ADDENDUM2_convector_fan_coil_list.pdf
PDF 64 KB Posted
- Attached to
- SHAPE International School, Belgium
- Solicitation number
- W912GB24R0015
- Issued by
-
Department of the Army European Command
About this file
This document contains a convector and fan coil unit list for a new Belgian school facility project along with details of a related federal contract opportunity. The project involves construction of a three-story, approximately 5,500 square meter academic building to replace existing facilities at SHAPE in Belgium. Interior spaces will include administrative offices, classrooms, an information center, mechanical rooms, restrooms, and other school support areas. Site improvements such as playgrounds, lighting, and recreation areas are also included. Interested vendors must submit SF Form 550 no later than March 8, 2024 to attend a scheduled site visit on March 20, 2024. The construction value is estimated between $10-25 million. The Army Corps of Engineers - Europe District is the contracting agency. The convector and fan coil unit lists provide specifications for heating and cooling the building areas.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM 2: CONVECTORLIST
100% For Construction
New Belgian School
S.H.A.P.E., Belgium
PN-328030
October 31, 2023
ABETEC Architects & Engineers nv
ABETEC ARCHITECTEN & INGENIEURS NV P1/6
CONVECTORLIST
List with characteristics of the convectors
TASK Shape Belgian School 140229
BUILDING OWNER US ARMY CORPS OF ENGINEERS - EUROPE DISTRICT 2023/10/31
Description of the heat production
Regime tsupply / treturn 60 / 40 °C and so E 30 -capacity
RADIATOR/CONVECTORDATA Cfr. EN 442
CONVECTOR Type of room ti Normalized
(°C) drawing heat-output E50 (W)
60 / 40 °C and ti 75/65/20°C n Type Height Length E50 (W) f2 = 1/f1.E/f2 (mm) (mm) 75/65/20°C
C.B.01 MEC.02 20 1491 1 3034 1,3 16 950 1200 3212
C.B.02 JAN.01 20 1880 1 3825 1,3 20 950 1400 4189
C.B.03 STO.02 20 1877 1 3819 1,3 20 950 1400 4189
C.B.04 COR.B2 20 1195 1 2431 1,3 15 950 1200 2575
C.B.05 COR.B1 20 1482 1 3015 1,3 16 950 1200 3212
C.B.06 MEC.03 20 722 1 1469 1,3 6 950 1200 1471
C.B.07 STO.01 20 2435 1 4955 1,3 21 950 1400 5488
C.00.01 PCL.15 20 1255 1 2554 1,3 11 650 1800 2777
C.00.02 PCL.15 20 1255 1 2554 1,3 11 650 1800 2777
C.00.03 COP.01 20 1538 1 3129 1,3 15 650 1800 3460
C.00.04 STO.03 20 686 1 1396 1,3 6 950 1200 1471
C.00.05 WC.06 20 771 1 1569 1,3 15 950 800 1717
C.00.06 WC.05 20 709 1 1443 1,3 15 950 800 1717
ROOMDATA
Correction values
DATA OF THE INSTALLATION
NBN B62-003 Δ T
Heat loss
E (W)
= needed capacity 1/f1
GROUND FLOOR
2,03
2,03
2,03
BASEMENT
Selection convector by contractor n-value to be adapt if known
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
SHAPE BELGIAN SCHOOL 140229
ABETEC ARCHITECTEN & INGENIEURS NV P2/6
C.00.07 PLC.14 20 1134 1 2307 1,3 11 650 1800 2770
