01 11 00 R001.pdf

PDF 70 KB Posted

Attached to
Utility Modernization, Chievres Air Base, USAG Benelux, Belgium
Solicitation number
W912GB21R0029
Issued by

About this file

This document package includes a technical specification section and a related federal contract opportunity notice. The technical specification covers repairs and upgrades to utility infrastructure at Chievres Air Base in Belgium, including the domestic water supply, fire protection water system, and sanitary sewer system. The scope of work involves replacing and upgrading various system components, including water mains and service lines, fire water storage tanks, a sanitary sewer force main, and associated buildings to house new equipment. The contract opportunity is a request for proposal from the Department of the Army for the utility modernization project at Chievres Air Base. Interested offerors must register to attend an upcoming pre-proposal site visit. Proposals are due by the dates specified in the solicitation.

View the file

Other files

File Type Posted
Appendix L Code Conflicts and Resolution.pdf PDF
Appendix E3a - Technical documentation Wet well and pump station.pdf PDF
B.08.03 W912GB21R0029 Amendment 0002 SF1442 and Price Schedule.pdf PDF
Appendix M Soil Study Report (French version).pdf PDF
Appendix E2 - Wet Well Structural Calc.pdf PDF
Chievres Replace Util_Design Analysis RTA Apr 28 2021 (No appendices).pdf PDF
Appendix E6 - Hydr Calc_Fire Alarm_Fire Pumps Datasheets.pdf PDF
B.08.03 W912GB21R0029 Amend 0002.pdf PDF
01 78 00 R001.pdf PDF
Appendix D Water Flow Tests.pdf PDF
08_CW111 R2.pdf PDF
Camera inspection Report - Runway crossing ducts.pdf PDF
Appendix C Geotechnical Report Final.pdf PDF
Appendix E4a - Technical documentation Ion exchange system.pdf PDF
Appendix E5 - Electrical technical documentation.pdf PDF
Appendix E1 - Tanks Structural Calc.pdf PDF
01 22 00 R001.pdf PDF
Appendix B Environmental Screening Report.pdf PDF
Appendix I Design Clarifications.pdf PDF
Appendix E3 - Wet well_Pump sta Calc_DS.pdf PDF
Appendix E4 - Ion Exchange Calculations.pdf PDF
08_CW110 R2.pdf PDF
B.08.03 W912GB21R0029 Amend 0001.pdf PDF
B.08.02.03 Attachment 3_Letter of Commitment Sample.docx DOCX document
B.08.02.07 11_M_100-104.pdf PDF
B.08.02 W912GB21R0029_Issued 15 JUN 21.pdf PDF
B.08.02.07 09_A_101-104.pdf PDF
B.08.02.06 Administrative Specifications_Apr 28, 2021 RTA.pdf PDF
B.08.02.07 01_G_008-014.pdf PDF
B.08.02.07 05_XD_100-121.pdf PDF
B.08.02.07 04_GC_100.pdf PDF
B.08.02.07 10_FA_FP_000-206.pdf PDF
B.08.02.01 Attachment 1_Past Performance Info Sheet.pdf PDF
B.08.02.07 07_UT_100-553.pdf PDF
B.08.02.07 12_E_100-108.pdf PDF
B.08.02.04 Attachment 4_BLA Template.docx DOCX document
B.08.02.07 08_CW_001-118.pdf PDF
B.08.02.07 01_G_001-014.pdf PDF
B.08.02.06 Technical Specifications Apr 28 2021 RTA_REV 2.pdf PDF
B.08.02.07 03_V_100-121.pdf PDF
B.08.02.08 Attachment 8_Site Visit Registration Form.xlsx XLSX spreadsheet
B.08.02.06 Submittal Register REV1.pdf PDF
B.08.02.07 02_BB_100-127.pdf PDF
B.08.02.05 Attachment 5_BLG Template.docx DOCX document
B.08.02.07 06_GP_100-503.pdf PDF
B.08.02.02 Attachment 2_PPQ.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Utility Repair Project (Domestic Water, Fire Protection, and Sanitary Sewer System)

Section 01 11 00 Page 1 (R001, Dated July 16, 2021)

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Salvage Plan; G

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes repair of utility infrastructure components to the potable domestic water supply, fire protection water system, and sanitary sewer system and incidental related work.

Item 0001 Repairs to the domestic water supply include upsizing the potable domestic water supply main lines and repairs to service lines, at the Chievres and Brugelette connection points, installation of backflow preventers, repairing service connections and construction of an ion exchange system in the Operations District. Repairs to the fire protection water supply include separating the fire water from the potable domestic water supply system, upsizing the fire loop, and construction of 2 new 1,450 cubic meter fire water tanks and a fire booster pump house, which will house two fire pumps, each rated at 2,500 gpm (9,462 L/min) at 140 psi (9.7 bar).

Repairs to the sanitary sewer system include the replacement of a segment of the existing sanitary sewer force main conveying effluent from the existing sanitary sewer lift station toward Gate 13 in the Operations District. Work includes the construction of an approximately 45 square meter buildings to house the ion exchange system and an approximately 65 square meter building to house the fire pumps.

Option Item 0002 Construction of an ion exchange system in the Community Support District near the Brugelette connection point and an approximately 45 square meter building to house the system.

Option Item 0003 Repairs to the sanitary sewer system located in the Community Support District include the construction of a wet well storage tank and sewer pump, new force main lines, blow off valves and connection for all sewage flows to the municipal sanitary sewer facilities in the City of Brugelette.

Option Item 0004 Removal of existing valve boxes, gate valves and fittings on the domestic water service lines. Base item as shown on the drawings is for abandonment of these items file://corp.pbwan.net/US/CentralData/USFDW100/PROJECT/SPECSINTACT/SPECS/Jobs/193690003/prntdata/Word/01%2033%2000.docx

Section 01 11 00 Page 2 (R001, Dated July 16, 2021)

All utility system repairs will require significant trenching of utility runs, site restoration to include pavement repairs and landscape restoration of softscape areas.

1.2.2 Location

The work is located at the Chievres Air Base in Belgium, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.4 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.5 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation and comply with Installation requirements for locating and marking underground utilities.

Contact local utility locating service a minimum of 48 hours] prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered.

Verify the elevations of existing piping, utilities, and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed.

Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.5.1 Notification Prior to Excavation

Notify the Contracting Officer at least 48 hours prior to starting excavation work.

1.9 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area.

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

Section 01 11 00 Page 3 (R001, Dated July 16, 2021)

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

PART 1 GENERAL
1.1 SUBMITTALS
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Location
1.4 EXISTING WORK
1.5 LOCATION OF UNDERGROUND UTILITIES
1.5.1 Notification Prior to Excavation

1.9 SALVAGE MATERIAL AND EQUIPMENT

PART 2 PRODUCTS
PART 3 EXECUTION