ATTACHMENT 1.12 DRAFT - APPENDIX F- COMPONENT UNIQUE IDENTIFIER.pdf
PDF 204 KB Posted
- Solicitation number
- W912DY25RRMMR
About this file
This document appears to be Appendix F - Component Unique Identifier (CUID) from a federal contract opportunity. It provides a detailed list of component acronyms and their corresponding Unified Facilities Criteria (UFC) section references for various equipment and systems associated with federal petroleum facilities and petroleum systems. The CUID is the standard for all DLA capitalized equipment and contractors may use additional tracking/labeling methods as long as they correlate to the CUID.
The related federal contract opportunity is for the Fuel Program Recurring Maintenance and Minor Repair (RMMR) program, which provides comprehensive maintenance and repair services for the U.S. Government's worldwide fueling capability. The program is divided into Recurring Maintenance, following UFC 3-460-03 criteria, and Minor Repair, providing corrective action for deficiencies. The contract requires experience in repair, maintenance, and operation of federal petroleum facilities and systems to ensure compliance with applicable codes, criteria, regulations, and laws. This acquisition does not include Architect/Engineering or construction services.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX F - Component Unique Identifier (CUID)
Component Unique Identifier:
Example:
DLA Work Type Category UFC Section Reference Work Category (Revised per Change 1, 29 April 2021)
Component Acronym
Air Compressors Air Compressors AIRC Externally Mounted Level Alarms (Section 8-9.9.1) EMLA
Internally Mounted Level Alarms (Section 8-9.9.3) IMLA
Bollard Bollards BLRD Building HVAC BHVAC Building Domestic Water System BWTR Building Waste Water BWSW Building - Lighting BLTG Building - Architectural BARCH Building - Fire Sprinkler System BFIRE Containment Systems (General) (Section 8-10.1) CSGEN Concrete and Cement Brick Dike/Berm Walls (Section 8-
10.2.1) DKBW
Dike/Berm Floors (Section 8-10.2.2) DKBF Earthen Dike Walls (Section 8-10.3) ETHDW Self-Diking or Vaulted Tank Containment (Section 8-10.4) SDVTCS Flexible Membrane Liners (Section 8-10.5) FXML
Fuel Truck and Rail Car Containment Areas (Section 11-1.1) FTKRCC
Remote Spill Containment (Section 11-1.2) RSCS Piers and Wharves Fuel Containment Systems (Section 5- 1.2) - Testing FPWCT
Fuel Pier/Wharf Containment (PWS Section 3) FPWC
Corrosion Control/Coatings Aboveground Piping and Equipment Coatings (Section 6-
10.1) AGPCT
Miscellaneous Miscellaneous Deactivated Components (Section 12-5) MDEAC Electrical/Lighting Lighting (Section 9-1.8) LIGHT
Electrical Equipment (Section 9-1.2) ELEQ Power Cables (Section 9-1.3) PWRCBL Motor Controls (Section 9-1.4) MTRCT Panelboards (Section 9-1.5) PNLB Electric Motors (Section 9-1.7) ELEMT Electronic Equipment (9-1.9) ELTREQ Card and Key Locks (Section 9-3) CKLK Power Grounding Systems (Section 9-1.6.1) PWRGS Static Grounding Systems (Section 9-1.6.2) STGS Cathodic Protection (Section 9-2.1) CP Lightning Surge Arresters (Section 9-2.2.1) LSAR Lightning Protection Systems (Section 9-4) LPTS Ground Verification System (Section 9-5) GRVS Electronic Overfill Protection Systems (Section 9-6) EOPS
Eyewash/Shower Emergency Eyewash/Showers (Section 11-3) EMEWSH
Fencing FENC
Gates GATE Pre-Filters (Section 3-6.1) PFVSL Filter Separators (Section 3-6.2) FLSP Haypack Filters (Section 3-6.3) HPKF Basket Strainers (Section 3-6.4) BSTR
Filter Separator Sump Heaters (Section 3-6.5) FSSH
Sidestream Filtration Systems (Section 8-9.11) SSFTS
Flame Arrestors (Section 8-9.5) FLMARR
Foam Fire Protection Systems (Section 8-9.15) FFPS Fire Protection Systems - Wet Pipe FPRS
Fuel Laboratories Ventilation Hoods (Section 11-4.1) VENTHD Pressure and Pressure/Vacuum Gauges (Section 6-7.1) PVGA Differential Pressure Gauges (Section 6-7.2) DPGA Mechanical Tape Gauges (Section 8-9.7) MTGA Mechanically Operated Tape Gauge (Section 8-9.8.1) MOTGA Magnetostrictive Probes (Section 8-9.8.2) MRPRB Servo Gauge (Section 8-9.8.3) SRVGA
Generators Back-Up Power Generators BGEN Steam Type Heating Coils (Section 8-9.16.1) STHC
Thermal Fluid Type Heating Coils (Section 8-9.16.2) TFTHC
Electric Rod Type Heating (Section 8-9.16.3) ERTH
Loading Fuel Hoses (Section 3-9.1) LDHS Offloading Fuel Hoses (Section 3-9.2) OLHS Aircraft Fueling Hoses (Section 4-7.5) ACFHS
Hydrazine Hydrazine Charging Units (Section 10-3) HDZCU Trouble Shoot TRBST API 510 Inspections API510 API 653 or STI Inspection API653 Coatings Condition Survey CCS Dispenser Nozzles (Section 7-2) DSNZ Dispenser Hoses (Section 7-3) DSHS Breakaways (Section 7-4) DSBW Swivels (Section 7-5) DSSW Hose Retriever (Section 7-6) HSRTV Dispenser Cabinet (Section 7-7) DSCB Dispenser Meters (Section 7-8) DSMTR Dispenser Filters (Section 7-9) DSFLR Dispenser Strainers (Section 7-10) DSSTR Ground Vehicle Fuel Piping (Section 7-11) GVFP
Hoses
Inspections
Fencing/ Gates
Filtration
Fire Suppression Equipment
Gauges
Heating Coils
Containment/Joints
Electrical/Power
Electrical/Protection
NOTE: If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment
Site Code-Facility #-Component Acronym-Sequential #
AAD-00063A-RCVL-0001
Alarms
Building
Example:
DLA Work Type Category UFC Section Reference Work Category (Revised per Change 1, 29 April 2021)
Component Acronym
NOTE: If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment
Site Code-Facility #-Component Acronym-Sequential #
AAD-00063A-RCVL-0001
Emergency Shutoff Valves (Shear Valves) (Section 7-12) ESHVL Dispenser Sumps (Section 7-13) DSSMP Transition Sumps (Section 7-14) TRSMP Remote Dispenser Pumps (Section 7-15.1) RDSP Self-Contained Dispenser Pumps (Section 7-15.2) SCDSP EFSO Systems (Section 7-16) EFSO Stage I Vapor Recovery (Section 7-17.1) SIVP Stage II Vapor Recovery (Section 7-17.2) SIIVP Vapor Burners (Section 7-17.3) VPBNR Point Sensor - Dry (Section 7-19.1.1) PSDRY Automatic Line Leak Detector (Section 7-19.1.2) ALLD Visual Monitoring (Section 7-20.1) VSLM Marine Receipt (Section 5-2) MRNRCP Marine Issue (Section 5-3) MRNISU Marine Loading Arms (Section 5-4) MRNLA Marine Transfer Hoses (Section 5-5.1) MBTHS Underwater Hoses (Section 5-5.2) UWHS Single Point Mooring Systems (Section 5-7.1) SPMSS Multi Point Mooring Systems (Section 5-7.2) MPMSS Submerged Piping Systems (Section 5-8) SMPS Boom Reels (Section 5-9) BMRL Liquefied Petroleum Tanks (Section 10-1.1) LPTANK Liquefied Petroleum Pipelines (Section 10-1.2) LPPIPE
Liquefied Petroleum Vapor Lines (Section 10-1.3) LPVPL
LPG Vaporizers (Section 10-1.4) LPGVPZ
Petroleum Gas Regulators (Section 10-1.5) PGREG
Liquefied Petroleum Gas Hoses (Section 10-1.6) LPGHS
Positive Displacement Meters (Section 3-7.1) PDMT Turbine Flow Meters (Section 3-7.2) TBFMT Orifice Flow Meters (Section 3-7.3) OFMT
Natural Disaster Natural Disaster CNG Piping (Section 10-2.1) NGPIPE
CNG Compressors (Section 10-2.2) NGCOMP
CNG Storage (Section 10-2.3) NGSTOR
CNG Dispensers (Section 10-2.4) NGDS
CNG Dispenser Hoses (Section 10-2.5) NGDSHS
Hydrant Adapters (Section 4-7.2) HADP
Fueling Nozzles (Section 4-7.3) FLNZ Other Fuel Additive Injectors (Section 3-11) FAIJ
Fixed Pantographs (Section 4-7.1.1) FXPNT Detachable Pantographs (Section 4-7.1.2) DTPNT On-Base Pipelines (Section 6-1.1) OBPL Non-DOT Regulated (Section 6-1.2.1) NDPL Aboveground Piping (Section 6-1.3) AGPL Double-Wall Piping (Section 6-1.4) DWPL Low Point Drains (Section 6-12.1) LPDN High Point Vents (Section 6-12.2) HPVT Sight Flow Indicators (Section 6-12.3) SFND Rope Sensor Systems (Section 6-13.1.1) RPSS Point Sensor - Dry (Section 6-13.1.2) PSDRY Visual Monitoring (Section 6-14.1) VSLM Pipe Penetrations (Section 8-10.6) PPEN Deactivated Petroleum Fuel Pipelines (Section 12-3) DEACPL Air Eliminator Tanks (Section 3-10.1) AELT Automatic Air Vents (Section 3-10.2) AAVT Surge Suppressors (Section 4-7.4) SRGSP Thermal and Pressure Relief Valves (Section 6-6.3) TPRVL Pressure Transmitters (Section 6-7.3) PRTR Differential Pressure Transmitters (Section 6-7.4) DPTR Flexible Ball Joints (Section 6-8) FBLJT Dial Thermometer (Section 6-9.1) DTHMR Emergency Vents (Section 8-9.4) EMGVT Centrifugal Pumps (Section 3-8.1) CENP Vertical Inline Pumps (Section 3-8.2) VILP
Vertical Turbine/Submerged Turbine Pumps (Section 3-8.3) VTSP
Sliding Vane Pumps (Section 3-8.5) SLVP Gear Pumps (Section 3-8.6) GERP Diaphragm Pumps (Section 3-8.7) DIAP
Internal Combustion Drives (Section 3-8.8) ICDR
Gearboxes (Section 3-8.9) GRBX
Deactivated Petroleum Fuel Pumps (Section 12-4) DEACP
Signage/Markings Signage and Markings (Section 2-7) SIGN Pumphouse/Filter Buildings (Section 11-2.1) PFBLDG Canopies (Section 11-2.2) CNPY Cranes and Hoists (Section 11-6) CRNHST Aboveground Field-Erected Tanks (Section 8-4) AGFET Geodesic Dome Roofs (Section 8-4.2) GEODR Foundations (Section 8-4.3) FOUND
Pressure/Temperature Control
Pump
Structures
Meter/ calibrations
Natural Gas
Nozzle
Pantograph
Piping
Issue/Receive - Ground
Issue/Receive - Marine
Liquefied Petroleum
Example:
DLA Work Type Category UFC Section Reference Work Category (Revised per Change 1, 29 April 2021)
Component Acronym
NOTE: If component acronym is not listed, the contractor shall request an acronym be established through the HNC Project Manager and Project Engineer via email. Contractors may utilize other means of tracking/labeling assets such as QR codes in addition to the required CUID however, tracking/labeling must correlate with the CUID. This CUID shall be the standard for all DLA capitalized equipment
Site Code-Facility #-Component Acronym-Sequential #
AAD-00063A-RCVL-0001
Aboveground Shop Fabricated Tanks (Section 8-5.1) AGSFP Self-Diking or Vaulted Tanks (Section 8-5.2) SDVT Rectangular Concrete-Encased Tanks (Section 8-5.3) RCET Single-Walled Underground Shop-Fabricated Tanks (Section
8-5.4.1) UGSSFT
Double-Walled Underground Shop-Fabricated Tanks (Section
8-5.4.2) UGDSFT
Underground Field-Constructed Tanks (Cut and Cover Tanks) (Section 8-6) UGFET
Tank Cleaning (Section 8-7) TCLEAN Aluminum Honeycomb Floating Pans (Section 8-9.1.1) AHFP Steel Floating Pans (Section 8-9.1.2) STLFP Pontoon Floating Pans (Section 8-9.1.3) PTNFP Floating Roofs (Section 8-9.1.4) FLTRF Floating Roof and Pan Pressure/Vacuum Vents (Section 8-
9.1.5) FPPVV
Floating Roof and Pan Legs (Section 8-9.1.6) FRPLG Secondary Tank Bottoms (Section 8-9.2) SNDTB Tank Pressure/Vacuum Vents (Section 8-9.3) TPVVT Product Saver Tanks (Section 8-9.10) PRDST Fill Ports (Section 8-9.12) FPRT Point Sensor - Dry (Section 8-9.13.1) PSDRY Point Sensor - Wet (Section 8-9.13.2) PSWET Point Sensor - Pressure/Vacuum (Section 8-9.13.3) PSPV
Visual Leak Detection (Section 8-9.13.4) VSLLD
Floating Suction Lines (Section 8-9.14) FLTSL Stilling Wells (Section 8-9.17) STGW Deactivated Petroleum Fuel Tanks (Section 12-2) DEACT
Testing Pressure Testing Isolation Valve Pits (Section 6-11.1) ISVLP Hydrant Fuel Pits (Section 6-11.2) HDFP High Point Vent Pits (Section 6-11.3) HPVP Low Point Drain Pits (Section 6-11.4) LPDP Lateral Control Pits (Section 6-11.5) LTCP General System Control Valves (Section 4-3.2.1) GSCVL Refuel Control Valves (Section 4-3.2.5) RCVL Pressure Relief Valves (Section 4-3.2.6) PRCVL Defuel Control Valve (Section 4-3.2.7) DFCVL Dual Rate-of-Flow Control Valves (Section 4-3.2.8) DRFCVL Combination Dual Rate-of-Flow Control and Solenoid Valves (Section 4-3.3.1) CFSCVL
Dual Pressure Relief, Solenoid Shutoff, and Check Valves (Section 4-3.3.2) DPSCVL
Non-Surge Check Valves (Section 4-4.2.1) NSCKVL Filter Separator Control Valves (Section 4-4.2.2) FSCVL Defuel/Flush Valves (Section 4-4.2.3) DFFCVL Issue Venturi (Section 4-4.2.4) ISVTR Return Venturi (Section 4-4.2.5) RTVTR Back Pressure Control Valves (Section 4-4.2.6) BPCVL Pressure Control Valves (Section 4-4.2.7) PCVL Hydrant Control Valves (Section 4-4.2.8) HCVL Emergency Shut-off Valves (Section 4-4.2.9) ESOVL Pantograph Control Valves (Section 4-5.2.12) PTCVL Pantograph Pressure Control Valves (Section 4-5.2.13) PTPCVL Overfill Valve for Product Recovery Tanks (Section 4-8.1) OVLPRT Plug Valves - Lubricated (Section 6-6.2.1) PLVL Plug Valves - Non-lubricated (Section 6-6.2.2) NPLVL Gate Valves (Section 6-6.2.3) GTVL Ball Valves (Section 6-6.2.4) BLVL Double Block and Bleed Valves (Section 6-6.2.5) DBBVL Butterfly Valves (Section 6-6.2.6) BFVL Globe Valves (Section 6-6.2.7) GLVL Check Valves (Section 6-6.2.8) CKVL Line Blanks, Ring Spacers, and Spectacle Blinds (Section 6-
6.2.9) BLIND
Manual Valve Gear Operators (Section 6-6.2.10) MVLGO Fire Valves (Section 6-6.4.1) FRVL Fusible Link Butterfly Valves (Section 6-6.4.2) FLBFVL
Truck Fill Valves (Section 6-6.5.1) TFVL
Motor Operators (Section 6-6.6) MTROP
External High Level Shutoff Valves (HLSO) (Section 8-9.6.1) EHLSVL
Internal HLSO Valves (Section 8-9.6.2) IHLSVL Waste Oil/Water Separators (Section 11-5) OWS
Valves
Tank
Underground Pits
Component Acronym
File details come from the government source that posted it. Updated .