C.00.08 PLC.14 20 1134 1 2307 1,3 11 650 1800 2770
C.00.09 PLC.13 20 1396 1 2840 1,3 15 650 1800 3460
C.00.10 PLC.12 20 1396 1 2840 1,3 15 650 1800 3460
C.00.11 PLC.11 20 1120 1 2279 1,3 11 650 1800 2777
C.00.12 PLC.11 20 1120 1 2279 1,3 11 650 1800 2777
C.00.13 PLC.10 20 1120 1 2279 1,3 11 650 1800 2777
C.00.14 PLC.10 20 1120 1 2279 1,3 11 650 1800 2777
C.00.15 PLC.09 20 1134 1 2307 1,3 11 650 1800 2777
C.00.16 PLC.09 20 1134 1 2307 1,3 11 650 1800 2777
C.00.17 PCL.08 20 1134 1 2307 1,3 11 650 1800 2777
C.00.18 PCL.08 20 1134 1 2307 1,3 11 650 1800 2777
C.00.19 MFS.01 20 1086 1 2210 1,3 11 650 1800 2777
C.00.20 MFS.01 20 1086 1 2210 1,3 11 650 1800 2777
C.00.21 MFS.01 20 1086 1 2210 1,3 11 650 1800 2777
C.00.22 MFS.01 20 1086 1 2210 1,3 11 650 1800 2777
C.00.23 MFS.01 20 1086 1 2210 1,3 11 650 1800 2777
C.00.24 MFS.01 20 1086 1 2210 1,3 11 650 1800 2777
C.00.25 COR.01 20 1339 1 2724 1,3 21 950 800 3136
C.00.26 COR.01 20 1339 1 2724 1,3 21 950 800 3136
C.00.27 COR.01 20 1339 1 2724 1,3 21 950 800 3136
C.00.28 COR.02 20 891 1 1813 1,3 16 950 900 2409
C.00.29 COR.02 20 891 1 1813 1,3 16 950 900 2409
C.00.30 COR.02 20 891 1 1813 1,3 16 950 900 2409
C.00.31 PCO.01 20 1637 1 3331 1,3 15 650 1800 3460
C.00.32 EDO.01 20 1052 1 2141 1,3 11 650 1800 2777
C.00.33 WK.01 20 1927 1 3921 1,3 10 650 1800 2180
C.00.34 WK.01 20 1 0 1,3 15 950 1100 2361
C.00.35 STA.A0 20 2732 1 5559 1,3 21 650 2000 6060
C.00.36 WC.03 20 803 1 1634 1,3 15 950 800 1717
C.00.37 WC.02 20 710 1 1445 1,3 15 950 800 1717
C.00.38 PCL.01 20 1134 1 2306 1,3 11 650 1800 2777
C.00.39 PCL.01 20 1134 1 2306 1,3 11 650 1800 2777
C.00.40 PCL.02 20 1120 1 2278 1,3 11 650 1800 2777
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
ABETEC ARCHITECTEN & INGENIEURS NV P3/6
C.00.41 PCL.02 20 1120 1 2278 1,3 11 650 1800 2777
C.00.42 PCL.03 20 1120 1 2278 1,3 11 650 1800 2777
C.00.43 PCL.03 20 1120 1 2278 1,3 11 650 1800 2777
C.00.44 PCL.04 20 1396 1 2840 1,3 15 650 1800 3460
C.00.45 PCL.05 20 1396 1 2840 1,3 15 650 1800 3460
C.00.46 PCL.06 20 1134 1 2306 1,3 11 650 1800 2777
C.00.47 PCL.06 20 1134 1 2306 1,3 11 650 1800 2777
C.00.48 PCL.07 20 1127 1 2293 1,3 11 650 1800 2777
C.00.49 PCL.07 20 1127 1 2293 1,3 11 650 1800 2777
C.00.50 LOB.01,02 20 3758 1 7646 1,3 21 950 1000 3920
C.00.51 LOB.01,02 20 1 0 1,3 21 950 1400 5488
C.00.52 LOB.03 20 2263 1 4605 1,3 21 950 1200 4704
C.00.53 ADM.01 20 2032 1 4135 1,3 21 950 1200 4704
C.00.54 ADM.02 20 2061 1 4194 1,3 21 950 1200 4704
C.00.55 TEA.01 20 1512 1 3076 1,3 21 950 800 3136
C.00.56 TEA.01 20 1512 1 3076 1,3 21 950 800 3136
C.00.57 ADM.03 20 593 1 1207 1,3 15 950 800 1717
C.00.58 COR.03 20 1111 1 2261 1,3 16 950 900 2409
C.00.59 STAIR LOBBY 20 977 1 1988 1,3 16 950 900 2409
C.01.01 LIB 01 20 1341 1 2728 1,3 11 650 1800 2777
C.01.02 LIB 01 20 1341 1 2728 1,3 11 650 1800 2777
C.01.03 LIB 01 20 1341 1 2728 1,3 11 650 1800 2777
C.01.04 STA.B1 20 1442 1 2934 1,3 16 950 1100 2945
C.01.05 WC.12 20 1078 1 2193 1,3 16 950 900 2409
C.01.06 SCL.08 20 966 1 1966 1,3 10 650 1800 2180
C.01.07 SCL.08 20 966 1 1966 1,3 10 650 1800 2180
C.01.08 COM.03 20 1204 1 2450 1,3 11 650 1800 2777
C.01.09 COM.03 20 1204 1 2450 1,3 11 650 1800 2777
C.01.10 SCL.07 20 953 1 1939 1,3 10 650 1800 2180
C.01.11 SCL.07 20 953 1 1939 1,3 10 650 1800 2180
C.01.12 SCL.06 20 953 1 1939 1,3 10 650 1800 2180
C.01.13 SCL.06 20 953 1 1939 1,3 10 650 1800 2180
C.01.14 SCL.05 20 966 1 1966 1,3 10 650 1800 2180
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
FIRST FLOOR
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
ABETEC ARCHITECTEN & INGENIEURS NV P4/6
C.01.15 SCL.05 20 966 1 1966 1,3 10 650 1800 2180
C.01.16 SCL.01 20 966 1 1966 1,3 10 650 1800 2180
C.01.17 SCL.01 20 966 1 1966 1,3 10 650 1800 2180
C.01.18 ADM.07 20 595 1 1211 1,3 06 650 1800 1919
C.01.19 ADM.07 20 595 1 1211 1,3 06 650 1800 1919
C.01.20 ADM.06 20 1062 1 2161 1,3 10 650 1800 2180
C.01.21 TEA.02 20 1064 1 2165 1,3 11 650 1800 2777
C.01.22 TEA.02 20 1064 1 2165 1,3 11 650 1800 2777
C.01.23 TEA.02 20 1064 1 2165 1,3 11 650 1800 2777
C.01.24 COR.04 20 4075 1 8291 1,3 21 950 800 3136
C.01.25 COR.04 20 1 0 1,3 21 950 800 3136
C.01.26 COR.04 20 1 0 1,3 21 950 800 3136
C.01.27 ADM.04 20 1348 1 2743 1,3 11 650 1800 2777
C.01.28 ADM.08 20 1029 1 2094 1,3 15 650 1200 2306
C.01.29 ADM.08 20 1029 1 2094 1,3 15 650 1200 2306
C.01.30 ADM.08 20 1029 1 2094 1,3 15 650 1200 2306
C.01.31 STA.A1 20 2678 1 5449 1,3 21 950 1400 5488
C.01.32 WC.09 20 479 1 975 1,3 11 950 700 1257
C.01.33 WC.10 20 479 1 975 1,3 11 950 700 1257
C.01.34 SCL.02 20 966 1 1966 1,3 10 650 1800 2180
C.01.35 SCL.02 20 966 1 1966 1,3 10 650 1800 2180
C.01.36 SCL.03 20 953 1 1939 1,3 10 650 1800 2180
C.01.37 SCL.03 20 953 1 1939 1,3 10 650 1800 2180
C.01.38 SCL.04 20 953 1 1939 1,3 10 650 1800 2180
C.01.39 SCL.04 20 953 1 1939 1,3 10 650 1800 2180
C.01.40 COM.01 20 1204 1 2450 1,3 11 650 1800 2777
C.01.41 COM.01 20 1204 1 2450 1,3 11 650 1800 2777
C.01.42 COM.02 20 935 1 1902 1,3 10 650 1800 2180
C.01.43 COM.02 20 935 1 1902 1,3 10 650 1800 2180
C.01.44 COM.02 20 935 1 1902 1,3 10 650 1800 2180
C.01.45 STU.01 20 1228 1 2499 1,3 11 650 1800 2777
C.01.46 STU.01 20 1228 1 2499 1,3 11 650 1800 2777
C.01.47 STU.01 20 1228 1 2499 1,3 11 650 1800 2777
C.01.48 STU.01 20 1228 1 2499 1,3 11 650 1800 2777
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
ABETEC ARCHITECTEN & INGENIEURS NV P5/6
C.01.49 STU.01 20 1228 1 2499 1,3 11 650 1800 2777
C.01.51 COR.05 20 4181 1 8507 1,3 21 950 800 3136
C.01.52 COR.05 20 1 0 1,3 21 950 800 3136
C.01.53 COR.05 20 1 0 1,3 21 950 800 3136
C.02.01 STA.B2 20 1374 1 2796 1,3 16 950 1100 2945
C.02.02 WC.15 20 545 1 1109 1,3 15 950 700 1502
C.02.03 WC.14 20 736 1 1498 1,3 15 950 700 1502
C.02.04 SCL.17 20 1126 1 2290 1,3 11 650 1800 2777
C.02.05 SCL.17 20 1126 1 2290 1,3 11 650 1800 2777
C.02.06 SCL.16 20 1543 1 3140 1,3 15 650 1800 3460
C.02.07 ADM.11 20 1543 1 3140 1,3 15 650 1800 3460
C.02.08 SCI.03 20 1134 1 2307 1,3 11 650 1800 2777
C.02.09 SCI.03 20 1134 1 2307 1,3 11 650 1800 2777
C.02.10 SCI.03 20 1134 1 2307 1,3 11 650 1800 2777
C.02.11 SCI.02 20 1126 1 2290 1,3 11 650 1800 2777
C.02.12 SCI.02 20 1126 1 2290 1,3 11 650 1800 2777
C.02.13 SCI.01 20 1134 1 2307 1,3 11 650 1800 2777
C.02.14 SCI.01 20 1134 1 2307 1,3 11 650 1800 2777
C.02.15 SCI.01 20 1134 1 2307 1,3 11 650 1800 2777
C.02.16 SCL.11 20 1123 1 2285 1,3 11 650 1800 2777
C.02.17 SCL.11 20 1123 1 2285 1,3 11 650 1800 2777
C.02.18 SCL.10 20 1126 1 2290 1,3 11 650 1800 2777
C.02.19 SCL.10 20 1126 1 2290 1,3 11 650 1800 2777
C.02.20 SCL.09 20 1329 1 2703 1,3 11 650 1800 2777
C.02.21 SCL.09 20 1329 1 2703 1,3 11 650 1800 2777
C.02.22 COR.09 20 4982 1 10137 1,3 21 950 800 3136
C.02.23 COR.09 20 1 0 1,3 21 950 900 3528
C.02.24 COR.09 20 1 0 1,3 21 950 900 3528
C.02.25 STA.A2 20 1609 1 3274 1,3 20 950 1400 4189
C.02.26 SCL.18 20 1134 1 2307 1,3 11 650 1800 2777
C.02.27 SCL.18 20 1134 1 2307 1,3 11 650 1800 2777
C.02.28 ADM.10 20 1133 1 2305 1,3 11 650 1800 2777
C.02.29 STO.05 20 1126 1 2290 1,3 11 650 1800 2777
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
SECOND FLOOR
ABETEC ARCHITECTEN & INGENIEURS NV P6/6
C.02.30 STO.05 20 1126 1 2290 1,3 11 650 1800 2777
C.02.31 SCI.04 20 1134 1 2307 1,3 11 650 1800 2777
C.02.32 SCI.04 20 1134 1 2307 1,3 11 650 1800 2777
C.02.33 SCI.04 20 1134 1 2307 1,3 11 650 1800 2777
C.02.34 ADM.09 20 1387 1 2822 1,3 15 650 1800 3460
C.02.35 SCL.12 20 1387 1 2822 1,3 15 650 1800 3460
C.02.36 SCL.13 20 1126 1 2291 1,3 11 650 1800 2777
C.02.37 SCL.13 20 1126 1 2291 1,3 11 650 1800 2777
C.02.38 SCL.14 20 1126 1 2291 1,3 11 650 1800 2777
C.02.39 SCL.14 20 1126 1 2291 1,3 11 650 1800 2777
C.02.40 SCL.15 20 1251 1 2544 1,3 11 650 1800 2777
C.02.41 SCL.15 20 1251 1 2544 1,3 11 650 1800 2777
C.02.42 COR.07 20 3699 1 7526 1,3 21 950 800 3136
C.02.43 COR.07 20 1,3 21 950 800 3136
C.02.44 COR.07 20 1,3 21 950 800 3136
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
2,03
ABETEC ARCHITECTEN & INGENIEURS NV P1/1
FAN COIL UNITS LIST
List with specifications fan coil units
PROJECT Shape Belgian School 140229
CLIENT 31/10/2023
Description heat production
SUMMER Regime tsupply / treturn 6 / 12 °C
SUMMER Indoortemperature ti 25 °C
WINTER Regime tsupply / treturn / °C
WINTER Indoortemperature ti °C
FAN COIL Room Total QnW QVBATT QsZ QlZ Model air flow & building m³/h kW kW kW kW size
FCU1 COM.02 1092 - - 3,8 1,16
FCU2 COM.02 1092 - - 3,8 1,16
FCU3 COM.01 981 - - 3,17 0,93
FCU4 COM.01 981 - - 3,17 0,93
FCU5 COM.03 981 - - 3,22 0,91
FCU6 COM.03 981 - - 3,22 0,91
INSTALLATION DATA
WINTER SUMMER
Air flow fresh air
ROOM DATA
m³/h
Shape Belgian School 140229