RTA_30_As-Built_Contract_2_Part-1.pdf
PDF 21 MB Posted
- Attached to
- Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
- Solicitation number
- W912DS26RA032
About this file
This is an As-Built Contract document for the Port Monmouth Phase II, Contract 1 Mitigation Project, prepared as part of the 30% design package submission broken into multiple files due to SAM size limitations.
The document supports the Two Phase Design and Construction solicitation (W912DS26RA032) issued by the Department of the Army Corps of Engineers Engineering District New York, with the State of New Jersey Department of Environmental Protection serving as the non-Federal sponsor. The Port Monmouth project addresses coastal and flood risk management for low-lying residential and commercial structures in the Raritan Bay area, specifically mitigating damage from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks. Phase II flood risk management components include a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regrading, and wetland mitigation. As an as-built contract document within the 30% design package, this file contains technical specifications, drawings, or design documentation related to the first contract phase of this two-phase project, serving as a reference document for contractors bidding on or executing work associated with this federal water resources project.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .