floors
03.03.14 Concrete topping on precast slabs (specification section 03.03.13) AND
03.03.15 Concrete topping on hollow core slabs (specification sections 03.05.13)
03.03.60 Steel for reinforced concrete
03.03.61 Reinforcement for reinforced concrete
January 26, 2024
03.03.62 Prefabricated welded mesh
03.03.90 Special formwork
03.03.91 Smooth formwork
03.04 IMPERMEABILITY
03.04.20 Impermeable joints
03.04.22 Bands for rubber joints
03.04.24 EPDM-strips for expansion joint sealing
03.05 INDUSTRIAL CONCRETE
03.05.10 Prefabricated components in reinforced concrete
03.05.11 Prefabricated reinforced concrete components other than prefabricated floorings
03.05.13 Hollow core precast slab, with concrete topping
03.06 STEEL CONSTRUCTION COMPONENTS
03.06.10 Steel constructions
03.06.11 Rolled steel sections
03.06.12 Tubular steel sections
03.06.30 Anti-corrosive painting on structural steel
03.06.31 Anti-corrosive painting on steel
03.07 NATURAL STONE
03.07.10 Belgian bluestone
03.07.11 Bluestone elements
03.09 RAISED MASONRY
03.09.10 Raised load bearing masonry
03.09.13 Raised, load-bearing masonry with hollow concrete blocks
03.09.20 Raised non load-bearing masonry
03.09.23 Raised, non load bearing masonry with hollow concrete blocks
03.09.30 Facing
03.09.34 Extruded brick facing build with traditional mortar
03.09.39 Non-decorative brick facing
03.09.80 Metal profiles for masonry
03.09.83 Galvanized steel profiles with epoxy finish for masonry work
03.09.90 Masonry accessories
03.09.91 Elastic joint sealant, based on MS-polymer
03.09.93 Thermal interruption for masonry
03.09.98 Sound breakers in rising masonry
03.10 JOINTING
03.10.20 Mortar grouting
03.10.21 Subsequent grouting with traditional mortar
03.10.22 Subsequent grouting with colored mortar
03.11 ANTI-MOISTURE WALL INSULATION
03.11.10 Wall flashing against upward moisture
03.11.17 Base wall flashing against upward moisture with PE sheets
03.11.20 Insulation to prevent dampness and condensation in cavity walls, and for rain drainage
03.11.26 Wall flashing for cavity walls with PE sheets
03.12 THERMAL INSULATION OF WALLS
03.12.10 Thermal insulation of cavity walls
03.12.15 Mineral wool boards for cavity wall insulation
03.12.30 Thermal insulation of concrete ceilings
03.12.36 Thermal insulation with mineral wool insulation boards
03.12.40 Underground wall insulation
03.12.44 Underground wall insulation with cellular glass and bituminous coating
03.15 ACCESSORIES
03.15.30 Anchoring
03.15.37 Brick tie channels
03.15.40 Crawl space vent system
03.15.41 Brick vent
03.15.50 Air and gas tight sealing systems for pipes and cables
03.15.52 Watertight ducting pipe system
03.15.53 Multiple cable / pipe seal
CHAPTER 05 – ROOF ASSEMBLY WORK AND ROOFING WATER DRAINAGE
05.01 SLOPING CONCRETE SLAB AND ROOF STRUCTURE
05.01.10 Sloping concrete slab
05.01.12 Insulated sloping concrete slab
January 26, 2024
05.01.30 Vapor barrier
05.01.34 Bitumen vapor barrier with an aluminum reinforcement
05.01.36 Self-adhesive bitumen vapor barrier reinforced with glass fiber mesh (for the covered playground structure) 94
05.01.40 Insulation boards for roofs
05.01.41 Mineral wool insulation boards for flat roofs
05.01.60 Steel roofing underlay
05.01.62 Steel deck for cold roof (for covered playground structure)
05.01.70 Wooden roofing underlay for cold roof
05.01.71 Roofing underlay with plywood panels (for covered playground structure)
05.04 HARD ROOFING COVERS
05.04.30 Metal sheet roofing covers
05.04.31 Zinc or zinc alloy roofing cover (for covered playground structure)
05.05 FLEXIBLE ROOF SEALING MEMBRANE
05.05.30 High polymer elastic waterproof coatings
05.05.32 EPDM single-ply membrane roofing system
05.05.60 Ballasted roofs
05.05.61 Stone ballasted roof
05.06 ACCESSORIES FOR ROOFS
05.06.10 Fascias and wall covering sections
05.06.15 Aluminum fascias and wall cover section
05.06.80 Roof pavers
05.06.81 Concrete roof pavers
05.07 RAINWATER DRAINAGE GUTTER (for covered playground structure)
05.07.10 Gutter framing
05.07.11 Gutter framing with wooden roof edge boarding
05.07.20 Gutter covers
05.07.21 Zinc gutter cover
05.08 ROOF DRAINAGE PIPES
05.08.10 Roof drainage pipes
05.08.11 Zinc rainwater chutes (for covered playground structure)
05.08.15 Siphonic roof drainage system in polyethylene
CHAPTER 06 – SEWAGE WORKS
06.01 DRAIN PIPELINES AND EMPTY CONDUITS
06.01.10 Drain piping
06.01.14 Polyvinyl chloride pipes
06.01.15 Polyethylene pipes
06.01.20 Empty conduits
06.01.21 Empty conduits in PVC
06.02 DRAINAGE PIPELINES
06.02.10 Drainage pipes
06.02.11 Polyvinyl chloride drainage pipes
06.03 INSTALLING SEPARATORS OUTSIDE THE BUILDING
06.03.20 Sand traps
06.03.21 Prefabricated concrete sand trap
06.04 SEWER DRAINS AND GUTTERS
06.04.20 Prefabricated sewer drains
06.04.21 Prefabricated concrete sewer drain
06.04.24 Prefabricated polyvinyl chloride sewer drains
06.04.25 Prefabricated polyethylene sewer drains
06.04.40 Prefabricated trenches with gratings
06.04.42 Prefabricated trench out of polyester concrete with grating
06.04.60 Storm drains
06.04.61 Cast-iron storm drain
06.05 MANHOLE COVERS AND GRATINGS
06.05.10 Single manhole covers
06.05.11 Cast-iron manhole covers
06.05.12 Composite manhole covers
06.06 WASTE WATER PURIFICATION
06.06.10 Septic cisterns
06.06.11 Prefabricated concrete septic cisterns
January 26, 2024
06.07 COLLECTORS
06.07.10 Rainwater cisterns
06.07.12 Prefabricated concrete rainwater cistern units
06.07.30 Rainwater detention units
06.07.40 Rainwater treatment units for harvesting rainwater
06.07.42 Filter unit for harvesting rainwater
06.08 SEWERAGE CONNECTIONS
06.08.10 Connections to the sewer network
06.08.15 Connection to the SHAPE utility network
06.08.30 High-pressure tube and suction pipes
06.08.32 Suction pipes made of plastic material
CHAPTER 07 – BUILDING ENVELOPE
07.01 EXTERIOR JOINERY
07.01.20 Exterior metallic joinery
07.01.21 Exterior steel joinery (basement entrance), EI 0 / EI 60
07.01.26 Spider glass canopy with polycarbonate panels
07.01.50 Thermally broken aluminum window and door systems
07.01.52 Thermally broken window and door systems in coated aluminum
07.01.80 Sandwich panels
07.01.84 Insulated aluminum sandwich panel with outside enameled glass finishing
07.02 EXTERIOR GLAZING
07.02.40 Insulated safety glazing for exterior
07.02.42 Insulated safety glazing made of laminated glass, providing solar control
07.03 WINDOW SILLS
07.03.20 Aluminum window sills
07.03.22 Window sill in coated aluminum
07.04 FACADE CLADDING
07.04.20 Curtain walls
07.04.21 Curtain wall in coated aluminum
07.04.30 Façade covers using panels
07.04.31 Finish façade with trapezoidal cladding
07.04.50 Façade covers using tiles
07.04.52 Unglazed ceramic tiles for exterior and interior walls
07.04.60 Façade plastering
07.04.61 Façade plastering with cement mortar
07.04.80 Louvre walls
07.04.82 Aluminum continuous louvre wall (outdoor MEP)
07.07 EXTERIOR SOLAR SHADING – FIXED INTO THE ALUMINUM WINDOW PROFILES
07.07.20 Exterior solar shading louver systems
07.07.21 Exterior sunshading systems in aluminum
07.09 RAILING, RAMPS, HANDRAILS, LADDERS
07.09.10 Railing
07.09.14 Stainless steel railings with horizontal bars
07.10 SAFETY EQUIPMENT
07.10.10 Steel safety equipment
07.10.11 Fall protection equipment
CHAPTER 09 – FLOORS
09.01 FLOOR COVERINGS AND INSULATIONS
09.01.30 Thermal insulation for floors
09.01.33 Thermal floor insulation with extruded polystyrene foam
09.01.34 Thermal floor insulation with polyisocyanurate foam
09.01.40 Sound insulation for floors
09.01.44 Sound insulation for floors using polyethylene
09.01.50 Waterproof membrane for floors
09.01.51 Bituminous waterproof membrane for floors
09.02 COVERING FLOORS
09.02.10 Covering floors with a cement base
09.02.14 Floating screed with a cement base layer
09.04 STONEWARE FLOORINGS
09.04.10 Ceramic floor tiles
09.04.11 Pressed unglazed porcelain stoneware floor tiles
January 26, 2024
09.05 HALF SOFT FLOORINGS
09.05.30 Linoleum floor coverings
09.05.34 Flooring with marble effect linoleum onto corkment underlay
09.05.40 Vinyl floor coverings
09.05.41 Flooring with loose lay acoustic vinyl tiles (science classrooms)
09.08 BASEBOARDS
09.08.10 Ceramic baseboards
09.08.11 Pressed unglazed porcelain stoneware baseboards
09.08.60 Wooden baseboards
09.08.64 Baseboard in MDF
09.08.70 Baseboards in synthetic material
09.08.72 Linoleum baseboard
09.09 STRIPS FOR FLOORINGS
09.09.50 Strips
09.09.52 Strip in aluminum
09.10 ACCESSORIES FOR FLOORS
09.10.10 Filling of floor joints
09.10.11 Expansion joint profile
09.10.30 Installation frames for entrance matting
09.10.32 Installation frame for entrance matting in aluminum
09.10.40 Entrance matting
09.10.44 Roll-up entrance matting
09.12 STAIR COVERINGS
09.12.10 Stair coverings in stone material
09.12.13 Stair covering in ceramic tile
09.13 EDGE FINISHING
09.13.10 Stone edge finishing
09.13.13 Edge finishing in ceramic tile
09.14 BALUSTRADES, BANISTERS AND HANDRAILS
09.14.10 Balustrades, banisters and handrails
09.14.12 Banister and balustrades in coated steel with stainless steel handrails
09.14.14 Handrail in stainless steel with wall brackets in coated steel
CHAPTER 10 – WALLS AND PARTITIONS
10.01 LIGHT PARTITIONS
10.01.30 Vertical barriers above suspended ceilings
10.01.31 Rock wool barriers above suspended ceilings
10.01.40 Sanitary partitions
10.01.41 Cubicle system cells made of solid grade laminate (HPL) panels
10.01.50 Wall linings
10.01.52 Wall lining in gypsum boarding
10.03 WALL COVERINGS
10.03.30 Wall covering in synthetic material
10.03.39 Customized acoustic glass wool wall panels
10.03.50 Wall covering with tiles
10.03.54 Glazed ceramic wall tiles
10.04 WALL PLASTERING
10.04.30 Lime and gypsum plastering
10.04.32 Gypsum plastering with prepared mortar
10.05 WINDOW SILLS
10.05.10 Wooden window sills
10.05.15 Window sills made of laminated panels
10.06 INTERIOR DOOR FRAMES
10.06.20 Steel interior door frames
10.06.22 Coated steel doorframe
10.07 WOODEN INTERIOR DOORS
10.07.30 Wooden interior doors finished with synthetic-resin panels
10.07.31 Wooden door leaf finished with synthetic-resin panels
10.11 FIRE DOOR UNITS
10.11.20 Wooden fire door units with steel doorframe
10.11.22 Solid wood fire door in steel doorframe, EI 60 (staircases, elevator shaft, corridor)
10.11.30 Metal fire door units
January 26, 2024
10.11.32 Metal fire door unit EI 60 (basement)
10.16 INTERIOR SUN BLINDS
10.16.10 Interior sunscreen blinds with horizontal blades
10.16.11 Interior sunscreen blinds with horizontal blades in aluminum
10.17 INTERIOR GLAZING
10.17.30 Single safety glazing for indoors
10.17.32 Single safety glazing made of laminated glass
10.17.90 Fire-resistant glazing
10.17.92 EI 60-resistant glazing
10.18 REMOVABLE AND FIXED PANELS
10.18.50 Access panels
10.18.51 Fire resistant inspection hatch with plasterboard, EI 60 for metal stud partitions
10.18.52 Fire resistant inspection hatch with silicate panels, EI 60 for masonry walls
10.20 WALL AND DOOR ACCESSORIES
10.20.10 Door closers and openers
10.20.11 Door closer
10.20.30 Doorstops
10.20.34 Stainless steel doorstop
10.20.50 Grills
10.20.52 Coated aluminum door grill
10.20.56 Coated aluminum transfer grill with fixed vanes
10.20.70 Anti-panic devices
10.20.71 Panic exit device with standard crossbar
10.20.72 Panic exit device with flat touchpad
10.20.80 Sealing of joints in walls
10.20.81 Jointing profile
10.20.82 Elastic joint sealants
CHAPTER 11 – CEILINGS
11.01 SUSPENDED CEILINGS
11.01.40 Suspended ceilings with boards on metal suspension system
11.01.43 Suspended ceiling with gypsum boards on metal suspension system
11.01.44 Suspended ceiling with soft mineral fibre panels with a hydrophobic hygienic coating (for sanitary rooms, warming kitchen, dishwasher room)
11.01.46 Suspended ceiling with hard mineral fibre panels
11.03 PLASTERINGS ON CEILINGS
11.03.10 Ceiling plastering on rough structure
11.03.12 Gypsum plastering with prepared mortar on rough structure
11.05 FINISHING OF SKYLIGHT OPENINGS
11.05.10 Finishing of skylight openings
11.05.19 Finishing of skylight openings with gypsum boards
11.06 ACCESSORIES FOR CEILINGS
11.06.10 Filling of ceiling joints
11.06.11 Profile for ceiling joint filling
CHAPTER 13 – FIXED EQUIPMENT
13.01 KITCHENETTE EQUIPMENT
13.01.10 Kitchenette cupboards
13.01.15 Kitchenette cupboard units
13.03 STORAGE FURNITURE
13.03.10 Storage furniture in wood
13.03.13 Cupboards in laminated panels
13.03.40 Steel storage furniture
13.03.42 Steel lockers (OPTION 1)
13.07 COAT HANGERS
13.07.30 Metal coat hangers
13.07.32 Aluminum coathooks on a wooden board
13.09 INFORMATION AND SIGNAGE
13.09.20 Signs, panels and pictograms
13.09.21 Tack boards (OPTION 2)
13.09.22 Signs, panels and pictograms in synthetic material with aluminum frame
13.09.23 Letters in brushed stainless steel for exterior use
13.10 DIDACTIC MATERIALS
January 26, 2024
13.10.10 Writing boards
13.10.11 White writing board
13.10.12 Interactive screens (OPTION 3)
13.13 LABORATORY SYSTEMS
13.13.10 Laboratory furniture
13.13.12 Complete laboratory equipment for science class
CHAPTER 14 – SANITARY APPLIANCES
14.09 SURFACE WATER RECEPTORS INSIDE THE BUILDING
14.09.40 Floor drains with adhesive flange and siphon
14.09.41 Cast iron floor drain with adhesive flange and siphon
14.09.42 Stainless steel floor drain DN50 with horizontal outlet with adhesive flange and siphon
CHAPTER 15 – PAINTING
15.02 PAINTING ON CONCRETE, CEMENT PLASTERING AND MINERAL FIBRE CEMENT
15.02.20 Interior dispersion painting on concrete. cement plastering and mineral fibre cement
15.02.21 Interior dispersion painting on concrete, cement plastering and mineral fibre cement
15.03 PAINTING ON MASONRY
15.03.20 Interior painting on masonry
15.03.21 Interior dispersion painting on masonry
15.04 PAINTING ON PLASTERING, GYPSUM BOARDING AND SILICATE SHEETS
15.04.20 Interior painting on plastering, gypsum boarding and silicate sheets
15.04.21 Interior dispersion painting on plastering, gypsum boarding and silicate sheets
15.05 PAINTING ON WOOD AND WOOD-BASED PANELS
15.05.20 Interior painting on wood and wood-based panels
15.05.21 Interior waterborne PU-satin gloss painting on wood and wood-based panels
CHAPTER 16 – CIVIL WORKS
16.01 GENERAL AND SPECIFIC EARTHWORKS
16.01.10 Digging up for civil works
16.01.11 Digging up and remove of turfs outside the work-site
16.01.12 Digging up and stockpiling of surface soil
16.01.13 Digging up and remove surface soil outside the work site
16.01.14 Excavations
16.01.15 Disposal and removing massive constructions of rocks, masonry and reinforced or non-reinforced concrete 283
16.01.20 Fill for civil works
16.01.21 Fill with soil from stockpile
16.01.22 Fill with compacted sand
16.01.30 Grading works
16.01.33 Spreading out the topsoil
16.01.40 Landscaping works
16.01.42 Laying out banks
16.01.50 Digging trenches for utilities
16.02 LINING/EROSION COVERING OF DITCHES AND SLOPES
16.02.20 Lining of slopes
16.02.26 Sheet protection of fills
16.03 BASES FOR SURFACINGS AND PAVINGS
16.03.10 Geo-textiles
16.03.13 Polyester geo-textiles
16.03.30 Bases
16.03.31 Rubble for rubble foundation with non-continuous stone grading
16.03.34 Unreinforced lean concrete
16.03.36 Sand/cement foundation
16.04 SURFACINGS AND PAVINGS
16.04.50 Surfacings out of synthetic materials
16.04.51 Resilient paving
16.04.60 Pavings out of pavers
16.04.63 Concrete pavers
16.04.90 Special pavings
16.04.91 Synthetic grass paving units
16.05 LINEAR PARTS
16.05.10 Curbstones
16.05.12 Concrete curbstones
January 26, 2024
16.06 ARCHITECTURAL WORKS AND WORKS OF ADJUSTMENTS
16.06.10 Stairs
16.06.11 Precast concrete stairs
16.06.20 Retaining walls
16.06.22 Reinforced concrete retaining walls
16.07 SITE FENCINGS
16.07.20 Wired meshed fencings
16.08 GATES AND BARRIERS
16.08.10 Hinge gates
16.08.12 Hinge gates made of steel
16.09 FURNITURES
16.09.10 Bike storage systems
16.09.13 Bicycle racks
16.09.24 Bollards
16.09.60 Benches
16.09.63 Wooden Benches (OPTION 4)
16.09.75 Tree root guides
16.09.80 Trash cans
16.13 MISCELLANEOUS WORKS
16.13.20 Repair of surfacing
16.13.21 Repair of asphalt surfacing in its original condition
16.13.22 Repair of pavement surfacing in its original condition
16.13.23 Repair of pavement synthetic grass paving units
16.13.24 Repair of curbstones
16.15 TRAFFIC SIGNAL WORK
16.15.10 Vertical traffic signal works, non-illuminated
16.15.30 Horizontal traffic signs
16.15.31 Road markings
16.16 ON SITE LIGHTING
16.16.10 Posts and foundation for lighting fixtures
16.16.11 Foundations for lighting fixtures
16.16.15 Posts for public lighting fixtures
16.16.20 Lighting fixtures
16.16.23 Floodlights
16.16.27 Urban lighting
CHAPTER 17 – LANDSCAPING, LAYING OUT AND MAINTENANCE
17.02 CULTIVATION WORKS
17.02.10 Soil cultivations
17.02.12 Plowing or digging
17.02.15 Levelling or smoothing
17.02.16 Milling or working with a rotary cultivator
17.05 PROCESSING OF SOIL IMPROVEMENT WORKS
17.05.10 Processing of soil improvements with compost
17.05.11 With compost based on organic and mineral composition
17.08 LAYING OUT LUSHED VEGETATION AND LAWNS
17.08.04 Laying out lawns by sowing
17.10 LAYING OUT VEGETATION
17.10.10 Prelimenary works to lay out vegetation
17.10.30 Planting trees
17.10.31 Planting standard trees
17.12 CONSTRUCTION WORKS RELATED TO LANDSCAPING WORKS
17.12.10 Delivery and placing tree staked constructions
