FY23 B1 PWS - Fort Stewart CM TE-4 Monthly Progress Report Format 20230130.pdf

PDF 283 KB Posted

Attached to
Fort Stewart – Hunter Army Airfield – GA
Solicitation number
W912DY-23-R-0006
Issued by

About this file

This monthly progress report template outlines requirements for corrective maintenance services at Fort Stewart in Georgia under solicitation number W912DY-23-R-0006 from the Department of the Army Corps of Engineers Engineering Support Center Huntsville. The contractor must provide updates on available funds by CLIN, numbers and costs of service orders by status, required and completed preventative maintenance visits by facility, any safety incidents or training, representative photographs, and a schedule of anticipated corrective maintenance work. The top 10 maintenance repair items must also be reported to identify trends. The contractor point of contact is included for issues. Appendices cover the required safety report, photographs with service order details, and an updated schedule.

View the file

Other files

File Type Posted
Attachment 8_ QandA.xlsx XLSX spreadsheet
B.08_AMEND 04 .pdf PDF
TE2 PWS FY24 B1 Fort Stewart M and S TE2 Bay Door List 20231107.xlsx XLSX spreadsheet
Collective Bargaining Agreement Chatham.pdf PDF
TE 1PWS FY24 B1 Fort Stewart M and S TE1.1 FS Facility List 202307028.xlsx XLSX spreadsheet
TE5 PWS FY24 B1 Fort Stewart M and S TE5 Engineer Form 3394 20230801.pdf PDF
Collective Bargaining Agreement Liberty.pdf PDF
TE1 PWS FY24 B1 Fort Stewart M and S TE 1.2 HAAF Facility List 20230728.xlsx XLSX spreadsheet
TE4 PWS FY24 B1 Fort Stewart M and S TE4 Service Order Forms 20231107.pdf PDF
TE3 PWS FY24 B1 Fort Stewart M and S TE3 Monthly Progress Report Format 20231107.pdf PDF
B.08 AMEND 03.pdf PDF
Attachment 03 Fort Stewart M and S Pricing Workbook.xlsx XLSX spreadsheet
Attachment 01PWS FY24 B1 Fort Stewart M and S 20231107 with Appendices.pdf PDF
Collective Bargaining Agreement Bryan.pdf PDF
FY23 B1 PWS - Fort Stewart CM Appendix A Technical Exhibits 20230130.docx DOCX document
FY23 B1 PWS - Fort Stewart CM Appendix G Government Points of Contact 20230105.docx DOCX document
FY23 B1 PWS - Fort Stewart CM Appendix H Service Order Process 20230821 Rev1.docx DOCX document
FY23 B1 PWS - Fort Stewart CM Appendix E Resident Management System 20230105.docx DOCX document
FY23 B1 PWS - Fort Stewart CM Appendix B Safety Variance 20230105.pdf PDF
FY23 B1 PWS - Fort Stewart CM Appendix D Required Submittals 20230130.docx DOCX document
Projnet Q_A Amendment 2.pdf PDF
FY23 B1 PWS - Fort Stewart CM Appendix C PRS 20230309.docx DOCX document
FY23 B1 PWS - Fort Stewart CM 20230821 Rev1.docx DOCX document
Amended RFP W912DY23R0006.pdf PDF
FY23 B1 PWS - Fort Stewart CM Appendix F Applicable Codes Standards and Regulations.docx DOCX document
FY23 B1 PWS - Fort Stewart CM TE-3 Acronyms and Definitions 20230821 Rev1.docx DOCX document
Davis Bacon Act Effingham.pdf PDF
Davis Bacon Act Tattnall.pdf PDF
Davis Bacon Act Liberty.pdf PDF
Collective Bargaining Agreement Bryan.pdf PDF
Projnet Answer Amendment 1.pdf PDF
Collective Bargaining Agreement Chatham.pdf PDF
RFP W912DY23R0006 Amendment 1.pdf PDF
Collective Bargaining Agreement Liberty.pdf PDF
PPQ.pdf PDF
FY23 B1 PWS - Fort Stewart CM TE-6 Eng_Form_3394_Aug 2021.pdf PDF
SCA Chatham.pdf PDF
FY23 B1 PWS - Fort Stewart CM TE-1.2 HAAF Facility List 20230728.xlsx XLSX spreadsheet
SCA_Evans County 08012023.pdf PDF
RFP_W912DY-23-R-0006 Ft Stewart.pdf PDF
FY23 B1 PWS - Fort Stewart CM TE-1.1 FS Facility List 202307028.xlsx XLSX spreadsheet
FY23 B1 PWS w Appendices- Ft Stewart CM 20230728.pdf PDF
WageDetermination-SCA-20230628-025340.zip ZIP file
FSG CM only FY23 Price workbook 20230703.xlsx XLSX spreadsheet
FY23 B1 PWS - Fort Stewart CM TE-5 Service Order Forms 20230728.pdf PDF
FY23 B1 PWS - Fort Stewart CM TE-3 Acronyms and Definitions 20230130.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS Technical Exhibit 4 FY23 B1 Fort Stewart CM Monthly Progress Report

