This document provides pricing and payment procedures for a utility modernization project at Chievres Air Base in Belgium. The project includes construction of new domestic water and fire water utility services, an ion exchange treatment system, and options for an additional treatment system, wastewater utility including a force main connection, and removal of existing valves and fittings. Payment will be made as jobs are completed for the base work and optional items. The base work includes all demolition, trenching, paving and landscaping to support the utility elements. The options would be awarded separately and exercising one option does not require awarding others. This request for proposal was issued by the Department of the Army European Command for the utility modernization at Chievres Air Base in Belgium. Interested offerors must register to attend an upcoming site visit by 18 June 2021.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01 22 00 Page 1 (Revised 27 Jul 21)
SECTION 01 22 00
PRICE AND PAYMENT PROCEDURES
01/21
PART 1 GENERAL
1.1 PAYMENT TYPES
The costs for performance of any work required by the contract which is not associated with a specific base or option item description shall be included in the first base item (Base Item 001).
1.1.1 Single Job Payment Items
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the PRICE SCHEDULE and described below.
All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.
The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.2 SUBMITTALS
Not Used
1.3 SCHEDULE OF ITEMS: BASE ITEMS
1.3.1 Base Item 001: Utility Repairs
Unit of Measure: Job.
Payment will be made for costs associated with the construction of the new domestic water utility services and connections, ion exchange treatment system in the Operations District, and new fire water utility services including fire water tanks and pumphouse with associated mechanical and electrical components as indicated in the SECTION 01 11 00 and shown on the contract documents, with the exceptions of the bid options listed below. This work shall include all applicable demolition, trenching, paving, landscaping work to support the work elements contained in this item.
1.4 SCHEDULE OF ITEMS: OPTION ITEMS
SECTION 01 22 00 Page 2 (Revised 27 Jul 21)
1.4.1 Awarding of Options
The Government reserves the right to award any option or combination of options in any order and the exercise of any option will not commit the Government to award any other option(s).
1.4.2 Option 1: Item 002: Ion Exchange Treatment System (Brugelette)
Payment will be made for costs associated with one Ion Exchange Treatment system located in the Community Support District at the Brugelette water utility connection as indicated in the SECTION 01 11 00 and shown on the contract documents. This work shall include all applicable demolition, trenching, paving, landscaping work to support the work elements contained in this item.
1.4.3 Option 2: Item 003: Wastewater utility including Sanitary Sewer Force Main connection with Brugelette
Payment will be made for costs associated with wastewater utility including sanitary sewer force main with connection to municipal utility in Brugelette, and wastewater treatment storage vault (wet well) as indicated in the SECTION 01 11 00 and shown the contract documents. This work shall include all applicable demolition, trenching, excavation, paving, landscaping work to support the work elements contained in this item.
1.4.4 Option 3: Item 004: Removal of existing valve boxes, gate valves and fittings
Unit of Measure: Job
Payment will be made for costs associated with the removal of existing valve boxes, gate valves and fittings as indicated in SECTION 01 11 00and shown on the contract documents. This work shall include all applicable demolition, trenching, paving, landscaping work to support the work elements contained in this item.
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section -