17.12.13 Delivery and positioning a 3 tree staked construction
17.12.92 Delivery and spreading out of substrate for trees
CHAPTER 19 – MISCELLANEOUS
19.04 TESTS ON THE BUILDING
19.04.10 Air tightness measurements
19.04.11 Blower Door Test under EPB regulation
19.04.20 On-site acoustic testing
19.04.21 Acoustic testing according to the Belgian standards
January 26, 2024
PART 2
TECHNICAL WORKS
CHAPTER 20 – GENERAL TECHNICAL CLAUSES AND BASIS OF DESIGN
20.01 VARIOUS DELIVERIES AND WORKS
20.01.01 Acoustics
20.01.02 Drillings and repairs
20.01.03 Testing and optimisation of the installation
20.01.03.01 Tests on the sanitary installation
20.01.03.02 Tests on the HVAC and refrigerating equipment
20.01.03.03 Testing and programming of electric and control engineering equipment
20.01.03.04 Inspection of the electrical equipment
20.01.07 Measurements, trials, inspections and tests
20.01.08 Commissioning
20.02 GENERAL INFORMATION
20.02.01 General note
20.02.02 Delivery, installation and commissioning
20.02.03 Protecting and maintaining the integrity of the existing constructions
20.02.04 Access to the construction site
20.02.05 Surveillance of the construction site
20.02.06 Protective measures and cleaning of the installation parts and devices
20.02.07 Planning
20.02.08 Complementary character of the file
20.02.09 Simultaneous assignments
CHAPTER 21 – ELECTRICITY, DATA AND LIGHTNING PROTECTION
21.01 GENERAL
21.03 INSTALLATION OF HIGH-VOLTAGE CONNECTION AND DISTRIBUTION
21.03.10 General
21.03.11 Compact switchgear and control gear
21.03.14 Distribution transformers
21.03.15 Accessories in HT areas
21.04 INSTALLATION OF LOW-VOLTAGE CONNECTION AND DISTRIBUTION
21.04.10 General
21.04.11 Equipment for connection and distribution panels
21.04.12 Switchgear and distribution panels for interior installation
21.08 LOW-VOLTAGE CURRENT DISTRIBUTION CIRCUITS
21.08.10 General
21.08.11 Current distribution circuits inside buildings
21.08.12 Current distribution circuits outside buildings
21.08.13 Conduits in PVC
21.08.15 Line passages
21.09 CABLE CHANNELS AND PARTS FOR RAISED FLOORS
21.09.11 Cable channels
21.09.13 Wall trunking
21.09.14 Floor trunking
21.10 CONTROL DEVICES AND POWER OUTLETS
21.10.10 General
21.10.11 Control devices
21.10.12 Current receptacles (Power outlets)
21.11 LIGHTING EQUIPMENT
21.11.10 General
21.11.18 Types of lighting equipment
21.11.20 Emergency lighting systems
21.12 GROUNDING AND GROUND-PLANE CONNECTIONS
21.12.10 General
21.12.11 Grounding
21.12.12 Ground Plane Connections
21.12.13 Connection of Instruments to Ground
21.13 LIGHTNING PROTECTION
21.13.10 General
21.13.11 New lightning installation
January 26, 2024
21.14 AUTOMATIC FIRE DETECTION, SIGNALING, WARNING AND ALARM
21.14.10 General
21.14.11 Fire Detection According to the Network System (Identification of Components)
21.17 TELECOMMUNICATIONS
21.17.10 General
21.18 DATA AND TELECOMMUNICATIONS INFRASTRUCTURE
21.18.11 Telephone Infrastructure
21.18.12 Data and telephone infrastructure
21.19 VIDEOPHONE
21.19.10 General
21.19.11 Videophone
21.21 CCTV SYSTEM
21.21.10 General
21.21.11 a Dome IP camera
21.21.12 Server with software
21.21.13 Cabinets
21.21.14 Cables and conduits
21.22 INTERACTIVE SCREENS
21.22.10 Installation of interactive screens
21.26 HOUR DISTRIBUTION
21.26.10 General
21.26.11 Main clock
21.26.12 Clocks
21.26.14 Sounders
21.26.15 Microphone
21.26.16 Cables and conduits
21.33 SOLAR POWER
21.33.01 Solar power > 10 kWp
21.33.02 Parts of the installation
21.40 MISCELLANEOUS
21.40.10 Installation Inspection
CHAPTER 22 – PLUMBING
22.01 GENERAL INFORMATION
22.01.11 Description
22.02 WATER SUPPLY
22.02.10 General
22.03 SUPPLY PIPING
22.03.11 Piping outside the building
22.03.12 Piping inside the building
22.03.13 Specific Precautions
22.04 VALVES
22.04.10 General
22.04.11 Shut-Off Valves
22.04.12 Regulating Valves
22.04.13 Safety Devices
22.04.14 Faucets
22.04.18 Pressure reduction valves
22.05 PUMPS
22.05.11 Closed plug and play pump unit with level detection in sump pit
22.05.12 Domestic hot water circulation pump
22.05.14 Rainwater utilisation system
22.05.15 Drain lift, service sink basement
22.06 SEWAGE SYSTEM
22.06.11 High-Density Polyethylene (HDPE) drain pipes
22.06.13 Ventilation piping
22.06.15 Roof extensions, roof caps
22.07 PLUMBING FIXTURES
22.07.10 Generalities
22.07.12 Wall mounted sink - disabled (PF-TSD)
22.07.14 Multiple washbasin unit (PF-TSM)
22.07.17 Science Classroom sinks (PF-LS and PF-LST)
January 26, 2024
22.07.24 Wall-fitted toilet with integrated flush tank (PF-WA)
22.07.25 Wall-fitted toilet with integrated flush tank - disabled (PF-WD)
22.07.32 Urinal - wall mounted (PF-URW)
22.07.34 Urinal divider
22.07.41 Service sink (PF-SS)
22.07.45 Drinking fountain (PF-DF)
22.07.46 Classroom sink cold water (PF-CS)
22.07.47 Sink warm water (PF-WS)
22.07.72 Mirrors
22.07.74 Sanitary accessories : installation only - delivery by SIS
22.07.81 Stainless steel kitchen sink
22.07.82 Drain and watersupply for Dishwasher (PF-DW)
22.07.83 Drain and watersupply for an industrial Dishwasher (PF-IDW)
22.07.84 Foldable countertop emergency eyewash (EYEWASH)
22.08 HOT WATER PREPARATION
22.08.11 A Indirect heated boiler 750l
22.08.12 Electrical domestic hot water boiler 15 liters
22.08.16 Sanitary run-through pressure expansion vessel
22.09 WATER TREATMENT
22.09.11 Water filter (automatic rinsing)
22.09.13 Water softener
22.09.14 Double filter with active carbon and mechanic filter
22.12 MEASURING AND CONTROL INSTRUMENTS
22.12.11 Hydrometer
22.12.12 Leak detection system
22.14 CORROSION PROTECTION
22.15 THERMAL INSULATION
22.15.11 Insulation
22.15.12 Pipe marking
22.15.13 Identification plates
CHAPTER 23 – MECHANICAL WORKS
23.01 HEAT GENERATORS AND BURNERS
23.01.01 Natural gas fueled condensing floor standing boilers
23.02 FUEL SUPPLY
23.02.01 Natural gas supply
23.03 COMBUSTION PRODUCT EXHAUST
23.03.01 Chimney for combustion gasses
23.04 COLD WATER PRODUCTION
23.04.01 Chillers with electric drive
23.04.04 Serverroom cooling system
23.05 EXPANSION AND SAFETY SYSTEM
23.05.01 Variabel pressure expansion system (constant air volume)
23.06 PIPE WORK
23.06.01 Carbon steel piping for heated and chilled water
23.06.03 Drain pipes of polyethylene high density
23.07 COCKS AND VALVES
23.07.03 Shut-off valves
23.07.04 Balancing valves
23.07.05 Mixing- and distributing valves
23.07.07 Convector valves
23.07.08 Double connection fitting
23.08 PUMPS AND CIRCULATORS
23.08.03&04 Frequency controlled pumps for heating circuits and cooling water circuits
23.10 HEATING AND COOLING ELEMENTS
23.10.04 Convectors
23.10.05 Fan coil units
23.10.08 Heating coil
23.12 AIR HANDLING UNITS
23.12.12 Air handling units for outdoor assembly
23.13 FANS
23.13.01 Roof fan for fume hoods
January 26, 2024
23.13.02 Duct fan
23.13.03 Ventilation box
23.14 AIR DUCTS
23.14.10 General terms and conditions concerning air ducts
This is the start of the file's text. The full file is on GovTribe.