Monthly Report Template

Base Ops Program U.S. Army Corps of Engineers- Engineering and Support Center, Huntsville

Monthly Status Report

Contract No. W912DY-XX-X-XXXX

FY23 B1 Fort Stewart Corrective Maintenance

Submission Date: Date/ Month/ Year

Submitted By:

Company Name

Digital Signature

TABLE OF CONTENTS

1.0 CURRENT AVAILABLE FUNDS

2.0 SERVICE ORDER OVERVIEW

3.0 PREVENTATIVE MAINTENANCE OVERVIEW

4.0 SAFETY

5.0 PHOTOGRAPHS

6.0 SCHEDULE

7.0 TOP 10 MAINTENANCE REPAIR ITEMS (to identify trends)

8.0 POINTS OF CONTACT

9.0 APPENDICES

Appendix A - Safety Report Appendix B - Photographs (Before and after with SO# and short description) Appendix C - Schedule

1.0 CURRENT AVAILABLE FUNDS

CLIN Amount Balance (Approved

SOs) Balance

(Submitted SOs)

Comments

2.0 SERVICE ORDER OVERVIEW

Service Order Overview- Up to date current option

SO Category Number of SOs

Total Cost

Requested by /Submitted to Customer 96 $550K In preparation (working to submit) 15 $320K Submitted to HNC 93 $532K Approved by HNC 46 $178K Executed (work completed) 62 $195K Disapproved / Cancelled by customer or HNC 1 $1K In-Progress (working in field) 107 $676K Average Days of Completion 42

Service Order Metrics- During this Period SO Category RSO ESO Urgent Long Lead Total Cost

Requested by /Submitted to Customer 6 2 1 $32K In preparation (working to submit) 4 2 1 $25K Submitted to HNC: 5 0 $30K Approved by HNC 5 1 1 1 $25K Executed (work completed) 2 2 0 0 $10K Disapproved / Cancelled by customer or HNC 0 0 0 0 In-Progress (working in field) 3 1 $38K Average Days of Completion 38 1.5 7 92

3.0 PREVENTATIVE MAINTENANCE OVERVIEW

Table 1 Required & Completed Maintenance Visits Up to Date Current Option

Description Facility

ID

Monthly Quarterly Semi-Annual Annual Required Completed

Required Completed Required Completed Required Completed 4 4 4 0 2 0 1 0 4 4 4 0 2 0 1 0 4 4 4 0 2 0 1 1 4 4 4 1 2 0 1 0 4 4 4 2 2 0 1 1 2 2 2 3 2 1 1 0 4 4 4 4 2 0 1 1 2 2 2 2 2 1 2 1 4 4 4 4 2 1 1 1

Table 1 Required & Completed Maintenance Visits Completed during this period

Description Facility

ID

Monthly Quarterly Semi-Annual Annual Required Completed

Required Completed Required Completed Required Completed 4 4 4 0 2 0 1 0 4 4 4 0 2 0 1 0 4 4 4 0 2 0 1 1 4 4 4 1 2 0 1 0 4 4 4 2 2 0 1 1 2 2 2 3 2 1 1 0 4 4 4 4 2 0 1 1 2 2 2 2 2 1 2 1 4 4 4 4 2 1 1 1

4.0 SAFETY

A. Reportable Incidents this period:

B. Safety training/briefings this period and attendees: Safety reports are included in Appendix A.

5.0 PHOTOGRAPHS

Representative photographs of maintenance repair work are included in Appendix B.

6.0 SCHEDULE

The updated schedule for anticipated CM work is included in Appendix C.

7.0 TOP 10 MAINTENANCE REPAIR ITEMS (to identify trends)

Rank Maintenance/Repair Number

8.0 POINTS OF CONTACT

Contractor Maintenance Manager - Johnny Smith, 555-555-5555, johnny.smith@abc.com

9.0 APPENDICES

Appendix A - Safety Report

Appendix B - Photographs (Before and after with SO# and short description)

Appendix C - Schedule

1.0 CURRENT AVAILABLE FUNDS
2.0 SERVICE ORDER OVERVIEW
3.0 PREVENTATIVE MAINTENANCE OVERVIEW
4.0 SAFETY
5.0 PHOTOGRAPHS
6.0 SCHEDULE
7.0 TOP 10 MAINTENANCE REPAIR ITEMS (to identify trends)
8.0 POINTS OF CONTACT
9.0 APPENDICES
Appendix A - Safety Report
Appendix B - Photographs (Before and after with SO# and short description)
Appendix C - Schedule

File details come from the government source that posted it. Updated .