RTA_30_As-Built_Contract_3.pdf
PDF 24 MB Posted
- Attached to
- Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
- Solicitation number
- W912DS26RA032
About this file
This file is an as-built contract document for the Port Monmouth Phase II, Contract 1 Mitigation Project. The document provides detailed records of construction completion and project deliverables for the flood risk management components of Phase II, which includes a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding activities, and wetland mitigation. The as-built documentation serves as the official record of constructed features and specifications as they were actually built, distinguishing any variations from original design plans. This contract is managed by the Department of the Army Corps of Engineers Engineering District New York, with the State of New Jersey Department of Environmental Protection (NJDEP) serving as the non-Federal sponsor.
The Port Monmouth project addresses storm damage reduction for low-lying residential and commercial structures in the region by mitigating coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. The as-built contract documentation is part of the two-phase project delivery approach, with Phase I addressing shore protection components and Phase II encompassing the flood risk management infrastructure noted above. This contract record is essential for project closeout, warranty purposes, and future maintenance operations of the completed mitigation facilities.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .