01 22 00 R001.pdf

PDF 60 KB Posted

Attached to
Utility Modernization, Chievres Air Base, USAG Benelux, Belgium
Solicitation number
W912GB21R0029
Issued by

About this file

This document provides pricing and payment procedures for a utility modernization project at Chievres Air Base in Belgium. The project includes construction of new domestic water and fire water utility services, an ion exchange treatment system, and options for an additional treatment system, wastewater utility including a force main connection, and removal of existing valves and fittings. Payment will be made as jobs are completed for the base work and optional items. The base work includes all demolition, trenching, paving and landscaping to support the utility elements. The options would be awarded separately and exercising one option does not require awarding others. This request for proposal was issued by the Department of the Army European Command for the utility modernization at Chievres Air Base in Belgium. Interested offerors must register to attend an upcoming site visit by 18 June 2021.

View the file

Other files

File Type Posted
Appendix L Code Conflicts and Resolution.pdf PDF
Appendix E3a - Technical documentation Wet well and pump station.pdf PDF
B.08.03 W912GB21R0029 Amendment 0002 SF1442 and Price Schedule.pdf PDF
01 11 00 R001.pdf PDF
Appendix M Soil Study Report (French version).pdf PDF
Appendix E2 - Wet Well Structural Calc.pdf PDF
Chievres Replace Util_Design Analysis RTA Apr 28 2021 (No appendices).pdf PDF
Appendix E6 - Hydr Calc_Fire Alarm_Fire Pumps Datasheets.pdf PDF
B.08.03 W912GB21R0029 Amend 0002.pdf PDF
01 78 00 R001.pdf PDF
Appendix D Water Flow Tests.pdf PDF
08_CW111 R2.pdf PDF
Camera inspection Report - Runway crossing ducts.pdf PDF
Appendix C Geotechnical Report Final.pdf PDF
Appendix E4a - Technical documentation Ion exchange system.pdf PDF
Appendix E5 - Electrical technical documentation.pdf PDF
Appendix E1 - Tanks Structural Calc.pdf PDF
Appendix B Environmental Screening Report.pdf PDF
Appendix I Design Clarifications.pdf PDF
Appendix E3 - Wet well_Pump sta Calc_DS.pdf PDF
Appendix E4 - Ion Exchange Calculations.pdf PDF
08_CW110 R2.pdf PDF
B.08.03 W912GB21R0029 Amend 0001.pdf PDF
B.08.02.03 Attachment 3_Letter of Commitment Sample.docx DOCX document
B.08.02.07 11_M_100-104.pdf PDF
B.08.02 W912GB21R0029_Issued 15 JUN 21.pdf PDF
B.08.02.07 09_A_101-104.pdf PDF
B.08.02.06 Administrative Specifications_Apr 28, 2021 RTA.pdf PDF
B.08.02.07 01_G_008-014.pdf PDF
B.08.02.07 05_XD_100-121.pdf PDF
B.08.02.07 04_GC_100.pdf PDF
B.08.02.07 10_FA_FP_000-206.pdf PDF
B.08.02.01 Attachment 1_Past Performance Info Sheet.pdf PDF
B.08.02.07 07_UT_100-553.pdf PDF
B.08.02.07 12_E_100-108.pdf PDF
B.08.02.04 Attachment 4_BLA Template.docx DOCX document
B.08.02.07 08_CW_001-118.pdf PDF
B.08.02.07 01_G_001-014.pdf PDF
B.08.02.06 Technical Specifications Apr 28 2021 RTA_REV 2.pdf PDF
B.08.02.07 03_V_100-121.pdf PDF
B.08.02.08 Attachment 8_Site Visit Registration Form.xlsx XLSX spreadsheet
B.08.02.06 Submittal Register REV1.pdf PDF
B.08.02.07 02_BB_100-127.pdf PDF
B.08.02.05 Attachment 5_BLG Template.docx DOCX document
B.08.02.07 06_GP_100-503.pdf PDF
B.08.02.02 Attachment 2_PPQ.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 22 00 Page 1 (Revised 27 Jul 21)

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

01/21

PART 1 GENERAL

1.1 PAYMENT TYPES

The costs for performance of any work required by the contract which is not associated with a specific base or option item description shall be included in the first base item (Base Item 001).

1.1.1 Single Job Payment Items

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the PRICE SCHEDULE and described below.

All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.

The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.2 SUBMITTALS

Not Used

1.3 SCHEDULE OF ITEMS: BASE ITEMS

1.3.1 Base Item 001: Utility Repairs

Unit of Measure: Job.

Payment will be made for costs associated with the construction of the new domestic water utility services and connections, ion exchange treatment system in the Operations District, and new fire water utility services including fire water tanks and pumphouse with associated mechanical and electrical components as indicated in the SECTION 01 11 00 and shown on the contract documents, with the exceptions of the bid options listed below. This work shall include all applicable demolition, trenching, paving, landscaping work to support the work elements contained in this item.

1.4 SCHEDULE OF ITEMS: OPTION ITEMS

SECTION 01 22 00 Page 2 (Revised 27 Jul 21)

1.4.1 Awarding of Options

The Government reserves the right to award any option or combination of options in any order and the exercise of any option will not commit the Government to award any other option(s).

1.4.2 Option 1: Item 002: Ion Exchange Treatment System (Brugelette)

Payment will be made for costs associated with one Ion Exchange Treatment system located in the Community Support District at the Brugelette water utility connection as indicated in the SECTION 01 11 00 and shown on the contract documents. This work shall include all applicable demolition, trenching, paving, landscaping work to support the work elements contained in this item.

1.4.3 Option 2: Item 003: Wastewater utility including Sanitary Sewer Force Main connection with Brugelette

Payment will be made for costs associated with wastewater utility including sanitary sewer force main with connection to municipal utility in Brugelette, and wastewater treatment storage vault (wet well) as indicated in the SECTION 01 11 00 and shown the contract documents. This work shall include all applicable demolition, trenching, excavation, paving, landscaping work to support the work elements contained in this item.

1.4.4 Option 3: Item 004: Removal of existing valve boxes, gate valves and fittings

Unit of Measure: Job

Payment will be made for costs associated with the removal of existing valve boxes, gate valves and fittings as indicated in SECTION 01 11 00and shown on the contract documents. This work shall include all applicable demolition, trenching, paving, landscaping work to support the work elements contained in this item.

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section -

File details come from the government source that posted it. Updated .