This document outlines a Performance Requirements Summary for corrective maintenance services at Fort Stewart in Georgia. The contractor will be required to provide key personnel meeting all position requirements, submit monthly progress reports and bi-weekly meeting agendas on time, maintain licenses and certifications for all personnel, appoint qualified site managers for each project, and properly prepare service order documentation for government approval within required timeframes. The contractor must also perform corrective maintenance within allocated timeframes according to each service order scope of work, follow manufacturer instructions or industry standards for repairs, coordinate all utility outages with the appropriate parties, conduct safety checks and meetings before maintenance tasks, complete all required safety training for all workers, prepare and follow an approved quality control plan, and ensure all employees complete antiterrorism, operations security, and insider threat training annually. The government will evaluate performance according to a quality assurance surveillance plan and deduct from invoices if more than 5% of work fails inspection for most requirements.

View the file

Other files

File Type Posted
Attachment 8_ QandA.xlsx XLSX spreadsheet
B.08_AMEND 04 .pdf PDF
TE2 PWS FY24 B1 Fort Stewart M and S TE2 Bay Door List 20231107.xlsx XLSX spreadsheet
Collective Bargaining Agreement Chatham.pdf PDF
TE 1PWS FY24 B1 Fort Stewart M and S TE1.1 FS Facility List 202307028.xlsx XLSX spreadsheet
TE5 PWS FY24 B1 Fort Stewart M and S TE5 Engineer Form 3394 20230801.pdf PDF
Collective Bargaining Agreement Liberty.pdf PDF
TE1 PWS FY24 B1 Fort Stewart M and S TE 1.2 HAAF Facility List 20230728.xlsx XLSX spreadsheet
TE4 PWS FY24 B1 Fort Stewart M and S TE4 Service Order Forms 20231107.pdf PDF
TE3 PWS FY24 B1 Fort Stewart M and S TE3 Monthly Progress Report Format 20231107.pdf PDF
B.08 AMEND 03.pdf PDF
Attachment 03 Fort Stewart M and S Pricing Workbook.xlsx XLSX spreadsheet
Attachment 01PWS FY24 B1 Fort Stewart M and S 20231107 with Appendices.pdf PDF
Collective Bargaining Agreement Bryan.pdf PDF
FY23 B1 PWS - Fort Stewart CM Appendix A Technical Exhibits 20230130.docx DOCX document
FY23 B1 PWS - Fort Stewart CM Appendix G Government Points of Contact 20230105.docx DOCX document
FY23 B1 PWS - Fort Stewart CM Appendix H Service Order Process 20230821 Rev1.docx DOCX document
FY23 B1 PWS - Fort Stewart CM Appendix E Resident Management System 20230105.docx DOCX document
FY23 B1 PWS - Fort Stewart CM Appendix B Safety Variance 20230105.pdf PDF
FY23 B1 PWS - Fort Stewart CM Appendix D Required Submittals 20230130.docx DOCX document
Projnet Q_A Amendment 2.pdf PDF
FY23 B1 PWS - Fort Stewart CM 20230821 Rev1.docx DOCX document
Amended RFP W912DY23R0006.pdf PDF
FY23 B1 PWS - Fort Stewart CM Appendix F Applicable Codes Standards and Regulations.docx DOCX document
FY23 B1 PWS - Fort Stewart CM TE-3 Acronyms and Definitions 20230821 Rev1.docx DOCX document
Davis Bacon Act Effingham.pdf PDF
Davis Bacon Act Tattnall.pdf PDF
Davis Bacon Act Liberty.pdf PDF
Collective Bargaining Agreement Bryan.pdf PDF
Projnet Answer Amendment 1.pdf PDF
Collective Bargaining Agreement Chatham.pdf PDF
RFP W912DY23R0006 Amendment 1.pdf PDF
Collective Bargaining Agreement Liberty.pdf PDF
PPQ.pdf PDF
FY23 B1 PWS - Fort Stewart CM TE-6 Eng_Form_3394_Aug 2021.pdf PDF
SCA Chatham.pdf PDF
FY23 B1 PWS - Fort Stewart CM TE-1.2 HAAF Facility List 20230728.xlsx XLSX spreadsheet
SCA_Evans County 08012023.pdf PDF
RFP_W912DY-23-R-0006 Ft Stewart.pdf PDF
FY23 B1 PWS - Fort Stewart CM TE-4 Monthly Progress Report Format 20230130.pdf PDF
FY23 B1 PWS - Fort Stewart CM TE-1.1 FS Facility List 202307028.xlsx XLSX spreadsheet
FY23 B1 PWS w Appendices- Ft Stewart CM 20230728.pdf PDF
WageDetermination-SCA-20230628-025340.zip ZIP file
FSG CM only FY23 Price workbook 20230703.xlsx XLSX spreadsheet
FY23 B1 PWS - Fort Stewart CM TE-5 Service Order Forms 20230728.pdf PDF
FY23 B1 PWS - Fort Stewart CM TE-3 Acronyms and Definitions 20230130.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWSAppendix CFort Stewart SRM
Performance Requirements Summary

C.1 Performance Requirements Summary The rights of the Government and remedies described in this section are in addition to all other rights and remedies set forth in this contract. Specifically, the Government reserves its right under the Inspection of Services and Termination for Default clauses. Any deductions pursuant to the Performance Requirements Summary (PRS) shall reflect the reduced value of service performed under the contract. The Contractor shall not be relieved of full performance of the services hereunder and may be terminated for default based upon inadequate performance of service even if a deduction was previously taken for inadequate performance. The Government may modify the type and frequency of inspection of items.

C.1.1 Purpose.

The Performance Requirements Summary is designed to:

C.1.1.1 List the contract requirements considered most critical to acceptable contract performance (Column 1).

C.1.1.2 List the contract paragraph number(s) which describe the requirements (Column 2).

C.1.1.3 Define the standard of performance for each required service specified (Column 3).

C.1.1.4 Show the maximum allowable degree of deviation or Acceptable Quality Levels (AQLs) from perfect performance that will be allowed by the Government before contract performance is considered unsatisfactory (Column 4).

C.1.1.5 Explain the quality assurance methods the Government will use to evaluate the Contractor's performance in meeting the contract requirements (Column 5). For this contract, 100% inspection means the Government will review 100% of the requirement or deliverable, not 100% of the process to meet the requirement or deliverable. For example, the Government will review the submitted monthly progress report to validate work completion rates.

C.1.1.6 Show the remedy available to the Contractor or Government to bring performance within the standard defined in Column 4 (Column 6).

C.1.2 Performance Requirements Summary. The Performance Requirements Summary lists those services/tasks for which the Government will make deductions from payment due the Contractor when services/tasks are found to be unsatisfactory during inspections made using the checklists. These deductions are in addition to reduced invoicing described in Section 7 of the PWS.

Performance Objective

PWS Paragraph
Performance Standard
Performance Threshold (maximum error rate)
Method of Surveillance
Remedy if Performance Threshold is not met
Provide Key Personnel
3.5 through 3.5.2
The Contractor shall provide key personnel meeting all PWS requirements for positions
100% (zero deviation)
100% Inspection
Deduction in invoice payment equal to contract cost of position(s) not filled until contractor provides qualified personnel
Monthly Progress Report
3.5.1
Contractor shall submit a Monthly Progress Report showing performance data for the previous month
No more than one (1) late Monthly Progress Report during a performance period
100% Inspection
Potentially a CDR
Bi-Weekly O&M Meeting & Report
3.5.1
Contractor shall submit a bi-weekly agenda one (1) business day prior to the scheduled meeting; frequency may be adjusted by the COR
100% (zero deviation)
100% Inspection
Potentially a CDR
Maintain Licenses and Certificates
3.8.1
The Contractor will ensure that the licenses or certificates of Contractor personnel are kept current. Copies of these licenses or certifications will be provided to the COR
100% (zero deviation)
100% Inspection
Contractor shall not perform work until qualified personnel are present; potentially a CDR
Provide L2 and/or L3 SHO for each SO
3.8.2
The Contractor shall appoint a L2 and/or L3 SHO for each project as determined by the Contractor’s L1 SHO.
100% (zero deviation)
100% Inspection
Contractor shall not perform work until a qualified L2 and/or L3 is appointed and on site
Preparation of Service Order Documentation for Government Approval
4.3.5.3 through 4.3.5.4
Service order documentation prepared correctly and includes all required documents including a Service Order Form, Statement of Competition/ Price Reasonableness Determination Form (as needed), quote(s), sole source justification (if required), etc.
95%

No more than 5% of service order packages returned for corrections

100% Inspection
Potentially a CDR
Corrective Maintenance Response Time
4.3.5.5
The Contractor shall prepare and submit all SO packages within the times listed in paragraph 4.3.5.5 or as defined on the SO scope of work; The Contractor shall annotate expected completion time for long lead SO on the SOF for KO approval; See Appendix H for additional information on long lead SO
95%

No more than 5% of service order packages submitted late

100% Inspection
Potentially a CDR
Corrective Maintenance Completion Time
4.3.7
The Contractor shall perform work as detailed in the CM SO within the time allocated in the SO Scope of Work.
95%

No more than 5% of the scheduled CM work requests are not complete within the times specified in the SO SOW; 100% complete within time extension granted by the KO

100% Inspection
Potentially a CDR
Corrective Maintenance Standards
4.3.9
The Contractor shall follow manufacturer’s instructions for repair or installation. If manufacturer’s instructions are not available, the Contractor shall follow industry standards and codes. The Contractor shall provide an industry standard warranty for workmanship.
100% (zero deviation)
Random Sampling, Customer Complaints, or equipment failure
Immediate reperformance at no additional cost to the Government; If equipment fails during the warranty period, the Contractor shall repair or replace equipment at no cost to the Government; labor costs may be applicable for manufacturer warranty work
Request Utility Outages
4.3.10
The Contractor shall coordinate all utility outages with the COR, DPW, and Canoochee EMC (for electrical outages)
100% (zero deviation)
100% Inspection
Potentially a CDR
Perform Safety Requirements
5.1 through 5.3.5 and 5.5 through 5.7
The Contractor shall perform checks for compliance with task order safety requirements and perform safety meetings prior to all maintenance tasks (signed AHA to document meeting)
99% for the work completed
Random Sampling
Potentially a CDR
Safety Training
5.4
Contractor shall complete all necessary safety training for all workers before they report on-site to perform work and document this training in the BaseOps monthly report
100% (zero deviation)
100% Inspection
Employee(s) not current in training shall not perform duties; potentially a negative CPARS narrative
Contractor QC Plan
6.1.1
The Contractor shall prepare and follow a QC Plan approved by the KO or designee
100% (zero deviation)
100% Inspection
Potentially a CDR
Government QA
6.3
The Government will evaluate the Contractor’s performance under the contract, IAW the Government’s Quality Assurance Surveillance Plan (QASP).
95% work selected for QA inspection shall pass as acceptable
Random sampling
Immediate reperformance and potentially a CDR
Rework Effectiveness
6.3
100% of completed rework accepted by the Government without further rework
100% (zero deviation)
100% Inspection
Reduced invoice equal to cost of the work rejected by the Government and potentially a CDR
AT Level I Awareness Training
8.7.5.1
All Contractor employees shall complete AT Level I Awareness training annually
100% (zero deviation)
100% inspection
Employee(s) not current in training shall not perform duties; potentially a CDR
OPSEC Training
8.7.5.2
All Contractor employees shall complete OPSEC training annually
100% (zero deviation)
100% inspection
Employee(s) not current in training shall not perform duties; potentially a CDR
iWATCH Training
8.7.5.3
All Contractor employees shall complete iWATCH training annually
100% (zero deviation)
100% inspection
Employee(s) not current in training shall not perform duties; potentially CDR