Appendix E3 - Wet well_Pump sta Calc_DS.pdf

PDF 3 MB Posted

Attached to
Utility Modernization, Chievres Air Base, USAG Benelux, Belgium
Solicitation number
W912GB21R0029
Issued by

About this file

This document contains a request for proposal for utility modernization services at Chievres Air Base in Belgium. The U.S. Army Corps of Engineers is soliciting proposals for upgrades to water, wastewater, and electrical utilities at the base. Interested offerors must register to attend an in-person site visit by June 18, 2021 to receive details. The solicitation seeks design and construction services for modernizing pumping stations, water mains, sewer lines, and related infrastructure to improve base operations. Proposals are due at a later date yet to be determined. The selected contractor will be responsible for replacing aging assets to meet current standards and capacity needs at the installation in support of the Department of the Army's European Command.

View the file

Other files

File Type Posted
Appendix L Code Conflicts and Resolution.pdf PDF
Appendix E3a - Technical documentation Wet well and pump station.pdf PDF
B.08.03 W912GB21R0029 Amendment 0002 SF1442 and Price Schedule.pdf PDF
01 11 00 R001.pdf PDF
Appendix M Soil Study Report (French version).pdf PDF
Appendix E2 - Wet Well Structural Calc.pdf PDF
Chievres Replace Util_Design Analysis RTA Apr 28 2021 (No appendices).pdf PDF
Appendix E6 - Hydr Calc_Fire Alarm_Fire Pumps Datasheets.pdf PDF
B.08.03 W912GB21R0029 Amend 0002.pdf PDF
01 78 00 R001.pdf PDF
Appendix D Water Flow Tests.pdf PDF
08_CW111 R2.pdf PDF
Camera inspection Report - Runway crossing ducts.pdf PDF
Appendix C Geotechnical Report Final.pdf PDF
Appendix E4a - Technical documentation Ion exchange system.pdf PDF
Appendix E5 - Electrical technical documentation.pdf PDF
Appendix E1 - Tanks Structural Calc.pdf PDF
01 22 00 R001.pdf PDF
Appendix B Environmental Screening Report.pdf PDF
Appendix I Design Clarifications.pdf PDF
Appendix E4 - Ion Exchange Calculations.pdf PDF
08_CW110 R2.pdf PDF
B.08.03 W912GB21R0029 Amend 0001.pdf PDF
B.08.02.03 Attachment 3_Letter of Commitment Sample.docx DOCX document
B.08.02.07 11_M_100-104.pdf PDF
B.08.02 W912GB21R0029_Issued 15 JUN 21.pdf PDF
B.08.02.07 09_A_101-104.pdf PDF
B.08.02.06 Administrative Specifications_Apr 28, 2021 RTA.pdf PDF
B.08.02.07 01_G_008-014.pdf PDF
B.08.02.07 05_XD_100-121.pdf PDF
B.08.02.07 04_GC_100.pdf PDF
B.08.02.07 10_FA_FP_000-206.pdf PDF
B.08.02.01 Attachment 1_Past Performance Info Sheet.pdf PDF
B.08.02.07 07_UT_100-553.pdf PDF
B.08.02.07 12_E_100-108.pdf PDF
B.08.02.04 Attachment 4_BLA Template.docx DOCX document
B.08.02.07 08_CW_001-118.pdf PDF
B.08.02.07 01_G_001-014.pdf PDF
B.08.02.06 Technical Specifications Apr 28 2021 RTA_REV 2.pdf PDF
B.08.02.07 03_V_100-121.pdf PDF
B.08.02.08 Attachment 8_Site Visit Registration Form.xlsx XLSX spreadsheet
B.08.02.06 Submittal Register REV1.pdf PDF
B.08.02.07 02_BB_100-127.pdf PDF
B.08.02.05 Attachment 5_BLG Template.docx DOCX document
B.08.02.07 06_GP_100-503.pdf PDF
B.08.02.02 Attachment 2_PPQ.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sanitary sewer

Data coming from Utility Master Plan and Planning Charrette Report

Description Value Unit

2018 water consumption 47,000.00 m³

2018 Base Population 833.00 capita

2018 water demand / capita 151.00 L/cap

2018 water demand / day 128.704,00 L/D

Future on post population 1,869.00 cap

Future off post population 678.00 cap

Future total population 2,547.00 cap

On post personel flow 50.00 gal/cap/D

Off post personnel flow 30.00 gal/cap/D

On post personel flow m³ 2.19*E-06 m³/cap/s

Off post personnel flow m³ 1.31*E-06 m³/cap/s

Peak rate factor 4.00 /

Hypothesis

1) All new construction and facilities discharge their wastewater to the

Community support district.

2) The pumping system must be able of emptying the volume of the wet well in

1h30. Release can only be done during certain period of the day.

3) The system for measuring the water level in the wet well is triggered when the water level reaches 155 m³.

4) The volume of wastewater discharged between 10.00 and 12.00 am corresponds to one hour of peak flow and 5 hours of average flow.

5) The volume of wastewater discharged between 14.00 and 16.00 pm corresponds to half an hour of peak flow and 3.5 hours of average flow.

6) The volume of wastewater discharged between 22.00 pm and 06.00 am corresponds to one hour of peak flow and 9 hours of average flow. It was decided that the wastewater discharge between midnight and 06.00 am could be corrected by a factor of 3.

Flow definition total on post personnel flow (1) 93,450.00 gal/D total off post personnel flow (2) 20,340.00 gal/D

Total flow (1+2) 113,790.00 gal/D

Peak flow 455,160.00 gal/D

Average daily flow per capita 44.676 gal/D total on post personnel flow (3) 0.004094291 m³/s total off post personnel flow (4) 0.000891149 m³/s

Total flow (3+4) 0.00498544 m³/s

Peak flow 0.01994176 m³/s

Average daily flow per capita 1.96*E-06 m³/s

Wet well volume definition

Peak flow / Hour 18,965.00 gal/h

Wet well volume = 1h of peak flow + 5h of mean flow (longest waiting period : 4 pm to 10 pm) 42,671.25 gal

Wet well volume = 1h of peak flow + 5h of mean flow (longest waiting period : 4 pm to 10 pm) 161.53 m³

Wet well storage volume 162.00 m³ detection level 155.00 m³

Total Dynamic Head (TDH)

Based on the Utility Map of CAB and on the results of the topographic survey, it is possible to compute the total dynamic head (TDH).

To do this, the Colebrook-White model was used with the following parameters :

- Flow : 115 m³/h

- Viscosity: 1.569 mm²/s

- Number of pumps: 2

- Type of installation: parallel pumps

- Geometrical height: 8 m the individual discharge piping inside the wet well will be made of metal / stainless steel and will have a diameter of 100 mm (DN 100) to ensure maximum longevity.

- Pipe length: 8 m

- Roughness: 0.25 mm

- Elbows 90°, non-return valve, T-connections, … : 1.9 m

- Speed : 1.681 m/s

This shows that the pressure losses inside the wet well created by the installations are equivalent to 0.5412 m

As far as the common discharge pipe is concerned, it will be made of HDPE with a diameter of 200 mm (DN 200).

- Pipe length: 450 m

- Roughness: 0.25 mm

- Elbows 90° : 10.8 m

- Exit : 1 m

The pressure drop obtained on the force main is 5.357 m

By adding the two pressure losses obtained above, as well as the static discharge pressure.

This gives a total head of 13.9 m.

Pumps definition

The flow rate and the total dynamic head made it possible to find the most suitable pump operating point for this project as shown in the diagram below.

Qté Ref. Description Prix unitaire Prix brut

SP Chièvres 3 Concertor N80-3800 0,00 0,00

Sous-total: 0,00 0,00

Prix total HT % TVA Prix total TTC

210,00 EUR 0,00 EUR

Spécification produit

Xy lem

10/13/202010/13/2020TPF - Base de Chièv res Oliv ier ANDRE

Projet N° du projet Mise à jourCréé par Créé le

BELGIUM-

Destinataire De

40 °C Température maxi fluide

La pompe pour eaux usées la plus intelligente du marché. Convient aux exploitants de stations de pompage traditionnelles "marche/arrêt" qui souhaitent bénéficier de fonctions de reparamétrage des performances de la pompe, de détection de colmatage et de nettoyage de la pompe, de démarrage progressif, de fonctionnement à puissance constante et de protection du moteur.

Hauteur mano.

68,1%

[m]

0 20 40 60 80 100 120 [m³/h]

Concertor N80-3800

170 mm

Nombres de canaux

Spécifications techniques

P - Installation immergée sur pied d'assise

Configuration

80 mm

Impeller diameter 170 mm

Discharge diameter 80 mm

Motor number Type d'Installation

0N6020.091 18-08-1AZ-W

4KW

Inlet diameter

Maximum operating speed 800-2600 1/min

Materials

Curves according to:

Pump information

Discharge diameter

100 mm

Impeller diameter

Roue Hard-Iron

Eau, claire [100%],4 °C,999,9 kg/m³,1,569 mm²/s

Curve: ISO 9906

SP Chièvres TPF - Base de Chièvres 10/13/2020Mise à jour

Créé le 10/13/2020 Olivier ANDRECréé parProjet

Bloc

Motor efficiency class IE4 according to IEC/TS 60034-30-2 Ed. 1

Facteur de puissance - 1/1 de charge 0,94

Facteur de puissance - 3/4 de charge 0,94

Facteur de puissance - 1/2 de charge 0,93

Rendement moteur - 1/1 de charge 89,0 %

Rendement moteur - 3/4 de charge 89,0 %

Rendement moteur - 1/2 de charge 90,0 %

Vitesse nominale - 1/1 de charge (200-240V)Vitesse nominale - 1/1 de charge (380-480V) 1150 2300

Vitesse nominale - 3/4 de charge (200-240V)

Vitesse nominale - 1/2 de charge (200-240V)

Vitesse nominale - 3/4 de charge (380-480V)

Vitesse nominale - 1/2 de charge (380-480V)

Concertor N80-3800 Spécifications techniques Motor - General

Fréquence Tension nominale

Puissance nominaleViitesse nominale

Intensité nominale

400 V

4 kW800-2600 1/min

7,11 A

3~0N6020.091 18-08-1AZ-W 4KW

Phases

Intensité de démarrage 7,11 A

Motor number

Certification

50 Hz

Classe d'isolation H

Type de service

Motor - Technical

S1No

SP Chièvres TPF - Base de Chièvres 10/13/2020Mise à jour

Créé le 10/13/2020

Concertor N80-3800 Courbe de performances Point de fonctionnement

14,3 m59,5 m³/h Hauteur mano.Débit

Curves according to:

Hauteur mano.

Rendement pompe Rendement global

Puissance absorbée P1 Puissance à l'arbre P2

Valeurs de NPSHR

70,9% Rend.

30039,4%

68,1%

14,3 m

67,3 %

59,1 %

3,45 kW

3,93 kW

2,99 m 59,5 m³/h

14,3 m

67,3 %

59,1 %

3,45 kW

3,93 kW

2,99 m 59,5 m³/h

14,3 m

67,3 %

59,1 %

3,45 kW

3,93 kW

2,99 m 59,5 m³/h

7800 (P2)

300 (P2)

3800 (P2)

14,3 m

67,3 %

59,1 %

3,45 kW

3,93 kW

2,99 m 59,5 m³/h

7800 (P1)

300 (P1)

3800 (P1)

14,3 m

67,3 %

59,1 %

3,45 kW

3,93 kW

2,99 m 59,5 m³/h

14,3 m

67,3 %

59,1 %

3,45 kW

3,93 kW

2,99 m 59,5 m³/h

[m]

[kW]

[m]

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 [m³/h]

Eau, claire [100%],4 °C,999,9 kg/m³,1,569 mm²/s

Curve: ISO 9906

SP Chièvres TPF - Base de Chièvres 10/13/2020Mise à jour

Créé le 10/13/2020

Pumps / Débit Hauteur Puissance à Débit Hauteur Puissance à Rend. Hydr. Energie NPSHre Systems mano. l'arbre mano. l'arbre spécifique

2 / 1 59,5 m³/h 14,3 m 3,45 kW 119 m³/h 14,3 m 6,9 kW 67,3 % 0,0661 kWh/m³ 2,99 m

Concertor N80-3800 Duty Analysis

Curves according to: Eau, claire [100%] ; 4°C; 999,9kg/m³; 1,569mm²/s

Hauteur mano.

38003800

68,1%

14,3 m

119 m³/h

[m]

0 20 40 60 80 100 120 140 160 180 200 220 240 260 [m³/h]

Operating characteristics

TPF - Base de Chièvres 10/13/2020Mise à jour

Créé le 10/13/2020

Pumps / Débit Hauteur Puissance à Débit Hauteur Puissance à Rend. Hydr. Energie NPSHre Systems mano. l'arbre mano. l'arbre spécifique

1 / 1 75,7 m³/h 11,2 m 3,45 kW 75,7 m³/h 11,2 m 3,45 kW 67 % 0,0519 kWh/m³ 3,64 m

Concertor N80-3800 Duty Analysis

Curves according to: Eau, claire [100%] ; 4°C; 999,9kg/m³; 1,569mm²/s

Hauteur mano.

38003800

68,1%

14,3 m

119 m³/h

[m]

0 20 40 60 80 100 120 140 160 180 200 220 240 260 [m³/h]

Operating characteristics

TPF - Base de Chièvres 10/13/2020Mise à jour

Créé le 10/13/2020

Plan d'encombrement

DN80

Weight Pump Stand kg 108 34

Ref. line

O ut let c en te r l ine

S cale Date

RevisionDrawing number

S uction inlet

P ump inlet

P ump outlet

Discharge outletNP 6020 HT

DN 80

DN 80 1:10 180628

8033900 3

40386

2" Guide bars

Z-Z

Z Z

SP Chièvres TPF - Base de Chièvres 10/13/2020Mise à jour

Créé le 10/13/2020

Equipements de télésurveillance et de contrôle

SP Chièvres TPF - Base de Chièvres 10/13/2020Mise à jour

Créé le 10/13/2020

Type Ø (mm)

? ou L Qté v (m/s) k (mm)

ΔH

(m)

Ø = Diamètre v = Vitesse k = Rugosité ΔH = Pertes de charge géométriques

Tuyauterie de refoulement individuelle - Metal / Acier inox PN 10 / DN 100 (104x2,0 mm) / EN 10 217/ DIN 2413

Longueur de la tuyauterie 110 8 m 1 1,681 0,25 0,2676

Pied d'assise 110 0,3 1 1,681 0,04319

Coude à 90° 110 0,3 1 1,681 0,04319

Clapets anti-retour 110 0,9 1 1,681 0,1296

Raccords en T 110 0,4 1 1,681 0,05759

Pertes de charge totales 0,5412

Conduite de refoulement commune - Plastic / PE100 (HDPE) PE 4710 SDR 17 (PN 10) / DN 200 (200x11,9 mm) / DIN 8074/75 /EN 13244

Longueur de la tuyauterie 176,2 450 m 1 1,31 0,25 5,113

Coude à 90° 176,2 1,8 6 1,31 0,1575

Sortie 176,2 1 1 1,31 0,08748

Pertes de charge totales 5,357

Pertes de charge 5,899 m

Pression de refoulement statique 8 m

Hauteur mano. totale 13,9 m

Calcul de pertes de charge

Liquide pompé Hauteur géo.

Pompes en parallèle

Type d'installationViscosité

1,569 mm²/s

Modèle de calcul

Colebrook-White

Nombre de pompes

Débit

115 m³/h

Options de représentation

Installation submersible8Eau, claire