RTA_30_As-built_Contract_5_Part 1.pdf
PDF 37 MB Posted
- Attached to
- Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
- Solicitation number
- W912DS26RA032
About this file
This is an as-built design document for Contract 5, Part 1 of the Port Monmouth Phase II Mitigation Project. The document supports the Two Phase Design and Construction solicitation (W912DS26RA032) issued by the Department of the Army Corps of Engineers Engineering District New York for the Port Monmouth Phase II project in New Jersey. The project aims to reduce storm damages to residential and commercial structures in the Port Monmouth area from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. The State of New Jersey, through the New Jersey Department of Environmental Protection (NJDEP), serves as the non-Federal sponsor.
The Phase II flood risk management components include a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regrading, and wetland mitigation. This as-built document represents the 30% design package (RTA 30%) for Contract 5, Part 1, which was divided and uploaded separately due to SAM size limitations. The document provides the technical design specifications and as-built conditions necessary for the subsequent construction phase of this federal project.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .